The file is a comprehensive set of engineering and construction design plans for the Golf Course Damage Repairs Project (SD202132) by the City of Livermore, California, involving flood mitigation and infrastructure improvements at the Livermore Municipal Airport golf course. The project is funded through FEMA (PA-09-CA-4308-PW-00602) and the Department of Water Resources Flood Protection Grant Program, with construction planned for May 2025. The scope includes reconstructing asphalt and concrete pathways, modifying golf course tee boxes and fairways, relocating irrigation systems, constructing concrete floodwalls, installing a flood gate at a cart bridge, and creating earthen flood berms along Airway Boulevard and the northern edge of the golf course parking lot.
The project involves extensive site modifications, including removing and replacing existing cart paths, relocating utilities, removing specific trees, and implementing erosion control measures. The contractor will be required to possess a valid Class A license, coordinate closely with golf course management to minimize operational disruptions, and adhere to strict environmental and construction guidelines. The work will take place across multiple golf course areas, including holes 10, 15, 16, 17, and 18, with careful attention to maintaining golf course functionality during construction. The total project area spans approximately 1,005 linear feet of floodwall and berm construction, with specific elevation and grading requirements to manage flood risks and maintain the golf course's infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Golf Project 2021-32 Specs Div 0 and 1 Final.pdf | ||
| ADDENDUM NO. 1 Golf Course Damage Repair 202132.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T1
TITLE SHEET
PREPARED UNDER THE DIRECTION OF :
RCE No. C68813
RECOMMENDED FOR APPROVAL :
Assistant City Engineer, City of Livermore Mallika Ramachandran
Joel Waxdeck City Engineer, City of Livermore
APPROVED BY THE CITY OF LIVERMORE:
Date
Date
Date
APPROVALS
Benjamin Shick Principal, Schaaf & Wheeler
The Contractor shall possess a valid Class A license at the time of bid opening.
Joe Prime Maintenance and Golf Operations Manager
Date
VICINITY MAP
NTS
Martinez
B.A.R.T.
Walnut Creek
Concord
Hayward
B.A.R.T.
Castro Valley
Palo Alto
View Mountain
Santa Clara Sunnyvale
ALAMEDA COUNTY
LIVERMORE
SAN
BAY
San
PABLO
B.A.R.T.
Richmond
Oakland
Alameda
Berkeley
San
Rafael
OCEAN
PACIFIC
BAY
SAN
FRANCISCO
San Mateo
B.A .R
.T
Bruno San
S.F.
South
Pacifica Burlingame
Francisco
Vallejo
Menlo Park
Redwood City
San Leandro
PROJECT LOCATION
SCALE: 1 INCH = 250 FEET
COMMUNITY DEVELOPMENT DEPARTMENT
PLANS FOR CONSTRUCTION OF
MAY 2025
VICINITY MAP
NTS
Martinez
B.A.R.T.
Walnut Creek
Concord
Hayward
B.A.R.T.
Castro Valley
Palo Alto
View Mountain
Santa Clara Sunnyvale
ALAMEDA COUNTY
LIVERMORE
SAN
BAY
San
PABLO
B.A.R.T.
Richmond
Oakland
Alameda
Berkeley
San
Rafael
OCEAN
PACIFIC
BAY
SAN
FRANCISCO
San Mateo
B.A .R
.T
Bruno San
S.F.
South
Pacifica Burlingame
Francisco
Vallejo
Menlo Park
Redwood City
San Leandro
PROJECT LOCATION
SITE MAP
INDEX OF SHEETS
SHEET NO DRAWING NO SHEET TITLE
1 T1 TITLE SHEET
2 T2 NOTES, ABBREVIATIONS, AND LEGEND
3 T3 NOTES
4 C1 PROJECT LOCATION MAP
5 C2 HAUL ROUTES AND DISPOSAL AREAS
6 C3 PROJECT IMPROVEMENTS
7 C4 ALIGNMENT PLAN & ALIGNMENT TABLES
8 C5 ALIGNMENT PLAN & ALIGNMENT TABLES
9 C6 SITE PLAN
10 C7 SITE PLAN
11 C8 SITE PLAN
12 C9 SITE PLAN
13 C10 SITE PLAN
14 C11 SITE PLAN
15 C12 CART PATH PROFILES
16 C13 FLOODWALL PLAN & PROFILE
17 C14 FLOODWALL CROSS SECTIONS
18 C15 CART PATH PROFILE AND CROSS SECTIONS
19 C16 AIRWAY BOULEVARD - BERM PLAN VIEW
20 C17 AIRWAY BOULEVARD - BERM PLAN VIEW
21 C18 AIRWAY BOULEVARD - FLOODWALL PLAN VIEW
22 C19 AIRWAY BOULEVARD - BERM CROSS SECTIONS
23 C20 AIRWAY BOULEVARD - BERM CROSS SECTIONS
24 C21 AIRWAY BOULEVARD - BERM PROFILE VIEW
25 C22
AIRWAY BOULEVARD - FLOODWALL PROFILE &
CROSS SECTIONS
26 C23 TREE REMOVAL PLAN
27 D1 DETAILS
28 D2 DETAILS
29 D3 DETAILS
30 S0
PROJECT DATA, GENERAL NOTES, STRUCTURAL
TESTING & SPECIAL INSPECTION
31 S1 FLOODWALL STRUCTURAL DETAILS
32 S2 FLOOD GATE PLAN & SECTION
33 S3 TYPICAL CONCRETE DETAILS
GOLF COURSE DAMAGE REPAIRS
PROJECT No. SD202132
US580
LIVERMORE MUNICIPAL
AIRPORT
KITTY HAWK ROAD
ARROYO LAS POSITAS
Mallika Ramachandran Assistant City Engineer, City of Livermore
Date
RCE No. C51782
RCE No. C49965
RCE No. C51782
05/16/25
City of Livermore
(ARROYO LAS POSITAS FLOOD MITIGATION PROJECT - PHASE 1)
FEMA PA-09-CA-4308-PW-00602
DEPARTMENT OF WATER RESOURCES FLOOD PROTECTION
GRANT PROGRAM
APPROXIMATE WORK AREA
LINDBERGH AVENUE
N
ISSEN
D R
IVE
EARHART WAY
SCALE: 1 INCH = 250 FEET
250 0 250 500
CLUBHOUSE DRIVE
BEEB'S SPORTS
BAR & GRILL
TERMINAL CIRCLE
APPROXIMATE WORK AREA
AIRWAY BOULEVARD
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
0.5
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
Associate Civil Engineer, City of Livermore Christopher Ferrel Date
RCE No. C95850
JoelW Pen Joel
JoelW Pen w
JoelW Pen ardeck
JoelW Pen
JoelW Text Box 6/4/25 cferrel Pen cferrel Pen Terrel cferrel Text Box 6/4/25
Mallika Typewritten Text 6/10/25
Mallika Typewritten Text 6/10/25
Mallika Image
Mallika Image
06/10/25
TREE PROTECTION NOTES
1. EXCEPT FOR TREES INDICATED TO BE REMOVED ON THE DRAWINGS, NO CUTTING OF ANY
PART OF PRIVATE OR CITY TREES, INCLUDING ROOTS, SHALL BE DONE WITHOUT SECURING
APPROVAL AND DIRECT SUPERVISION FROM THE CITY ARBORIST.
2. ANY ROOTS DAMAGED DURING CONSTRUCTION SHALL BE EXPOSED TO SOUND TISSUE AND
CUT CLEANLY WITH APPROVED TOOLS/EQUIPMENT. ACCIDENTALLY BROKEN ROOTS SHOULD
BE SAWED ABOUT TWO INCHES (2") BEHIND THE RAGGED END. CRUSHED OR TORN ROOTS
ARE MORE LIKELY TO ALLOW DECAY TO BEGIN; SHARPLY CUT ROOTS PRODUCE A FLUSH OF
NEW ROOTS HELPING THE TREE TO RECOVER FROM ITS INJURY.
3. NO TRENCHING SHALL BE DONE WITHIN THE DRIP LINE OF EXISTING TREES WITHOUT THE
APPROVAL OF THE CITY ARBORIST.
4. WHEN TRENCHING IS ALLOWED, THE CONTRACTOR MUST FIRST CUT ROOTS WITH A
VERMEER ROOT CUTTER PRIOR TO ANY TRENCHING TO AVOID TUGGING OR PULLING OF
ROOTS.
5. IF TRENCHING WITHIN DRIPLINE OF TREE IS ALLOWED / APPROVED BY CITY ARBORIST, THEN
CONTRACTOR IS TO REFILL OPEN TRENCHES QUICKLY WITHIN HOURS OF EXCAVATION WHEN
THEY OCCUR WITHIN THE DRIP LINE OF EXISTING TREES. IF THIS IS NOT POSSIBLE AND
WEATHER IS HOT, DRY, OR WINDY, CONTRACTOR MUST KEEP ROOT ENDS MOIST BY
COVERING THEM WITH WET BURLAP.
6. WHEN CONSTRUCTION OCCURS WITHIN DRIP-LINE OF EXISTING TREES, CONTRACTOR IS TO
PLACE SOIL AND OTHER MATERIALS BEYOND THE DRIP-LINE. WHEN THIS IS NOT POSSIBLE,
WITH THE APPROVAL OF CITY/PROJECT ARBORIST, PLACE SOIL ON PLYWOOD, A TARP, OR
THICK BED OF MULCH. THIS IS TO HELP PREVENT CUTTING INTO THE SOIL SURFACE WHEN
REFILLING THE TRENCH.
