GROUNDWATER WELLS WITH DATALOGGERS AND BARAMETRIC DATALOGGERS

WY NPS YELL 10(25): Canyon to Fishing Bridge Junction

Attachment 002 – Table of Borings

TABLE OF BORINGS

GROUNDWATER WELLS WITH DATALOGGERS AND BARAMETRIC DATALOGGERS 2Page of 3 WY NPS YELL 10(25): Canyon to Fishing Bridge Junction

All groundwater well locations are in North American Datum of 1983 (NAD83) coordinates.

Field ID Groundwater Well (GW) ID

Purpose of GW well Installation Latitude (deg. N)

Longitude (deg. W)

Estimated Feet of Auger

Estimated Feet of Casing

Max. hole Diameter

(in.)

Comments: Drill Type, Access, Instruments, Etc.

0 CAFB_W_03 Assess Hydrologic Connectivity 44.7255852 -110.494274 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

1 CAFB_W_02 Assess Hydrologic Connectivity 44.7256344 -110.494328 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

2 CAFB_W_04 Assess Hydrologic Connectivity 44.7251785 -110.494409 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

3 CAFB_W_05 Assess Hydrologic Connectivity 44.7188022 -110.504788 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

4 CAFB_W_06 Assess Hydrologic Connectivity 44.7184906 -110.504809 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

5 CAFB_W_07 Assess Hydrologic Connectivity 44.7140402 -110.504503 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

6 CAFB_W_08 Assess Hydrologic Connectivity 44.7116368 -110.505285 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

7 CAFB_W_09 Assess Hydrologic Connectivity 44.7100694 -110.505894 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

8 CAFB_W_10 Assess Hydrologic Connectivity 44.7039177 -110.504859 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

9 CAFB_W_18 Assess Hydrologic Connectivity 44.6191727 -110.423032 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

10 CAFB_W_19 Assess Hydrologic Connectivity 44.6156468 -110.414867 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

11 CAFB_W_21 Assess Hydrologic Connectivity 44.5958349 -110.387415 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

12 CAFB_W_01 Assess Hydrologic Connectivity 44.7261283 -110.494003 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

13 CAFB_W_11 Assess Hydrologic Connectivity 44.6973159 -110.50187 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

14 CAFB_W_12 Assess Hydrologic Connectivity 44.6958137 -110.501465 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

15 CAFB_W_14 Assess Hydrologic Connectivity 44.6751672 -110.482454 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

16 CAFB_W_15 Assess Hydrologic Connectivity 44.6491311 -110.461817 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

17 CAFB_W_17 Assess Hydrologic Connectivity 44.6301434 -110.439543 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

TABLE OF BORINGS

GROUNDWATER WELLS WITH DATALOGGERS AND BARAMETRIC DATALOGGERS 3Page of 3 WY NPS YELL 10(25): Canyon to Fishing Bridge Junction

18 CAFB_W_13 Assess Hydrologic Connectivity 44.6885295 -110.497757 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

19 CAFB_W_20 Assess Hydrologic Connectivity 44.5963456 -110.387926 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

20 CAFB_W_16 Assess Hydrologic Connectivity 44.6303941 -110.443881 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

21 CAFB_W_09A Assess Hydrologic Connectivity 44.7099575 -110.506079 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

22 WFL_OC_1 Assess Hydrologic Connectivity 44.7018344 -110.506333 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

23 WFL_OC_2 Assess Hydrologic Connectivity 44.6781137 -110.486515 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

24 WFL_AC_1 Assess Hydrologic Connectivity 44.6781137 -110.486515 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

25 WFL_AC_2 Assess Hydrologic Connectivity 44.6779934 -110.486667 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

26 WFL_AC_3 Assess Hydrologic Connectivity 44.6771515 -110.485376 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

27 WFL_AC_4 Assess Hydrologic Connectivity 44.6772958 -110.485189 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

28 WFL_TC_1 Assess Hydrologic Connectivity 44.6461507 -110.458896 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

29 WFL_TC_2 Assess Hydrologic Connectivity 44.6462527 -110.458727 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

30 WFL_EAC_1 Assess Hydrologic Connectivity 44.6403964 -110.454927 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

31 WFL_EAC_2 Assess Hydrologic Connectivity 44.640532 -110.454772 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.

32 WFL_WET_2 Assess Hydrologic Connectivity 44.6187195 -110.423086 4 5 4 GW will be installed using handheld augers, access will be by foot, vegetation disturbances at drill sites will be limited to drilling activities.