3_GLEN_15-3307_Specifications.pdf
PDF 642 KB Posted
- Attached to
- FA2550-17-R-1015 Repair West Drainage Crossing
- Solicitation number
- GLEN_15-3307
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2_Water_Fill_Point_Map.pdf | ||
| 1_Clean_Soil_Stockpile_Area_Map.pdf | ||
| GLEN_15-3307_RFI_3_Gov't_Response.pdf | ||
| 7_WD_CO20160012.pdf | ||
| GLEN_15-3307_Drawings.PDF | ||
| 2_GLEN_15-3307_SOW.pdf | ||
| 4_Design_Guide_Version_March_2016.pdf | ||
| 5_GLEN_15-3307_Form_66.xlsx | XLSX spreadsheet | |
| 01_57_20.04_SAFB_Overreaching_Environmental.rtf | RTF text file | |
| 1_FA255017R1015_GLEN15-3307_1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
(FOR CONSTRUCTION CONTRACT)
90 PERCENT
SOLICITATION NO. W9128F-16-X-00XX
CHANNEL IMPROVEMENTS FOR SOUTH
PERIMETER (EAST AND WEST)
SCHRIEVER AFB, COLORADO
PREPARED BY:
U.S. Army Corps of Engineers, Omaha District
JANUARY 2016
This page was intentionally left blank for duplex printing.
00 01 10 - 1 PROJECT TABLE OF CONTENTS
SPECIFICATIONS FOR CONSTRUCTION
CHANNEL IMPROVEMENTS FOR SOUTH PERIMETER (EAST AND WEST)
SCHRIEVER AFB, COLORADO
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 41 26.05 24 (FEDERAL FACILITIES COLORADO) NPDES PERMIT REQUIREMENTS FOR
STORM WATER DISCHARGES FROM CONSTRUCTION SITES
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 41 16 METAL SHEET PILING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 15 00 AGGREGATE SURFACE COURSE
32 31 00.00 10 CHAIN LINK FENCE
32 92 19 SEEDING
-- End of Project Table of Contents --
Channel Improvements for South Perimeter - Schriever SH37
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 41 26.05 24
(FEDERAL FACILITIES COLORADO) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES FROM CONSTRUCTION SITES
02/07
PART 1 GENERAL
1.1 REFERENCES (Not Applicable)
1.2 SUBMITTALS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL
3.2 IMPLEMENTATION
3.2.1 Notice of Intent
3.2.2 Storm Water Pollution Prevention Plan
3.2.2.1 General
3.2.2.2 Acceptance of SWPPP
3.2.2.3 Notification of Changes
3.2.3 Posting Notice
3.2.4 Inspections and Reporting
3.2.4.1 Inspector Qualifications
3.2.5 Maintenance
3.2.6 Notice of Termination
3.2.7 Retention of Records
3.2.8 Continuation of Expired Permit
-- End of Section Table of Contents --
SECTION 01 41 26.05 24 Page 1
SECTION 01 41 26.05 24
(FEDERAL FACILITIES COLORADO) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES FROM CONSTRUCTION SITES
02/07
Attachments: Government's SWPPP
PART 1 GENERAL
1.1 REFERENCES (Not Applicable)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Inspector Qualifications
Name and qualifications of all personnel who will be performing inspections on the site.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL
The Contractor shall be responsible for implementing the terms and requirements of the attached National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities (Permit No. COR12000F, hereinafter called "the permit") as specified below. The Government and the Contractor shall be considered co-permittees. The Government has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications. The Contractor shall have day-to-day operational control of those activities which are necessary to ensure compliance with the requirements specified herein. The Contractor shall be responsible for all submissions to the EPA and shall retain the official copy of all documents pertaining to compliance with the permit during construction. The project site is not located in designated critical habitat and there are no known "listed species" located in the project area.