7. NO MATERIALS, EQUIPMENT, FUELS, PAINT, SPOIL, WASTE OR WASH-OUT WATER MAY BE
DEPOSITED, STORED, OR PARKED WITHIN THE DRIP-LINE OF A TREE.
8. THE DEATH OF A TREE DUE TO DAMAGE DURING CONSTRUCTION SHALL RESULT IN THE
CONTRACTOR REPLACING THE TREE WITH ANOTHER OF COMPARABLE SIZE. IN THE EVENT
THE TREE IS, DUE TO LARGE SIZE OR UNIQUE STRUCTURE, UNABLE TO BE DUPLICATED, A
FAIR VALUE AS DETERMINED BY A CERTIFIED ARBORIST OR THE "GUIDE FOR ESTABLISHING
VALUE OF TREES" (COUNCIL OF TREE AND LANDSCAPE APPRAISERS) WILL BE CHARGED TO
THE CONTRACTOR.
LEGEND
T2
AND LEGEND
1. NO CHANGE TO THE PROJECT IMPROVEMENT PLANS SHALL BE PERMITTED WITHOUT PRIOR APPROVAL BY THE CITY. CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT TO THE EXTENT ARISING FROM THE NEGLIGENCE OF
THE CITY OR ENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG MEN, CONES OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN ACCORDANCE WITH THE
SPECIFICATIONS. SEE ALSO TRAFFIC CONTROL NOTES.
3. CONTRACTOR SHALL REPLACE, AT HIS EXPENSE, ALL TREES, SHRUBS, LAWNS, FENCES, IRRIGATION SYSTEMS AND IMPROVEMENTS WHICH ARE TO REMAIN INTACT BUT HAVE BEEN REMOVED OR DAMAGED DURING CONSTRUCTION. CONTRACTOR SHALL NOT REMOVE OR DAMAGE IMPROVEMENTS LOCATED WITHIN CITY PROPERTY WITHOUT WRITTEN PERMISSION FROM THE CITY; OR FROM PRIVATE PROPERTY WITHOUT WRITTEN PERMISSION FROM THE PROPERTY OWNER.
4. TREES, SHRUBS, AND ROOTS OUTSIDE OF THE DEFINED EXCAVATION LIMITS SHALL NOT BE TRIMMED OR PRUNED WITHOUT THE APPROVAL OF THE CITY.
5. CLEARING AND GRUBBING SHALL BE PERFORMED WITHIN THE ENTIRE GRADING LIMITS AREA SHOWN ON THE PLANS. THE SITE SHALL BE STRIPPED AND CLEARED OF ALL VEGETATION, DEBRIS, AND ORGANIC-LADEN TOP SOIL. THE STRIPPED MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
VEGETATION AND DEBRIS SHALL BE REMOVED FROM THE SITES AND DISPOSED OF BY THE CONTRACTOR'S EXPENSE.
6. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLITION DEBRIS AND EXCESS EXCAVATED MATERIAL TO A SUITABLE SITE. ALL TESTING REQUIRED FOR LEGAL DISPOSAL SHALL BE CONDUCTED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS RESPONSIBLE TO DISPOSE OF ALL MATERIALS IN A PROPER AND LEGAL MANNER. IF THE MATERIAL IS TESTED AND FOUND TO BE HAZARDOUS, THE CONTRACTOR'S PRICE AND CONTRACT TIME SHALL BE ADJUSTED. MATERIAL TESTING PREVIOUSLY COMPLETED BY THE CITY IS PROVIDED AS AN APPENDIX TO THE SPECIFICATIONS. REFERENCE SPECIFICATION SECTION 31 30 00 -EARTHWORK.
7. ALL PERMANENT IMPROVEMENTS REMOVED OR DAMAGED BY THE CONTRACTOR, THAT ARE NOT SPECIFICALLY SHOWN TO BE REMOVED, SHALL BE RESTORED TO THEIR ORIGINAL LOCATION AND CONDITION BY THE CONTRACTOR USING NEW MATERIALS AS DIRECTED BY THE ENGINEER
8. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT AND VEHICLES IS PERMITTED WITHIN STAGING AREAS INDICATED ON PLAN SHEETS. ALL EQUIPMENT SHALL BE SURROUNDED BY REFLECTIVE DELINEATORS AT ALL TIMES. SOIL MAY BE TEMPORARILY STAGED NEAR A MINIMUM DISTANCE OF 100-FEET FROM THE CREEK OR CHANNEL TO ALLOW AN APPROPRIATE DRYING TIME PRIOR TO TRANSPORT. STOCKPILING OF MATERIALS IS NOT PERMITTED AT STAGING LOCATIONS UNLESS IT IS CONTAINED WITH EROSION CONTROL BMPs. PARKING EQUIPMENT AND STORING MATERIALS IN OTHER LOCATIONS, INCLUDING WITHIN THE STREET RIGHT-OF-WAY SHALL NOT BE PERMITTED, EXCEPT AT LOCATION(S) APPROVED BY THE
CITY TRAFFIC ENGINEER.
9. THE USE OF TRACKED EQUIPMENT ON TRAILS AND ROADWAYS IS AT THE DISCRETION OF THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR AND REPLACE ANY DAMAGE TO TRAILS AND ROADWAYS AT COMPLETION OF CONSTRUCTION. ANY SETTLEMENT, CRACKING, OR DAMAGE TO EXISTING TRAILS (DIRT, AC, CONCRETE, ETC.) DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR. AC TRAIL REPAIR SHALL BE PERFORMED BY REPLACING THE FULL WIDTH OF THE AC TRAIL FOR THE LENGTH OF THE DAMAGED TRAIL SECTION.
TRAILS SHALL BE REPLACED AS DETAILED ON THE PLANS.
10.MUD AND CONSTRUCTION DEBRIS ON STREETS, SIDEWALKS OR BICYCLE PATHS SHALL BE CLEANED OFF IMMEDIATELY.
11.NO WORK OR ACCESS WITHIN THE CHANNEL TOP OF BANK LIMITS AS SHOWN ON THE PLANS SHALL BE ALLOWED AT ANY TIME DURING CONSTRUCTION.
12.CONTRACTOR SHALL PERFORM HIS CONSTRUCTION AND OPERATION IN A MANNER WHICH WILL NOT ALLOW HARMFUL POLLUTANTS TO ENTER THE CREEK. TO ENSURE COMPLIANCE, THE CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE BEST MANAGEMENT PRACTICE (BMP) AS OUTLINED IN THE "CALIFORNIA STORM WATER BMP HANDBOOK" FOR CONSTRUCTION (www.cabmphandbooks.com) AND THE CITY OF LIVERMORE'S "STREAM MAINTENANCE PROGRAM MANUAL (SMP)". INCLUDING, BUT NOT LIMITED TO:
a. CREEK FLOW SHALL BE DIVERTED AROUND OR THROUGH EXCAVATION
ACTIVITIES PER SECTION NS-5, CLEAR WATER DIVERSION
b. STOCKPILED MATERIALS SHALL BE PROTECTED PER SECTION
WM-3, STOCKPILE MANAGEMENT
c. HANDLING OF ALL SHRUBS, TREES, AND MATERIALS TO BE
DISPOSED OF SHALL FOLLOW SECTION WM-5 SOLID WASTE
MANAGEMENT
d. STREAMBANK STABILIZATION AND SEDIMENT CONTROL SHALL
FOLLOW SECTION EC-12, STREAMBANK STABILIZATION
13. ALL BMP MATERIALS SHALL ADHERE TO THE REQUIREMENTS AND SPECIFICATIONS WITHIN THE CALIFORNIA STORM WATER BMP HANDBOOK.
14.UTILITIES HAVE NOT BEEN LOCATED AND ARE NOT SHOWN ON PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES WITH THE APPROPRIATE UTILITY AGENCIES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY OWNERS 48 HOURS PRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY. CONTACT UNDERGROUND SERVICE ALERT (USA) AT 1-800-227-2600.
15.REGULATORY PERMITS WILL BE PROVIDED TO THE CONTRACTOR PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS WITHIN THE REGULATORY
PERMITS IN ADDITION TO THE REQUIREMENTS HEREIN.
16.CONSTRUCTION SHALL BE SEQUENCED TO PROVIDE THE LEAST POSSIBLE EFFECT ON NATURAL RESOURCES.
17.CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR SHALL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSON AND PROPERTY; THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD OWNER AND DESIGN CIVIL ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE CIVIL ENGINEER.
18. THE LOCATION, DEPTH, AND EXISTENCE OF UNDERGROUND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE POSITIONS BASED UPON INFORMATION AVAILABLE TO THE ENGINEER.
THE CONTRACTOR SHALL EXCAVATE INSPECTION HOLES ("POT HOLES") AND DETERMINE THE LOCATION AND DEPTH OF ALL UNDERGROUND STRUCTURES AND UTILITIES THAT ARE IN THE VICINITY OF AND/OR MAY BE AFFECTED BY THE PROPOSED IMPROVEMENT WORK PRIOR TO ANY CONSTRUCTION WORK WHICH COULD DAMAGE OR CONFLICT WITH SAID
STRUCTURES AND/OR UTILITIES.
