About this file

This document is a Request for Bids (RFB) issued by Grand Traverse County for the demolition and replacement of three water heaters at the Grand Traverse County Jail located in Traverse City, Michigan. The project involves removing existing water heaters and associated piping, and installing new water heaters, valves, venting, piping, and performing necessary testing, permitting, and inspections. A mandatory pre-bid conference is scheduled for Monday, May 5, 2025, at 10:00 am in the jail lobby, and sealed bids are due on Wednesday, May 14, 2025, at 12:00 pm. The work must comply with engineering, electrical, and mechanical specifications prepared by Nealis Engineering and follow industry best practices, with final acceptance determined by Grand Traverse County.

The bidder is required to provide installation workmanship warranty and the manufacturer's full system warranty. The bid form includes provisions for bonding, with options for Labor and Material Payment Bonds and Performance Bonds. Bidders must submit two copies of their proposal and keep their bid valid for 60 consecutive calendar days. The county reserves the right to reject any and all bids, negotiate separately with sources, and make awards based on the most advantageous proposal considering price and other factors. Contractors are expected to visit the site, verify existing conditions, and be prepared to provide detailed documentation, including safety policies, permits, and compliance with local, state, and federal regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 -

Memorandum

Grand Traverse County Facilities Management

1213 W Civic Center Dr.

Traverse City, MI 49686

(231) 922-4511 jchase@gtcountymi.gov

TO: Prospective Bidders

DATE: April 25, 2025

FROM: John Chase, Director of Parks and Facilities

SUBJECT: Request For Bids for Grand Traverse County Jail water heaters

Grand Traverse County invites sealed bids from qualified firms for demolition and replacement of three water heaters at the Grand Traverse County Jail.

Attached to this letter is an Invitation to Bid and Bid Form to provide interested parties with sufficient information to enable them to prepare and submit bids for a contract award.

The County reserves the right to consider bids or modifications received at any time before award is made, if such action is in the best interest of the County. The County also reserves the right to reject any and all bids received as a result of this request, or to negotiate separately with any source whatsoever in any manner necessary to serve the best interests of the County. The County does not intend to award a contract solely on the basis of any response made to this request or otherwise pay for the information solicited or obtained.

The completed bid forms must be submitted no later than Wednesday, May 14, 2025, at 12:00 pm to:

Re: Jail water heaters Administration, 3rd floor 400 Boardman Avenue Traverse City, Michigan 49684

Attachments:

1. Instructions to Bidders

2. Specifications

3. Bid Form

4. Miscellaneous Bidding Information

- 2 -

REQUEST FOR PROPOSAL

Mandatory Pre-Bid: Monday, May 5, 2025, 10:00 am, Grand Traverse County Jail lobby, Traverse City, MI 49684

Due: Wednesday, May 14, 2025, 12:00 pm

Issued by

Parks and Facilities Management

1213 W. Civic Center Dr.

Traverse City, MI 49686

POINT OF CONTACT

Contract Administration: John Chase, Director of Parks and Facilities jchase@gtcountymi.gov

- 3 -

INSTRUCTIONS TO BIDDERS

GENERAL INFORMATION

1-1 Purpose

Grand Traverse County is requesting bids for demolition and replacement of three water heaters at the Grand Traverse County Jail.

1-2 Contract Award

The contract that may be entered into will be that which is most advantageous to the County, price and other factors considered. The County reserves the right to consider bids or modifications received at any time before award is made, if such action is in the best interest of the County.

1-3 Rejection of Bids

The County reserves the right to reject any and all bids received as a result of this Request For Bids, or to negotiate separately with any source whatsoever in any manner necessary to serve the best interests of the County. The County does not intend to award a contract solely on the basis of any response made to this request or otherwise pay for the information solicited or obtained.

1-4 Incurring Costs

Grand Traverse County is not liable for any cost incurred by the firm prior to the issuance of a contract.

1-5 Prebid Conference

A mandatory pre-bid conference will be held at the time, date, and location specified in the cover letter. The purpose of this conference is to discuss with prospective contractors the work to be performed and to allow them to ask questions concerning the RFB.

1-6 Inquiries

Questions that arise as a result of this RFB which require a written response must be submitted in writing to the Issuing Office.

1-7 Addenda to the RFB

In the event it becomes necessary to revise any part of this RFB, addenda will be provided to all firms who received the basic RFB.

- 4 -

1-8 Response Date

To be considered, sealed bids must arrive at the Issuing Office on or before the date specified in the cover letter. Firms mailing bids should allow normal delivery time to insure timely receipt of their bids.

1-9 Bids

To be considered, firms must submit a complete response to this RFB, using the format provided. Sealed bids must be submitted in two [2] copies to the Issuing Office. No other distribution of bids will be made by the firm. Bids must be signed by an official authorized to bind the firm to its provisions. For this RFB, the bid must remain valid for at least sixty (60) days.

