This is an Invitation to Bid (ITB) document from the City of Brighton, Michigan for the Grit Room Force Main Replacement project at the Brighton Wastewater Treatment Plant. The project involves removing and replacing three force main pipes (two 12" and one 8" ductile iron sewer force mains) located inside the Grit Room, with an additional 8" force main to be abandoned. The bid is due on March 26, 2025, at 10:00 am, with a mandatory pre-bid meeting scheduled for March 11, 2025, at 1 pm. The project requires the contractor to remove existing pipes, install new ductile iron pipes with protective epoxy coating, replace valves and flow meters, and ensure continuous operation of at least one 12" and one 8" force main during the project. The project is to be completed by August 31, 2025, with a two-week completion expectation.
The bid is structured as a lump sum project with an alternate option for using HDPE pipe and fittings instead of ductile iron. Bidders must provide detailed information about their company, including references, financial status, and legal structure. The project requires comprehensive insurance coverage, including workers' compensation, commercial general liability, and automobile liability, with minimum coverage of $2 million per occurrence. The contractor will be responsible for all aspects of the project, including obtaining accurate measurements, coordinating shutdowns, managing wastewater flow, installing new flow meters, and reconnecting them to the WWTP computer/SCADA system. The City reserves the right to accept or reject any bid and will not be responsible for parts or equipment that do not fit or function properly.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grit Room Force Main Replacement
DATE: March 3, 2025
ITB: #ITB-WW-25-01
ITEM: Grit Room Force Main Replacement
DEADLINES: Deadline for bidder inquiries is Friday, March 21, 2025 at 4 p.m.
All addenda will be posted no later than Monday, March 24, 2025 at 4 p.m.
MANDATORY March 11, 2025 – 1 pm PRE-BID MEETING: 6570 Hamburg Road, Brighton, MI
DUE DATE: March 26, 2025 – 10:00 am
QUESTIONS: All questions must be submitted via email (brooksc@brightoncity.org)
1. SUBMISSION AND RECEIPT OF BID
To be considered, bids shall be received prior to the specified time of opening as designated on the bid form. NO LATE BIDS WILL BE ACCEPTED. The City of Brighton reserves the right to postpone the opening for its own convenience. Bidders shall use the bid documents furnished as none other may be accepted. Bids are considered received when in the possession of the Brighton City Clerk. All bids shall be labeled with the ITB Number, item; as well as the aforementioned deadline date/time and the vendor’s name and address on the outside of the envelope. Bids shall be sealed when submitted. Separate bids shall be submitted on each bid number and shall be typewritten or written in ink and legibly prepared. Bids having any erasures or corrections thereon may be rejected unless explained or initialed by the bidder. No faxed or emailed bids will be accepted.
SUBMITTALS MUST BE ENCLOSED IN SEALED ENVELOPES MARKED:
#ITB-WW-25-01
City of Brighton City Hall 200 N. First Street
Brighton, MI 48116
2. RESPONSIVE BIDS
All pages and the information requested here in shall be furnished completely in compliance with instructions.
The manner and format of submission is essential to permit prompt evaluation of all bids on a fair and uniform basis. Unless otherwise specified, the City of Brighton reserves the right to accept any item in the bid. Bidders may submit bids on any item or group of items, provided however, that the unit prices are shown as required.
Accordingly, the City of Brighton reserves the right to declare as non-responsive and reject any incomplete bid if
CITY OF BRIGHTON
material information requested is not furnished, or where indirect or incomplete answers or information is provided. Alterations to the written requirements will negate any response. The City of Brighton appreciates efforts to reduce the waste. When possible, responses should be printed double-sided to reduce paper use.
3. OFFICIAL DOCUMENTS
The City of Brighton officially distributes bid documents through the Michigan Intergovernmental Trade Network (MITN). Copies of documents obtained from any other source are not considered official copies. Only those vendors who obtain documents from the MITN system are guaranteed access to receive addendum information if such information is issued. If you obtained this document from a source other than MITN, it is recommended that you register on the MITN site, www.mitn.info and obtain an official copy and any addenda. The City of Brighton reserves the right to use any other method of distributing bid information; however, any additional method of distribution will also direct vendors to MITN.