19.IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE CITY INSPECTOR AND THE CIVIL ENGINEER OF ANY DIFFERENCES IN LOCATIONS OF EXISTING UTILITIES SHOWN, OR ANY CONFLICTS WITH THE DESIGN THAT BECOME APPARENT DURING CONSTRUCTION, BEFORE CONTINUING WITH WORK IN THAT AREA.
20.THE CONTRACTOR SHALL PROVIDE ADEQUATE COVER FOR THE PROTECTION OF ALL PROPOSED AND EXISTING UTILITIES DURING THE CONSTRUCTION OF THIS PROJECT.
21.ALL GRADING OPERATIONS SHALL BE CONTINUOUSLY OBSERVED BY A SOILS ENGINEER. CONTRACTOR MUST NOTIFY SOILS ENGINEER TWO (2) WORKING DAYS IN ADVANCE.
22.THE SURVEYOR SHALL BE NOTIFIED 48 HOURS IN ADVANCE OF WHEN FIELD STAKING IS TO BE REQUIRED.
23.ALL CUT SLOPES SHALL BE ROUNDED TO MEET EXISTING GRADES AND BLEND WITH SURROUNDING TOPOGRAPHY. ALL GRADED SLOPES OVER FIVE FEET IN HEIGHT SHALL BE PLANTED
WITH SUITABLE GROUND COVER.
NOTES, ABBREVIATIONS,
LEGEND
ABBREVIATIONS
(E) EXISTING
(N) NEW
AB AGGREGATE BASE
AC
ASPHALTIC CONCRETE/
ASBESTOS CEMENT
ALP ARROYO LAS POSITAS
APPROX APPROXIMATE
BMP BEST MANAGEMENT PRACTICES
CAMUTCD
CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES
CASQA
CALIFORNIA STORM WATER QUALITY
ASSOCIATION
CDF CONTROLLED DENSITY FILL
CFS CUBIC FEET PER SECOND
CLSM
CONTROLLED-LOW-STRENGTH
MATERIAL
COMP COMPACTION
CY CUBIC YARD
EG EXISTING GRADE
ELEV ELEVATION
ESA ENVIRONMENTALLY SENSITIVE AREA
FEMA
FEDERAL EMERGENCY MANAGEMENT
AGENCY
FG FINISHED GRADE
GALV GALVANIZED
GPS GLOBAL POSITIONING SYSTEM
H, HOR. HORIZONTAL
INV INVERT
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
NTS NOT TO SCALE
OC ON CENTER
OHWM ORDINARY HIGH WATER MARK
PVC POLYVINYL CHLORIDE
STA STATION
SWPPP
STORM WATER POLLUTION
PREVENTION PLAN
TOB TOP OF BANK
TYP TYPICAL
USA UNDERGROUND SERVICE ALERT
V, VER. VERTICAL
W/ WITH
GENERAL NOTES
EXISTING DEBRIS, DEADFALL, AND TRASH THROUGHOUT THE LIMITS OF WORK SHALL BE
REMOVED BY THE CONTRACTOR. NATURAL WOOD MATERIAL SHALL BE CHIPPED AND
PLACED IN THE LOCATIONS SHOWN ON THE PLANS. ALL OTHER MATERIAL SHALL BE
PROPERLY DISPOSED OF BY THE CONTRACTOR.
DEBRIS AND DEADFALL REMOVAL NOTES
TREE SHALL BE REMOVED AS SHOWN ON THE PLANS. ALL TREES TO BE REMOVED SHALL BE
MARKED BY THE CONTRACTOR AND CONFIRMED BY THE CITY PRIOR TO REMOVAL. LARGE
TREES WITH ROOT BALLS SHALL BE EXCAVATED AND REMOVED IN ONE COMPLETE SECTION
AS REQUIRED TO INSTALL BURIED WOODY DEBRIS ALONG THE CHANNEL AS SHOWN ON THE
PLANS. ALL BRANCHES AND TREES NOT REQUIRED FOR WOODY DEBRIS SHALL BE CHIPPED
AND PLACED IN THE LOCATIONS ON THE PLANS AND/OR PROPERLY DISPOSED OF BY THE
CONTRACTOR.
TREE REMOVAL NOTES
STAGING/STOCKPILE AREA
EXISTING FENCE
XX
EXISTING TREES TO REMAIN
SHEET NO. WHERE DETAIL OR SECTION IS DRAWN
A
PROPERTY LINE
EXISTING GRADE
EXISTING CONTOUR PROPOSED GRADE
EXISTING STORM DRAIN
A
DISPOSAL AREA
REMOVE EXISTING TREE
EXISTING IRRIGATION MAINW
EXISTING IRRIGATION LINEIRR IRR
EXISTING TOP OF BANK
TEMPORARY CONTROL POINT
DETAIL OR SECTION DESIGNATION
ORDINARY HIGH WATER MARK
PROPOSED CONTOUR545
UE EXISTING UNDERGROUND
ELECTRIC
REMOVE CART PATH
NEW CONCRETE CART PATH
NEW ROCK RIP RAP
FLOW DIRECTION
COM EXISTING AT&T CONDUIT
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
EXISTING SANITARY SEWERSSEXISTING CITY WATER MAINW
EXISTING RECLAIMED WATER MAINRW
ESA/SILT FENCE/\ /\ /\ /\
W EXISTING ABANDONED
CITY WATER MAIN
NEW ASPHALT CART PATH
LIMITS OF DISTURBANCELOD
1. CONTRACTOR SHALL PROVIDE ALL BARRIERS AND SIGNS, TO BE APPROVED BY THE CITY, TO
CLOSE OFF PUBLIC ACCESS TO EACH SITE DURING CONSTRUCTION. THE EXACT LOCATION
OF SITE CLOSURE SHALL BE COORDINATED WITH THE CITY PRIOR TO BEGINNING
CONSTRUCTION.
2. IF THE CONTRACTOR PLANS TO CLOSE TRAFFIC LANES FOR ANY PERIOD OF TIME, OR
DISRUPT THE FLOW OF TRAFFIC, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL
PLAN TO THE CITY ENGINEER FOR APPROVAL PRIOR TO BEGINNING WORK. THE PLAN SHALL
BE SIGNED BY A LICENSED CIVIL OR TRAFFIC ENGINEER WHEN IT INVOLVES AN ARTERIAL
STREET. CONTRACTOR SHALL PROVIDE ALL NECESSARY TRAFFIC CONTROL IN
ACCORDANCE WITH THE LATEST EDITION OF THE "CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES". A MINIMUM OF OF ONE TRAFFIC LANE (10' MIN) SHALL BE OPEN
TO VEHICULAR TRAFFIC DURING ALL HOURS, WEEKENDS, AND HOLIDAYS. STREET DETOURS
SHALL ONLY TAKE PLACE UPON CITY APPROVAL.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH PART 6 AND PART 9 OF THE LATEST EDITION OF THE "CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES".
4. ALL CONES USED FOR LANE CLOSURE AFTER NIGHTFALL SHALL BE FITTED WITH
RETROREFLECTIVE BANDS (OR SLEEVES).
5. ALL ADVANCED WARNING SIGN INSTALLATIONS SHALL BE EQUIPPED WITH FLAGS FOR
DAYTIME CLOSURES. FLASHING BEACONS SHALL BE PLACED AT THE LOCATIONS INDICATED
FOR NIGHTTIME CLOSURES.
6. PERMANENT SIGNS OR EXISTING PAVEMENT MARKINGS THAT CONFLICT WITH THE TRAFFIC
CONTROL PLAN SHALL BE COVERED, OBLITERATED OR REMOVED AS DIRECTED BY THE
ENGINEER, AND RESTORED TO THEIR ORIGINAL CONDITION UPON COMPLETION OF THE
WORK.
7. DURING ALL CONSTRUCTION PERIODS, THE CONTRACTOR SHALL HAVE AT THE JOBSITE ALL
NECESSARY TRAFFIC CONTROL DEVICES (APPROPRIATE SIGN, LIGHTED ARROW DISPLAY,
CHANNELIZING DEVICES, ETC.) NEEDED TO IMPLEMENT THE APPROVED TRAFFIC CONTROL
PLAN
8. CONSTRUCTION SHALL BE SEQUENCED TO PROVIDE THE LEAST POSSIBLE ADVERSE EFFECT
TO RESIDENCES AND BUSINESS.
9. CONSTRUCTION MATERIALS SHALL BE KEPT OFF SIDEWALKS AND CONSOLIDATED IN AREAS
WITHIN THE CITY RIGHT-OF-WAY UNLESS OTHERWISE APPROVED BY THE CITY.
10.CONTRACTOR SHALL COORDINATE DETOUR ROUTES (IF NECESSARY) WITH THE CITY.
T3
NOTES
ACCESS TO PROJECT BY CONSTRUCTION EQUIPMENT, MATERIAL DELIVERY AND OTHER HEAVY
LOADS SHALL BE LIMITED TO THE FOLLOWING ROUTE:
I-580 TO AIRWAY BOULEVARD, AIRWAY BOULEVARD TO TERMINAL CIRCLE
THE WHEEL-LOADING ON THE ABOVE ROUTES SHALL NOT EXCEED THE STATE LOAD LIMITS.