1-10 Acceptance of Bid Content

The contents of the bid of the successful bidder, as mutually modified, amended or supplemented shall become contractual obligations if a contract ensues. Failure of the successful bidder to accept these obligations may result in cancellation of the award.

1-11 Interview/Oral Presentation

The County may request an interview and/or oral presentation of any firms who submit a bid. These meetings provide opportunity for the County to ask questions and for the bidder to clarify the bid. The Issuing Office will schedule these presentations.

1-12 News Releases

News releases pertaining to this RFB or the service, study, or project to which it relates will not be made without prior County approval, and then only in coordination with the Issuing Office.

1-13 Disclosure of Bid Contents

Bids are subject to disclosure under the Michigan Freedom of Information Act (P.A. 1976, Act 442).

After contract award, a summary of total price information for all submissions will be furnished upon request to those bidders participating in this RFB.

1-14 Independent Price Determination

By submission of a proposal, the offer or certifies, and in the case of a joint proposal each party thereto certifies as to its own organization, that in connection with this proposal:

- 5 -

A. The prices of the proposal have been arrived at independently without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other offeror with any other competitor;

B. Unless otherwise required by law, the prices which have been quoted in the proposal have not been knowingly disclosed by the offer or and will not be knowingly disclosed by the offeror to any competitor; and

C. No attempt has been made or will be made by the offeror to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition.

1-15 Contractor's Liability

The Contractor will provide and maintain public and professional liability, property damage, and worker's compensation insurance insuring, as they may appear, the interests of all parties to any agreement that results from this RFB. The Contractor is responsible for insuring that all precautions are exercised at all times for the protection of all persons and property. Documentation of the above insurances will be provided by the successful bidder to the County prior to Contract execution and will be included as a Contract rider. Listed below are the minimum limits to liability.

Coverages Limits of Liability

Workers' Compensation Statutory

Employer's Liability $ 500,000

Commercial General Liability $1,000,000 each occurrence

Property Damage Liability $1,000,000 each occurrence

Excess Liability Coverage $1,000,000 each occurrence

The contractor must provide these property and liability insurance coverages on an "Occurrence Basis". Coverages shall include the following extensions (A) Contractual Liability; (B) Products and Completed Operations; (C) Independent Contractors Coverage; (D) Broad Form General Liability Extensions or equivalent.

The Contractor shall secure all necessary certificates and permits from municipal or other public authorities and comply with all national, State, and municipal laws, ordinances, and regulations as may be required.

- 6 -

1-16 County's Liability

The selected firm agrees to indemnify, defend, and save harmless the County, its officers, agents, and employees from any and all claims and losses accruing or resulting from the negligent performance of work as described in any agreement that results from this RFB.

Further, if any recipient of a contract subcontracts for work, they will enter into a contract with such subcontractor(s) which indemnifies the County as provided herein.

1-17 Permits

The Contractor shall secure all necessary certificates and permits from municipal or other public authorities and comply with all national, State, and municipal laws, ordinances, and regulations as may be required.

1-18 Silence of Specifications

The apparent silence of this specification and any supplemental specification as to any detailed description omission shall be regarded as meaning that only the best commercial practices are to prevail and that only material of first quality and correct type, size and design are to be used. All workmanship is to be first quality. All interpretation of this specification shall be made upon the basis of this statement.

1-19 Safety

The contractor shall comply with and ensure that the contractor’s personnel and subcontracted personnel comply with all current applicable local, state and federal policies, regulations and standards relating to safety and health, including, by way of illustration and not limitation, the standards of the Michigan Occupational Safety and Health Administration for the general industry and for the construction industry. The contractor shall provide or cause to be provided all technical expertise, qualified personnel, equipment, tools and material to safely accomplish the work specified to be performed by the contractor and subcontractor(s).

The contractor shall identify to the County Project Office at least one on-site person who is the contractor’s competent, qualified, or authorized person on the worksite and who is, by training or experience, familiar with policies, regulations and standards applicable to the work being performed. The competent qualified or authorized person must be capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees, shall be capable of ensuring that applicable safety regulations are complied with, and shall have the authority and responsibility to take prompt corrective measures, which may include removal of the contractor’s personnel from the work site. The contractor shall provide to the County, at the County’s request, a copy of the contractors written safety policies and safety procedures applicable to the scope of work. Failure to provide this information within seven (7) days of the County’s request may result in cancellation of the award.

BID FORM - PAGE 7

1-20 OSHA Requirements

The contractor certifies that all material supplied or used under this contract meets all Occupational Safety and Health Administration (O.S.H.A.) requirements, both federal and those of the commonwealth of Michigan; and further certifies that, if the material delivered or used in the performance of the work is found to be deficient in any of the applicable State or Federal Occupational Safety and Health requirements, all costs necessary to bring the material into compliance with the requirements shall be borne by the contractor.