This Invitation to Bid document contains all of the following:
Invitation to Bid and Contract Documents
Scope of Work
Contract Requirements
4. INTERPRETATION OF BID AND/OR CONTRACT DOCUMENTS
Neither the City Manager nor any of his representatives will give verbal instructions or verbal answers to any inquiries regarding the meaning of specifications prior to the award of the contract. Any verbal statement regarding the specifications by any persons associated with the City, prior to award, shall be unauthorized.
Clarifications to bid documents shall be requested in writing via email to the Director of Public Services, Marcel Goch, at gochm@brightoncity.org.
5. CHANGES AND ADDENDA TO BID DOCUMENTS
Each change or addendum issued in relation to this bid will be posted to MITN. It shall be the bidder’s responsibility to make inquiry as to the changes or addenda issued. All such charges or addenda shall become part of the contract and all bidders shall be bound by such changes or addenda. The City will post all addenda to these bid documents no later than Monday, March 24, 2025, except in cases of emergency.
6. SPECIFICATIONS
Unless otherwise stated by bidder, the bid will be considered as being in strict accordance with the City’s applicable standard specifications, and any special specifications outlined in the document. Reference to a particular trade name, manufacturer’s catalogue, or model number are made for descriptive purposes to guide the bidder in interpreting the requirements of the City and should not be construed as excluding bids on other types or materials, equipment and supplies unless otherwise stated. However, the bidder, if awarded the contract, will be required to furnish the particular item referred to in the specifications or description unless departure or substitution is clearly noted and described in the bid. The City reserves the right to determine if equipment/product or service being bid is equal to the specified equipment/product or service requested.
7. ALTERNATES
Bidders are cautioned that any alternate bid, unless requested, or any changes, insertions, or omissions to the terms and conditions, specifications, or any other requirements of this bid, may be considered non-responsive, and at the opinion of the City Manager, may result in rejection of the bid.
8. PRICING
This is a Lump Sum Project.
9. TAXES, TERMS AND CONDITIONS
The City of Brighton and all agencies listed in this request are exempt from Federal Excise and State Sales Tax.
Please review The State of Michigan’s REVENUE ADMINISTRATIVE BULLETIN 1999-2 for clarification https://www.michigan.gov/documents/rab99-2_109055_7.pdf . The City’s tax number is 38-6004526. General payment terms are Net 30 days upon receipt of goods and/or invoice for services, including progress payments (unless otherwise stated below). Cooperative members will provide their tax-exempt status as required by the awarded vendor.
10. QUANTITIES
All quantities stated, unless indicated otherwise are estimates and the City reserves the right to increase or decrease the quantity at unit price bid, as may be reasonably necessary.
11. DELIVERY
Bids shall include all charges for delivery, packing, crating, etc., unless otherwise stated in the bid document.
General delivery hours are 8:30 a.m. to 3:00 p.m. Monday through Friday, excluding holidays.
12. AWARD
The bid will be awarded to that responsible, responsive bidder whose bid, conforming to this solicitation, will be most advantageous to the City, price and other factors considered. The City reserves the right to accept or reject any or all bids, in part or whole and to waive informalities and minor irregularities in bids received.
13. WITHDRAWL OF BID
Bids may be withdrawn in person by a bidder, or authorized representative, provided their identity is made known and a receipt is signed for the bid, but only if the withdrawal is made prior to the stated bid deadline. No bid may be withdrawn for at least ninety (90) days after bid opening except the successful company whose prices shall remain firm for the entire contract period. In case of error by the bidder in making up a bid, the City may, by discretion, reject such a bid upon presentation of a letter by the Bidder, which sets forth the error, the cause thereof, and sufficient evidence to substantiate the claim. The City may, in its discretion, award the contract to the next qualified bidder, and the error by the initial bidder may be subject to penalties for default set forth in Section 18, below.