HAUL ROUTE/ CONSTRUCTION ACCESS
TRAFFIC CONTROL NOTES
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
BASIS OF BEARING (GOLF COURSE WORK)
THE BEARINGS SHOWN HEREON ARE BASED ON CALIFORNIA COORDINATE SYSTEM ZONE III AS
DETERMINED BY GPS OBSERVATIONS
BENCHMARK DATA (GOLF COURSE WORK)
THE STATION IS A 2 BRASS DISK STAMPED "RE 13962" IN MONUMENT WELL, 15'±E OF W EDGE OF
KINROSS DRIVE AT INTERSECTION OF KINROSS DRIVE AND SISKIYOU DRIVE PER CITY OF
WALNUT CREEK GEODETIC CONTROL SURVEY -2003 RECORDED IN BOOK 127 OF LAND
SURVEYOR MAPS, AT PAGES 30-36 OFFICIAL RECORDS OF CONTRA COSTA COUNTY.
DATUM (GOLF COURSE WORK)
HORIZONTAL - CALIFORNIA COORDINATE SYSTEM ZONE 3 NAD 83(EPOCH 2010.86).
VERTICAL - NAVD 88 BASED ON NGS PUBLISHED BENCHMARK VALUES AND GEOID99 MODEL
HEIGHTS.
1. THE CONTRACTOR SHALL DEVELOP A DETAILED CONSTRUCTION SCHEDULE INDICATING THE
DURATION OF WORK AT EACH LOCATION THROUGHOUT THE PROJECT. THE SCHEDULE SHALL BE
SUBMITTED PRIOR TO CONSTRUCTION AND SHALL BE REVIEWED AND APPROVED BY THE CITY AND
THE GOLF COURSE.
2. THE CONTRACTOR SHALL MARK THE LIMITS OF WORK AT EACH PROJECT LOCATION AND REVIEW
WITH THE CITY AND GOLF COURSE FOR APPROVAL PRIOR TO CONSTRUCTION.
3. CONTRACTOR SHALL ADJUST THE LIMITS OF WORK AND CONSTRUCTION SCHEDULE AS NECESSARY
TO MINIMIZE IMPACT ON GOLF COURSE OPERATIONS THROUGHOUT CONSTRUCTION.
4. THE DURATION OF WORK ON THE GOLF COURSE SHALL BE MINIMIZED TO THE MAXIMUM EXTENT PRACTICABLE. CONTRACTOR SHALL IMMEDIATELY RESTORE THE SITE WITHIN THE GOLF COURSE
UPON COMPLETION OF THE WORK.
5. APPROXIMATELY 2 WEEKS PRIOR TO ANY WORK ON THE GOLF COURSE THE CONTRACTOR SHALL HAVE AN ONSITE MEETING WITH GOLF COURSE REPRESENTATIVES AND CITY STAFF TO DISCUSS
IMPACTS TO THE GOLF COURSE AND COORDINATION.
6. CONTRACTOR SHALL COORDINATE WITH A GOLF COURSE REPRESENTATIVE DURING
CONSTRUCTION. CONTRACTOR SHALL WORK WITH THE CITY'S INSPECTOR TO PROVIDE THE GOLF
COURSE WITH ANY UPDATES, CHANGES TO THE CONSTRUCTION SCHEDULE, OR CONSTRUCTION
COORDINATION ISSUES THAT MAY ARISE DURING CONSTRUCTION.
GOLF COURSE COORDINATION:
1. THE PROJECT REQUIRES WORK ON AN ACTIVE GOLF COURSE. THE GOLF COURSE MAY
TEMPORARILY RELOCATE SOME OF THE GOLF COURSE FACILITIES; HOWEVER, THE CONTRACTOR
SHALL ANTICIPATE THAT THE GOLF COURSE WILL BE ACTIVE AT ALL TIMES DURING CONSTRUCTION.
2. CONTRACTOR SHALL ANTICIPATE GOLF BALLS HITTING VEHICLES, EQUIPMENT, AND PERSONNEL
DURING THE COURSE OF WOK ON, AND ADJACENT TO THE GOLF COURSE.
3. CONTRACTOR SHALL CONSIDER INSTALLING FENCING AROUND THE ACTIVE WORK AREA TO PROVIDE
PROTECTION FROM GOLF BALLS.
4. ALL PERSONNEL WORKING ON THE GOLF COURSE SHALL MONITOR THE GOLF COURSE ACTIVITIES
AND PROVIDE PERSONNEL PROTECTION AS NECESSARY TO MITIGATE THE HAZARDS OF WORKING
ON A GOLF COURSE.
5. CONTRACTOR SHALL USE FLAGGERS AND SIGNAGE TO DIRECT GOLFERS AROUND THE ACTIVE
WORK AREAS.
WORK ON ACTIVE GOLF COURSE:
1. EXISTING GOLF COURSE IRRIGATION SHALL BE MODIFIED, RELOCATED, AND EXPANDED AS
NECESSARY TO PROVIDE FULL COVERAGE ON ALL TURF WITHIN THE GOLF COURSE, INCLUDING NEW
FLOOD BERMS.
2. CONTRACTOR SHALL COORDINATE WITH THE GOLF COURSE TO DETERMINE ACCEPTABLE
LOCATIONS AND SPACING OF NEW AND RELOCATED IRRIGATION SPRAY HEADS.
GOLF COURSE IRRIGATION:
1. ALL DAMAGED OR REMOVED TURF SHALL BE REPLACED WITH NEW SOD AS DETAILED ON THE PLANS.
2. ALL AREAS DISTURBED WITHIN THE GOLF COURSE SHALL BE RESTORED WITH NEW SOD, INCLUDING
NEW FLOOD BERMS AND CART PATH REMOVAL LOCATIONS.
GOLF COURSE TURF:
1. THE EXISTING 8” POTABLE WATER MAIN ON THE NORTH SIDE OF BEEB'S IS ASBESTOS CEMENT (AC) PIPE AND THE CITY IS NOT ABLE TO ACCURATELY LOCATE THE PIPE. THE EXISTING 8” GOLF COURSE IRRIGATION MAIN ON THE NORTH SIDE OF BEEB'S CANNOT BE ACCURATELY LOCATED BY THE CITY OR THE GOLF COURSE. ANY USA MARKINGS FOR THE WATER MAINS ARE APPROXIMATE IN NATURE AND SHALL BE FIELD LOCATED AND VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. THE
WATER MAINS DO NOT HAVE TRACER WIRE.
2. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING, POTHOLING, AND SURVEYING THE LOCATION OF THE POTABLE WATER MAIN AND THE GOLF COURSE IRRIGATION MAIN ON THE NORTH SIDE OF BEEB'S WITHIN THE EXCAVATION LIMITS OF THE PROJECT A MINIMUM OF 15 WORKING DAYS PRIOR TO
CONSTRUCTING THE NEW FLOODWALL AND BERM ON THE NORTH SIDE OF BEEB'S. THE
CONTRACTOR SHALL POTHOLE AND SURVEY THE WATER MAINS AT A MINIMUM OF THREE
LOCATIONS, INCLUDING AT THE LIMITS OF EXCAVATION. POTHOLE AND SURVEY DATA SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTION.
WATER MAIN RELOCATION MAY BE NECESSARY DEPENDING ON THE LOCATION AND DEPTH OF THE
WATER MAIN.
3. CONTRACTOR MAY NEED TO PERFORM MULTIPLE UTILITY POTHOLES TO ACCURATELY LOCATE THE WATER MAIN, STARTING AT THE NEAREST WATER VALVES AS SHOWN ON THE CITY'S WATER MAIN
UTILITY MAPS WHICH ARE INCLUDED AS ATTACHMENTS TO THE SPECIFICATIONS.
4. CONTRACTOR SHALL TAKE CAUTION TO PROTECT THE EXISTING WATER MAINS AND UTILITIES IN PLACE AT ALL TIMES DURING CONSTRUCTION. THE EXISTING AC WATER MAIN IS FRAGILE AND SHALL
BE LOCATED AND POTHOLED WITH EXTREME CAUTION.
WATER MAIN LOCATING:
BASIS OF BEARING (AIRWAY BOULEVARD WORK)
THE BEARINGS OF NORTH 87°49'24" EAST TAKEN BETWEEN NGS PID HS5109 (GOLD CREEK) AND
NGS PID AA3816 (GREENVILLE) AS CALCULATED BETWEEN THE COORDINATES PUBLISHED ON
THE DATA SHEETS FOR SAID POINTS ON THE NGS WEBSITE WAS TAKEN AS THE BASIS FOR ALL
BEARING SHOWN HEREON.
THE COORDINATES SHOWN HEREON ARE BASED ON CALIFORNIA COORDINATE SYSTEM
NAD1983, ZONE 3.
(EPOCH DATA 2010.00)
BENCHMARK DATA (AIRWAY BOULEVARD WORK)
NGS: HS5109
DESIGNATION: GOLD CREEK
DATUM: NAVD 1988
ELEVATION: 564.85
DATUM (AIRWAY BOULEVARD WORK)
HORIZONTAL - CALIFORNIA COORDINATE SYSTEM ZONE 3 NAD 83(EPOCH 2010.86).
