B.08.02 Solicitation GROUP1-18-R-J012, Manatee County SPP.pdf

PDF 4 MB Posted

Attached to
SHORE PROTECTION PROJECT, ANNA MARIA ISLAND, BEACH RENOURISHMENT 2020, MANATEE COUNTY, FLORIDA
Solicitation number
GROUP1-18-R-J012
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP1-18-R-J012

Jacksonville District

Shore Protection Project

Anna Maria Island, Beach Renourishment 2020

Manatee County, Florida

Construction Solicitation and Specifications

TASK ORDER

17 DECEMBER 2019

ADDENDUM TO THE STANDARD FORM 1442

Shore Protection Project (SPP) Anna Maria Island, Beach Renourishment Manatee, County, Florida

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE

ONLY TO THE FOLLOWING CONTRACTORS AWARDED A

CONTRACT UNDER SOLICITATION NUMBER W912EP18R0029,

GROUP 1 - UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029); Manson Construction Co.

(W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc.

(W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED

DREDGING MATOC POOL.

EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors.

The factors for evaluation will be as follows:

FACTOR 1 - Availability of technically acceptable dredge(s).

FACTOR 2 - Past performance.

FACTOR 3 – Price.

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.

To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and available to meet the required period of performance.

FACTOR 2 - Past performance.

NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.

Evaluation Method:

Past Performance was recently evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order all offerors will receive the Past Performance rating of "Acceptable".

Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be reviewed from the aforementioned additional sources to determine the offeror “Acceptable” or “Unacceptable.

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Offerors are required to submit the following:

1) Completed Bid Schedule (see Section 00010A).

2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.

3) (3) Completed “Addendum to the Standard Form 1442 with the latest revision”.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 7. ISSUED BY:

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

Block 9 -- For additional information contact:

A. NAME: Frederick L. Cooper

B. EMAIL ADDRESS: Frederick.L.Cooper@usace.army.mil

C. TELEPHONE NO.: 904-232-1186

Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: The proposed project is to nourish approximately 5.5 miles of shoreline Anna Maria Island using beach compatible material. Work consists of beach fill between R-12 to R-41+305. The primary sand source will be located in Passage Key Inlet ebb shoal. The fill template design includes a berm crest elevation of +4.0 feet North American Vertical Datum 1988 (NAVD88).

The seaward face of the berm has a slope of 1v:14h from R-12 to R-33 and a slope of 1v:15h for R-33 to R-41+305. The cut depths at the borrow areas vary from 14 feet to 27 feet with a two-foot disturbance depth. Project work also includes, but is not limited to, beach tilling, construction/vibration control and monitoring, turbidity monitoring, mailto:Frederick.L.Cooper@usace.army.mil pipeline corridor mapping, endangered species monitoring, sea turtle trawl-sweeping (hopper dredges only), beach fill remediation, and incidental related work.

DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.

MAGNITUDE OF CONSTRUCTION: Between $15,000,000 and $25,000,000.

THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED

YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM

THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.

THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL

BUSINESS SIZE STANDARD IS $27.5 MILLION.

Block 11 -- See FAR Clause 52.211-10 for required period of performance.

Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE

AND PAYMENT BONDS: YES

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.

Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Block 7 by 2:00 PM, local time 16 January 2020.

B. An offer guarantee is required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.

D. Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A-20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code) http://www.sam.gov/

DUNS: CAGE:

Block 15. TELEPHONE NO. (Include area code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 30 calendar days after the date offers are due.

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

Block 20A. NAME AND

TITLE OF PERSON

AUTHORIZED TO SIGN

OFFER (Type or print to include email address)

Block 20B. EMAIL

ADDRESS

Block 20C.

SIGNATURE

Block 20D.