3.2 IMPLEMENTATION
3.2.1 Notice of Intent
The Contractor shall electronically complete and sign a Notice of Intent (NOI) in accordance with the Permit. The Contractor shall notify the
SECTION 01 41 26.05 24 Page 2
Contracting Officer's Representative within 24 hours after submitting his NOI. The Contractor shall not submit his NOI to the EPA until his Storm Water Pollution Prevention Plan has been accepted by the Government. After completion of the electronic NOI, a 14-day waiting period begins. The EPA will give the Contractor authorization that his NOI is in effect after the 14-day waiting period. The Contractor may not begin land disturbance activities until authorized by the Contracting Officer.
3.2.2 Storm Water Pollution Prevention Plan
3.2.2.1 General
The Contractor shall each prepare a Stormwater Pollution Prevention Plan (SWPPP) for the project. The SWPPP describes the Government's responsibilities as the permittee with operational control over construction plans and specifications. The SWPPP describes the Conntractor's responsibilities to include all other requirements described in the general permit. The Government will provide the Contractor with a SWPPP template to use if he chooses. The Contractor shall include appropriate controls and measures for any off-site support activities covered under the permit. The SWPPP shall describe the nature and location of the activity and a location map and site map shall be included in accordance with the permit. The Contractor shall be responsible for implementing, maintaining and updating the SWPPP (including Site Map) during construction. Unless otherwise indicated, the Contractor shall be responsible for implementing all measures described in the SWPPP. The Contractor shall maintain the following records and attach to the SWPPP:
the dates when major grading activities occur; the dates when construction activities temporarily or permanently cease on a portion of the site; and the dates when stabilization measures are initiated. The SWPPP shall be signed by the Contractor and the Government. A copy of the written authorization shall be attached to the SWPPP for any person signing the SWPPP or Inspection Reports other than the person described in the permit.
If major changes to the SWPPP are required during construction, the SWPPP shall be recertified by the Contractor.
3.2.2.2 Acceptance of SWPPP
Acceptance of the SWPPP is required prior to the start of construction.
Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes to thr SWPPP if the Contracting Officer determines that environmental protection requirements are not being met.
3.2.2.3 Notification of Changes
After acceptance of the SWPPP, the Contractor shall notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
3.2.3 Posting Notice
The Contractor shall post copies of each of the NOI's electronically submitted to the EPA Storm Water Notice Processing Center. The NOI shall be posted conspicuously near the main entrance of the construction site.
SECTION 01 41 26.05 24 Page 3
3.2.4 Inspections and Reporting
The Contractor shall be responsible for all inspections required by the general permit. The Contractor shall also prepare and sign all reports summarizing the inspections as required by the general permit. Copies of inspection reports shall be attached to the SWPPP and provided to the Contracting Officer's Representative within 24 hours after completion of each inspection. The Contractor shall notify the Contracting Officer within 24 hours if an inspection identifies any incidents of non-compliance with the SWPPP and the general permit.
3.2.4.1 Inspector Qualifications
Contractor personnel performing inspections shall be knowledgeable in the principles and practice of erosion and sediment controls and possess the skills to assess conditions at the construction site that could impact storm water quality and to assess the effectiveness of any sediment and erosion control measures selected to control the quality of storm water discharges from the construction site. The Contractor shall submit the name and qualifications of all personnel who will be performing inspections on the site.
3.2.5 Maintenance
The Contractor shall be responsible for maintaining all erosion and sediment control measures and other protective measures identified in the SWPPP in an effective operating condition. The Government reserves the right to require the Contractor to perform maintenance on erosion and sediment control measures and other protective measures if the Contracting Officer determines that environmental protection requirements are not being met.
3.2.6 Notice of Termination
The Contractor shall establish a stand of grass in all disturbed areas of the project not otherwise surfaced and shall meet the requirements for "Final Stabilization" as defined in the permit prior to terminating permit coverage. The Contractor shall notify the Contracting Officer within 2 working days after final stabilization on all portions of the site has been achieved in accordance the permit. The Contractor shall electronically complete and sign a Notice of Termination (NOT) in accordance with the permit. A copy of the Contractor's NOT and the updated SWPPP shall be furnished to the Contracting Officer within 5 calendar days after final stabilization has been achieved on all portions of the site.