VERTICAL - NAVD 88 BASED ON NGS PUBLISHED BENCHMARK VALUES AND GEOID99 MODEL
HEIGHTS.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
C6
CLUBHOUSE DRIVE LINDBERHG AVENUE
N
IS
S E
N D
R
IV
E
TERMINAL CIRCLE
LIVERMORE MUNICIPAL
AIRPORT
C8 C10
C11
BEEB'S SPORT
BAR & GRILL
C23
AIRWAY BOULEVARD
C17 C18
C7
C9 C16
C1
PROJECT LOCATION MAP
SCALE: 1" = 150'
PLAN
SCALE: 1 INCH = 150 FEET
150 0 150 300
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
DISPOSAL AREA FOR
CHIPPED TREES
TEMPORARY STORAGE AREA TO BE USED
DURING FLOODWALL CONSTRUCTION
CONTRACTOR SHALL NOT EXCEED LOADING LIMIT
OF EXISTING BRIDGE OF 36 TONS. CONTRACTOR
TO PROVIDE TRAFFIC CONTROL DURING BRIDGE
USE. CONTRACTOR SHALL REPAIR ANY DAMAGES
CAUSED TO BRIDGE DURING CONSTRUCTION.
HAUL ROUTES AND
DISPOSAL AREAS
NOTES:
1. LOCATION OF HAUL ROUTES AND DISPOSAL AREAS ARE APPROXIMATE AND WILL BE FIELD VERIFIED BY THE CITY PRIOR TO CONSTRUCTION.
HAULING OF MATERIAL AND EQUIPMENT SHALL NOT INTERRUPT GOLF COURSE OPERATIONS. CONTRACTOR SHALL PROVIDE TRAFFIC
CONTROL FLAGGERS AT ALL TIMES WHEN WORKING WITHIN THE ACTIVE GOLF COURSE AREAS.
2. RESTORE CONDITIONS OF ROUTES TO PRE-PROJECT CONDITION WHEN CONSTRUCTION IS COMPLETE.
3. DO NOT REMOVE ANY TREES NOT LABELED FOR REMOVAL ON THE TREE REMOVAL PLANS. SEE SHEET C23 FOR ADDITIONAL INFORMATION.
4. CHIPPED WOOD SHALL BE EVENLY PLACED IN THE AREAS SHOWN ON THIS SHEET TO AN APPROXIMATE DEPTH OF 6-INCHES. THE LOCATION OF THE WOOD CHIP PLACEMENT SHALL BE CONFIRMED BY THE GOLF COURSE PRIOR TO PLACEMENT.
LEGEND
DISPOSAL AREAS
CONSTRUCTION STAGING AREAS
HAUL ROUTES (10' WIDTH)
C2
SCALE: 1" = 150'
PLAN
CLUBHOUSE DRIVE
BEEB'S SPORTS
BAR & GRILL
TERMINAL CIRCLE
AIR
W
AY BO
U
LEVAR
D
SCALE: 1 INCH = 150 FEET
150 0 150 300
I-580
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
PROJECT IMPROVEMENTS
C3
SCALE: 1 INCH = 150 FEET
150 0 150 300
SCALE: 1" = 150'
PLAN
TERMINAL CIRCLE
CLUBHOUSE DRIVE LINDBERGH AVENUE
EARHART WAY
N
IS
S E
N D
R
IV
E
AIRWAY BOULEVARD
BEEB'S SPORTS
BAR & GRILL
LIVERMORE MUNICIPAL
AIRPORT
ARROYO LAS POSITAS CHANNEL CENTERLINE
(N) BERM
(N) CART PATH
(N) BERM AND CART PATH
(N) BERM AND CART PATH
(N) FLOODWALL
SHEET NOTES:
1. SEE SHEETS C6 TO SHEET C18 FOR ADDITIONAL DETAILS.
2. ESA & SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE PLANS AND AS DIRECTED BY THE CITY'S BIOLOGIST IN THE FIELD, PER DETAIL . ADDITIONAL SILT FENCE AND BMP'S ARE REQUIRED AS
SHOWN IN THE PROJECT SWPPP.
(N) AIRWAY BOULEVARD BERM
(N) AIRWAY BOULEVARD FLOODWALL
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
90% DRAFT - NOT FOR CONSTRUCTION
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
DRAFT
MODIFY AND RAISE (E)
GOLF COURSE TEE BOX
REMOVE (E) CART PATH
REMOVE (E) CART PATH
(N) FLOOD GATE
(N) ESA & SILT FENCE, TYP.
NOTE 2
D2
MH
C1
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L28
L29
L31
L32
L33
L34
L35
L36
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46 L47
L48
L49
L50
L51
L30
L5
L6
L7
L13
L14
L1
L2 L3
L4
L8
L9
L10
L11
L12
CP44
CP50
CP42
CP12
CP13
CP14
CP40
CP67
CP47
CP15
LINE TABLE: GOLF COURSE FLOODWALL ALIGNMENT
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
LENGTH
47.80'
82.35'
46.75'
16.07'
23.02'
17.58'
187.35'
4.08'
25.00'
11.78'
DIRECTION
N70° 07' 30"E
N70° 07' 33"E
S89° 49' 50"E
S57° 13' 58"E
N82° 02' 51"E
N33° 16' 15"E
N80° 51' 51"E
N21° 18' 33"E
N21° 18' 33"E
N21° 18' 33"E
START POINT
N: 2079055.56 E: 6178275.95
N: 2079071.81 E: 6178320.90
N: 2079099.80 E: 6178398.34
N: 2079099.66 E: 6178445.09
N: 2079090.97 E: 6178458.61
N: 2079094.15 E: 6178481.41
N: 2079108.85 E: 6178491.05
N: 2079138.59 E: 6178676.02
N: 2079142.40 E: 6178677.51
N: 2079165.69 E: 6178686.59
END POINT
N: 2079071.81 E: 6178320.90
N: 2079099.80 E: 6178398.34
N: 2079099.66 E: 6178445.09
N: 2079090.97 E: 6178458.61
N: 2079094.15 E: 6178481.41
N: 2079108.85 E: 6178491.05
N: 2079138.59 E: 6178676.02
N: 2079142.40 E: 6178677.51
N: 2079165.69 E: 6178686.59
N: 2079176.67 E: 6178690.87
NOTE
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
NORTH FACE OF GOLF COURSE FLOODWALL ALIGNMENT
LINE TABLE: BEEB'S CART PATH ALIGNMENT
LINE #
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
LENGTH
39.94'
29.07'
24.85'
31.79'
49.11'
10.36'
35.54'
16.13'
20.73'
23.72'
DIRECTION
N07° 24' 40"E
N08° 15' 10"E
N41° 32' 38"E
N50° 30' 13"E
N43° 55' 05"E
N75° 54' 53"E
N87° 17' 33"E
N75° 40' 53"E
N65° 00' 08"E
N89° 14' 14"E
START POINT
N: 2078907.37 E: 6178217.56
N: 2078946.97 E: 6178222.71
N: 2078975.74 E: 6178226.89
N: 2078994.34 E: 6178243.37
N: 2079014.55 E: 6178267.90
N: 2079049.93 E: 6178301.96
N: 2079052.45 E: 6178312.01
N: 2079054.13 E: 6178347.51
N: 2079058.12 E: 6178363.14
N: 2079066.88 E: 6178381.92
END POINT
N: 2078946.97 E: 6178222.71
N: 2078975.74 E: 6178226.89
N: 2078994.34 E: 6178243.37
N: 2079014.55 E: 6178267.90
N: 2079049.93 E: 6178301.96
N: 2079052.45 E: 6178312.01
N: 2079054.13 E: 6178347.51
N: 2079058.12 E: 6178363.14
N: 2079066.88 E: 6178381.92
N: 2079067.20 E: 6178405.65
NOTE
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
CENTERLINE OF BEEB'S CART PATH
LINE TABLE: PARKING LOT CART PATH ALIGNMENT
LINE #
L28
L29
L30
LENGTH
45.25'
8.33'
81.41'
DIRECTION
N08° 02' 34"E
N28° 42' 32"E
N44° 37' 07"E
START POINT
N: 2079145.61 E: 6178723.52
N: 2079190.42 E: 6178729.85
N: 2079197.73 E: 6178733.85
END POINT
N: 2079190.42 E: 6178729.85
N: 2079197.73 E: 6178733.85
N: 2079255.68 E: 6178791.04
NOTE
CENTERLINE OF PARKING LOT CART PATH
CENTERLINE OF PARKING LOT CART PATH
CENTERLINE OF PARKING LOT CART PATH
LINE TABLE: HOLE 16 CART PATH ALIGNMENT
LINE #
L31
L32
LENGTH
74.21'
37.77'
DIRECTION
S25° 09' 24"E
S26° 12' 21"E
START POINT
N: 2079403.89 E: 6178920.59
N: 2079336.72 E: 6178952.14
END POINT
N: 2079336.72 E: 6178952.14
N: 2079302.83 E: 6178968.82
NOTE
CENTERLINE OF HOLE 16 CART PATH
CENTERLINE OF HOLE 16 CART PATH
CURVE TABLE: HOLE 16 CART PATH ALIGNMENT
