21Q000013_QandA_2021-03-03.pdf

PDF 111 KB Posted

Attached to
GROUNDWATER WELLS WITH DATALOGGERS AND BARAMETRIC DATALOGGERS
Solicitation number
69056721Q000013
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR QUESTIONS AND ANSWERS

Solicitation No.: 69056721Q000013 Project No.:

Project Name:

# General Technical Question Answer Date

1 X Will this be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement?

This is a new requirement. 24-Feb-2021

2 X Who will be responsible for the maintenance of the groundwater wells and downloading the data during the sensor deployment (May - October)?

This will be the responsibility of the contractor (addressed in Amendment 0001). 25-Feb-2021

3 X If the contractor is responsible, what is the requested frequency of maintenance/download?

A single "mid-year" visit is required to ensure data loggers are working and groundwater wells are intact (addressed in Amendment 0001).

25-Feb-2021

4 X

Will the 4" boring holes be filled with clean sand as described in the Photos and Figures or backfilled with stockpiled material from the borings as described in the SOP for Subsurface Investigations?

Boreholes will be backfilled with the excavated material and NOT filter pack or sand (addressed in Amendment 0002).

3-Mar-2021

Groundwater Wells with Brand Name Dataloggers N/A

File details come from the government source that posted it. Updated .