3.2.7 Retention of Records
After the Contractor submits his NOT, the Government shall be responsible for retaining copies of the SWPPP and all reports in accordance with the permit.
3.2.8 Continuation of Expired Permit
If the current permit expires prior to completion of construction, the Contractor shall comply with the conditions of the new permit.
-- End of Section --
SECTION 01 41 26.05 24 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 57 20.00 10
ENVIRONMENTAL PROTECTION
04/06
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
1.2.2 Environmental Protection
1.2.3 Contractor Generated Hazardous Waste
1.2.4 Installation Pest Management Coordinator
1.2.5 Land Application for Discharge Water
1.2.6 Pesticide
1.2.7 Pests
1.2.8 Surface Discharge
1.2.9 Waters of the United States
1.2.10 Wetlands
1.3 GENERAL REQUIREMENTS
1.4 SUBCONTRACTORS
1.5 PAYMENT
1.6 SUBMITTALS
1.7 ENVIRONMENTAL PROTECTION PLAN
1.7.1 Compliance
1.7.2 Contents
1.7.3 Appendix
1.8 PROTECTION FEATURES
1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
1.10 NOTIFICATION
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 ENVIRONMENTAL PERMITS, REVIEWS, APPROVALS, AND NOTIFICATIONS
3.1.1 State of Colorado Fugitive Dust Permit
3.1.2 EPA's National Pollutant Discharge Elimination System (NPDES)
General Permit for Storm Water Discharge Associated with Construction Sites
3.1.2.1 Municipal Separate Storm Sewer Systems (MS4) Permit
3.1.3 Notification of Demolition and Renovation
3.1.4 US Army Corps of Engineers 404 Permit
3.2 LAND RESOURCES
3.2.1 Work Area Limits
3.2.2 Landscape
3.2.3 Erosion and Sediment Controls
3.2.4 Contractor Facilities and Work Areas
3.3 WATER RESOURCES
3.4 AIR RESOURCES
SECTION 01 57 20.00 10 Page 1
3.4.1 Particulates
3.4.2 Odors
3.4.3 Sound Intrusions
3.4.4 Burning
3.5 MANAGEMENT AND DISPOSAL OF WASTE AND CHEMICAL MATERIALS
3.5.1 Solid Wastes
3.5.2 Chemicals and Chemical Wastes
3.5.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
3.5.4 Fuel and Lubricants
3.5.5 Waste Water
3.6 RECYCLING AND WASTE MINIMIZATION
3.7 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
3.8 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.9 BIOLOGICAL RESOURCES
3.9.1 Migratory Bird Treaty Act
3.10 INTEGRATED PEST MANAGEMENT
3.10.1 Pesticide Delivery and Storage
3.10.2 Qualifications
3.10.3 Pesticide Handling Requirements
3.10.4 Application
3.11 PREVIOUSLY USED EQUIPMENT
3.12 MAINTENANCE OF POLLUTION FACILITIES
3.13 MILITARY MUNITIONS
3.14 TRAINING OF CONTRACTOR PERSONNEL
3.15 POST CONSTRUCTION CLEANUP
SECTION 01 57 20.00 10 Page 2
SECTION 01 57 20.00 10
ENVIRONMENTAL PROTECTION
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011) Safety and Health Requirements Manual
WETLAND MANUAL Corps of Engineers Wetlands Delineation Manual Technical Report Y-87-1
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
33 CFR 328 Definitions of Waters of the United States
40 CFR 150 - 189 Pesticide Programs
40 CFR 260 Hazardous Waste Management System: General
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 279 Standards for the Management of Used Oil
40 CFR 302 Designation, Reportable Quantities, and Notification
40 CFR 355 Emergency Planning and Notification
40 CFR 68 Chemical Accident Prevention Provisions
49 CFR 171 - 178 Hazardous Materials Regulations
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life;
affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.