1-21 Hazardous Materials

Grand Traverse County is subject to the Hazard Communication Standard, 29 CFR S1910.1200 (standard). The contractor agrees that it will provide or cause to be provided safety data sheets required under the standard for all hazardous materials supplied to the County or used in the performance of the work. Such material safety data sheets shall be delivered to the County no later than the time of actual delivery of any hazardous materials to the County or use of such material in the performance of work under the contract by the contractor or its subcontractors. Container labeling meeting the requirements of the standard shall be appropriately affixed to the shipping or internal containers. The County reserves the right to refuse shipments of hazardous materials not appropriately labeled, or when material safety data sheets have not been received prior to or at the time of receipt of the shipment for use by the County or for use by the contractor in the performance of the contract, or whenever the material is delivered in a manner inconsistent with any applicable law or regulation. Contractor is responsible for removal of hazardous material related to the job, after job has been completed.

BID FORM - PAGE 8

PROJECT BID FORM

PROJECT: Grand Traverse County Jail water heater demolition and replacement

DUE DATE: Wednesday, May 14, 2025, 12:00 pm

TO:

Grand Traverse County Re: Jail water heaters Administration, 3rd floor 400 Boardman Avenue Traverse City, Michigan 49684

FROM: _________________________________

Bidder's Tel. No.:____/__________

PROJECT DESCRIPTION

Base Bid Demolition of existing water heaters and associated piping and sourcing and installation of new water heaters, valves, venting, piping, pad extension, and associated equipment, testing, permitting, and inspections necessary to operate the water heaters. Work must comply with all engineering, electrical, and mechanical specifications outlined in the attached documentation prepared by Nealis Engineering and all requirements as specified in the manufacturer’s specifications. All work is to be completed following industry best practices for workmanship quality with acceptance determined by Grand Traverse County. Supply installation workmanship warranty and manufacturer’s full system warranty.

BASE PROPOSAL

The undersigned hereby proposes to furnish design service and construction implementation as called for in the Request For Bids for

BASE BID:

(amount in words) (amount in figures)

BID FORM - PAGE 9

SPECIAL TERMS AND CONDITIONS

The undersigned has attached all special terms and conditions which would be contingent upon entering into a contract.

PROOF OF BONDABILITY

Accompanying this Bid is a letter from a Surety, licensed to do business in the State of Michigan, stating that Bidder is able to obtain Performance Bonds, and Labor and Material Payment Bonds, for one hundred percent (100%) of the Base Bid amount.

BONDING COST

At the Owner’s option, bonds will be furnished at an increase to the Base Bid sum as follows:

A. Labor and Material Payment Bond Add ($_________________________)

B. Performance Bond Add ($_________________________)

ACKNOWLEDGMENTS

The undersigned acknowledges that:

The bidder has received the Bid Form, the Bid Request, and Specifications, and further acknowledges that the bidder has received the following addenda issued thereto and has incorporated their provision in the bid:

Addendum No. ______ Dated __________

The bid documents have been read and carefully examined that the bidder fully understands and has correlated their observations with the requirements of the bidding documents.

The bidder has visited the site, has familiarized themselves with the local conditions under which the work is to be performed and has correlated their observations with the requirements of the proposed contract documents.

Their bid is based upon the materials, systems and equipment required by the bid documents and that exceptions are fully explained.

This cost and price analysis is submitted in full compliance with the provisions of the paragraph titled 'Independent Price Determination' in Part I of the RFB to which this proposal is a response.

FEES FOR HANDLING ADDITIONAL WORK

For additional work to be performed, upon instruction of the owner, by the undersigned or subcontractors of the undersigned, the undersigned agrees to add to the

BID FORM - PAGE 10

subcontractor's sums for such additional work, a fee of _________ percent (_________%), which fee includes all the charges of the undersigned for overhead and profit.

The undersigned agrees that each proposal covering extra work shall be accompanied with complete itemized material and labor breakdown.

For all revisions involving the deletion (after award) of contract work, the undersigned agrees that full credit for material and labor costs shall be given the owner for such deleted work. The undersigned further agrees that any credit will not include any factor reflecting undersigned's overhead or profit.

NEGOTIATION

The undersigned agrees that should the overall costs of this project exceed the funds available, after designation as the successful bidder, the bidder will be willing to negotiate with the owner for the purpose of making reductions in the contract work. The contractor shall agree to give full credit for all such deductions in the work requested by the owner, including full value for labor, material and subcontract work, and reasonable proportionate reductions in overhead and profit, thereby arriving at an agreed upon contract price.

PROPOSED SUBCONTRACTORS AND SUPPLIERS

The undersigned submits the "Subcontractors Listing" below, listing proposed subcontractors for any portions of the work to be subcontracted and the amounts of their sub-bids.

Proposed Subcontractor __________________________________

Proposed Subcontractor __________________________________

The undersigned agrees to be responsible for the work, materials, equipment, and supplies furnished by each subcontractor.

Waivers of lien will be required from all subcontractors, if applicable, at the time of final bill submission.

