SF 30 CONTINUATION SHEET
Palm Beach Harbor Maintenance Dredging, 33-Foot Project, Entrance Channel Palm Beach County, Florida
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Additions are underlined and green in color. Deletions are struck out and red in color.
The Submittal Register is reissued due to the addition of a new submittal.
DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.
DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.
2. DRAWINGS: No change to drawings.
(End of Summary of Changes)
REVISION 0001, DATED 08/22/2019
GROUP1-18-R-J007 1 REVISION 0001
ADDENDUM TO THE STANDARD FORM 1442
Palm Beach Harbor Maintenance Dredging, 33- Foot Project, Entrance Channel, Palm Beach County, Florida
NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE
ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT
UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 1 -
UNRESTRICTED:
Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025);
Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029);
Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc.
(W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).
PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER
THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 -
UNRESTRICTED DREDGING MATOC POOL.
EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:
FACTOR 1 - Availability of technically acceptable dredge(s).
FACTOR 2 - Past performance.
FACTOR 3 – Price.
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
FACTOR 1 - Availability of technically acceptable dredge(s).
The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).
GROUP1-18-R-J007 2 REVISION 0001
Evaluation Method:
The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.
To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and available to meet the required period of performance.
FACTOR 2 - Past Performance.
NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.
Evaluation Method:
Past Performance was recently evaluated for all contractors under the Dredging MATOC.
An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order all offerors will receive the Past Performance rating of "Acceptable".
Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be reviewed from the aforementioned additional sources to determine the offeror “Acceptable” or “Unacceptable.
GROUP1-18-R-J007 3 REVISION 0001
FACTOR 3 – Price.
The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.
Offerors are required to submit the following:
(1) Completed Bid Schedule (see Section 00010A).
(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.
(3) Completed “Addendum to the Standard Form 1442 with the latest revision”.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS
TASK ORDER:
Block 7. ISSUED BY:
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
Block 9 -- For additional information contact:
A. NAME: Brian Kilpatrick
EMAIL ADDRESS: brian.j.kilpatrick@usace.army.mil
B. TELEPHONE NO.: 904-232-1792
Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: Project work entails maintenance dredging shoal material from Palm Beach Harbor. Work will include dredging the Entrance Channel to depths varying from 37 to 39 feet with a 2-foot allowable overdepth. All material will be placed in the permitted beach disposal area which lies immediately south of the inlet.
Incidental work includes, but is not limited to turbidity monitoring and endangered species monitoring.
DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.
GROUP1-18-R-J007 4 REVISION 0001
mailto:brian.j.kilpatrick@usace.army.mil
MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000.
THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED
YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM
THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.
THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL
BUSINESS SIZE STANDARD IS $27.5 MILLION.
Block 11 -- The Contractor shall begin performance within 45 calendar days of receipt of Notice to Proceed and complete it NOT LATER THAN 24 DECEMBER 2019. This COMPLETION DATE is mandatory. (See FAR Clause 52.210.11, Alt I, in Section 00700).
Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED
PERFORMANCE AND PAYMENT BONDS: YES
Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER
AWARD.
Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:
A Sealed offer in original and 3 copies to perform the work required are due at the place specified in Block 7 by 2:00 PM, local time 4 September 2019.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A-20D below:
Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)
GROUP1-18-R-J007 5 REVISION 0001
http://www.sam.gov/
DUNS: CAGE:
Block 15. TELEPHONE NO. (Include area code):
Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)
Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D).
Block 18. The offeror agrees to furnish any required performance and payment bonds.
Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)
REVISION
NO.
DATE
Block 20A. NAME AND
TITLE OF PERSON
AUTHORIZED TO SIGN
OFFER (Type or print to include email address)
Block 20B. EMAIL
ADDRESS
Block 20C. SIGNATURE Block 20D.