CURVE #
C1
RADIUS
34'
LENGTH
34.16'
CHORD DIRECTION
S71° 20' 03"E
START POINT
N: 2079302.83 E: 6178968.82
END POINT
N: 2079292.34 E: 6178999.87
NOTE
CENTERLINE OF HOLE 16 CART PATH
LINE TABLE: GOLF COURSE CART PATH ALIGNMENT
LINE #
L33
L34
L35
L36
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46
L47
L48
L49
L50
L51
LENGTH
42.35'
15.93'
12.01'
27.27'
21.00'
16.78'
16.68'
85.02'
12.42'
11.40'
20.84'
20.48'
29.31'
18.12'
19.15'
21.70'
30.41'
12.25'
19.85'
DIRECTION
S80° 34' 33"E
S81° 02' 09"E
S83° 39' 06"E
S85° 03' 28"E
S85° 49' 18"E
N87° 46' 15"E
N80° 34' 00"E
N74° 59' 04"E
N79° 31' 15"E
N82° 48' 43"E
N84° 24' 28"E
N76° 35' 09"E
N64° 38' 28"E
N72° 16' 30"E
S84° 31' 18"E
S65° 06' 51"E
S50° 21' 25"E
S52° 43' 18"E
S73° 32' 39"E
START POINT
N: 2079292.40 E: 6179010.35
N: 2079285.46 E: 6179052.13
N: 2079282.98 E: 6179067.87
N: 2079281.65 E: 6179079.81
N: 2079279.30 E: 6179106.97
N: 2079277.77 E: 6179127.92
N: 2079278.43 E: 6179144.68
N: 2079281.16 E: 6179161.13
N: 2079303.19 E: 6179243.25
N: 2079305.45 E: 6179255.46
N: 2079306.87 E: 6179266.77
N: 2079308.90 E: 6179287.51
N: 2079313.65 E: 6179307.43
N: 2079326.21 E: 6179333.92
N: 2079331.73 E: 6179351.18
N: 2079329.90 E: 6179370.25
N: 2079320.77 E: 6179389.93
N: 2079301.37 E: 6179413.35
N: 2079293.95 E: 6179423.09
END POINT
N: 2079285.46 E: 6179052.13
N: 2079282.98 E: 6179067.87
N: 2079281.65 E: 6179079.81
N: 2079279.30 E: 6179106.97
N: 2079277.77 E: 6179127.92
N: 2079278.43 E: 6179144.68
N: 2079281.16 E: 6179161.13
N: 2079303.19 E: 6179243.25
N: 2079305.45 E: 6179255.46
N: 2079306.87 E: 6179266.77
N: 2079308.90 E: 6179287.51
N: 2079313.65 E: 6179307.43
N: 2079326.21 E: 6179333.92
N: 2079331.73 E: 6179351.18
N: 2079329.90 E: 6179370.25
N: 2079320.77 E: 6179389.93
N: 2079301.37 E: 6179413.35
N: 2079293.95 E: 6179423.09
N: 2079288.33 E: 6179442.12
NOTE
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
CENTERLINE OF GOLF COURSE CART PATH
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
CLUBHOUSE DRIVE
BEEB'S CART
PATH ALIGNMENT
PARKING LOT CART
PATH ALIGNMENT
NORTH FACE OF FLOODWALL ALIGNMENT
HOLE 16 CART
PATH ALIGNMENT
SCALE: 1" = 80'
PLAN
SCALE: 1 INCH = 80 FEET
80 0 80 160
GOLF COURSE CART
PATH ALIGNMENT
ALIGNMENT PLAN &
ALIGNMENT TABLES
C4
TEMPORARY CONTROL POINTS
POINT # NORTHING EASTING ELEVATION DESCRIPTION
12 2079132.86 6178737.01 380.45 MAG NAIL
13 2079240.13 6178822.13 385.99 HUB
14 2079342.12 6178851.55 380.01 HUB
15 2079442.79 6178972.30 382.61 MAG NAIL
40 2079349.55 6178949.09 381.92 MAG NAIL
42 2079262.30 6178345.74 383.60 MAG NAIL
44 2079204.25 6178221.99 382.14 HUB
47 2079085.48 6178287.67 377.57 HUB
50 2079049.99 6178484.43 378.68 MAG NAIL
67 2079300.90 6179348.43 387.62 REBAR
NOTES:
1. TEMPORARY LOCAL CONTROL POINTS WERE ESTABLISHED IN 2022 AND MAY NOT EXIST.
CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND ESTABLISHING ALL CONTROL POINT TO
BE USED FOR PROJECT.
C2
L53
L57
L58
L59
L60
L61
L56
L55L54
L52
L74
L75
L78
L79
L76 L77
CP21
CP22
CP27
CP25
LINE TABLE: HOLE 17 CART PATH ALIGNMENT
LINE #
L52
L53
L54
L55
L56
L57
L58
L59
L60
L61
LENGTH
64.31'
33.41'
49.17'
65.80'
72.99'
34.89'
34.11'
47.31'
46.84'
42.35'
DIRECTION
S73° 45' 27"E
S63° 36' 56"E
S74° 50' 33"E
N80° 59' 21"E
N54° 03' 37"E
N37° 40' 08"E
N27° 43' 00"E
N15° 48' 50"E
N31° 12' 40"E
N10° 18' 15"E
START POINT
N: 2079468.89 E: 6179574.66
N: 2079450.90 E: 6179636.40
N: 2079436.05 E: 6179666.33
N: 2079423.19 E: 6179713.79
N: 2079433.50 E: 6179778.78
N: 2079476.34 E: 6179837.88
N: 2079503.96 E: 6179859.20
N: 2079534.15 E: 6179875.06
N: 2079579.67 E: 6179887.95
N: 2079619.72 E: 6179912.22
END POINT
N: 2079450.90 E: 6179636.40
N: 2079436.05 E: 6179666.33
N: 2079423.19 E: 6179713.79
N: 2079433.50 E: 6179778.78
N: 2079476.34 E: 6179837.88
N: 2079503.96 E: 6179859.20
N: 2079534.15 E: 6179875.06
N: 2079579.67 E: 6179887.95
N: 2079619.72 E: 6179912.22
N: 2079661.39 E: 6179919.80
NOTE
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
CENTERLINE OF HOLE 17 CART PATH
LINE TABLE: AIRWAY BOULEVARD BERM ALIGNMENT
LINE #
L74
L75
LENGTH
65.44'
163.27'
DIRECTION
S01° 23' 28"W
S01° 23' 28"W
START POINT
N: 2079512.88 E: 6180420.07
N: 2079447.46 E: 6180418.48
END POINT
N: 2079447.46 E: 6180418.48
N: 2079284.23 E: 6180414.51
NOTE
CENTERLINE OF AIRWAY BOULEVARD BERM
CENTERLINE OF AIRWAY BOULEVARD BERM
CURVE TABLE: AIRWAY BOULEVARD BERM ALIGNMENT
CURVE #
C2
RADIUS
658'
LENGTH
593.67'
CHORD DIRECTION
S26° 43' 30"E
START POINT
N: 2079284.23 E: 6180414.51
END POINT
N: 2078771.80 E: 6180672.53
NOTE
CENTERLINE OF AIRWAY BOULEVARD BERM
LINE TABLE: AIRWAY BOULEVARD FLOODWALL ALIGNMENT
LINE #
L76
L77
L78
L79
LENGTH
26.16'
35.39'
61.57'
14.95'
DIRECTION
S35° 20' 24"E
S88° 57' 59"E
S88° 55' 46"E
S88° 55' 48"E
START POINT
N: 2078645.61 E: 6181011.25
N: 2078624.27 E: 6181026.38
N: 2078623.63 E: 6181061.76
N: 2078622.48 E: 6181123.32
END POINT
N: 2078624.27 E: 6181026.38
N: 2078623.63 E: 6181061.76
N: 2078622.48 E: 6181123.32
N: 2078622.20 E: 6181138.26
NOTE
NORTH FACE OF AIRWAY BOULEVARD FLOODWALL
NORTH FACE OF AIRWAY BOULEVARD FLOODWALL
NORTH FACE OF AIRWAY BOULEVARD FLOODWALL
NORTH FACE OF AIRWAY BOULEVARD FLOODWALL
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
TERMINAL CIRCLE
CLUBHOUSE DRIVE
A
IR
W A
Y B
O U
LE
V
A R
D
HOLE 17 CART
PATH ALIGNMENT
AIRWAY BOULEVARD
BERM ALIGNMENT
AIRWAY BOULEVARD
FLOODWALL ALIGNMENT
SCALE: 1" = 80'
PLAN
SCALE: 1 INCH = 80 FEET
80 0 80 160
ALIGNMENT PLAN &
ALIGNMENT TABLES
C5
TEMPORARY CONTROL POINTS
POINT # NORTHING EASTING ELEVATION DESCRIPTION
21 2079665.76 6179880.30 384.55 HUB
22 2079713.41 6179997.99 384.53 HUB
25 2079501.08 6180309.78 384.55 HUB
27 2079507.37 6180388.95 390.39 MAG NAIL
NOTES:
1. TEMPORARY LOCAL CONTROL POINTS WERE ESTABLISHED IN 2022 AND MAY NOT EXIST.
CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND ESTABLISHING ALL CONTROL POINT TO
BE USED FOR PROJECT.
