Grounds Maintenance at George Guy Park and Jackson James Park.pdf

PDF 140 KB Posted

Attached to
Grounds Maintenance at George Guy Park and Jackson James Park
Solicitation number
2026-003
Issued by
Charleston County, South Carolina

About this file

This is a Request for Proposals (RFP) issued by the City of Chester, South Carolina for comprehensive grounds maintenance services at George B. Guy Park and Jackson James Park. The City is seeking qualified contractors to provide all labor, equipment, materials, supervision, transportation, and disposal necessary to maintain both parks in clean, safe, and attractive condition. The scope of work includes one-time initial clearing activities such as removing trash, debris, fallen limbs, illegal dumping, and weeds, as well as trimming vegetation and spreading mulch, along with bi-weekly maintenance consisting of trash removal, weed eating, property line cleanup, drainage ditch maintenance, leaf and debris removal, and general beautification. Proposals are due by September 4, 2026 at 4:00 p.m., submitted in sealed envelopes to Yulanda Littlejohn at the City of Chester offices. A mandatory site visit to both parks is required before proposal submission and must be scheduled with Mr. Sundray Gregory; failure to complete the site visit may result in proposal rejection. The initial contract term is one year with options to renew for two additional one-year terms upon mutual agreement and satisfactory performance.

Contractors must submit proposals with pricing broken down by initial clearing, bi-weekly maintenance, emergency cleanup, hourly additional work, and mulch installation; exact pricing amounts are not specified in the RFP. Evaluation criteria include experience (25 points), qualifications (20 points), equipment and staffing (20 points), references (15 points), and cost proposal (20 points). Contractors must demonstrate a minimum of three years of relevant experience, provide three references, submit a South Carolina Business License, and provide proof of Commercial General Liability, Automobile Liability, and Workers' Compensation Insurance prior to contract execution. The City reserves the right to reject any or all proposals, waive informalities, and award the contract in its best interest.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CHESTER, SOUTH

CAROLINA

REQUEST FOR PROPOSALS

RFP 2026-003

Grounds Maintenance

George B. Guy Park & Jackson James Park

Issue Date: August 4, 2026

Proposal Due Date: September 4, 2026, by 4:00 p.m.

Proposal Submission

Sealed proposals shall be submitted to:

Yulanda Littlejohn

Executive Assistant

City of Chester

120 Church Street

Chester, SC 29706

All proposals must be submitted in a sealed envelope clearly marked:

RFP 2026-003 – Grounds Maintenance Services.

Emailed or faxed proposals will not be accepted. Late proposals will not be accepted.

Introduction

The City of Chester is soliciting sealed proposals from qualified contractors to provide comprehensive grounds maintenance services for George B. Guy Park and Jackson James Park.

The selected contractor shall furnish all labor, supervision, equipment, tools, materials, transportation, disposal, and incidentals necessary to maintain both parks in a clean, safe, and attractive condition.

Contract Term

The initial contract term shall be one (1) year with the option to renew for two (2) additional one-year terms upon mutual agreement and satisfactory performance.

Mandatory Site Visit

A mandatory site visit is required before submitting a proposal. Contractors must visit both

George B. Guy Park and Jackson James Park.

To schedule a site visit contact:

Mr. Sundray Gregory dgregory@chester.sc.gov

Failure to complete the site visit may result in the proposal being deemed non-responsive.

Scope of Work

The Contractor shall provide all labor, equipment, materials, supervision, transportation and disposal necessary to perform the work.

Initial Clearing (one-time):

• Clean all property lines.

• Remove all trash, litter, leaves, brush, and debris.

• Remove fallen limbs and branches.

• Remove illegal dumping.

• Clear drainage ditches.

• Weed eat all overgrown areas.

• Trim vegetation around fences, sidewalks, signs, playgrounds, pavilions, benches, and buildings.

• Spread mulch in landscape beds and around designated trees.

• Beautify the grounds.

• Remove and legally dispose of all debris.

Bi-Weekly Maintenance:

• Trash and litter removal.

• Weed eating.

• Property line cleanup.

• Drainage ditch cleanup.

• Removal of leaves, branches, and debris.

• Blow sidewalks, courts, parking areas, and pavilions.

• Spot mulch replacement as directed.

• General beautification.

Performance Standards

Both parks shall remain clean, safe, and attractive. Excessive weeds, litter, debris, leaves, brush, or fallen limbs shall not remain between scheduled maintenance visits. Emergency cleanup requested by the City shall begin within 48 hours unless otherwise directed.

Contractor Responsibilities

The Contractor shall:

• Provide all labor, equipment, tools, fuel, supervision, and disposal.

• Repair any damage caused by operations.

• Comply with OSHA and all applicable laws.

• Remove all debris from the site after each visit.

• Notify the City of vandalism, hazards, or damaged facilities.

Qualifications

Contractors shall submit:

• Company profile

• Minimum three years of relevant experience

• Three references

• Equipment list

• Staffing plan

• South Carolina Business License

• Proof of General Liability and Workers' Compensation Insurance

Proposal Contents

Include:

• Cover Letter

• Company Qualifications

• References

• Staffing Plan

• Equipment List

• Maintenance Schedule

• Pricing Proposal

• Insurance Certificates

• Business License

Pricing Proposal

Description Price

Initial Clearing (Both Parks) $__________

Bi-Weekly Maintenance $__________

Emergency Cleanup $__________

Hourly Additional Work $__________

Mulch Installation $__________

Evaluation Criteria

Criteria Points

Experience 25

Qualifications 20

Equipment & Staffing 20

References 15

Cost Proposal 20

Insurance

The successful contractor shall provide proof of Commercial General Liability, Automobile

Liability, and Workers' Compensation Insurance prior to contract execution.

City Rights

The City reserves the right to reject any or all proposals, waive informalities, request additional information, negotiate with proposers, and award the contract deemed in the best interest of the

City.

Non-Collusion Certification

By submitting a proposal, the proposer certifies that the proposal has been prepared independently and without collusion.

Signature

Company: _______________________________

Authorized Representative: __________________________

Title: ______________________

Signature: __________________ Date: ______________

File details come from the government source that posted it. Updated .