OFFER DATE
Block 26 --This Task Order will be administered by:
West Palm Beach Resident Office
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
GROUP1-18-R-J007 6 REVISION 0001
Palm Beach Harbor Maintenance Dredging, 33-Foot Project Entrance Channel, Palm Beach County, Florida
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.2.3 Safety Requirements
1.2.4 Work Hours
1.2.5 Contractor's Field Office
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.5.4 Maritime Traffic
1.5.5 Obstruction of Channel
1.5.6 Hydrographic Surveys
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 OFFICE SPACE FOR GOVERNMENT PERSONNEL
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1 GROUP1-18-R-J007 Revision 0001
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR Section 00 31 32, Geotechnical Data Report for Palm Beach Harbor Maintenance Dredging, 33-Foot Project, Palm Beach County, Florida
EM 385-1-1 Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
Project work entails maintenance dredging shoal material from Palm Beach Harbor. Work will include dredging the Entrance Channel to depths varying from 37 to 39 feet with a 2-foot allowable overdepth. All material will be placed in the permitted beach disposal area which lies immediately south of the inlet. Incidental work includes, but is not limited to turbidity monitoring and endangered species monitoring.
1.2.2 Location
The work is located in Palm Beach Harbor, Palm Beach County, Florida.
1.2.3 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.4 Work Hours
Work is restricted to daylight hours only, 7 days per week.
1.2.5 Contractor's Field Office
Contractor may utilize an off-site office within a 5-mile radius of the project area. The off-site office must meet all other field office requirements indicated in Section 01 50 02 TEMPORARY CONSTRUCTION FACILITIES of the MATOC.
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700
SECTION 01 11 00 Page 2
CONTRACT CLAUSES in Volume 1.
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 PHYSICAL DATA
Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.1 Physical Conditions
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT ( GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.
1.5.2 Weather, Water Stage and Tide Data
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.
1.5.3 Contractor Investigation
Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.4 Maritime Traffic
Marine traffic in the project area consists of Naval, cruise ships, commercial, pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.
1.5.5 Obstruction of Channel
The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.
1.5.6 Hydrographic Surveys
Hydrographic surveys are posted as separate electronic files. Survey numbers are indicated on the drawings.
SECTION 01 11 00 Page 3
1.6 LAYOUT OF WORK
Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.6.1 Established Project Control
The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.
For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. All projects constructed and maintained to a tidal datum shall be calibrated to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.
See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.
1.6.2 Layout
From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.
1.6.3 Survey
The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor. The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.
1.7 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is
SECTION 01 11 00 Page 4 damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or job prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or job prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.8 OFFICE SPACE FOR GOVERNMENT PERSONNEL
The Contractor shall provide a 10-foot by 10-foot partitioned space on the dredge or in a field office trailer (with locking door) to be made available for use by Government personnel in the Contractor's trailer with the following:
a. Two office desks with lockable drawers (60 inches by 30 inches, laminated top) and two swivel office chairs.
b. Fire resistant, five drawer, legal size, lockable filing cabinet.
c. A microwave oven and refrigerator.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
SECTION 01 11 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23
DREDGING
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DREDGING RESTRICTIONS
1.4.1 Vessel Traffic
1.4.2 Order of Work
1.4.3 Transportation of Material
1.5 SPECIAL INSTRUCTIONS
1.5.1 Probability of Rock in Dredging Area
1.5.1.1 Screening and Disposal of Rock
1.6 PUMPING OF BILGES
1.7 HISTORICAL PERIOD SHIPWRECK SITES
1.8 UTILITY CROSSINGS
1.8.1 General
1.8.2 Sand Transfer Plant Subaqueous Pipeline Crossing
1.9 PERMITS
1.10 FUEL OIL TRANSFER OPERATIONS
1.11 SIGNAL LIGHTS
1.12 NOTICE TO MARINERS -- DREDGING CONTRACTS