UE
UE
UE
(E) TREE,
PROTECT IN PLACE
SD
SD
SD
UE
UE
UE
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IR
R
IR
R
W
W
W
W
W
W W
W W
W
WWWWWWWWWWWWW
W
W
W
W
W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W W
W W
W
W
W
W
WW
W
WWWWW
W
W
W
W
W
W
W
W
W
W
IRR
IRR
IRR
IRR
IRR
IR
R
IR
R
IRR
IR
R
IR
R
IRR
IRR
IRR IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IR
R
IR
R
IRR
IRR
IRR
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IRR
IRR IRR
IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IR
R
IRR
IRR
IRR
IR
R
U E
U E
U E
U E
U E
U E
U E
U E
COM COM
C O
M C
O M
C O
M C
O M
COM
COM
COM COM
W W
W W
W W
(E) TOP OF BANK
(E) TOP OF BANK
(E) UNDERGROUND ELECTRIC
WATER IRRIGATION LINE, TYP.
RELOCATE AS NECESSARY FOR CONSTRUCTION
(E) ORDINARY HIGH
WATER MARK
ARROYO LAS POSITAS
REMOVE (E) CART PATH
(E) 8" AC CITY POTABLE
WATER MAIN
(E) RESTROOM
RAISE (E) CART PATH,
SEE DETAIL 5
D1
(E) 12" SD OUTFALL,
NOTE 14
(N) ESA & SILT FENCE
NOTE 12
(E) IRRIGATION LINES
(E) 8" GOLF COURSE
IRRIGATION MAIN
(E) AT&T CONDUIT
RAISE (E) CART PATH,
SEE PROFILE A
C12
12'
14'
12'
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LOD
LOD LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD 380
RAISE (E) TEE BOX FOR HOLE 10
NOTE 7, 8, & 11
500+00
500+50
501+00
501+50
NOTE 13
(N) CART PATH,
SEE DETAIL 2
D1
MATCH (E) PATHWAY
ALIGNMENT, GRADE AS SHOWN
LIMITS OF DISTURBANCE
SCALE: 1 INCH = 20 FEET
20 0 20 40
SCALE: 1" = 20'
PLAN
NOTES:
1. THE EXTENT, ELEVATIONS, AND QUANTITIES OF GRADING IS APPROXIMATE AND SHALL BE
CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S REPRESENTATIVES IN THE FIELD DURING
CONSTRUCTION.
2. CONTRACTOR SHALL REMOVE AND DISPOSE OF TRASH, SOIL, SILT, MUD, EXCESSIVE ORGANIC
MATERIAL AND DEBRIS WITHIN THE LIMITS OF CONSTRUCTION.
3. SITE RESTORATION NORTH OF PATHWAY AND HOLE 10 TEE BOX: BIODEGRADABLE EROSION
CONTROL BLANKET AND BROADCAST SEEDING SHALL BE INSTALLED ON DISTURBED SLOPES
STEEPER THAN 5H:1V, AND HYDROSEEDING SHALL BE PLACED ON ALL OTHER DISTURBED AREAS AT
THE COMPLETION OF CONSTRUCTION. AVOID PLACEMENT IN LOW FLOW CHANNEL.
4. SOIL AND SEDIMENT REMOVAL SHALL NOT OCCUR WITHIN THE LIMITS OF THE EXISTING TREE ROOT
SYSTEMS FOR TREES TO REMAIN.
5. EQUIPMENT SHALL NOT ENTER THE CHANNEL BELOW THE OHWM AS DIRECTED BY THE CITY'S
BIOLOGIST.
6. PROTECT EXISTING TREES IN PLACE AND PROVIDE NECESSARY PROTECTION MEASURES. FULL
TREE PROTECTION MEASURES MAY NOT BE POSSIBLE DUE TO TREE LOCATION. CONTRACTOR
SHALL TAKE CAUTION TO NOT DAMAGE OR DISTURB TREE DURING CONSTRUCTION.
7. CONTRACTOR SHALL COORDINATE LOCATION AND LIMITS OF (N) TEE BOX FOR HOLE 10 WITH THE GOLF COURSE AND CITY. CONTRACTOR SHALL MARK LOCATION OF PROPOSED TEE BOX LOCATION
AND DISCUSS WITH CITY PRIOR TO CONSTRUCTION.
8. TEE BOX AND SURROUNDING GROUND FROM THE EXISTING RESTROOM TO THE (N) CART PATH SHALL BE RAISED TO A MINIMUM ELEVATION OF 380.5'. CLEAR, GRUB, AND GRADE AREA PER THE
SPECIFICATIONS. 2-FEET OF OVEREXCAVATION IS NOT REQUIRED AT THIS LOCATION.
9. ALL DAMAGED OR REMOVED TURF IN THE FAIRWAYS AND ROUGH AREAS SHALL BE FULLY
RESTORED WITH SOD PER DETAIL .
10. GOLF COURSE TEE BOX SHALL BE CONSTRUCTED PER DETAIL .
11. CONTRACTOR SHALL ADJUST, MODIFY, AND REPLACE EXISTING IRRIGATION SYSTEM AS NECESSARY
TO PROVIDE COMPLETE COVERAGE TO ALL AREAS IMPACTED BY THE WORK. CONTRACTOR SHALL
LOCATE (E) IRRIGATION HEADS AND LINES, PREPARE DRAWINGS OF PROPOSED IRRIGATION
MODIFICATIONS, AND OBTAIN APPROVAL FROM THE CITY AND GOLF COURSE PRIOR TO
CONSTRUCTION.
12. ESA & SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE PLANS AND AS DIRECTED BY THE CITY'S BIOLOGIST IN THE FIELD, PER DETAIL . ADDITIONAL SILT FENCE AND BMP'S ARE REQUIRED AS
SHOWN IN THE PROJECT SWPPP.
13. CONTRACTOR SHALL REFER TO ALIGNMENT TABLE ON SHEET C4, FOR BEEB'S CART PATH
ALIGNMENT.
14. CONTRACTOR SHALL CLEAN AND CCTV INSPECT THE EXISTING 12" STORM DRAIN OUTFALL PIPE.
CONTRACTOR SHALL EXPECT THE PIPE TO BE NEARLY FULL OF SEDIMENT AND DEBRIS. CLEANING MAY REQUIRE A SIGNIFICANT EFFORT AND ADVANCED CLEANING TOOLS/EQUIPMENT. THE STORM DRAIN OUTFALL IS BURIED WITHIN THE CHANNEL AND IS NOT ACCESSIBLE. CONTRACTOR SHALL NOT
ALLOW CLEANING WATER OR DEBRIS TO ENTER THE CHANNEL.
A M
A T
C H
L
IN
E
- S
E E
S H
E E
T A
C
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
D1
D1
D2
SITE PLAN
C6
U E
U E
U E
U E
U E
U E
U E
U E
U E
G G
G U
E U
E U
E
U E
U E
U E
U E
U E
U E
C 12E
(E) TOP OF BANK
C
A
BEEB'S SPORTS
BAR & GRILL
(E) SANITARY SEWER
L1
L7
L9
L14
MH
SD
SD
SD
SD
S D
S D
S D
SDSD
S D
S D
SD
SD
SD
SDSDSDSDSD
U E
U E
U E
U E
U E
U E
U E
U E
U E
W W
W
W
W W
W
W W
W
W
W
W
G G
G G
G G
G
W
W
W
W W W W W W W W
W
W
W
W
W W W
W W
W W
W W
W W
W W
W
W
W W W W W W W W W W
W W W W W W W W W W W W W W W
W
WWWW
IRR IRR
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IR
R
IRR
IRR
IR
R
C O
M C
O M
COMCOMCOMCOMCOMCOMCOMCOMCOMCOM
COM COM COM COM COM COM COM COM COM COM COM COM
COM
COM
COM
COM
COM
COM COM COM COM COM COM COM COM COM COM COM
COM
C O
M C
O M
C O
M C
O M
COM
COM
COM
COM
COM
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
U E
UE UE UE UE UE UE UE UE UE UE UE
U E
U E
U E
U E
U E
U E
U E
W
R W
R W
R W
R W
R W
R W
R W
R W
RW
RW
RW
RW RW
W W
W W
W W
R W
W
W
W
W
W
W
IRR
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IR
R
IR
R
IRR
IRR
IRR
U E
UE
SS
SS
SS
SS
SS
S S
S S
S S
S S
S S
S S
S S
S S
S D
S D
S D
W
W
W
W W
W W
W
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
(N) 6" CONCRETE CURB
NOTE 18
INSTALL (N) RAILING ON TOP
OF (E) RETAINING WALL
SEE DETAIL
(E) PARKING LOT
NOTE 10
(N) 6" CONCRETE CURB
FROM STA 501+63 TO STA 502+74
NOTE 18
D1
(N) ESA & SILT FENCE,
SEE NOTE 17
(E) ORDINARY HIGH
WATER MARK
(E) TOP OF BANK
ARROYO LAS POSITAS
REMOVE (E) CART PATH &
PARKING STALLS. RESTORE
AREA W/ HYDROSEEDING AND
EROSION CONTROL BLANKET
SLOPE TO DRAIN TO CHANNEL
CLEAN & INSPECT PIPE AND
INSTALL (N) 12" INTERNAL CHECK VALVE
NOTE 12 & 13
(E) GAS MAIN
C
E
C
G
C14 I
DRAIN AND FLAPGATE
THROUGH FLOODWALL
SEE NOTE 8
GREEN FOR
HOLE #18
ARROYO LA
S P
OSIT
AS
(E) IRRIGATION WATER MAIN
C
H
C
D
L3
C
J
C
C
0 379
C
B
C
F
REMOVE AND REPLACE (E) CURB AND GUTTER,
AC PARKING LOT, AND PAVEMENT MARKINGS
AS NECESSARY FOR CONSTRUCTION
NOTE 10
(E) 18" RECLAIMED WATER MAIN
(N) FLOODWALL TYPE 1,
SEE SHEET C13 & DETAIL A
S1
L5
L4
L2
(N) CART PATH
SEE PROFILE & DETAILA
C12
REMOVE (E) TREE, TYP.