AGREEMENTS

In submitting this bid, the undersigned agrees:

1. To hold their bid open for 60 consecutive calendar days from the bid due date.

2. To enter into and execute a contract with Grand Traverse County, 400 Boardman

Avenue, Traverse City, Michigan, 49684, if awarded on the basis of this bid, and to furnish required submittals within seven (7) days of notification of selection of contract for the work.

BID FORM - PAGE 11

3. To perform the work in accord with the proposed contract documents and to perform said work within the time period stipulated in the bid.

LEGAL STATUS AND SIGNATURE OF BIDDER

1. Check appropriate section and complete information.

____ Corporation incorporated under the laws of the State of ____________

_____ Partnership

Names and Address of all members

NAME ADDRESS

_____ Sole Proprietorship, doing business as ____________________

- 12 -

2. Complete all information below.

Authorized Negotiator

Name _______________________________

Title _______________________________

Federal ID #_______________

License # _______________ Type ______________

(if applicable)

Bidder

By

Title

Signed this __________ day of _________________, 2025.

ENGR. PROJ.#

TS

GLS

25001

TI

TL

E

SH

EE

T

AN

D

L O

C

AT

IO

N

M

AP

DRAWN BY:

CHECKED BY:

DAR

DATE:

SH

EE

T

TI

TL

E:

PR

O

JE

C

T

TI

TL

E:

SHEET NUMBER

G ra nd T ra ve rs e

C ou nt y

Ja il

W as hi ng to n

St re et

W at er H ea te r R ep la ce m nt

Tr av er se

C ity

, M I

04.22.2025

CONST.

Grand Traverse County

JAIL WATER HEATER REPLACEMENT

SHEET INDEX

TS Title Sheet and Location Map

Nealis Engineering, Inc.

1419 Industry Drive

Traverse City, MI 49696

ENGINEER

231.933.0510 phone contact: Doug Radtke, PE, Mechancial

P1 Plumbing Partial Plan - Boiler Room

GT County 320 Washington Street

Traverse City, MI 49684 contact: Jason VanBrocklin, PE, Electrical

PD1 Plumbing Demolition Partial Plan - Boiler Room

OWNER

Grand Traverse County

1207 W. Civic Center Drive Traverse City, MI 49686

231.922.4511 phone contact: John Chase

TO EXTG AIR SEP.,

EXTG EXP. TANK

EXTG HWS

O U

TL

ET

IN

LE

T

O U

TLET

IN

LET

O U

TL

ET

IN

LE

T

O U

TLET

IN

LET

PD-1

PD-2

PD-4 PD-5

PD-3

PD-2

PD-6

PD-7

ED-2

ED-2

ED-2

ED-1

SPECIAL NOTICE TO CONTRACTORS

1. IT IS RECOMMENDED THAT ALL CONTRACTORS BIDDING THIS PROJECT VISIT THE JOB SITE AND VERIFY THE EXISTING CONDITIONS PRIOR TO SUBMITTING THEIR BID. CONTRACTORS ARE TO CAREFULLY REVIEW ALL CONSTRUCTION DOCUMENTS AND NOTE ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE CONDITIONS OBSERVED AT THE JOB SITE PRIOR TO SUBMISSION OF ANY BID. THE BUILDING OWNER REPRESENTATIVE MAY BE CONTACTED FOR ACCESS TO THE JOB SITE.

2. PRIOR TO CONSTRUCTION, CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE LOCATION AND CONDITION OF THE FOLLOWING:

A. ALL POINTS OF CONNECTION TO BUILDING UTILITIES AND/OR SYSTEMS INCLUDING, BUT NOT LIMITED TO, GAS, WATER, SEWER, VENT, ELECTRICAL, MECHANICAL SYSTEMS, DUCTWORK, EXHAUST/OUTSIDE AIR, SECURITY, FIRE/LIFE SAFETY, DATA, AND PHONE.

B. ALL REQUIRED CONNECTIONS TO THE BUILDING STRUCTURE.

C. ALL REQUIRED BUILDING PENETRATIONS.

3. ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE CONDITIONS OBSERVED SHALL BE BROUGHT TO THE ATTENTION, IN WRITING, TO THE ARCHITECT AND/OR ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION.

4. REFER TO THE CONSTRUCTION DOCUMENTS FOR ALL CONTACT INFORMATION.

DEMO AND REMOVE EXISTING GAS WATER HEATERS AND ASSOCIATED PIPING BACK TO

THE MAIN HEADERS (TO LOCATIONS SHOWN ON PLAN). COORDINATE DEMOLITION WITH

NEW GAS WATER HEATER INSTALLATION TO MINIMIZE OR ELIMINATE DOWN TIME FOR

BUILDING HOT WATER SUPPLY.

DEMO AND REMOVE EXISTING COLD WATER, HOT WATER, AND HOT WATER RETURN MAIN

PIPING BACK TO THE APPROPRIATE LOCATION (SHOWN ON PLAN) AS TO CONNECT WITH

NEW GAS WATER HEATER PIPING LOCATIONS.