1.13 FINAL CLEANUP
1.14 WORK VIOLATIONS
1.15 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SYSTEM (HOPPER
DREDGES AND DUMP SCOWS)
1.15.1 System Requirements
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 NOTIFICATION OF COAST GUARD
3.1.1 Navigation Aids
3.1.2 Dredging Aids
3.1.3 Subaqueous Utility Crossings
3.2 WORK AREA
3.2.1 Access
3.2.2 Protection of Existing Waterways
3.2.3 Adjacent Property and Structures
3.2.4 Subaqueous Utility Crossings
3.3 CHARACTER OF MATERIALS
3.4 DISPOSAL OF EXCAVATED MATERIAL
3.4.1 General
3.4.2 Order of Placement
3.4.3 Construction
SECTION 35 20 23 Page 1
3.4.3.1 Construction Equipment Limitations
3.4.3.2 Grade Stake Installation and Recovery Operations
3.4.3.3 Control of Fill
3.4.3.4 Ramps and Walkways
3.4.4 Placement
3.4.4.1 Dressing
3.4.4.2 Beach Escarpment Elimination
3.4.4.3 Tolerance for Fill Placement
3.4.5 Dredge Location Control
3.4.5.1 Dredge Control
3.4.6 Misplaced Materials
3.4.7 Placing of Dredged Material
3.4.8 Dredge Pipelines
3.4.8.1 Dredge Discharge Pipeline
3.4.8.2 Submerged Pipeline
3.4.8.3 Floating Pipeline
3.4.9 Booster Pumps
3.5 QUALITY CONTROL
3.5.1 Preparatory Inspection
3.5.2 Initial Inspections
3.5.3 Follow-up Inspection
3.6 QUALITY CONTROL FOR BEACH FILL
3.6.1 Beach Fill Observation and Sampling
3.6.2 Determination of Aerial Extent of Noncompliant Beach Fill
3.6.3 Remediation
3.6.4 Noncompliant and Unacceptable Material Contingency Plan
3.7 REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES
3.7.1 Required Depth
3.7.2 Allowable Overdepth
3.7.3 Side Slopes
3.7.4 Excessive Dredging
3.7.5 Areas to be Dredged
3.7.6 Acceptance Sections
3.8 SURVEYS
3.8.1 General
3.8.2 Contractor Representative
3.8.3 Tide Data
3.8.3.1 Real Time Kinematic (RTK) GPS
3.8.3.2 Kinematic Tidal Datum
3.9 INSPECTION
3.9.1 Quality Assurance Representative (QAR)
3.9.2 Failure to Comply
3.10 FINAL EXAMINATION AND ACCEPTANCE
3.10.1 Final Examination of Work
3.10.2 Bed Leveling
3.10.3 Bed Leveling - Reporting and Documenting
3.10.4 Final Acceptance
3.11 SHOALING
3.12 CONTINUITY OF WORK
3.13 NOISE CONTROL
3.14 DREDGE CERTIFICATION
3.15 GENERAL DREDGING SAFETY REQUIREMENTS
3.15.1 Dredge Plant Restriction Definitions
3.15.1.1 Certification Required Line - Coast Guard Inspected (CRL-C)
3.15.1.2 Certification Required Line - Load Line (CRL-L)
3.15.1.3 Certification Required Line - Hopper (CRL-H)
3.15.2 Certification of Attendant and Auxiliary Plant
3.15.3 Minimum Tow-Boat Requirements
3.15.4 Harbor Specific Dredging Restrictions
SECTION 35 20 23 Page 2
3.15.4.1 Palm Beach Harbor
3.16 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 35 20 23 Page 3
SECTION 35 20 23
DREDGING
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all excavation and disposal of all material as specified herein or indicated on the drawings. This scope also includes all necessary measures for protection of the environment.
Environmental protection requirements under this contract are as important to overall completion of the work as other technical aspects. Failure to meet the requirements of these specifications for environmental protection may result in work stoppages or termination for default. No part of the time lost due to any such work stoppages shall be made the subject of claims for extensions of time or for excess costs or damages by the Contractor. If the Contractor fails or refuses to promptly repair any damage caused by violation of the provisions of these specifications, the Contracting Officer may have the necessary work performed and charge the cost thereof to the Contractor.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D422 (1963; R 2007; E 2014; E 2014)
Particle-Size Analysis of Soils
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
EM 1110-1-1000 (2015) Photogrammetric Mapping
EM 1110-1-1002 (2012) Survey Markers and Monumentation
EM 1110-1-1003 (2011) NAVSTAR Global Positioning System Surveying
EM 1110-1-1004 (2002) Deformation Monitoring and Control Surveying
EM 1110-1-2909 (2012) Geospatial Data and Systems
EM 1110-2-1003 (2013) Hydrographic Surveying
FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND MAPPERS (FBPSM)
FBPSM Minimum Technical Standards, Chapters 177, SECTION 35 20 23 Page 4
472, 61G17
TRI-SERVICE STANDARDS (TSS)
TSS (2006) A/E/C CADD Standards
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Notice of Intent to Dredge
Prior to commencement of work on this contract, the Contractor shall notify the Commander, Seventh Coast Guard District of his intended operations to dredge and request that it be published in the Local Notice to Mariners. This notification must be given in sufficient time so that it appears in the Notice to Mariners at least two weeks prior to the commencement of this dredging operation. A copy of the notification shall be provided to the Contracting Officer.
