Grand Valley RD Pumping SoW.docx
DOCX document 57 KB Posted
- Attached to
- GMUG Grand Valley RD Vault Pumping
- Solicitation number
- 1240LP25Q0092
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SoW) for vault toilet pumping services for the Grand Valley Ranger District within the Grand Mesa, Uncompahgre, and Gunnison (GMUG) National Forests, issued by the US Department of Agriculture (USDA) Forest Service. The contract requires a contractor with a 1500-gallon pumper tank, vacuum pump, 3-inch intake valve, 200 feet of hose, and other specialized equipment to service 10 different locations with vault toilets and one septic tank between September 15, 2025, and October 31, 2026.
The pumping services include detailed technical requirements such as removing vault contents to 90%, disposing of waste at commercial treatment facilities, using high-pressure jet washing, and thoroughly cleaning and disinfecting facilities. Locations range from visitor centers to boat launches and ski hill areas, with varying vault capacities (750-2000 gallons) and pumping frequencies (1-2 times per season). The contractor must comply with OSHA, state, and local regulations, prevent resource damage, and maintain professional conduct while performing services across multiple national forest sites.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _1240LP25Q0092.pdf | ||
| Grand Valley RD Toilet Pumping SOI.docx | DOCX document | |
| Past Performance Data Sheet.pdf | ||
| WD 2015-5423 R29.pdf | ||
| Grand Valley Vicinity Map.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 4 |
| 5.0 Deliverables / Schedule | 4 |
Project Grand Valley Ranger District Vault Toilet Pumping
General Information
1.0 Scope of Work
Regular and as-needed vault toilet pumping at multiple locations on the Grand Valley Ranger District within the Grand Mesa, Uncompahgre, and Gunnison (GMUG) National Forests.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contractor Equipment shall meet or exceed these minimum requirements:
1. Pumper tank capacity of 1500 gallons.
2. Vacuum pump.
3. 3 inch diameter intake valve and 200 feet of hose.
4. Long handled grappling device.
5. Capability of carrying extra water for cleaning purposes and for re-charging.
6. Back-up warning devices.
The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision and other incidentals necessary to perform the services listed.
There are several different vault toilet designs including:
· Single unit/single vault
· Double unit/double vault
· Double unit/single vault
· Septic Systems All vaults have a maximum capacity of 1000 gallons and need pumped when they reach 80% Capacity, with 90% of the vault contents removed per standard commercial practices. All vault waste shall be disposed of at a commercial treatment facility off National Forest Lands. Applicable OSHA, State and Local laws and regulations will be followed. It shall be the responsibility of the Contractor to secure permission from local municipal plants to add such waste to their system with any cost to be at the Contractor’s expense.
Pumping Procedures when an outside Manhole is Available As long as the outside pump-out access is in excess of 20 inches in diameter (or 20 inches square) the Contractor shall not be allowed to remove the vault contents through the toilet riser.
After removing the manhole cover, use the clam rakes or long handles grabber to remove as much of the debris as possible before trying to pump out the waste. This procedure will help stir up the contents of the vault and breakup the dense concentration of waste typically located just under the toilet riser (the impact zone).
By removing most or all of the debris before pumping, the Contractor will find that the hose will not clog so often and the liquid portion of the contents will not be removed before the thicker solids are removed.
All Debris Removed from the vault shall be placed into a leak proof container so that no contamination to the surrounding ground will result.
If the bottom of the vault is flat, then the waste shall be removed to within 4-5 inches of the bottom. At this point the hose will begin to suck air (vortexing) and further removal will be slow. At this time remove any further debris that was not removed during the initial raking and removal. Using a high-pressure jet washer system, wash down the interior walls of the vault before the clinging debris has a chance to dry. If at this time there is a heavy concentration of solids on the bottom of the vault, use the high-pressure jet washer system to break up and dilute the solids and then pump this diluted waste, down again until the suction hose begins to suck too much air to make further pumping practical. The flat-bottomed vault shall now be pre-charged with enough clean, fresh water to bring the depth of water up to 10 inches.
If the bottom of the vault is sloped (all vaults should be sloped a minimum of 1 inch per ft.), then pump the waste down (at the deep end) to where the hose begins to suck air. Remove any remaining debris and then go inside the building with the high-pressure jet washer system and wash the remaining waste down the sloped bottom. Wash down the vault walls from inside the building or from the outside manhole, whichever is easier. Now pump out the remaining waste and the water that was just added by the high-pressure jet washer until the suction hose begins to suck too much air to make further pumping impractical.