VERIFY EXISTING GAS WATER HEATER VENTING IN THE FIELD. DEMO AND REMOVE

HORIZONTAL VENT PIPE AND PREPARE TO TIE IN NEW GAS WATER HEATER VENT PIPE TO

VERTICAL PIPING THAT GOES UP TO THE ROOF.

DEMO AND REMOVE EXISTING FLOOR DRAIN GRATE AND CONDENSATE LINE SERVING

EXISTING GAS WATER HEATERS. PREPARE TO INSTALL NEW FLOOR DRAIN GRATE AND

CONDENSATE FROM NEW GAS WATER HEATERS.

VERIFY EXISTING GAS WATER HEATER COMBUSTION AIR IN THE FIELD. DEMO AND

REMOVE HORIZONTAL COMBUSTION AIR PIPE AND PREPARE TO TIE IN NEW GAS WATER

HEATER COMBUSTION AIR PIPE TO VERTICAL PIPING.

DEMO EXISTING COLD WATER PIPING TO EXISTING EXPANSION TANK AND PREPARE TO

ROUTE NEW COLD WATER PIPING FROM EXPANSION TANK TO NEW COLD WATER

HEADER.

DEMO AND REMOVE EXISTING GAS PIPING TO THE GAS WATER HEATERS. PREPARE TO

ROUTE NEW GAS PIPING FROM THE EXISTING MAIN TO NEW GAS WATER HEATERS

DISCONNECT AND REMOVE ELECTRICAL DEVICE(S) WHICH WILL INTERFERE WITH THE

DEMOLITION AND REMOVAL OF MECHANICAL EQUIPMENT, CONTROLS, AND PIPING AS

DESCRIBED IN THE MECHANICAL DEMOLITION PLANS. REMOVE ABANDONED CIRCUITRY

(WIRING) AND CONDUIT BACK TO PANEL AND DISCARD. CAUTION!!! MAINTAIN EXISTING

BUILDING EQUIPMENT AND SYSTEMS THAT ARE TO REMAIN.

DISCONNECT AND REMOVE EXISTING ELECTRICAL CONNECTIONS TO EXISTING

MECHANICAL EQUIPMENT WHICH IS TO BE REMOVED AND REPLACED AS NOTED PER THE

FLOOR PLANS. COORDINATE DISCONNECTION WITH MECHANICAL CONTRACTOR. REMOVE

CIRCUITRY (WIRING) AND CONDUIT BACK TO SOURCE AND DISCARD, UNLESS IT CAN BE

REUSED. COORDINATE EQUIPMENT THAT IS TO BE TURNED OVER TO THE OWNER PRIOR

TO DEMOLITION. PROVIDE NEW ELECTRICAL CONNECTIONS TO NEW MECHANICAL

EQUIPMENT AS SHOWN. PROVIDE BLANK COVERS FOR USED AND UNUSED JUNCTION

BOXES.

PD-1

PD-2

DEMOLITION KEYED NOTES

PD-3

PD-4

PD-5

PD-6

MD-7

PLUMBING DEMOLITION NOTES

1. EQUIPMENT, PIPING, DUCTWORK, ETC., TAGGED WITH A PRECEDING "EX." OR "x" ARE

EXISTING.

2. BEFORE COMMENCING WORK ENSURE GAS IS OFF, AND ELECTRICAL POWER IS TURNED OFF

TO THE EXISTING EQUIPMENT.

3. THE MECHANICAL CONTRACTOR SHALL REMOVE ALL ITEMS INDICATED AND SHALL BE

RESPONSIBLE FOR THEIR DISPOSAL PER LOCAL, STATE AND FEDERAL REGULATIONS AND

PAY FOR ALL ASSOCIATED COSTS OF DISPOSAL.

4. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE

TO DETERMINE IF ANY PARTS OR EQUIPMENT ARE DESIRED TO BE KEPT BY THE OWNER. THE

OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL. ANY ITEM NOT WISHED TO BE RETAINED,

SHALL BE DISPOSED OF AT THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.

5. ITEMS HATCHED SHALL BE PERMANENTLY REMOVED.

6. ITEMS CLOUDED SHALL BE TEMPORARILY REMOVED AND REUSED.

ED-1

ED-2EXISTING ELECTRICAL PANELS (VIF)

ELECTRICAL SYMBOL LEGEND

DESCRIPTIONSYMBOL NOTES

VERIFY EXISTING CONDITIONS

SM SINGLE POLE MOTOR TOGGLE SWITCH WITH THERMAL SQUARE D #CLASS 2510 FGJ5

OVERLOAD & LOCKOUT

120V-20A DUPLEX RECEPTACLE FIELD VERIFY EXISTING

SINGLE-PHASE SPECIAL CONNECTION REFER TO SHOP DRAWINGS

1. CIRCUITS SHOWN ON PLANS WITH AN * AFTER IT, INDICATE THE CIRCUIT

CIRCUIT AND USE IT IF DIFFERENT THAN CIRCUIT INDICATED.