Relocation of Navigation Aids
The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid to navigation. Within 7 calendar days following receipt of Notice of Award, the Contractor shall notify the Commander, Seventh Coast Guard District, Miami, Florida, of his plan to dredge adjacent to any aids which require relocation to facilitate dredging. The notification shall be sent via Fax to 305-415-6757, ATTN: Mr. Gene Stratten. This notification shall be immediately followed by a formal written request with a copy to the Contracting Officer. The Contractor shall also contact the U.S.
Coast Guard, 305-415-6750, for information concerning the position to which the aids will be relocated.
SD-02 Shop Drawings
General Work Plan ; G, RO
The Contractor shall submit a Work Plan for review and approval by the Contracting Officer. The work plan shall include but not be limited to the following:
a. Disturbance Depth Protection: Provide a detailed description of methods and equipment to be used for each operation, and the sequence of operations, including sketches showing how the Contractor will not exceed the Disturbance depth at each project dredge area.
b. Progress Map: Provide a progress schedule map of the contractor's design. The progress schedule map shall be a plan view drawing depicting the beach fill site and access areas to
SECTION 35 20 23 Page 5 used on the project. The map shall show all acceptance sections (AS), access/staging areas and pipeline landings anticipated to be used on the project. For each AS, the information shall list the following: Anticipated quantity of material per acceptance section, projected dates for fill to be placed and completed. The map shall provide dates when access areas are to be used and ready for public use. The map will be color coordinated with the following color scheme: Red depicting an area not ready for construction; Orange depicting an area currently being worked, and Green meaning an area accepted by the Contracting Officer and ready for public use. The map shall be updated at least weekly and whenever significant changes occur to the projected dates.
Since the map will be used by the Government for coordination with the public and to track progress, the update shall be provided prior to the weekly project progress meeting.
c. Buoy Log: The Contractor shall develop a method of inventory for all anchors, buoys, and buoy cables used in the construction of the project. This record shall be used by the Contractor to recover all buoys and anchoring equipment at the completion of the project
d. Grade Stake Log: The Contractor shall provide a sample Grade Stake Log used on the project and indicate how the log is prepared and maintained to inventory the grade stakes used on the project. The log shall include information concerning the location, installation, and recovery of all grade stakes. The Contractor shall make this log available for review by the appropriate Government personnel upon request. Upon completion of the project, the Contractor shall furnish the log to the Contracting Officer.
e. Staging and Access Area: The Contractor shall indicate if they plan on obtaining additional access or staging areas for their construction operations other than what is shown on the drawings. If the Contractor plans on obtaining additional access/staging areas, submit proposed drawings depicting the areas for Contracting Officer approval.
f. Public Protection: Provide a Contractor's plan for ensuring pedestrian, worker, and vehicular safety at each access location used by the Contractor. Submit means and methods for pedestrian protection during beach fill operations for review and approval by the Contracting Officer. Submit product information and methods of installation for orange safety fencing for crowd control.
Submit methods of staking in place and maintenance of system for duration of construction. Submit off-road trucking operation safety plan.
Relocation of Navigation Aids
Within 7 calendar days following receipt of Notice of Award, the Contractor shall notify the Commander, Seventh Coast Guard District, Miami, Florida of their plan to dredge adjacent to any aids which require relocation to facilitate dredging for each project fill segment. The notification shall be sent via Fax to 305-415-6757. This notification shall be immediately followed by a formal written request with a copy to the Contracting Officer.
The Contractor shall also contact the U.S. Coast Guard at
SECTION 35 20 23 Page 6
305-415-6727 for information concerning the position to which the aids will be relocated.