OFFER DATE

Block 26 --This Task Order will be administered by:

Tampa Resident Office

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

Shore Protection Project (SPP) Anna Maria Island, Beach Renourishment Manatee, County, Florida

NOTES:

1. SEE SECTION 00100 INSTRUCTIONS TO OFFERORS.

2. OFFERORS MUST PRICE ALL LINE ITEMS.

LINE ITEMS AND PRICING SCHEDULE

SHORE PROTECTION PROJECT, ANNA MARIA ISLAND

BEACH RENOURISHMENT 2020, MANATEE COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 MOBILIZATION AND DEMOBILIZATION JOB $______________

0002 BEACH FILL 815,000 CUBIC YARD $______________

(R-12 to R-33.4, ESTIMATED QUANTITY)

0003 SCREENING 815,000 CUBIC YARD $______________

(R-12 to R-33.4, ESTIMATED QUANTITY )

0004 BEACH FILL 235,000 CUBIC YARD $______________

(R-33.4 to R-41, ESTIMATED QUANTITY)

0005 SCREENING 235,000 CUBIC YARD $______________

(R-33.4 to R-41, ESTIMATED QUANTITY)

0006 REMEDIATION OF NONCOMPLIANT MATERIAL 1 ACRE $_____________ $______________

(ESTIMATED QUANTITY)

0007 TRANSPORTATION AND DISPOSAL OF 10 CUBIC YARD $_____________ $______________

NONCOMPLIANT MATERIAL

(ESTIMATED QUANTITY)

0008 BEACH TILLING: R-12 to R-33.4 51 ACRE $_____________ $______________

(ESTIMATED QUANTITY)

0009 BEACH TILLING: R-33.4 to R-41 24 ACRE $_____________ $______________

(ESTIMATED QUANTITY)

0010 CONSTRUCTION/VIBRATION CONTROLS AND JOB $______________

MONITORING

0011 TURBIDITY MONITORING JOB $______________

0012 ENDANGERED SPECIES OBSERVER JOB $______________

(HOPPER DREDGE ONLY, SEE NOTE 4)

0013 MOBILIZATION AND DEMOBILIZATION FOR JOB $______________

SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGES ONLY, SEE NOTE 3)

0014 SEA TURTLE TRAWL SWEEPING 1 DAY $______________

(HOPPER DREDGES ONLY, SEE NOTE 3)

0015 DEDICATED MANATEE AND SEA TURTLE JOB $______________

OBSERVER (MECHANICAL DREDGING ONLY,

SEE NOTE 4)

0016 STANDBY TIME (SEE NOTE 2) 72 HOUR $_____________ $______________

0017 PARTNERING REGROUP 1 EACH $_____________ $______________

TOTAL (LINE ITEMS 0001 THRU 0017) $______________

NOTES:

(1) OFFER MUST PRICE ALL LINE ITEMS.

(2) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF

THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED

ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE

GROUP1-18-R-J012 00010A-1

LINE ITEMS AND PRICING SCHEDULE

SHORE PROTECTION PROJECT, MANATEE COUNTY, FLORIDA

BEACH RENOURISHMENT 2020, ANNA MARIA ISLAND

CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS.

PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION

01 22 00 MEASUREMENT AND PAYMENT AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(3) SEA TURTLE TRAWL SWEEPING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER. THIS LINE ITEM IS

NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT ONLY BE MADE FOR THE ACTUAL

TIME REQUIRED FOR SEA TURTLE TRAWL SWEEPING. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(4) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A DEDICATED MANATEE AND SEA

TURTLE OBSERVER IS REQUIRED FOR MECHANICAL DREDGING ONLY. THESE LINE ITEMS ARE NOT SUBJECT TO THE

VARIATION IN ESTIMATED QUANTITY CLAUSE AND PAYMENT WILL ONLY BE MADE FOR THE ACTUAL OBSERVING

ASSOCIATED WITH HOPPER AND/OR MECHANICAL DREDGING. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

GROUP1-18-R-J012 00010A-2

GROUP1-18-R-J012 00010A-2

SECTION 00010A, Attachment A

INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in

ProjNet at (https://www.projnet.org) No Later Than (NLT) January 10, 2020 (4:00 pm). To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment

/question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

The Solicitation Number is: GROUP1-18-R-J012

The Bidder Inquiry Key is: RMZ4V6-YFNKED

Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:

1. Identify the Agency. This should be marked as USACE.

2. Email. Enter the email address you would like to use for communication.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. Identify the Agency. This should be marked as USACE.