Pre-charge the vault with clean, fresh water so that there is 10 inches of water covering the bottom under the toilet riser. Add the recommended amount of Citrus deodorizer (or equivalent) to deodorize the remaining vault contents.
Thoroughly clean and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover, back into the vault if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for flies, a potential health risk and an odor problem. This problem should be avoided. Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not interfered with. If there is not an airtight seal, the Contractor shall notify the COR and District Representative.
Pumping Through the Toilet Riser When There Is No Outside Manhole The Contractor shall remove the toilet riser prior to pumping or removing debris. The Contractor shall not remove debris through or pump through the toilet riser without removing the riser. Remove the debris and pump in accordance with 4-1.
Extra care shall be taken to prevent waste spillage onto the interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be protected from damage and the toilet paper shall be covered with waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.
During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) will become an attractant for flies, a possible health risk for barefoot persons and an odor problem. Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover before replacing the riser. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, The Contractor shall notify the COR or District Representative. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.
Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until the final cleanup is accomplished.
Offsite Disposal of Sewage and Debris The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payment of all fees.
Disposal shall conform to all Federal, State and Local laws and ordinances. COR shall approve all disposal sites before pumping begins.
The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.
The Contractor shall dispose of all effluent in a State approved water disposal facility and shall furnish certifications of written evidence that only such approved facilities are used. Dumping at sanitary landfills shall not be permitted. No septic or vault waste shall be dumped on agricultural lands or private properties. Dumping shall only occur in Forest Service lagoons with written approval.
Conduct of Personnel The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreation areas while engaged in the performance of the agreement. Due to the nature of the duties under the agreement, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public or is otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment or any Government-owned property.
Resource Damage Any damage or defacement that occurs to government property or land resources during the Contractor’s operations shall be repaired at the Contractor’s expense to its original condition. Onsite Inspection will be made by the COR or District Representative prior to acceptance of work.
4.0 Government Furnished
None
5.0 Deliverables / Schedule for 2025-2026 Season
Key Deliverables for 2025-2026 Season
| Item No. |
| Location |
| Location |
| Gallon Capacity per Toilet |
| Pump Frequency |
| Dates |
| 1 |
| 39.039 |
-107.987
| Grand Mesa Visitor Center |
| 2000/tank |
1 septic tank
| 2 |
| 9/15/25-10/31/2026 |
| 2 |
| 39.023 |
-108.031
| County Line |
| 1000/vault |
4 vaults
| Need the two single vaults done twice this year and the double vault once this year |
| 9/15/25-10/31/2026 |
| 3 |
| 39.028 |
-108.049
| Mesa Top North |
| 1000/vault |
1 vault
| 2 |
| 9/15/25-10/31/2026 |
| 4 |
| 39.028 |
-108.048
| Mesa Top South |
| 1000/vault |
2 vaults
| 2 |
| 9/15/25-10/31/2026 |
| 5 |
| 39.043 |
-108.067
| Skyway |
| 1000/vault |
4 vault
| 2 |
| 9/15/25-10/31/2026 |
| 6 |
| 39.076 |
-107.966
| Cottonwood Boat Launch |
| 750/vault |
2 vault
| 1 |
| 9/15/25-10/31/2026 |
| 7 |
| 39.019 |
-107.999
| Ward Creek Reservoir Parking |
| 1000/vault |
2 vault
| 1 |
| 9/15/25-10/31/2026 |
| 8 |
| 39.038 |
-107.974
| Ward Way PG |
| 750/vault |
2 vaults
| 1 |
| 9/15/25-10/31/2026 |
| 9 |
| 39.067 |
-108.105
| Old Mesa Ski Hill |
| 1000/vault |
2 vaults
| 2 |
| 9/15/25-10/31/2026 |
| 10 |
| 39.043 |
-108.998
| Crags Crest |
| 1000/vault |
2 vaults
| 1 |
| 9/15/25-10/31/2026 |
Timeframes can vary due to several factors such as amount of use a toilet receives throughout the year and accessibility due to weather restraints.
Note: Uses I-70 at Horizon in Grand Junction as starting point (39.111718 / -108.540008) for mileage. Septic Tank locations are approximate within the site of the Ranger Station. Some toilets are approximate, due to recent construction or uncertainty of location from satellite imagery. You may enter these coordinates to locate the facility and to get directions and approx. travel times in numerous mapping programs on the internet.
image1.png
File details come from the government source that posted it. Updated .