Construction and Grade Stakes Recovery Plan ; G, RO
The Contractor shall submit a Construction and Grade Stakes Recovery Plan. The plan will outline the steps that the Contractor will implement to recover all the stakes used on the project. This plan will include the use of the Grade Stake Log submitted with the General Work Plan above. A sample plan is on the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below, with further information provided in paragraph "Grade Staking and Removal" below.
Rock Removal Plan ; G, DO
The Contractor shall submit to the Contracting Officer a plan detailing the method for removal of rock at the outfall pipe. The plan shall also include the method for which the quantity of rock removed is measured, paid, and the location of rock disposal for acceptance by the Contracting Officer. Refer to heading titled " Screening and Disposal of Rock" for more details.
Noncompliant and Unacceptable Material Contingency Plan
Submit a Noncompliant Material Contingency Plan as indicated in paragraph QUALITY CONTROL FOR BEACH FILL below.
Electronic Tracking System Charts
The Contractor shall furnish required plotted charts to the Contracting Officer.
Dredge Location Control Color-Coded Plot
The Contractor shall furnish the required color-coded plots to the Contracting Officer.
Acceptance Sections Plan ; G, DO
Submit an acceptance sections plan for approval by the Government prior to commencement of work. See subparagraph "Acceptance Sections" in paragraph REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES below.
Drag Bar
Submit drawings and one photograph showing drag bar equipment used for final leveling work indicated in the paragraph FINAL EXAMINATION AND ACCEPTANCE below.
SD-07 Certificates
Electronic Tracking System Data
The Contractor shall furnish required discs, CD-ROM, and charts to the Contracting Officer.
Equipment and Performance Data
SECTION 35 20 23 Page 7
The Contractor shall furnish proof of electronic positioning equipment calibration to the Contracting Officer.
Historical Period Shipwreck Sites
The Contractor shall immediately notify the Contracting Officer if any shipwreck, artifact, or other objects of antiquity that have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered.
Surveys
The Contractor shall give 10 days advance notice, in writing, to the Contracting Officer of the need for a pre-dredging survey or after-dredging survey for final acceptance for each acceptance section.
Daily/Monthly Report of Operations
The Contractor shall prepare on QCS and submit one (1) hard copy of the Daily Report of Operations, using either ENG Form No. 27A or ENG Form No. 4267, for each dredge and/or unloader working.
This report shall be submitted on a daily basis and not in groups (groups = multi-days reports packaged together at one time). In addition to the daily report, the Contractor shall prepare a Monthly Report of Operations for each month or partial month's work on either ENG Form No. 27A or ENG Form No. 4267. The monthly report shall be submitted on or before the 7th of each month, consolidating the previous month's work. Upon completion of the job, the Contractor shall submit a consolidated job report, combining the monthly reports. The Contractor shall distribute one copy of each report to the District Engineer; ATTN:
CESAJ-EN-C; U.S. Army Engineer District, Jacksonville, P.O. Box 4970; Jacksonville, Florida 32232-0019. Reports shall be submitted on a monthly basis with daily reports accompanying the monthly report and job report.
Additionally, one copy of the form(s) shall be maintained by the Contractor on the dredge(s) for the Contracting Officer's inspection purpose. Further instructions on the preparation of the reports will be furnished at the Preconstruction Conference.
Misplaced Material
The Contractor shall notify the U.S. Coast Guard Marine Safety Office of any misplaced material as stated in the Clause OBSTRUCTION OF NAVIGABLE WATERWAYS of Section 00700 CONTRACT CLAUSES in Volume 1.
Declaration of Inspection
Refer to paragraph FUEL OIL TRANSFER OPERATIONS below for submittal.
SECTION 35 20 23 Page 8
1.4 DREDGING RESTRICTIONS
1.4.1 Vessel Traffic
The Contractor shall coordinate with the port pilots to determine the impacts that vessel traffic will have on dredging operations within the Entrance Channel.
1.4.2 Order of Work
There is no specific order of work for this project. The dredging performed by all dredges shall be continuous within reaches approved by the Contracting Officer.
1.4.3 Transportation of Material
Water and dredge material shall not be permitted to overflow or spill out of barges or hopper dredges during transport to the disposal site.
