Government Center Complex.pdf
PDF 306 KB Posted
- Attached to
- 202508FEMAGCC
- Solicitation number
- PE-69700-NONST-2025-000000015
- Issued by
- Lowndes County, Georgia
About this file
McDuffie County has issued an Invitation to Bid for damage repairs related to Hurricane Helen at six county locations, including the Government Center Complex, Vonteego Park, Pitt Street Park, Big Hart Campground, and Eubank Park. The bid solicitation requires separate bids for each location, with bids to be received by September 17, 2025 at 2 p.m. at the McDuffie County Finance Department. Interested parties can obtain bid specifications from the county website or by contacting Lori Ducey. The county will award the contract to the lowest responsive and responsible bidder, reserving the right to reject any or all bids.
The scope of work for Location 1 (Government Center) includes extensive repairs across three areas: the Information Technology Corridor, Information Technology Office, and Courthouse. Repair tasks involve floor protection, removal and replacement of cove base molding, drywall, suspended ceiling tiles, bat insulation, and diffusing panels. Additional work includes taping drywall joints, sealing, priming, painting walls, and cleaning and deodorizing carpets. Specific measurements are provided for each task, such as 76.5 linear feet of cove base molding in the IT Corridor, 351.67 square feet of drywall replacement, and 207 square feet of suspended ceiling tile removal and replacement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Government Center Complex.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION 1
Government Center
Information Technology Corridor
Provide floor protection with heavy paper and tape
Removal of Cove base molding that is 4" high (76.5 LF)
Replace Cove base molding to 611 high (76.5 LF)
Remove and replace 5/8" drywall - hung, taped, floated, and ready to paint (351.67 SF)
Remove and replace suspended ceiling tile 2 x 4 (207 SF)
Remove and replace bat insulation - 611
/ R21- unfaced bat (231 SF)
Remove and replace diffusing panel (24 SF)
Tape Joint for new to existing drywall (20 LF)
Seal/prime (1 coat), then paint the surface area {351.67 SF)
Paint the walls (1 coat) (807.67 SF)
Clean and deodorize carpet (231 SF)
Information Technology Office
Provide floor protection with heavy paper and tape (236.25 SF)
Removal of Cove base molding that is 411 high (48.92 LF)
Replace Cove base molding to 6 11 high (48.92 LF)
Remove and replace 1/2" drywall - hung, taped, floated, and ready to paint (118.33 SF)
Remove and replace suspended ceiling tile 2 x 4 (220.25 SF)
Remove and replace bat insulation - 611 / R21- unfaced bat (236.25 SF)
Remove and replace diffusing panel (16 SF)
Tape Joint for new to existing drywall {20 LF)
Seal/prime (1 coat), then paint the surface area {118.33 SF)
Paint the walls (1 coat) {508.78 SF)
Clean and deodorize carpet (236.25 SF)
Courthouse
Remove and replace suspended ceiling tile 2 x 4 (224 SF)
Remove and replace bat insulation - 611
/ R21 - unfaced bat (250 SF)
Remove and replace diffusing panel (24 SF)