3. Email. Enter the email address you used to register previously in ProjNet.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC SECTIONS OF

THE ORIGINAL SOLICITATION NUMBER W12EP18R0029

THESE ADDENDUMS ARE ONLY APPLICABLE TO THIS SPECIFIC TASK ORDER

REQUEST FOR PROPOSAL NUMBER: GROUP1-18-R-J012

TASK ORDER PROJECT TITLE:

Shore Protection Project, Anna Maria Island Beach Renourishment 2020, Manatee County, Florida

NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.

THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC CLAUSES OF THE

ORIGINAL SOLICITATION NUMBER(S) For GROUP 1 use: W912EP18R0029

THIS ADDENDUM IS ONLY APPLICABLE TO THIS

SPECIFIC TASK ORDER

REQUEST FOR PROPOSAL NUMBER: GROUP1-18-R-J012

PROJECT TITLE:

SHORE PROTECTION PROJECT, ANNA MARIA ISLAND

BEACH RENOURISHMENT 2020, MANATEE COUNTY,

FLORIDA

NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.

00100-1 GROUP1-18-R-J012

ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100 ARE HEREBY PROVIDED:

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

15.9% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Manatee County, Florida.

(End of provision)

00100-2GROUP1-18-R-J012

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for – 08 January 2020 at 2:00pm

(c) Participants will meet at – Near Staging Area shown on C-11.

(d) Participants should call Yvette Powell at (813) 348-0690 on or before 06 January 2020 to make arrangements.

(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 00 11 00 and 00 31 32 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)

(f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only.

The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.

(End of provision)

SEAGOING BARGE ACT ‐SPECIAL STANDARD OF RESPONSIBILITY

This is not applicable to this requirement.

ADDENDUM TO SECTION 00700, CONTRACT CLAUSES

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE HEREBY PROVIDED:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, ALT I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 01 May 2021. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed with 15 to 30 calendar days after award or after all required bonds are in place, whichever is later.

The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,789 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least Forty (40) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of Clause)

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations See Section(s) 00 31 32 and 01 11 00 of this contract.

(b) Weather conditions See Section 00 33 50 of this contract.

(c) Location See Section 01 11 00 and drawings of this contract.

(End of Clause)

00700-1

00700-2 GROUP1-18-R-J012

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Shore Protection Project Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida

Plans G-01

(End of clause)

00800-1 GROUP1-18-R-J012

ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE HEREBY PROVIDED:

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR

SUBCONTRACTORS

The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following positions and/or items of subcontracted work: named dredge(s)

(End of clause)

SEAGOING BARGE ACT ‐ SPECIAL STANDARD OF RESPONSIBILITY

This is not applicable to this requirement.

ADDENDUM TO SECTION 00800A, WAGES DETERMINATIONS AND OTHER

ATTACHMENTS

THE FOLLOWING WAGES RATES ARE HEREBY INCORPORATED INTO THIS TASK

ORDER:

LIST OF CONSTRUCTION CONTRACT ATTACHMENTS

No. TITLE DATE NO. OF

PAGES

1 General Decision Number FL20190002 10/04/2019 8 2 General Decision Number FL20190003 01/04/2019 6 2

GROUP1-18-R-J012 00800A-1

NOTE NOTE NOTE

THIS PROJECT INCORPORATES THE STATEWIDE HEAVY DREDGING AND HOPPER DREDGING

WAGE DECISIONS FOR FLORIDA

EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE OF

$10.60 FOR 2019 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON ACT

FOR ALL HOURS PERFORMED ON THE CONTRACT IN CALENDAR YEAR 2019.

EFFECTIVE 01 JANUARY 2020, THE HOURLY MINIMUM WAGE WILL INCREASE TO

$10.80.

IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE DECISIONS

FURNISHEDFOR THIS PROJECT, PLEASE CONTACT:

FRAN RUSSELL, OFFICE OF COUNSEL, JACKSONVILLE DISTRICT, U.S. ARMY

CORPS OF ENGINEERSAT fran.g.russell@usace.army.mil

GROUP1-18-R-J012 00800A-2

mailto:fran.g.russell@usace.army.mil

General Decision Number: FL20190002 10/04/2019

Superseded General Decision Number: FL20180002

State: Florida

Construction Type: Heavy Dredging

Counties: Florida Statewide.