1.5 SPECIAL INSTRUCTIONS
Dredging of insitu rock is not required; but if encountered, the location and extent of any insitu rock above grade or required depth shall be reported to the Contracting Officer.
1.5.1 Probability of Rock in Dredging Area
In situ rock was encountered by the dredge and displaced in the Entrance Channel during a recent dredging event. Therefore, it is reasonable to assume that sand to boulder-sized rock fragments may be encountered in the shoal material along the channel sides and in the overdepth. The amount of rock fragments is estimated to be less than 0.2 percent of the total dredge volume. Notwithstanding this, intact formations of in situ rock, if encountered, are not required to be dredged. See subparagraph "Rock Screening and Removal" below.
1.5.1.1 Screening and Disposal of Rock
To reduce the significant occurrence of remediation on placed material, all material greater than 3/4 inch shall be screened at the outfall pipe to remove from fill placement. Screened material shall be removed and disposed at a location accepted by the Contracting Officer. Crushing of the rock and dispersing in the fill material shall not be allowed. The method by which the Contractor removes the rock shall be of their own design and shall be constructed so as to insure removal of all such rock. If using a Hopper Dredge, rock screening shall not be performed at the drag head. The material retained will include rock fragments, whole and broken shell, and coral fragments. The Contractor's method of screening for rock removal shall be of their own design, however, the outfall discharge shall be fully encased by the 3/4 inch screen on all sides, including top and bottom, and not allow for any discharge to escape without passing through the 3/4 inch screen. If at any time it is determined that any portion of the outfall slurry is being discharged without passing through the screen, the Contractor shall shut down the dredge plant operations until the screen is repaired or changes in the methodology are made to ensure all outfall slurry discharge is passing through the screen. The contractor shall be responsible for remediation of all material greater than 3/4 inch placed on the beach at the Contractor's own expense. The Contractor's method for screening shall be submitted for information and approval prior to
SECTION 35 20 23 Page 9 commencement of work. The separation does not exclude the Contractor meeting the Table 1 requirements specified further herein.
1.6 PUMPING OF BILGES
Contractors are warned that pumping oil or bilge water containing oil into navigable waters, or into areas which would permit the oil to flow into such waters, is prohibited by Section 13 of the River and Harbor Act of 1899, approved 3 March 1899 (30 Stat. 1152; 33 U.S.C. 407). Violation of this prohibition is subject to the penalties under the referenced Acts.
1.7 HISTORICAL PERIOD SHIPWRECK SITES
If any shipwreck, artifact, or other objects of antiquity that have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered, the Contractor acknowledges that:
a. The site(s), articles, or other materials are the property of the State of Florida, with title vested in the Department of State, Division of Historical Resource; and that,
b. He will immediately notify the Contracting Officer.
1.8 UTILITY CROSSINGS
1.8.1 General
It is the Contractor's responsibility to investigate the location of all utility crossings. The Contractor shall take precautions against damages which might result from his operations in the vicinity of the utility crossings. If any damage occurs as a result of his operations, the Contractor will be required to suspend dredging until the damage is repaired and approved by the Contracting Officer. Costs of such repairs and downtime of the dredge and attendant plant shall be at the Contractor's expense.
1.8.2 Sand Transfer Plant Subaqueous Pipeline Crossing
Two subaqueous sand transfer pipelines cross underneath the Entrance Channel within the bounds of the dredging area. Location and depth of these pipelines are shown on the drawings. The Contractor shall take precaution to avoid damaging these pipelines.
1.9 PERMITS
The Contractor's attention is directed to the Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1 and the paragraph PERMITS AND AUTHORIZATIONS of Section 01 57 20 ENVIRONMENTAL
PROTECTION.
1.10 FUEL OIL TRANSFER OPERATIONS
In accordance with U.S. Coast Guard regulations (33 CFR 156.120), couplings used in fuel oil transfer operations on any vessel with a capacity of 250 or more barrels of oil shall be either a bolted or full-threaded connection; or a quick-connect coupling approved by the Commandant; or an automatic back-pressure shutoff nozzle used to fuel the vessel. An executed fuel oil transfer (Declaration) form signed by the tanker operator
SECTION 35 20 23 Page 10 shall be submitted to the Contracting Officer for each refueling operation. The U.S. Coast Guard shall also be notified prior to any refueling. A copy of the Declaration of Inspection for Refueling is on the web site indicated in the paragraph CONSTRUCTION FORMS AND DETAILS below.