14. INFRINGEMENTS AND INDEMNIFICATIONS
The bidder, if awarded a contract, agrees to protect, defend, and save the City and the cooperative members listed herein, its officials, employees, departments and agents harmless against; any demand for payment for the use of any patented material, process, or device that may enter into the manufacture, construction, or from a part of the work covered by either order or contract; and from suits or charges of every nature and description brought against if for, or on account of, any injuries or damages received or sustained by any person or entity by or from any of the acts or omissions of the Contractor, the Contractor’s employees, or agents; from all liability claims, demands, judgments and expenses to persons or property occasioned, wholly, or in part, by the acts or omissions of the bidder, Contractor, agents or employees. The Contractor shall release, indemnify and hold the City, its officers, agents and employees harmless form liability of any kind or nature, including the Contractor’s use of any copyrighted or un-copyrighted composition, secret process, patented or unpatented invention, article or appliance furnished or used in the performance of this contract.
15. SAMPLES
Generally, when required, samples will be specifically requested in the Invitation to Bid. Samples, when required, are to be furnished free of charge. Except for those samples destroyed or mutilated in testing, samples will be returned at an offeror request, transportation collect.
16. NON-COLLUSION
By signing the bid, the offeror certifies that the bid submitted, has been arrived at independently and has been submitted without collusion with, and without any agreement, understanding or planned common course of action with, any other vendor of materials, supplies, equipment or services described in the invitation to Bid, designed to limit independent bidding or competition.
17. CANCELLATION
Unless otherwise stated in the additional terms and conditions listed in the ITB, any contract entered into as a result of this bid may be canceled by the City upon sixty (60) days’ notice, in writing, prior to the effective date of the cancellation. Further, any Participating agency may cancel its participation upon thirty (30) days written notice. Any cancellation under this provision shall not affect the rights and obligations attending orders outstanding at the time of cancellation, including any right to the City to indemnification by the Contractor, rights of payment for goods/services delivered and accepted, and rights attending any warranty or default in performance in association with any order. Cancellation of the contract due to the Contractor default may be immediate.
18. DEFAULT AND REMEDIES
Any of the following events shall constitute cause for the City of Brighton to declare Contractor in default of the contract:
Nonperformance of contractual requirements
A material breach of any term or condition of this contract.
Please note, the City of Brighton shall issue a written notice of default providing a period in which the Contractor shall have an opportunity to cure. Time allowed for cure shall not diminish or eliminate the Contractor’s liability for liquidated or other damages. If the default remains, after the Contractor has been provided the opportunity to cure, the City of Brighton may do one or more of the following:
Exercise any remedy provided by law;
Terminate this contract and any related contracts or portions thereof; or
Suspend the Contractor from receiving future bids solicitations.
19. LAWS AND REGULATIONS
All supplies, services and equipment offered and furnished shall comply fully with all applicable Federal and State laws and regulations.
20. GOVERNING LAW
This procurement and the resulting agreement shall be governed by and construed in accordance with the laws of the State of Michigan. The construction and effect of any Participating Addendum or order against the contract(s) shall be governed by and construed in accordance with the laws of the participating entity’s State. Venue for any claim, dispute or action concerning an order placed against the contract(s) or the effect of a Participating Addendum shall be in Livingston County Circuit Court.
21. ASSIGNMENT/SUBCONTRACT
Contractor shall not assign, sell, transfer, subcontract or sublet rights, or delegate responsibilities under this contract, in whole or in part, without the prior written approval of the City of Brighton.