NUMBER FROM OLD DRAWINGS OR A TAKEOFF. E.C. IS TO VERIFY ACTUAL

2. CAUTION!!! THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE

OWNER'S REPRESENTATIVE TO DETERMINE IF ANY PARTS OR EQUIPMENT ARE

DESIRED TO BE KEPT BY THE OWNER. THE OWNER SHALL HAVE THE RIGHT OF

FIRST REFUSAL. ANY ITEM NOT WISHED TO BE RETAINED, SHALL BE DISPOSED

OF AT THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR.

ELECTRICAL GENERAL NOTES

ENGR. PROJ.#

PD1

GLS

25001

PL

U

M

BI

N G

D

EM

O

LI

TI

O

N P

AR

TI

AL

P

LA

N

DRAWN BY:

CHECKED BY:

DAR

DATE:

SH

EE

T

TI

TL

E:

PR

O

JE

C

T

TI

TL

E:

SHEET NUMBER

G ra nd T ra ve rs e

C ou nt y

Ja il

W at er H ea te r R ep la ce m nt

Plumbing Demolition Partial Plan - Boiler Room

SCALE: 1/4"= 1'-0"

Key Plan

W as hi ng to n

St re et Tr av er se C ity , M

I

BO

IL

ER

R O

O M

04.22.2025

CONST.

NO SCALE

AutoCAD SHX Text

%%USTAFF CORRIDOR

AutoCAD SHX Text

%%USTOR.

AutoCAD SHX Text

%%UBOILER ROOM

AutoCAD SHX Text

%%UMEETING/CHAPLIN

AutoCAD SHX Text

%%UCONTROL

AutoCAD SHX Text

%%UEQUIPMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXTG PADS

AutoCAD SHX Text E

AutoCAD SHX Text

EXTG HWR

AutoCAD SHX Text E

AutoCAD SHX Text %%UxB-1

AutoCAD SHX Text %%UxB-2

AutoCAD SHX Text %%UxB-3

AutoCAD SHX Text %%UxB-4

AutoCAD SHX Text %%UxP-2

AutoCAD SHX Text %%UxP-3

AutoCAD SHX Text %%UxP-4

AutoCAD SHX Text %%UxP-5

AutoCAD SHX Text %%UxP-6

AutoCAD SHX Text %%UxP-7

AutoCAD SHX Text %%UxFIL-1

AutoCAD SHX Text %%UxFIL-2

AutoCAD SHX Text xCS 15 GPM

AutoCAD SHX Text xFD

AutoCAD SHX Text xRP

AutoCAD SHX Text xGWHs (3)

AutoCAD SHX Text xCW

AutoCAD SHX Text xCW

AutoCAD SHX Text xHWR

AutoCAD SHX Text xHW

AutoCAD SHX Text xHW

AutoCAD SHX Text xHWR

AutoCAD SHX Text xCA UP (3)

AutoCAD SHX Text xVENT TO GWHs

AutoCAD SHX Text xVENT UP

AutoCAD SHX Text xET

AutoCAD SHX Text xELEC CONN.

AutoCAD SHX Text xG

TO EXTG AIR SEP.,

EXTG EXP. TANK

EXTG HWS

O U

TL

ET

IN

LE

T

O U

TLET

IN

LET

O U

TL

ET

IN

LE

T

O U

TLET

IN

LET

GWH-1 GWH-2

2" CW

2" HW

FD

GWH-3

(3) 4" CA TO GWHs

(3) 4" VENT TO xVENT

3/4" CW

EXTEND CONCRETE

PAD FOR NEW GWHs 2" G TO GWHs

EQUAL TO SIOUX

CHIEF 842-36PNR

S M SM SM

GWH-1 GWH-2 GWH-3

3/4" CW

2" CW

2" HW

3" V

3" V

3" V

COND LINES TO FD

INSTALL PIPE DROPS TO

THE SIDE OF GWHs FOR

EASY REPLACEMENT AND

SERVICEABILITY

DISTRIBUTION

WATER

SYSTEM

DRAINAGE

SYSTEMS

& VENT

PLUMBING

22 07 19

INSULATION

VALVES

ANCHORS

SUPPORTS &

22 10 05

22 10 05

22 00 00

REQUIREMENTS

PLUMBING

BASIC

22 10 00

22 10 00

1. ALL WORK TO BE DONE AND MATERIALS FURNISHED COMPLYING WITH APPLICABLE LAWS AND REGULATIONS, INCLUDING THE STATE OF MICHIGAN MECHANICAL, PLUMBING AND FIRE SAFETY CODES. OBTAIN AND PAY FOR REQUIRED PERMITS AND FEES.

2. ALL MATERIALS USED SHALL BE NEW AND UNDAMAGED.

3. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH CURRENT CONSTRUCTION INDUSTRY STANDARDS AND WORKMANSHIP.

4. FURNISH ACCESS DOORS (RATED OR NON-RATED AS REQUIRED) WHERE VALVES OR EQUIPMENT ARE CONCEALED BEHIND A NON-ACCESSIBLE CEILING OR WALL.

FURNISH ACCESS DOORS TO GENERAL CONTRACTOR FOR INSTALLATION.

5. FURNISH STEEL PIPE SLEEVES WHERE PIPES PENETRATE RATED WALLS. PROVIDE FIRESTOPPING MATERIALS AND SYSTEM TO MAINTAIN THE REQUIRED RATING OF

THE WALL PENETRATED. PROVIDE SHOP DRAWINGS SHOWING LISTING AND RATING OF FIRESTOPPING MATERIALS.

6. ALL MANUFACTURED EQUIPMENT, ACCESSORIES AND MATERIALS SHALL BE USED AS INTENDED BY THE MANUFACTURER IN STRICT ACCORDANCE WITH THE

MANUFACTURER'S WRITTEN INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS.

1. INSULATE ABOVE FLOOR HOT & COLD WATER PIPING WITH FIBERGLASS PREFORMED PIPE INSULATION WITHOUT JACKETING. ALL INSULATING MATERIALS TO HAVE FLAME SPREAD RATING OF 25 OR LESS AND SMOKE DEVELOPMENT RATING OF 50 OR LESS AS TESTED BY ANSI/ASTM E 84 (NFPA 233) METHOD. INSULATE ALL HW PIPING WITH 1-1/2" INSULATION AND ALL CW PIPING WITH 1" INSULATION. JOINTS IN INSULATION SHALL BE GLUED, NOT TAPED.

1. ABOVE GRADE: WATER PIPING SHALL BE TYPE L COPPER ASTM B 75, ASTM B 88, ASTM B 251, ASTM B 447 WITH WROUGHT COPPER SOLDER-JOINT FITTINGS ASME B 16.

2. THOROUGHLY FLUSH AND CLEAN ALL NEW AND EXISTING WATER PIPING SYSTEMS. TEST ALL PIPING SYSTEMS PER REGULATIONS IN ITEM NO.1 OR AT 225 PSI FOR A

MINIMUM OF 2 HOURS WITH NO PRESSURE DROP INDICATED PRIOR TO INSULATING.

3. STERILIZE ALL DOMESTIC WATER PIPING PER REQUIREMENTS OF LOCAL HEALTH DEPARTMENT.

1. BALL VALVES SHALL BE CLASS 125 FOR WATER AND 200 FOR C.A. WITH ENDS AND MATERIALS TO MATCH PIPING SYSTEMS.

2. BALL VALVES 2" AND SMALLER SHALL HAVE BRONZE BODY, STAINLESS STEEL BALL, TEFLON SEATS AND STUFFING BOX RING, LEVER HANDLE AND BALANCING STOPS, ENDS TO MATCH PIPING SYSTEM.

1. FURNISH PIPE HANGERS, WHERE REQUIRED, FIRMLY SUPPORTED FROM BUILDING STEEL, WOOD OR MASONRY STRUCTURE. SUPPORT CROSS-LINKED POLYETHYLENE TUBING SYSTEMS SECURELY WHILE ALLOWING FOR PIPE AND BUILDING EXPANSION AND CONTRACTION. PROVIDE PLASTIC INSULATING AND SUSPENSION CLAMPS.

MAXIMUM SPACING SHALL BE 32" FOR HORIZONTAL AND 4' FOR VERTICAL PIPING. FURNISH PLUMBING EQUIPMENT SUPPORTS AS DETAILED OR AS REQUIRED TO

SAFELY AND PERMANENTLY CARRY THE WEIGHT.

1. WITHIN BUILDING, SCHEDULE 40 PVC, DWV TYPE PIPE AND SOLVENT WELDED PIPE FITTINGS, SCHEDULE 30 PVC PIPE MAY BE USED FOR VENT PIPING WHERE PERMITTED BY CODE. HORIZONTAL PIPE SHALL BE SUPPORTED BY ADJUSTABLE RING HANGERS EQUAL TO ITT-GRINNEL FIG. 97. VERTICAL PIPING SHALL BE SUPPORTED AT EACH FLOOR OR ATTIC LEVEL BY RISER CLAMPS EQUAL TO ITT-GRINNEL FIG. 261.

2. OUTSIDE OF BUILDING, PIPING MAY BE ONE OF THE FOLLOWING: PVC - MEETING ANSI/ASTM D3033, TYPE PSP OR D3034, TYPE PSM; ABS, MEETING ANSI/ASTM D2751.

MANHOLES SHALL BE PRECAST MEETING ANSI/ASTM C478. MANHOLES SHALL BE C1 WITH "SANITARY" CAST INTO SOLID 20" DIAMETER LID. BOTTOM OF MANHOLES SHALL HAVE HAND FORMED CONCRETE FLOW CHANNELS. PIPE AND MANHOLES SHALL BE SET TO GRADES INDICATED AND SLOPES SHALL BE ACCURATELY CHECKED

AND MAINTAINED. BACKFILL, COMPACT AND RE-SEED ALL TRENCHING.

PLUMBING SPECIFICATIONSSECTION

ABBREVIATIONS

COND CONDENSATE

CW DOMESTIC COLD WATER

DN DOWN

ELEC ELECTRICAL

EQUIP EQUIPMENT

ET EXPANSION TANK

EX EXISTING (ALSO: "EXT'G", "x")

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FV or VIF FIELD VERIFY or VERIFY IN FIELD

G GAS, NATURAL GAS OR LP AS NOTED

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HW DOMESTIC HOT WATER

KW KILOWATT

LBS POUNDS

MBH THOUSAND BTU PER HOUR

MC MECHANICAL CONTRACTOR

MBC MICHIGAN BUILDING CODE

MMC MICHIGAN MECHANICAL CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION. LIFE SAFETY CODE

NG NATURAL GAS

TYP TYPICAL

V VENT

VIF or FV VERIFY IN FIELD or FIELD VERIFY

VTR VENT THRU ROOF

WCO WALL CLEAN OUT

WH WATER HEATER

SYMBOL LEGEND

CA

COND

DOMESTIC COLD WATER (CW) PIPING

DOMESTIC COLD WATER (CW) PIPING BELOW FLOOR

CW

DOMESTIC HOT WATER (HW) PIPING

FLOW DIRECTION DESIGNATOR

DOMESTIC HOT WATER (HW) PIPING BELOW FLOOR

DOMESTIC TEMPERED WATER (TW) PIPING

DOMESTIC HOT WATER RECIRCULATED (HWR) PIPING

SANITARY WASTE/SEWER (SAN) PIPING

SANITARY WASTE/SEWER (SAN) PIPING BELOW FLOOR

STORM (ST) PIPING

STORM (ST) PIPING BELOW FLOOR

VENT (V) PIPING

CONDENSATE (COND) PIPING

GAS (G) PIPING

COMPRESSED AIR (CA) PIPING

PIPE DOWN

PIPE UP

PIPE BREAK (FOR CLARITY)

CAPPED PIPE

BALL VALVE, SHUT-OFF AND ISOLATION

NEW-TO-EXISTING CONNECTION

CW

HW

HW

TW

HWR

G

SAN

SAN

ST

ST

VENT

STANDARD CHECK VALVE

ENGR. PROJ.#

P1

GLS

25001

PL

U

M

BI

N G

PA

R

TI

AL

P

LA

N

DRAWN BY:

CHECKED BY:

DAR

DATE:

SH

EE

T

TI

TL

E:

PR

O

JE

C

T

TI

TL

E:

SHEET NUMBER

G ra nd T ra ve rs e

C ou nt y

Ja il

W at er H ea te r R ep la ce m en t

Plumbing Partial Floor Plan - Boiler Room

SCALE: 1/4"= 1'-0"

Water Heater Detail

NO SCALE

W as hi ng to n

St re et Tr av er se C ity , M

I

04.22.2025

CONST.

Key Plan

NO SCALE

BO

IL

ER

R

O O

M

AutoCAD SHX Text

%%USTAFF CORRIDOR

AutoCAD SHX Text

%%USTOR.

AutoCAD SHX Text

%%UBOILER ROOM

AutoCAD SHX Text

%%UMEETING/CHAPLIN

AutoCAD SHX Text

%%UCONTROL

AutoCAD SHX Text

%%UEQUIPMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXTG PADS

AutoCAD SHX Text E

AutoCAD SHX Text

EXTG HWR

AutoCAD SHX Text E

AutoCAD SHX Text %%UxB-1

AutoCAD SHX Text %%UxB-2

AutoCAD SHX Text %%UxB-3

AutoCAD SHX Text %%UxB-4

AutoCAD SHX Text %%UxP-2

AutoCAD SHX Text %%UxP-3

AutoCAD SHX Text %%UxP-4

AutoCAD SHX Text %%UxP-5

AutoCAD SHX Text %%UxP-6

AutoCAD SHX Text %%UxP-7

AutoCAD SHX Text %%UxFIL-1

AutoCAD SHX Text %%UxFIL-2

AutoCAD SHX Text xCS 15 GPM

AutoCAD SHX Text xRP

AutoCAD SHX Text xCA UP (3)

AutoCAD SHX Text xVENT TO GWHs

AutoCAD SHX Text xVENT UP

AutoCAD SHX Text xCW

AutoCAD SHX Text xHWR

AutoCAD SHX Text xET

AutoCAD SHX Text xELEC CONN.

AutoCAD SHX Text xG

AutoCAD SHX Text xHWR

AutoCAD SHX Text xET

AutoCAD SHX Text xRP

Grand Traverse County Jail water heater replacement project.pdf
4-22-2025 GTJWHR 100% CDs

File details come from the government source that posted it. Updated .