1.11 SIGNAL LIGHTS
The Contractor shall display signal lights and conduct operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as set forth in Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International-Inland (COMDTINST M16672.2), or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable.
1.12 NOTICE TO MARINERS -- DREDGING CONTRACTS
Should the Contractor, during operations, encounter any objects on the channel bottom which could be a hazard to navigation, the Contractor shall immediately notify the Contracting Officer as to the location of said object and shall provide any other pertinent information necessary for the Contracting Officer to prepare and issue a Notice to Mariners.
1.13 FINAL CLEANUP
Final cleanup, as stated in the paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK of Section 00700 CONTRACT CLAUSES in Volume 1, shall include the removal of all the Contractor's plant and equipment either for disposal or reuse. Plant and/or equipment and/or materials to be disposed of shall only be disposed in a manner and at locations approved by the Contracting Officer. Unless otherwise approved by the Contracting Officer, the Contractor will not be permitted to abandon any equipment in the disposal area or other areas adjacent to the worksite. Failure to promptly remove all plant, pipeline, equipment, and materials upon completion of the dredging will be considered a delay in the completion of the final cleanup and demobilization work. In such case, the Government will exercise its right as stated in Clause DEFAULT (FIXED-PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1 to remove any plant and/or equipment and/or materials at the Contractor's expense.
1.14 WORK VIOLATIONS
Work done in violation of these specifications or a verbal or written stop order of the Contracting Officer will be considered as unsatisfactory progress for purposes of progress payments in accordance with Clause PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700 CONTRACT CLAUSES in Volume 1.
SECTION 35 20 23 Page 11
1.15 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SYSTEM (HOPPER DREDGES
AND DUMP SCOWS)
1.15.1 System Requirements
See Section 35 20 26.01 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW - TRACKING PROFILE, Section 35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE HYDRAULIC DREDGE and Section 35 20 28 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE. However, in the event of NDQMP System failure (not fully operational), the Contractor shall notify the Contracting Officer and continue tracking using ETS (see paragraph "Electronic Tracking System (ETS) for Ocean Disposal Vessels" below) for up to 48 hours until the NDQMP System is fully operational and in use. If, upon NDQMP System failure, the Contractor cannot use ETS or cannot use the NDQMP System within 48 hours of failure, all dredging operations for the vessel shall cease until the NDQMP System is fully operational. Any delays resulting from NDQMP System failure shall be at the Contractor's expense.
When required to calculate displacement, the density of water shall be 64.0 pounds per cubic foot or its metric equivalent of 1025 kilograms per cubic meter.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 NOTIFICATION OF COAST GUARD
3.1.1 Navigation Aids
Navigation aids located within or near the areas required to be dredged will be removed, if necessary, by the U.S. Coast Guard in advance of dredging operations. Notify the U.S. Coast Guard as indicated in paragraph SUBMITTALS above for relocation of navigation aids . The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid of navigation.
3.1.2 Dredging Aids
The Contractor shall obtain approval from the U.S. Coast Guard for all buoys, dredging aid markers to be placed in the water, and dredging aid markers affixed with a light prior to the installation. Dredging aid markers and lights shall not be colored or placed in a manner that they will obstruct or be confused with navigation aids.
3.1.3 Subaqueous Utility Crossings
The Contractor shall notify the local Coast Guard Captain of the Port at least 3 weeks in advance of the start of dredging in the Entrance Channel to determine what coordination and/or actions are required of the Contractor by the Coast Guard in regards to the subaqueous sand transfer pipelines crossing under the Entrance Channel. The Contractor shall provide a written report to the Contracting Officer of any requirements put in place by the Coast Guard concerning pipeline crossing as soon as practicable after issue by the Coast Guard.