22. NONDISCRIMINATION
The offeror agrees to abide by the provisions of Title VI and Title VII of the Civil Rights Act of 1964 (42 USC 2000e), which prohibits discrimination against any employee or applicant for employment, or any applicant or recipient of services, on the basis of race, religion, color, or national origin; and further agrees to abide by Executive Order No. 11246, as amended, which prohibits discrimination on basis of sex; 45 CFR 90 which prohibits discrimination on the basis of age, and Section 504 of the Rehabilitation Act of 1973, or the Americans with Disabilities Act of 1990 which prohibits discrimination on the basis of disabilities. The offeror further agrees to furnish information and reports to requesting agencies, upon request, for the purpose of determining compliance with these statutes.
Offeror agrees to comply with each individual agency’s certification requirements, if any, as stated in the additional terms and conditions listed in the solicitation. This contract may be canceled if the offeror fails to comply with the provisions of these laws and regulations. The offeror must include this provision in every subcontract relating to purchases by the agencies to ensure that subcontractors and vendors are bound by this provision.
23. SEVERABILITY
If any provision of this contract is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected; and the rights and obligations of the parties shall be construed and enforced as if the contract did not contain the particular provision held to be invalid.
24. FORCEMAJEURE
Neither party to this contract shall be held responsible for delay or default caused by fire, riot, acts of God and/or war, which is beyond that party’s reasonable control. The City of Brighton may terminate this contract after determining such delay or default will reasonably prevent successful performance of the contract.
25. BID PREPARATION COSTS
The City of Brighton is not liable for any costs incurred by the offeror in bid preparation.
26. CONFLICT OF INTEREST
The City of Brighton Charter requires that “no contract or purchase involving an amount in excess of one hundred dollars ($100) shall be made by the City in which any elective or appointive officer or any member of his family has any pecuniary interest, direct or indirect” unless the conflict is disclosed and approved by unanimous vote of the City Council. Brighton City Charter, Section 5.13:
In order to determine whether your company presents any potential conflict of interest with respect to the award of the subject contract, on a separate piece of paper, please disclose any familial or business relationships you have with any current or former employee, agent, consultant, officer or elected or appointed official of the City of Brighton, or others who are or have been within the past year, in a decision making position with the City of Brighton, and who may be able to grant favorable treatment with respect to being awarded this contract. Please disclose the full nature and extent of your relationship, for review by City Council regarding Charter compliance.
27. INDEPENDENT CONTRACTOR
The Contractor shall be an independent contractor, and as such shall have no authorization, express or implied to bind the City of Brighton or the respective agencies to any agreements, settlements, liability or understanding whatsoever, and agrees not to perform any acts as agent for the City of Brighton or participating agencies, except as expressly set forth herein.
28. NON-IRAN LINKED BUSINESSES
By the AUTHORIZATION/ACCEPTANCE OF SPECIFICATIONS below, “I certify and agree on behalf of myself and the company submitting this bid the following: (1) that I am duly authorized to legally bind the company submitting this bid; and (2) that the company submitting this bid is not an “Iran linked business,” as that term is defined in Section 2[e] of the Iran Economic Sanctions Act, being Michigan Public Act No. 517 of 2012; and (3) That I and the company submitting this bid will immediately comply with any further certifications or information submissions requested by the City in this regard.”
29. INSURANCE (REQUIRED FOR WORK ON OR WITHIN CITY PROPERTY/FACILITIES)
The Contractor, or any of their subcontractors, shall not commence work under this contract until they have obtained the insurance required under this paragraph, and shall keep such insurance in force during the entire life of this contract. All coverages shall be with insurance companies licensed and admitted doing business in the State of Michigan and acceptable to The City of Brighton. The requirements below should not be interpreted to limit the liability of the Contractor. All deductibles and Self-Insured Retention (SIR’s) are the responsibility of the Contractor. The Contractor shall procure and maintain the following insurance coverage:
A. Worker’s Compensation Insurance including Employers’ Liability Coverage, in accordance with all applicable statutes of the State of Michigan.