SECTION 01 57 20.00 10 Page 3
1.2.2 Environmental Protection
Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.3 Contractor Generated Hazardous Waste
Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners,excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.
1.2.4 Installation Pest Management Coordinator
Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.
1.2.5 Land Application for Discharge Water
The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.
1.2.6 Pesticide
Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.
1.2.7 Pests
The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.
1.2.8 Surface Discharge
The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers,creeks, and/or "waters of the United States" and would require a
SECTION 01 57 20.00 10 Page 4 permit to discharge water from the governing agency.
1.2.9 Waters of the United States
All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.
1.2.10 Wetlands
Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with WETLAND MANUAL.
1.3 GENERAL REQUIREMENTS
Minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. Comply with all applicable environmental Federal, State, and local laws and regulations.
Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility.
1.4 SUBCONTRACTORS
Ensure compliance with this section by subcontractors.
1.5 PAYMENT
No separate payment will be made for work covered under this section.
Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations are the Contractor's responsibility. All costs associated with this section must be included in the contract price.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Environmental Protection Plan; G,RO
The environmental protection plan.
1.7 ENVIRONMENTAL PROTECTION PLAN
Prior to commencing construction activities or delivery of materials to the site, the Contractor shall submit an Environmental Protection Plan for review and approval by the Contracting Officer. The purpose of the Environmental Protection Plan is to present a comprehensive overview of
SECTION 01 57 20.00 10 Page 5 known or potential environmental issues which the Contractor must address during construction. Issues of concern shall be defined within the Environmental Protection Plan as outlined in this section. The Contractor shall address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but which the Contractor considers necessary, shall be identified and discussed after those items formally identified in this section. Prior to submittal of the Environmental Protection Plan, the Contractor shall meet with the Contracting Officer for the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's Environmental Plans. The Contractor shall maintain a current version of the Environmental Protection Plan on site for review by interested parties.
1.7.1 Compliance
No requirement in this Section shall be construed as relieving the Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During Construction, the Contractor shall be responsible for identifying, submitting for approval, and implementing any additional requirements to be included in the Environmental Protection Plan.
1.7.2 Contents
The environmental protection plan shall include, but shall not be limited to, the following:
a. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan.
b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.
c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
d. Description of the Contractor's environmental protection personnel training program.
e. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan shall include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations. A Storm Water Pollution Prevention Plan (SWPPP) may be substituted for this plan.
f. Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials including methods to control runoff and to contain materials on the site.
g. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet
SECTION 01 57 20.00 10 Page 6 weather. Plan shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.
h. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within authorized work areas.
i. Drawing showing the location of borrow areas.
j. The Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. This plan shall include as a minimum:
1. The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual shall immediately notify the Schriever's Fire Department, the Contracting Officer, and Schriever's Directorate of Public Works Office, Environmental Office in addition to the legally required Federal, State, and local reporting channels (including the National Response Center 1-800-424-8802) if a reportable quantity is released to the environment. The plan shall contain a list of the required reporting channels and telephone numbers.
2. The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
3. Training requirements for Contractor's personnel and methods of accomplishing the training.
4. A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
5. The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
6. The methods and procedures to be used for expeditious contaminant cleanup.
k. A non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris. The plan shall include schedules for disposal. The Contractor shall identify any subcontractors responsible for the transportation and disposal of solid waste. Licenses or permits shall be submitted for solid waste disposal sites that are not a commercial operating facility. Evidence of the disposal facility's acceptance of the solid waste shall be attached to this plan during the construction. The Contractor shall attach a copy of each of the Non-hazardous Solid Waste Diversion Reports to the disposal plan. The report shall be submitted on the first working day after the first quarter that non-hazardous solid waste has been disposed and/or diverted and shall be for the previous
SECTION 01 57 20.00 10 Page 7 quarter (e.g. the first working day of January, April, July, and October). The report shall indicate the total amount of waste generated and total amount of waste diverted in cubic yards or tons along with the percent that was diverted.