3.2 WORK AREA
The Contractor will be permitted to exclude the public from the work areas in the immediate vicinity of his dredging, transporting, and disposal
SECTION 35 20 23 Page 12 operations . The Contractor shall prevent public access to the discharge end of the pipeline. The Contractor shall erect, maintain, and move as necessary, a restrictive barrier around the discharge of the hydraulic pipeline. The barrier shall be constructed so as to prevent the public from approaching the discharge from any direction closer than 40 feet. The Contractor shall post signs in a conspicuous location with the wording "DANGER - HIGH PRESSURE DISCHARGE FROM DREDGE". Enforcement shall be the Contractor's responsibility at no additional cost to the Government. The enforcement shall be coordinated with local enforcement agencies and will be subject to approval of the Contracting Officer. Additionally, the Contractor shall place a safety person at the discharge end of the disposal pipeline. The safety person shall be present at all times during discharge operations and will maintain radio communication between the dredge and the disposal operation.
3.2.1 Access
The Contractor shall be responsible for providing and maintaining access necessary for his equipment and plant to and from the work site, mooring area, and disposal area. The Contractor shall ascertain the environmental conditions which can affect the access such as climate, winds, currents, waves, depths, shoaling, and scouring tendencies.
3.2.2 Protection of Existing Waterways
The Contractor shall conduct his operations in such a manner that material or other debris are not pushed outside of dredging limits or otherwise deposited in existing side channels, basins, docking areas, or other areas being utilized by vessels. The Contractor will be required to change his method of operations as may be required to comply with the above requirements. Should any bottom material or other debris be pushed into areas described above, as a result of the Contractor's operations, the same must be promptly removed by and at the expense of the Contractor to the satisfaction of the Contracting Officer.
3.2.3 Adjacent Property and Structures
No dredging will be permitted within 25 feet of any structure. Any damage to private or public property or structures resulting from the disposal or dredging operations shall be repaired promptly by the Contractor at his expense. Any damage to structures as a result of Contractor's negligence will result in suspension of dredging and require prompt repair at the Contractor's expense as a prerequisite to the resumption of dredging.
3.2.4 Subaqueous Utility Crossings
The Contractor shall be responsible for verifying the locations and depths of all utility crossings and take precautions against damages which might result from his operations, especially the sinking of dredge spuds and/or anchors into the channel bottom, in the vicinity of utility crossings. If any damage occurs as a result of his operations, the Contractor will be required to suspend dredging until the damage is repaired and approved by the Contracting Officer. Costs of such repairs and downtime of the dredge and attendant plant shall be at the Contractor's expense.
3.3 CHARACTER OF MATERIALS
a. Materials to be removed under this contract are described in Section 00 31 32 GEOTECHNICAL DATA REPORT as referred to in Section
SECTION 35 20 23 Page 13
01 11 00 SUMMARY OF WORK.
b. Due to typical harbor activities, debris such as trash, rope, chain, cable, tires, miscellaneous scrap metal, woody debris, etc., may be encountered in the channel. All such materials shall be brought to the surface and disposed of in a disposal area obtained by the Contractor in a manner approved by the Contracting Officer.
3.4 DISPOSAL OF EXCAVATED MATERIAL
3.4.1 General
Material excavated shall be transported to and deposited in the disposal areas designated on the drawings. The average distance to which the material will have to be transported is approximately 1 mile and the maximum distance will be approximately 2 miles.
3.4.2 Order of Placement
Dredged material shall be placed commencing at DEP Monument R-76 and proceeding southerly until all dredged material has been placed to the sections and limits shown on the contract drawings.
3.4.3 Construction
The beach is subject to changes and the elevations on the beach at the time the work is done may vary from the elevations shown on the drawings. The Contracting Officer reserves the right to vary the width and grade of the berm from the lines and grades shown on the plans in order to establish a uniform beach for the entire length of the project. The beach fill profiles shown on the drawings are for the purpose of estimating the theoretical amount of fill needed and will be used by the Contracting Officer in making any change in the lines and grades. The Contractor will not be required to dress the fill below the mean high water to the slopes shown but will be required to do the dressing specified in subparagraph "Dressing" below.
3.4.3.1 Construction Equipment Limitations
Grading and other construction equipment will not be permitted outside the landward limit of fill at the time of construction except for designated ingress and egress to and from the site. Mobile equipment of any type operating within 50 feet of any seawall, building, groins, geotextile bags, or other structure as determined by the Contracting Officer shall be rubber wheeled.