B. Commercial General Liability Insurance on an “Occurrence Basis” with limits of liability not less than Two
Million Dollars ($2,000,000.00) per occurrence and aggregate. Coverage shall include the following extensions: (A) Contractual Liability; (B) Products and Completed Operations; (C) Independent Contractors Coverage; (D) Broad Form General Liability Extensions or equivalent, if not already included.
C. Automobile Liability including Michigan No-Fault Coverages, with limits of liability not less than Two Million Dollars ($2,000,000.00) per occurrence, combined single limit for Bodily Injury, and Property Damage. Coverage shall include all owned vehicles, all non-owned vehicles, and all hired vehicles.
D. Additional Insured: Commercial General Liability and Automobile Liability, as described above, shall include an endorsement stating the following shall be Additional Insureds: The City of Brighton, all elected and appointed officials, all employees and volunteers, all boards, commissions, and/or authorities and board members, including employees and volunteers thereof. It is understood and agreed by naming The City of Brighton as additional insured, coverage afforded is considered to be primary and any other insurance The City of Brighton may have in effect shall be considered secondary and/or excess.
E. Cancellation Notice: All policies, as described above, shall include an endorsement stating that it is understood and agreed Thirty (30) days, Ten (10) days for non-payment of premium, Advance Written Notice of Cancellation, Non-Renewal, Reduction, and/or Material Change shall be sent to: The City of Brighton, Attention: Finance Director, 200 North First Street, Brighton, MI 48116.
F. Proof of Insurance Coverage: The Contractor shall provide The City of Brighton, at the time that the contracts are returned by him/her for execution, a Certificate of Insurance as well as the required endorsements. In lieu of required endorsements, if applicable, a copy of the policy sections where coverage is provided for additional insured and cancellation notice would be acceptable. Copies or certified copies of all policies mentioned above shall be furnished, if so requested.
G. If any of the above coverages expire during the term of this contract, the Contractor shall deliver renewal certificates and endorsements to the City of Brighton at least ten (10) days prior to the expiration date.
30. GENERAL SCOPE OF WORK
The City of Brighton, Michigan desires to employ the services of a contractor, or contractors, to remove and replace three (3) force main pipes in the Grit Room at the City of Brighton Wastewater Treatment Plant.
31. DETAILED SCOPE OF WORK
See attached Details and Drawings beginning on Page 16.
32. SCHEDULE
After contract award, the work shall commence at time agreed upon by the City and the contractor. Work shall be completed Monday through Friday, from 7 a.m. to 4 p.m., unless otherwise approved by the DPS Director.
33. BONDS
As part of your bid response, it will be required to provide bid security. The bid security must be a certified check or bid bond made out to the City of Brighton for Five Percent (5%) of the Total Bid, in a form approved by the City Attorney. The security will ensure that your company can meet the insurance requirements listed in Section 29 and will contract with the City to do all the required as specified herein. The Bid Security will be returned to all bidders after the work has been approved to proceed.
After receiving the Notice to Proceed and prior to any work beginning, a Performance Bond of One Hundred Percent (100%) of the bid amount shall be provided. The Performance Bond shall be returned after all work is completed to the City’s satisfaction. For multi-year contracts, the City will accept a bond for the term of the contractor or a one-year renewable Performance Bond, which shall be provided prior to work commencing each year.
34. COMPENSATION
The City shall pay the contractor within thirty (30) days after receipt of invoice providing all work has been completed to its satisfaction.
35. FAILURE TO PERFORM
Should the contractor fail to perform under the terms of the agreement, the Public Services Director shall notify the contractor of the corrective action needed. The corrective action shall occur within a timeframe agreed upon by both parties.
If the contractor continues to have problems meeting the agreement performance requirements, the City Manager shall make the final decision on the termination of the contract.
All necessary permits, licenses, insurance policies, etc., required by local, State or Federal laws will be provided and obtained by the contractor at the contractor’s sole expense for any work enumerated herein, or requested for performance under the terms of this agreement.