l. A recycling and solid waste minimization plan with a list of measures to reduce consumption of energy and natural resources. The plan shall detail the Contractor's actions to comply with and to participate in Federal, State, Regional, and local government sponsored recycling programs to reduce the volume of solid waste at the source.
m. An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
n. A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1, a copy of the Material Safety Data Sheets (MSDS) and the maximum quantity of each hazardous material to be on site at any given time shall be included in the contaminant prevention plan. As new hazardous materials are brought on site or removed from the site, the plan shall be updated.
o. A waste water management plan that identifies the methods and procedures for management and/or discharge of waste waters which are directly derived from construction activities, such as concrete curing water, clean-up water, dewatering of ground water, disinfection water, hydrostatic test water, and water used in flushing of lines. If a settling/retention pond is required, the plan shall include the design of the pond including drawings, removal plan, and testing requirements for possible pollutants. If land application will be the method of disposal for the waste water, the plan shall include a sketch showing the location for land application along with a description of the pretreatment methods to be implemented. If surface discharge will be the method of disposal, a copy of the permit and associated documents shall be included as an attachment prior to discharging the waste water. If disposal is to a sanitary sewer, the plan shall include documentation that the Waste Water Treatment Plant Operator has approved the flow rate, volume, and type of discharge.
p. A historical, archaeological, cultural, biological, and wetland resources plan that defines procedures for identifying and protecting the resources known to be on the project site and any resources discovered during construction. The plan shall identify lines of communication between Contractor personnel and the Contracting Officer.
q. A pesticide treatment plan shall be included and updated, as information becomes available. The plan shall include: sequence of treatment, dates, times, locations, pesticide trade name, EPA registration numbers, authorized uses, chemical composition, formulation, original and applied concentration, application rates of active ingredient (i.e. pounds of active ingredient applied), equipment used for application and calibration of equipment. The Contractor is responsible for Federal, State, Regional and Local pest management record keeping and reporting requirements as well as any additional specific requirements.
SECTION 01 57 20.00 10 Page 8
1.7.3 Appendix
Copies of all environmental permits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents shall be attached,as an appendix, to the Environmental Protection Plan.
1.8 PROTECTION FEATURES
This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any on site construction activities, the Contractor and the Contracting Officer shall make a joint condition survey. Immediately following the survey, the Contractor shall prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. This survey report shall be signed by both the Contractor and the Contracting Officer upon mutual agreement as to its accuracy and completeness. The Contractor shall protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the Contractor's work under the contract.
1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
Any deviations, requested by the Contractor, from the drawings, plans and specifications which may have an environmental impact will be subject to approval by the Contracting Officer and may require an extended review, processing, and approval time. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.
1.10 NOTIFICATION
The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State or local environmental laws or regulations, permits, and other elements of the Contractor's Environmental Protection plan. The Contractor shall, after receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions shall be granted or equitable adjustments allowed to the Contractor for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or Federal Law.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 ENVIRONMENTAL PERMITS, REVIEWS, APPROVALS, AND NOTIFICATIONS
This paragraph supplements the Contractor's responsibility under the
SECTION 01 57 20.00 10 Page 9 contract clause "PERMITS AND RESPONSIBILITIES". The Contractor shall be responsible for obtaining all environmental construction permits, approvals, and/or submitting notifications required by Federal, State, Regional, and local environmental laws and regulations.
3.1.1 State of Colorado Fugitive Dust Permit
The Contractor shall be responsible for obtaining the State of Colorado Land Development (Fugitive Dust)permit prior to construction commencing.
The State of Colorado may take a maximum of 60-days to review and issue the permit. The Contractor shall be responsible for completing, modifying any information to comply with the State of Colorado laws and regulations, and submitting the attached Air Pollutant Emission Notice(APEN)-and-Application for Construction permit including the Land Development-Fugitive Dust Control Plan, and the Notice of Start-up (which is required to be submitted 30 days prior to commencement of construction) along with the project's grading plan to the State of Colorado. The Contractor is responsible for payment of all fees associated with the permit.