SEE SHEET C23
(E) AT&T CONDUIT
(N) CONSTRUCTION
STOCKPILE AREA
(N) CONSTRUCTION
STOCKPILE AREA
(E) 8" AC CITY POTABLE
WATER MAIN
(E) 16" DI CITY
POTABLE WATER MAIN
L11
12'
(N) BERM
SEE NOTE 15
L6
C 12D
NOTE 19
NOTE 14
NOTE 14
L8
L10
L13
L12
LOD
LO
D
LO
D
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LODLOD
LODLOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
502+81
2+
502+50
REMOVE (E) LIGHT POLE
NOTE 9
REMOVE (E) SDDI &
REPLACE W/ (N) SDMH
NOTE 11
(E) ELECTRICAL
TRANSFORMER
(E) 8" GOLF COURSE
IRRIGATION MAIN
(N) FLOOD GATE,
SEE DETAIL AND SPECIFICATION SECTION 107119A
S2
(E) UNDERGROUND ELECTRIC
REMOVE (E) CURB & GUTTER
WITHIN LIMITS OF WORK
NOTE 10
EXTEND CURB TO
(N) FLOODWALL
(E) PG&E TRANSFORMER
D1
LIMITS OF DISTURBANCE
REMOVE (E)
STOCKPILED SOIL
365'
370'
375'
380'
385'
390'
395'
400'
405'
365'
370'
375'
380'
385'
390'
395'
400'
405'
5000+00 5000+25 5000+50 5000+75 5001+00 5001+25 5001+50 5001+75 5002+00
(N
S D
M H
R
IM
: 3
.0
IN
V : 3
.8
(1
2"
IN
REMOVE (E) SDDI
RIM: 376.80
(E
S D
D I -
R
IM
: 3
.9
IN
V
: 3
.4
(1 2"
IN
IN
V
: 3
.4
(1 2"
O U
T
(E) 12" SD
CLEAN & INSPECT (E) 12" SD
NOTE 12
(N) GRADE
(E) GRADE
INSTALL (N) 12" INTERNAL CHECK VALVE
NOTE 13
SCALE: 1 INCH = 20 FEET
20 0 20 40
SCALE: 1" = 20'
PLAN
A M
A T
C H
L
IN
E
S E
E S
H E
E T
A C
C8
B
M
ATCH LINE - SEE SHEET
B
NOTES:
1. THE EXTENT, ELEVATIONS, AND QUANTITIES OF GRADING IS APPROXIMATE
AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY THE CITY'S
REPRESENTATIVES IN THE FIELD DURING CONSTRUCTION.
2. THE LOCATIONS AND LIMITS OF TREE REMOVAL AND TRIMMING IS
APPROXIMATE AND SHALL BE CONFIRMED AND ADJUSTED AS DIRECTED BY
THE CITY'S REPRESENTATIVES IN THE FIELD DURING CONSTRUCTION.
3. CONTRACTOR SHALL REMOVE AND DISPOSE OF TRASH, SOIL, SILT, MUD,
EXCESSIVE ORGANIC MATERIAL AND DEBRIS.
4. SITE RESTORATION NORTH OF PATHWAY AND FLOODWALL:
BIODEGRADABLE EROSION CONTROL BLANKET AND BROADCAST SEEDING
SHALL BE INSTALLED ON DISTURBED SLOPES STEEPER THAN 5H:1V, AND
HYDROSEEDING SHALL BE PLACED ON ALL OTHER DISTURBED AREAS AT
THE COMPLETION OF CONSTRUCTION. AVOID PLACEMENT IN LOW FLOW
CHANNEL.
5. SOIL AND SEDIMENT REMOVAL SHALL NOT OCCUR WITHIN THE LIMITS OF
THE EXISTING TREE ROOT SYSTEMS FOR TREES TO REMAIN.
6. EQUIPMENT SHALL NOT ENTER THE CHANNEL BELOW THE OHWM AS
DIRECTED BY THE CITY'S BIOLOGIST.
7. REMOVE TREES AS INDICATED ON THE PLANS AND AS SHOWN ON SHEETS
C23, SEE TECHNICAL SPECIFICATIONS FOR TREE REMOVAL
REQUIREMENTS.
8. INSTALL (N) DRAIN THROUGH FLOODWALL AND ATTACH (N) FLAPGATE TO
FLOODWALL PER DETAIL . LOCATE AT THE LOW POINT ON SOUTH SIDE
OF WALL.
9. CONTRACTOR SHALL REMOVE (E) LIGHT POLE AND DISPOSE OF POLE AND
FOUNDATION. CONTRACTOR SHALL RECONNECT (E) LIGHT CIRCUIT AND
INSTALL (N) PULL BOX AS NECESSARY TO MAINTAIN (E) EXTERIOR LIGHTING
TO REMAIN. WORK SHALL BE COORDINATED W/ GOLF COURSE AND THE
CITY.
10. REMOVE AND REPLACE (E) AC PARKING LOT AND CONCRETE CURB PER
DETAIL & , AS NECESSARY FOR CONSTRUCTION.
11. CONTRACTOR SHALL REMOVE (E) SDDI AND REPLACE W/ (N) SDMH. THE
NEW STORM DRAIN MANHOLE SHALL BE INSTALLED PER DETAIL . SEE
PROFILE BELOW.
12. CONTRACTOR SHALL CLEAN AND CCTV INSPECT THE EXISTING 12" STORM
DRAIN OUTFALL PIPE. CONTRACTOR SHALL EXPECT THE PIPE TO BE
NEARLY FULL OF SEDIMENT AND DEBRIS. CLEANING MAY REQUIRE A
SIGNIFICANT EFFORT AND ADVANCED CLEANING TOOLS/EQUIPMENT. THE
STORM DRAIN OUTFALL IS BURIED WITHIN THE CHANNEL AND IS NOT
ACCESSIBLE. CONTRACTOR SHALL NOT ALLOW CLEANING WATER OR
DEBRIS TO ENTER THE CHANNEL.
13. CONTRACTOR SHALL INSTALL (N) 12" INTERNAL CHECK VALVE ON (E) 12"
STORM DRAIN. CHECK VALVE SHALL BE RED VALVE CHECKMATE
ULTRAFLEX OR APPROVED EQUAL.
14. CONTRACTOR SHALL REFER TO ALIGNMENT TABLE ON SHEET C4, FOR
GOLF COURSE FLOODWALL ALIGNMENT.
15. CONTRACTOR SHALL CONSTRUCT BERM CONNECTING HIGH POINT ALONG
(N) CART PATH AT ELEVATION 382.5' TO THE HIGH POINT WITHIN THE GOLF
COURSE AT ELEVATION 382.5'. CONTRACTOR SHALL MARK OUT LOCATION
AND DISCUSS GRADING WITH CITY AND ENGINEER PRIOR TO
CONSTRUCTING. AREA UNDER RAISED PATHWAY AND BERM SHALL BE
OVEREXCAVATED 2' BELOW EXISTING GRADE, SCARIFY AND COMPACT
SUBGRADE PRIOR TO PLACING FILL MATERIAL.
D2
A L I F O R N I AC
BE
NJAMIN L.
No. 68813
CI LIV
STATE OF
AINROFILAC
RE
GI
ST
ER
ED
PROF
RE
EN
IG
NE
LANOISSE
SHICK
(707) 528-4848
SANTA ROSA, CA 95405
2200 RANGE AVENUE, STE 201
CONSULTING CIVIL ENGINEERS
Schaaf WheelerInch
1.0
APPROVED BY DATE
05/16/25
DESIGNED BY JFO
DRAWN BY JFO
CHECKED BY BLS NO. DATE BY REVISIONS
CITY OF GOLF COURSE DAMAGE REPAIRS
PROJECT NO. SD202132
Sheet
Of
Scale: AS SHOWN
COMMUNITY DEVELOPMENT DEPARTMENT-ENGINEERING DIVISION
City Project No. SD202132
D1
D2
D2
D2
HOR. SCALE: 1" = 20'
PROFILE
VER. SCALE: 1" = 10'
NOTES CONTINUED:
16. CONTRACTOR SHALL ADJUST, MODIFY, AND REPLACE (E) IRRIGATION SYSTEM AS NECESSARY TO PROVIDE COMPLETE COVERAGE TO ALL AREAS IMPACTED.
CONTRACTOR SHALL LOCATE (E) IRRIGATION HEADS AND LINES, PREPARE DRAWINGS OF PROPOSED IRRIGATION MODIFICATIONS, AND OBTAIN APPROVAL
FROM THE CITY AND GOLF COURSE PRIOR TO CONSTRUCTION.
17. ESA & SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE PLANS AND AS DIRECTED BY THE CITY'S BIOLOGIST IN THE FIELD, PER DETAIL . ADDITIONAL
SILT FENCE AND BMP'S ARE REQUIRED AS SHOWN IN THE PROJECT SWPPP.
18. INSTALL (N) 6" CONCRETE CURB PER DETAIL .