The contractor is presumed to know and shall strictly comply with all local, State or Federal laws, ordinances and/or requirements in any manner while engaged in the performance of the duties enumerated under this agreement.
36. SAFETY
Contractor is responsible for all jobsite safety security.
Contractor is responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work.
Hard hats are required by Federal/State law in all construction areas. Federal and State Safety Inspectors have jurisdiction on the project.
If unsafe work practices are observed, the City of Brighton reserve the right to contact proper safety enforcement agencies.
37. PROCESS OF REVIEW OF BID
To be considered, your company must specialize in and have provided the services listed herein as indicated in the Detailed Scope of Work. Submit one (1) original and two (2) copies of the bid (PAGES 9-15), in one sealed envelope or box.
PRICING & SCHEDULE PROPOSAL
PRICING
Base Bid Grit Room Force Main Replacement $_________________
Bid Alternate 1
HPDE pipe and fittings in place of ductile iron pipe and fittings $_________________
FIRM PRICE GUARANTEE
This price is firm for _____________________________ days (Minimum 90) from opening date and will become fixed upon contract award.
ACKNOWLEDGEMENT OF OFFICIAL DOCUMENTS
I , certify that I have read section 3 (Official Documents) of the invitation to bid and that the bid proposal documents contained herein were obtained directly from the City of Brighton, or MITN website, www.mitn.info and is an official copy of the authorized version.
AUTHORIZATION/ACCEPTANCE O F S PE CI F I C A T I O N S
By signing below, I certify that I have read and understand the specifications herein and that I am duly authorized to contract on behalf of my company)
Signed Company
Printed
Address City/State/Zip __________________________________
Title____________________________________ Date
Office Phone Cell Phone ____________________________________
Contact Person
Office Phone Cell Phone ____________________________________
CONTRACTOR QUESTIONNAIRE
Please give the following information regarding your proposal:
1. List references where this service has been provided in the last 5 years (municipal preferred).
Agency Name: Contact Person: _________________________________
General Property Information: ____________________________________________________________
Phone : E-mail address: _________________________________
Details of Work Performed: _____________________________________________________________
2. Name of your bank and financial references: ________________________________________________
3. How many years’ experience have you and/or your company had in this business?
YEARS Explain (if in a related field):
4. Has your company filed for bankruptcy or reorganized for financial reasons in the past 36 months?
NO YES
5. Include a list of equipment to be used for this project and if the equipment is owned/leased or rented.
SUBCONTRACTORS
Name of Firm: _________________________________________________________________________________
Contact Person: _______________________________ Title: _________________________________
Address: _____________________________________________________________________________________
Phone: _______________________________
Work to be performed for general contractor: ______________________________________________
Name of Firm: ________________________________________________________________________
Contact Person: _______________________________ Title: _________________________________
Address: ___________________________________________________________________________
Phone: ____________________________________________________________________________
Work to be performed for general contractor: ______________________________________________
The contractor shall not sublet, assign or transfer the contract or any portion of any payment due the contractor hereunder, without the written consent of the City. If it is the intention of the bidder to use subcontractor(s) for any of the work called for herein, the bidder shall provide the information required for each subcontractor, below.
LEGAL STATUS BIDDERS
Fill out the appropriate section and strike out the other two.
Corporation
State in which incorporated: _____________________ Year Incorporated: ____________________
Official title of person issuing response: ___________________________________________________
Address: ___________________________________________________________________________
Website: ____________________________________________________________________________
Names and Titles of the corporation’s officers:
Name Title
Partnership Name of Members Address
Individual
Official Name: ____________________________________________________________________
Address: _________________________________________________________________________
Date Signed: _________________________________
PROJECT DESCRIPTION
This project consists of the removal and replacement of three (3) force main pipes in the Grit Room at the City of
Brighton Wastewater Treatment Plant (WWTP). There are two (2) - 12” and one (1) – 8” ductile iron sewer force mains located inside of the Grit Room. There is also a second 8” force main pipe that is no longer in service and will be abandoned as part of this project.
SCOPE OF WORK
Removal and disposal of existing force main pipe, pipe fittings, valves, link seals, and flow meters.
Removal includes the first 3’ of pipe outside of the Grit Room building and pipe entering flow channel.
Installation of new ductile iron pipe, pipe fittings, valves, link seals, restraints, and flow meters.
New pipe and pipe fittings are to be coated with a protective epoxy paint coating system that is designed to withstand the environment inside of the Grit Room.
Submittal of information pertaining to the new epoxy coatings is required so City staff and/or our engineer can review. (See Page 9)
New valves will be operated using the standard size 2” operating nut. Wrenches for each valve are to be included with the project.
One (1) - 12” force main (flow 1.2 MGD) and one (1) 8” force main (flow 60,000 GPD) will need to remain in service at all times during the project. If the bypass restricts the 12” force main flow, it may cause issues with four different lift stations connected to the force mains. If this occurs the second 12” pipe may have to be bypassed as well.
Any live taps, valve insertions, bypass piping, bypass pumping, or hauling of wastewater flow will be the responsibility of the contractor.
There are two (2) – 8” force main pipes entering the Grit Room building. Only one (1) 8” force main is in service. The 8” force main that is currently not being used will be abandoned using blind flanges. Before blind flanges are installed the section of 8” pipe that flows into the flow channel will be replaced. The section that passes through the building foundation can be cleaned/sandblasted and recoated with epoxy paint.
Contractor will work with City staff to coordinate shutdowns and draining of piping. City staff will perform any shutdowns/turn ons that may be needed.
Wastewater flow that drains from the force mains into the force main access pit inside of the Grit Room can be pumped into the flow channel in the Grit Room. It is the contractor’s responsibility to pump that sewer flow.
Any wastewater flow that drains into the excavated area outside of the building will be removed and disposed of by City staff using a Vactor truck.
New Rosemont flow meters will be constructed from materials that are conducive to handling raw wastewater flow. Documentation will be provided by the contractor for verification.
Submittal of information pertaining to the new flow meters is required so city staff and/or our engineer can review. (See Page 9)
Each flow meter will need a remote read out mounted on existing Unistrut adjacent to force main access pit.
All wiring required to install the new flow meters is to be provided by the contractor.
It is the contractor’s responsibility to reconnect the new flow meters to the WWTP computer/SCADA system.
The new flow meters will need to be calibrated by and certified by a qualified contractor. A report will be provided to show that each meter is measuring incoming sewer flow accurately.
Bid Alternate 1
Provide pricing for using HPDE pipe and fittings in place of ductile iron pipe and fittings. Standards and specifications for the use of HDPE pipe can be found on the City of Brighton website under engineering Standards.
ADDITIONAL CONTRACT REQUIREMENTS
Proposal must include:
All costs associated with any equipment, materials and labor needed for the removal, refurbishment, replacement, and acceptable operation of the Grit Room sewer force mains and flow meters.
Any deviation of any work that is conducted as part of the contract must first be discussed with and approved by the City before work can take place.
Unless agreed upon by both parties, contractor has two weeks to complete the project.
Once project has begun it shall be worked on until completion.
The contractor is responsible for cleanup of the work area each day.
The contractor is required to have a competent Superintendent on site while work is being performed so they can make decisions on behalf of the contractor.
The contractor shall provide the City of Brighton with the project Superintendent’s daytime and emergency phone numbers prior to beginning work.
It is the contractor’s responsibility to obtain accurate measurements and assessments of the pipe, flow meters, and any other related equipment for this project at the Mandatory Pre-Bid Meeting.
The City of Brighton is NOT responsible for the cost of parts and equipment that are ordered and received that do not fit or function properly.
Contractor is expected to follow all safety measures required for this project through MI-OSHA standards and any additional safety standards required by the City of Brighton.
Project is to be completed by August 31, 2025.
File details come from the government source that posted it. Updated .