3.1.2 EPA's National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharge Associated with Construction Sites
The Contractor and the Government shall be co-permittee's for EPA's National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharge Associated with Construction Sites on Federal Lands in the State of Colorado if the Corps of Engineers is the design agent. If the Contractor is the design agent as well as the Construction Contractor then the Contractor is the sole permittee for EPA's National Pollution Discharge Elimination System (NPDES) General Permit for Storm Water Discharge Associated with Construction Sites on Federal Lands in the State of Colorado. Construction activities results in the disturbance of 1 acre of land or more, coverage under the EPA Storm Water General Permit For Construction Activities (Colorado Permit No. COR12*##F) is required. See
SECTION 01 41 26.05 24 NPDES PERMITS FOR STORM WATER DISCHARGES FROM
CONSTRUCTION SITES.
3.1.2.1 Municipal Separate Storm Sewer Systems (MS4) Permit
Schriever is under a Municipal Separate Storm Sewer System (MS4) permit, issued by the US Environmental Protection Agency (EPA), which allows discharges of stormwater from Schriever. The MS4 permit also requires Schriever to manage a stormwater program and enforce compliance with EPA-issued permits. The following are requirements under the MS4 permit which are not required in the Construction General Permit for NPDES and must be included in the SWPPP. The MS4 permit also requires Schriever to manage a stormwater program and enforce compliance with EPA-issued permits.
- A dewatering plan will need to be included in the SWPPP, as the State of Colorado dewatering permit does not apply to Schriever.
- Cover trash containers at all times. When trash container is approximately 85% full, haul container to approved dump location.
- All concrete washouts need to be lined. The exchangeable pans are acceptable, as long as the washout water is managed adequately.
3.1.3 Notification of Demolition and Renovation
The Contractor shall be responsible for coordinating and submitting the notification of demolition and renovation to the governing agency in
SECTION 01 57 20.00 10 Page 10 accordance with all Federal, State, Regional, and local environmental laws and regulations.
3.1.4 US Army Corps of Engineers 404 Permit
The Army Corps of Engineer will issue coverage under a 404 permit for this work. The Environmental Assessment is being completed and then a 404 permit will be issued for the work in the Channel. A 401 State of Colorado permit will also be obtained as part of the 404 Permit process.
(NOTE: Will add more information as E/A is completed, draft is due 12/8.)
3.2 LAND RESOURCES
The Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any construction, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without approval. No ropes, cables, or guys shall be fastened to or attached to any trees for anchorage unless specifically authorized. The Contractor shall provide effective protection for land and vegetation resources at all times as defined in the following subparagraphs. Stone, soil, or other materials displaced into uncleared areas shall be removed by the Contractor.
3.2.1 Work Area Limits
Prior to commencing construction activities, the Contractor shall mark the areas that need not be disturbed under this contract. Isolated areas within the general work area which are not to be disturbed shall be marked or fenced. Monuments and markers shall be protected before construction operations commence. Any markers shall be visible in the dark. The Contractor's personnel shall be knowledgeable of the purpose for marking and/or protecting particular objects.
3.2.2 Landscape
Trees, shrubs, vines, grasses, land forms and other landscape features indicated and defined on the drawings to be preserved shall be clearly identified by marking, fencing, or wrapping with boards, or any other approved techniques. The Contractor shall restore landscape features damaged or destroyed during construction operations outside the limits of the approved work area.
3.2.3 Erosion and Sediment Controls
The Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall construct or install temporary and permanent erosion and sediment control best management practices (BMPs) as specified in Section 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL. BMPs may include, but not be limited to, vegetation cover, stream bank
SECTION 01 57 20.00 10 Page 11 stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Any temporary measures shall be removed after the area has been stabilized.
3.2.4 Contractor Facilities and Work Areas
The Contractor's field offices, staging areas, stockpile storage, and temporary buildings shall be placed in areas designated on the drawings or as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities shall be made only when approved. Erosion and sediment controls shall be provided for on-site borrow and spoil areas to prevent sediment from entering nearby waters. Temporary excavation and embankments for plant and/or work areas shall be controlled to protect adjacent areas.
3.3 WATER RESOURCES
The Contractor shall monitor construction activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. All water areas affected by construction activities shall be monitored by the Contractor.
For construction activities immediately adjacent to impaired surface waters, the Contractor shall be capable of quantifying sediment or pollutant loading to that surface water when required by State or Federally issued Clean Water Act permits.
3.4 AIR RESOURCES
Equipment operation, activities, or processes performed by the Contractor shall be in accordance with all Federal and State air emission and performance laws and standards.
3.4.1 Particulates
Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphalt batch plants; shall be controlled at all times, including weekends, holidays and hours when work is not in progress. The Contractor shall maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates which would cause the Federal, State, and local air pollution standards to be exceeded or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, baghouse, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. The Contractor must have sufficient, competent equipment available to accomplish these tasks. Particulate control shall be performed as the work proceeds and whenever a particulate nuisance or hazard occurs. The Contractor shall comply with all State and local visibility regulations. The Contractor shall comply with the attached Fugitive Dust Control Plan for Land Development and State of Colorado Fugitive Dust Permit.
3.4.2 Odors
Odors from construction activities shall be controlled at all times. The odors shall not cause a health hazard and shall be in compliance with State
SECTION 01 57 20.00 10 Page 12 of Colorado regulations and/or local ordinances.
3.4.3 Sound Intrusions
The Contractor shall keep construction activities under surveillance and control to minimize environment damage by noise. The Contractor shall comply with the provisions of the State of Colorado rules.
3.4.4 Burning
Burning shall be prohibited on the Government premises.
3.5 MANAGEMENT AND DISPOSAL OF WASTE AND CHEMICAL MATERIALS
Management and disposal of wastes and chemical materials shall be as directed below, unless otherwise specified in other sections and/or shown on the drawings. The Army has a "Sustainability" goal to reduce by 50% the amount of construction related debris that is deposited in local landfills. Material that are recyclable, e.g., concrete, asphalt, aluminum, copper, brass, steel, plastic, cardboard, glass, etc., shall be recycled so as to minimize impact on local landfills.
3.5.1 Solid Wastes
Solid wastes (excluding clearing debris) shall be placed in containers which are emptied on a regular schedule. Handling, storage, and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste off Government property and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal. A Subtitle D RCRA permitted landfill shall be the minimum acceptable off-site solid waste disposal option. The Contractor shall verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate.
3.5.2 Chemicals and Chemical Wastes
Chemicals shall be dispensed ensuring no spillage to the ground or water.
Periodic inspections of dispensing areas to identify leakage and initiate corrective action shall be performed and documented. This documentation will be periodically reviewed by the Government. Chemical waste shall be collected in corrosion resistant, compatible containers. Collection drums shall be monitored and removed to a staging or storage area when contents are within 6 inches of the top. Wastes shall be classified, managed, stored, and disposed of in accordance with Federal, State, and local laws and regulations.
3.5.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
Hazardous wastes are defined in 40 CFR 261, or are as defined by applicable State and local regulations. Hazardous materials are defined in 49 CFR 171 - 178. The Contractor shall, at a minimum, manage and store hazardous waste in compliance with 40 CFR 262. The Contractor shall take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. The Contractor shall segregate hazardous waste from other materials and wastes, shall protect it from the weather by placing it in a safe covered location, and shall take precautionary measures such as berming or other appropriate measures against accidental spillage. The Contractor shall be responsible for storage, describing, packaging, SECTION 01 57 20.00 10 Page 13 labeling, marking, and placarding of hazardous waste and hazardous material in accordance with 49 CFR 171 - 178, State, and local laws and regulations. The Contractor shall transport Contractor generated hazardous waste off Government property within 60 days in accordance with the Environmental Protection Agency and the Department of Transportation laws and regulations. The Contractor shall dispose of hazardous waste in compliance with Federal, State and local laws and regulations. Spills of hazardous or toxic materials shall be immediately reported to the Contracting Officer. Cleanup and cleanup costs due to spills shall be the Contractor's responsibility. The disposition of Contractor generated hazardous waste and excess hazardous materials are the Contractor's responsibility.
3.5.4 Fuel and Lubricants
Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spill and evaporation. Fuel, lubricants and oil shall be managed and stored in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded shall be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279, State, and local laws and regulations. There shall be no storage of fuel on the project site. Fuel must be brought to the project site each day that work is performed.
3.5.5 Waste Water
Disposal of waste water shall be as specified below.
a. Waste water from construction activities, such as on site material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. shall not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. The Contractor shall dispose of the construction related waste water off-Government property in accordance with all Federal, State, Regional and Local laws and regulations or by collecting and placing it in a retention pond where suspended material can be settled out and/or the water can evaporate to separate pollutants from the water. The site for the retention pond shall be coordinated with and approved by the Contracting Officer. At the time of completion of the project, the water and residue left in the pond shall be removed, tested, and disposed off-Government property in accordance with Federal, State, and local laws and regulations. The area shall be backfilled to the original grade, top-soiled and seeded/sodded.
b. Ground water encountered during construction activities shall be land applied on-site. Land application shall follow State of Colorado requirements for discharge although the State of Colorado does not have jurisdiction on Federal Facilities and no discharge permit will be necessary on Schriever. The Contractor shall discharge the water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, defined drainage areas, or discharge into the "waters of the State" shall occur.
3.6 RECYCLING AND WASTE MINIMIZATION
The Contractor shall participate in State and local government sponsored
SECTION 01 57 20.00 10 Page 14 recycling programs. The Contractor shall recycle acceptable cardboard and paper products through Schriever's Environmental Compliance Division, Office of Solid Waste. The Contractor is further encouraged to minimize solid waste generation throughout the duration of the project.
3.7 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
The Contractor shall maintain an inventory of non-hazardous solid waste diversion and disposal of construction and demolition debris. The Contractor shall submit a report toSchriever's Directorate of Public Work, Environmental Division Office through the Contracting Officer on the first working day after each fiscal year quarter, starting the first quarter that non-hazardous solid waste has been generated. The following shall be included in the report:
a. Construction and Demolition (C&D) Debris Disposed = _____ in cubic yards or tons, as appropriate.
b. Construction and Demolition (C&D) Debris Recycled = _____ in cubic yards or tons, as appropriate.
c. Total C&D Debris Generated = _____ in cubic yards or tons, as appropriate.
d. Waste Sent to Waste-To-Energy Incineration Plant (This amount should not be included in the recycled amount) = _____ in cubic yards or tons, as appropriate.
3.8 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
If during excavation or other construction activities any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, all activities that may damage or alter such resources shall be temporarily suspended. Resources covered by this paragraph include but are not limited to: any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human historical activities. Upon such discovery or find, the Contractor shall immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. The Contractor shall cease all activities that may result in impact to or the destruction of these resources. The Contractor shall secure the area and prevent Contractor personnel or other persons from trespassing on, removing, or otherwise disturbing such resources.
3.9 BIOLOGICAL RESOURCES
The Contractor shall minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The Contractor shall be responsible for the protection of threatened and endangered animal and plant species including their habitat in accordance with Federal, State, Regional, and local laws and regulations.
3.9.1 Migratory Bird Treaty Act
Clearing and grubbing shall be scheduled so as to avoid disturbance to any active nests of migratory birds covered by the above Act. Normally, that
SECTION 01 57 20.00 10 Page 15 allows clearing only from 15 September to 15 April. However, subject to the results of a survey by a qualified biologist, the CO may determine that trees and grasslands in the work area are free of nests, and allow such trees and grasslands to be cleared outside the stated time window.
Adherence to these guidelines will help avoid any unnecessary take of migratory birds and the penalties specified in the Act and associated regulations.
3.10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .