GR00114 - STEP ONEPart4.pdf

PDF 41 MB Posted

Attached to
Garrison Project Spillway Bridge Concrete Repairs
Solicitation number
W9128F24B0013
Issued by

About this file

This document appears to be an Invitation for Bid (IFB) for the Garrison Project Spillway Bridge Concrete Repairs contract, Solicitation Number W9128F24B0013. The contract is being issued by the Department of the Army Corps of Engineers Engineering District Omaha. Key details include:

The IFB is for concrete repair work on a spillway bridge as part of the Garrison Project. A site visit is scheduled for August 2nd at 9:00 AM. The contract is being solicited as an Invitation for Bid, which indicates it will be awarded to the lowest responsive and responsible bidder. No other specifics are provided regarding the products, services, pricing terms, set-asides, or incumbents. This appears to be the main body of the IFB document without any additional attachments or appendices.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

S P

IL

L

W A

Y B

R

ID

G E

C O

N C

R E

T E

R E

P A

IR

S

G A

R R

IS

O

N D

A M

N

O R

T H

D A

K O

T A

W

F

/0

/2

O M

A H

A

N E

C A

P

IT

O L

A V

E

O M

A H

A D

IS

T

R

IC

T

F

IL

E

N U

M B

E R

F

IL

E N

A M

E

S D

E N

N

IN

G

R E

P A

IR

P

H O

T O

S

S-202

J O

S B

O R

N

S D

E N

N

IN

S

-2 .d g n

J O

S B

O

N

D S

P

D

:0

:2

P

M

/8 /2

G R

S

-2

.d g n

SAW CUT LINES

APPROXIMATE

APPROXIMATE SAW CUT LINES

APPROXIMATE SAW CUT LINES

BY THE CONTRACTOR TO REMOVE.

WILL LIKELY REQUIRE SOME EFFORT

STUCK TO THE METAL RAILING AND

THAT THE PIPE SLEEVE IS LIKELY

EPOXY COATING SYSTEM. NOTE

COAT WITH ALUMINUM PIGMENTED

PLATE FOR METAL RAILING AND

REPLACE STEEL SLEEVE AND END

REMOVE DEBRIS FROM EXPANSION JOINT

EXPANSION JOINT

REMOVE DEBRIS FROM

EPOXY COATING SYSTEM

WITH ALUMINUM PIGMENTED

METAL RAILING PIPE AND COAT

SAND BLAST AND BRUSH END OF

2'- 0"

EXPANSION PLATE

CONCRETE BENEATH

INCLUDE DETERIORATED

EXTEND REPAIR TO

EXPANSION PLATE

CONCRETE BENEATH

INCLUDE DETERIORATED

EXTEND REPAIR TO

9"

3'- 8"

1'- 3"

9"

CONSTRUCTION JOINTS

SIDEWALK BETWEEN

REMOVE AND REPLACE

BRACING FOR PARAPET

PROVIDE TEMPORARY

9'-6"

4' -3

DURING REPAIR

PROTECT PIPES

(1'-3" X 1'-6" X 6")

AND PLACE REPAIR MATERIAL

TENSIONED GROUT POCKET

REMOVE GROUT AT POST-

POCKET LIMITS

APPROXIMATE GROUT

CUT LINES

APPROXIMATE SAW

1'-6"

9"

'-0

1'-0" 1'-0

2'-3"

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S T

E P

O N

E

ASPHALT OVERLAY

THE BRIDGE DECK HAS AN ASPHALT OVERLAY

THE BRIDGE DECK HAS AN

ASPHALT OVERLAY

THE BRIDGE DECK HAS AN

PHOTO 15 - REPAIR 2: FIRST GROUT POCKET AT MONOLITH 29

PHOTO 19 - REPAIR 4: PLAN NORTH SIDEWALK IN SPAN 20 PHOTO 20 - REPAIR 4: PLAN NORTH SIDEWALK IN SPAN 25

PHOTO 16 - REPAIR 3: UPSTREAM SIDEWALK IN SPAN 21

PHOTO 21 - REPAIR 4: PLAN NORTH SIDEWALK IN SPAN 27

PHOTO 17 - REPAIR 4: WEST ABUTMENT PLAN SOUTH SIDEWALK

PHOTO 22 - REPAIR 5: PLAN SOUTH METAL RAIL CONNECTION AT MONOLITH 16

PHOTO 18 - REPAIR 4: PLAN NORTH PARAPET AT PIER OVER MONOLITH 9

ASPHALT OVERLAY

THE BRIDGE DECK HAS AN

ASPHALT OVERLAY

THE BRIDGE DECK HAS AN

STRUCTURAL
S-202REPAIR PHOTOS (1)

File details come from the government source that posted it. Updated .