Dredging Construction Projects FLORIDA (Excluding West of the

Aucilla River and its tributary waterways)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the

GROUP1-18-R-J012 00800A-3

federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

1 05/10/2019

2 10/04/2019

* ENGI0025-002 10/01/2019

Rates Fringes

Dredging : (Hydraulic Dredges

Over 20"")

CLASS A1....................$ 40.31 17.71+a

CLASS A2....................$ 35.92 17.71+a

CLASS B1....................$ 34.86 17.71+a

CLASS B2....................$ 32.82 17.71+a

CLASS C1....................$ 31.92 17.61+a

CLASS C2....................$ 30.89 17.61+a

CLASS D.....................$ 25.66 17.51+a

Hydraulic Dredges Under 20""

Cook........................$ 8.11 1.73+b

Deckhand....................$ 7.77 1.73+b

Engineer....................$ 9.59 1.73+b

Launchman...................$ 8.19 1.73+b

Leverman....................$ 10.03 1.73+b

Mate........................$ 8.82 1.73+b

Mess Cook...................$ 7.71 1.73+b

Messman & Janitor...........$ 7.53 1.73+b

Oiler & Fireman.............$ 8.11 1.73+b

Shoreman....................$ 7.82 1.73+b

GROUP1-18-R-J012 00800A-4

Spider Barge Operator.......$ 8.68 1.73+b

Spill Barge Operator........$ 8.68 1.73+b

Welder......................$ 9.79 1.73+b

CLASSIFICATIONS:

CLASS A1: Deck Captain, Leverman, Mechanical Dredge Operator.

Licensed Tug Operator over 1000 HP

CLASS A2: Crane Operator (360 swing)

CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge

Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician, Licensed Boat

Operator, Licensed Crew Boat Operator.

CLASS B2: Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill

Placer, Steward.

CLASS C2: Boat Operator.

CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor, Drill Oiler

PREMIUMS: Additional 20% for hazardous material work

FOOTNOTE APPLICABLE TO ABOVE CRAFTS:

a. New Year's Day, Good Friday, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day and Christmas Day.

Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.

b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.

INCENTIVE PAY : (Add to Hourly Rate)

Operator (NCCCO License/Certification) $1.80; Licensed Tug

Operator over 1000 HP (Assigned as Master) USCG licensed

Master of Towing Vessels (MOTV) $1.80; Licensed Boat

GROUP1-18-R-J012 00800A-5

Operator (assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80; Oiler QMED and Tankerman endorsement (USCG) $1.80; All classifications Tankerman endorsement only (USCG) $1.55; Deckhand or Mater AB w/Lifeboatman only (USCG) $1.80; Welder (ABS certification)

$1.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

GROUP1-18-R-J012 00800A-6

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that

GROUP1-18-R-J012 00800A-7

no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

GROUP1-18-R-J012 00800A-8

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

GROUP1-18-R-J012 00800A-9

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GROUP1-18-R-J012 00800A-10

General Decision Number: FL20190003 01/04/2019

Superseded General Decision Number: FL20180003

State: Florida

Construction Types: Heavy Dredging

Counties: Florida Statewide.

HOPPER DREDGE CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts

GROUP1-18-R-J012 00800A-11

entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

SUFL1993-010 05/24/1993

Rates Fringes

Self-Propelled Hopper Dredge

Drag Tenders................$ 8.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is

GROUP1-18-R-J012 00800A-12

like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, GROUP1-18-R-J012 00800A-13

005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in

GROUP1-18-R-J012 00800A-14

the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

GROUP1-18-R-J012 00800A-15

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GROUP1-18-R-J012 00800A-16

SPP, Anna Maria Island, Beach Renourishment 2020

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 31 32 GEOTECHNICAL DATA REPORT (See Separate File)

00 33 50 WEATHER, WATER STAGE AND TIDE DATA

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES (SEE BASE MATOC)

01 32 01 PROJECT SCHEDULE (Alternate) (SEE BASE MATOC)

01 33 00 SUBMITTAL PROCEDURES (SEE BASE MATOC)

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING (SEE BASE MATOC)

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS (SEE BASE MATOC)

01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) (SEE

BASE MATOC)

01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY

CONTROL (SEE BASE MATOC)

01 50 02 TEMPORARY CONSTRUCTION FACILITIES (SEE BASE MATOC)

01 52 10 CONTRACTING OFFICER'S FIELD OFFICE

01 55 26 TRAFFIC CONTROL (SEE BASE MATOC)

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 22 13 VIBRATION MONITORING REQUIREMENTS FOR EXISTING STRUCTURES

(SEE BASE MATOC)

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 25 BEACH FILL

35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE

HYDRAULIC DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 00 31 21 CONTROL MONUMENT DESCRIPTION

SECTION 00 31 21 PAGE 1

DESIGNATION: 13 85 A12

STAMPING: 13 85 A12

DESCRIPTION: BEING A DEPARTMENT OF NATURAL RESOURCES DISK IN

CONCRETE AND LOCATED AT THE NORTHEAST CORNER OF THE DRIVEWAY FOR

A HOUSE (5614 GULF DRIVE). BEING APPROXIMATELY 4 FEET WEST OF

THE EDGE OF ASPHALT.

SECTION 00 31 21 PAGE 2

DESIGNATION: 13 85 A14

STAMPING: N/A

DESCRIPTION: BEING A NAIL IN CONCRETE LOCATED IN FRONT OF

MARTINIQUE SOUTH (5200 GULF DRIVE). LYING IN THE CENTER OF A

SIDEWALK APPROXIMATELY 3 FEET EAST FROM THE END OF SAID CONCRETE

SIDEWALK AND 2.5 FEET NORTH FROM A FENCE COLUMN DISPLAYING THE

ADDRESS LOCATED ON THE EAST SIDE OF THE ENTRANCE. (USED AS

SUPPLEMENTAL CHECK ONLY)

SECTION 00 31 21 PAGE 3

DESIGNATION: 13 84 B02

STAMPING: 13 84 B02

DESCRIPTION: BEING A DEPARTMENT OF NATURAL RESOURCES DISK IN

CONCRETE LOCATED IN FRONT OF GULF WATCH 111 (601 GULF DRIVE).

LYING IN THE CENTER OF A SIDEWALK ALONG THE EAST SIDE OF SAID

GULF DRIVE APPROXIMATELY 60 FEET NORTH OF 6TH STREET NORTH

CENTERLINE AND 300 FEET NORTH OF THE NORTHERLY EDGE OF CORTEZ

ROAD WEST.

SECTION 00 31 21 PAGE 4

DESIGNATION: 13 84 B05

STAMPING: 13 84 B05

DESCRIPTION: BEING A DEPARTMENT OF NATURAL RESOURCES DISK

APPROXIMATELY 1 FOOT BELOW THE GROUND'S SURFACE AND LOCATED IN

COQUINA BEACH ON A HILL SIDE ALONG THE EAST SIDE OF GULF DRIVE

AND NORTH SIDE OF LONGBOAT PASS. BEING APPROXIMATELY 40 FEET

EAST OF THE NORTHERLY END OF A GUARD RAIL. BEING 20 FEET WEST OF

A TREE AND 19 FEET SOUTHWEST OF A METAL POWER POLE.

SECTION 00 31 21 PAGE 5

DESIGNATION: 13 84 B04

STAMPING: 13 84 B04

DESCRIPTION: BEING A DEPARTMENT OF NATURAL RESOURCES DISK IN

CONCRETE FLUSH WITH THE GROUND AND LOCATED IN COQUINA BEACH

ALONG THE EAST SIDE OF GULF DRIVE AND 0.6 MILES NORTH OF THE

NORTHERLY EDGE OF THE GULF DRIVE BRIDGE OVER LONGBOAT PASS.

BEING APPROXIMATELY 20 FEET NORTHEAST OF THE EDGE OF PAVEMENT OF

GULF DRIVE AND 18 FEET SOUTHWEST OF A PALM TREE. BEING 15 FEET

EAST OF A “CENTER LANE” SIGN.

SECTION 00 33 50 WEATHER AND WATER STAGE DATA

SECTION 00 33 50 Page 1

1. The following water stage, wave, wind, and weather data are provided for inclusion into the subject Plans and Specifications. The following water level datums are provided for information only and are not to be utilized in conjunction with any contract related hydrographic surveying.

a) Water Stages. Water levels in the project area are mainly affected by semi-diurnal tidal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .