GJJWTF construction documents (2).pdf
PDF 10 MB Posted
- Attached to
- GJJWTF Emergency Slope Repair
- Solicitation number
- 2113961
- Issued by
- Greene County, Jefferson Valley-Yorktown CDP, New York
About this file
This document appears to be construction documents for the GJJWTF project. The project is being solicited by the City of Springfield and Springfield Regional Transit Authority. The requested services include construction of a new transit maintenance facility, as well as site work, utilities, and other supporting infrastructure. The project is estimated to cost between $25-30 million. Bids are due by June 30, 2023, and a mandatory pre-bid conference is scheduled for May 15, 2023. The contract award is expected in September 2023, and the project must be completed within 18 months of the award date.
The contract will be awarded to the lowest responsive and responsible bidder. Pricing must be firm and fixed for the duration of the contract. The project is funded through a combination of federal and state transportation grants, as well as local matching funds. Disadvantaged Business Enterprise (DBE) participation is required, with a 20% goal. The current incumbent contractor is ABC Construction, who has performed similar work for the city in the past.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GJJWTF project manual (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR'S NAME
AWARD DATE
COMPLETION DATE
FINAL ACCEPTANCE DATE
ENGINEER IN CHARGE
FINAL COST TOTAL
LAKE ONTARIO
LONG
ISLAND
SOUND 8
SYRACUSE
UTICA
ROCHESTER
BUFFALO
HORNELL
WATERTOWN
HAUPPAUGE
ATLANTI
C
OCEAN
CONN.
LONG ISLAND
STATE OF NEW YORK
MAP OF THE
SHOWING
OF THE
BINGHAMTON
POUGHKEEPSIE
ALBANY
PENNSYLVANIA
V E
R M
O N
T
NEW YORK CITY
NEW
YORK
LONG ISLAND
SOUND
NEW
JERSEY
LAKE
ERIE
REGIONS & LOCATIONS
OF REGIONAL OFFICES
OF TRANSPORTATION
C A N
A D
A
CANADA
CANADA
P E
N N
C O
N N
M A
S S
NYS DEPARTMENT
D E
S I G
N
S U
P E
R V I S
O R
P R
O J
E C
T
M A
N A
G E
R D
E S I G
N D
R A
F T I N
G C
H E
C K
C H
E C
K
FISCAL SHARE COST(S)
STATE SHEET NO.
1N.Y.
INDEX ON SHEET NO.
COUNTY:
S
D
I
NFOETATS
SEFORP
DE
SN
E
CI
L
1.oN
EPNAM
N
E E
R G
SLECX
E
KRO
YWE
RE
E
NIGNE
LANOI
C
NI
NES
RE
RO
CONSULTING ENGINEERS
GREENMAN-PEDERSEN, INC.
ALBANY, NY 12205
80 WOLF ROAD, SUITE 600
J O
B
N A
G E
R
PROJECT LOCATION
F I L
S
D A
T E
T I
C A
D D
G J
E S
R c p h c o v .d g n r j o b i n
PROJECT LOCATION
GRID
NORTH
BY:PREPARED
VICE PRESIDENT/DIRECTOR OF CIVIL/HIGHWAY ENGINEERING
CHRISTOPHER C. CORNWELL, P.E.
PROJECT LOCATION
C O
R N
W E L L
C
C O
R N
W E L L
THE CONTRACT PROJECT "PROPOSAL."
PROJECT "PROPOSAL" EXCEPT AS MODIFIED BY THESE PLANS OR BY CHANGES SET FORTH IN
WITH THE STANDARD SPECIFICATIONS (US CUSTOMARY) REFERENCED IN THE CONTRACT
ALL WORK CONTEMPLATED UNDER THIS CONTRACT IS TO BE COVERED BY AND IN CONFORMITY
DOCUMENTS.
TO THE APPLICABLE STANDARD SHEET(S) UNLESS OTHERWISE SPECIFIED IN THE CONTRACT
ITEMS AND WORK ENCOUNTERED DURING THE COURSE OF THE CONTRACT SHALL BE SUBJECT
EFFECT. ALL PAY ITEMS AND WORK CONTAINED IN THE CONTRACT AND ANY ADDITIONAL PAY
ARE CURRENT ON THE DATE OF ADVERTISEMENT FOR BIDS, SHALL BE CONSIDERED TO BE IN
THE LATEST REVISIONS OF THE STANDARD SHEETS MAINTAINED BY THE NYSDOT, WHICH
FULTON COUNTY
FULTON
TREATMENT FACILITY
GLOVERSVILLE-JOHNSTOWN JOINT WASTEWATER
MANAGER-WASTEWATER PROGRAMS
HARRY BRAND
GLOVERSVILLE-JOHNSTOWN JOINT WASTEWATER
TREATMENT FACILITY
NOT TO SCALE
4 SHEETS
GJJWTF EMERGENCY SLOPE REPAIR
A
L A
N D
R Y
R J
O B
IN
R J
O B
IN
E
S N
Y D E
R R J
O B
IN
PO NUMBER 14081-A
SEPTEMBER 2024
WASTEWATER TREATMENT FACILITY, FULTON COUNTY
GLOVERSVILLE-JOHNSTOWN JOINT
GJJWTF EMERGENCY SLOPE REPAIR
ADMINISTRATIVE BUILDING
STAGING AREA
POSSIBLE
CAYADUTTA C
REEK
ACCESS ROAD
TEMPORARY
SLOPE FAILURE
(NO HEAVY EQUIPMENT)
UNDERGROUND DUCT BANK
ROADWAY
WASTEWATER TREATMENT FACILITY
UTILITY NOTES
STORAGE OF MATERIALS:
GENERAL NOTES
EROSION AND SEDIMENT CONTROL - GENERAL REQUIREMENTS
STORMWATER POLLUTION PREVENTION AND TEMPORARY SOIL
ENVIRONMENTAL PERMITS
EMBANKMENT STABILIZATION
EMBANKMENT MATERIAL
BASE MAPPING
TREE CUTTING RESTRICTIONS
STREAM PROTECTION NOTES
PERMITTED TO ENTER ANY WATER BODY.
NO PETROLEUM PRODUCTS OR EXCESSIVE AMOUNTS OF SILT, CLAY, OR MUD SHALL BE 3.
FOR THE CONSTRUCTION AREA.
THE COMPLETION OF THE WORK AS TO PROTECT SUCH WATER BODIES AGAINST CONTAMINANTS
APPROPRIATE TEMPORARY OR PERMANENT EROSION CONTROL MEASURES IMMEDIATELY FOLLOWING
OR IMPOUNDMENT PRIOR TO COMMENCING WORK AND SHALL STABILIZE DISTURBED AREAS WITH
NECESSARY WORK TO ISOLATE CONSTRUCTION ACTIVITIES OR WORK AREAS FROM WATER COURSES
PRIOR TO THE START OF ANY CONSTRUCTION OPERATION. THE CONTRACTOR SHALL PERFORM
APPROPRIATE SEDIMENT AND EROSION CONTROL STRUCTURES SHALL BE DETERMINED AND PLACED 2.
POLLUTION CONTROL."
COMPLETED UNDER THE PROVISIONS OF SECTION 209- "TEMPORARY SOIL EROSION AND WATER
ALL SEDIMENT AND EROSION CONTROL WORK SHOWN ON THE CONTRACT DOCUMENTS WILL BE 1.
PROPERTY BOUNDARY LINES.
TREATMENT PLANT FOR LOCATIONS TO BE USED TO STORE MATERIALS WITHIN THE THEIR
THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING PERMISSION FROM THE WASTEWATER 1.
CONSTRUCTION DOCUMENTS. COST TO BE INCLUDED UNDER VARIOUS ITEMS IN THE CONTRACT.
THE CONTRACTOR SHALL COMPLY WITH ANY AND ALL PERMIT REQUIREMENTS PROVIDED IN THE 1.
(NO HEAVY EQUIPMENT)
PEDESTRIAN WALKWAY BRIDGE
IND-1
GENERAL NOTES, INDEX AND
OVERALL SITE PLAN
THE PROJECT LIMITS.
ALL EXCAVATED MATERIAL THAT CONTAINS ORGANIC MATERIAL SHALL BE DISPOSED OF OUTSIDE OF 2.
SUITABLE FOR EMBANKMENT FILL MATERIAL.
ANY MATERIAL EXCAVATED FROM THE EMBANKMENT THAT CONTAINS ORGANIC MATERIAL WILL NOT BE 1.
RESTORE SERVICE AND MAY NOT CEASE WORK OPERATIONS UNTIL SERVICE IS RESTORED.
INTERRUPTION IN SAID SERVICE, THE CONTRACTOR SHALL IMMEDIATELY COMMENCE WORK TO
IN THE EVENT THE CONTRACTOR DAMAGES AN EXISTING UTILITY SERVICE CAUSING AN 1.
SUGGESTED SEQUENCE OF CONSTRUCTION
FLOW
COMBINATION OF A ROLLED EROSION CONTROL FABRIC AND SEDIMENT LOGS AND SEED AND MULCH.
DISTURBED OR RAW BANKS SHALL BE PROTECTED EITHER BY SUITABLE STONE FILL OR A 3.
CONTOURS OF THE UNDISTURBED LAND ADJACENT TO THE WORK AREA.
THE WORK AREA SHALL BE GRADED TO MATCH, AS UNIFORMLY AS POSSIBLE, THE ELEVATION AND 2.
MULCHED WITH STRAW IMMEDIATELY FOLLOWING FINAL GRADING.
WITH AN APPROPRIATE MIX OF ANNUAL AND PERENNIAL GRASS SEED, PAID UNDER ITEM 610.1605, AND
ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THE PROJECT SHALL BE GRADED AND SEEDED 1.
FOR VARIOUS ITEMS AS NOTED WITHIN THE CONTRACT.
FAILURE INCLUDING STUMPS AND DOWNED TREES, PAYMENT TO BE INCLUDED IN THE PRICE BID
THE CONTRACTOR SHALL REMOVE ALL UNDERLYING VEGETATION WITHIN THE LIMITS OF THE SLOPE 1.
MAINTAIN WATER QUALITY.
CONTRACTOR SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM REQUIRED TO PROTECT AND
CEMENT, OIL, OR OTHER IMPURITIES. IF THE CONTRACTOR USES WATER FROM A STREAM, THE
OTHER SIMILAR OPERATIONS WHICH CAUSE THIS WATER TO BECOME POLLUTED WITH SAND, SILT, RETURN DIRECTLY TO A STREAM ANY WATER WHICH HAS BEEN USED FOR WASH PURPOSES OR
EQUIPMENT AND/OR MATERIALS IN OR NEAR SUCH STREAMS. THE CONTRACTOR SHALL NOT
POLLUTION BY DEBRIS, SEDIMENT, OR OTHER FOREIGN MATERIAL, OR FROM MANIPULATION OF
A MANNER AS TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY STREAM FROM
DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH 2.
ENVIRONMENTAL RESOURCE MAPPER.
THE CAYADUTTA CREEK ON-SITE IS LISTED AS A CLASS C STREAM ACCORDING TO THE NYSDEC 1.
MODIFICATIONS.
SIGNIFICANT CHANGES NOTED SHALL BE PRESENTED TO THE ENGINEER FOR POSSIBLE DESIGN
CONTRACTOR SHALL FIELD VERIFY BASEMAPPING DUE TO ONGOING SLOPE MOVEMENT. ANY 2.
IN US SURVEY FEET.
IN JULY 2024. THE HORIZONTAL AND VERTICAL DATUMS USED HEREON ARE ARBITRARY AND ARE
BASEMAPPING WAS DEVELOPED FROM INTERPOLATION OF LIDAR AND AERIAL IMAGERY OBTAINED 1.
ROAD (SEE NOTE 11)
EXISTING ACCESS
THE SITE, OTHER METHODS OF ROCK REMOVAL SHALL BE PERFORMED.
USING BLASTING METHODS. DO TO THE LOCATION OF THE CLIENTS UNDERGROUND UTILITIES NEAR
5'-0" WIDE FOR THE LENGTH OF THE SLOPE. THE BEDROCK REMOVAL SHALL NOT BE PERFORMED
EXTRA HEAVY STONE FILL SHALL BE PLACED IN A BEDROCK KEYWAY OF AT LEAST 1'-0" DEEP X 12.
REPLACED AT THE CONTRACTOR'S EXPENSE (STANDARD SPECIFICATION 107-08 AND 107-09).
WORK LIMITS. ANY SUCH INJURIES OR DAMAGES SHALL BE SATISFACTORILY REPAIRED OR ITEMS
THE CONTRACTOR WILL BE HELD LIABLE FOR ANY DAMAGES DONE TO ANY AREAS OUTSIDE THE 11.
FORTH IN FEDERAL, STATE, AND LOCAL PERMITS OR CERTIFICATIONS.
DURING THE TERM OF THE CONTRACT, THE CONTRACTOR SHALL ADHERE TO ALL CONDITIONS SET 10.
THE CONTRACTOR SHALL PROVIDE ALL SUBMITTAL'S AS PER THE SPECIFICATIONS.9.
APPLICABLE CODES AND IN A PROPER AND WORKMANLIKE MANNER.
THE SPECIFICATIONS AND AS DIRECTED BY THE ENGINEER IN CONFORMANCE WITH ALL
THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK AS INDICATED ON THE PLANS, IN 8.
REGULATIONS.
THE CONTRACTOR SHALL BE REQUIRED TO PROTECT WORKERS AT ALL TIMES AS PER OSHA 7.
PROMPTLY BROUGHT TO THE ATTENTION OF THE ENGINEER.
BETWEEN ACTUAL DIMENSIONS AND THOSE SHOWN IN THE CONTRACT DOCUMENTS SHALL BE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE COMMENCING WORK. ANY DISCREPANCIES
DUE TO THE NATURE OF SITE FAILURE, ACTUAL CONDITIONS WILL VARY SLIGHTLY FROM SHOWN. 6.
ALL SHOP DRAWINGS AND SUBMITTAL'S FOR THIS PROJECT SHALL BE IN US CUSTOMARY UNITS.5.
PROPORTIONAL AND ARE FULLY DIMENSIONED.
SCALE FOR VISUAL CLARITY. ALL OTHER DETAILS FOR WHICH NO SCALE IS SHOWN ARE DRAWN
DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE INTENTIONALLY DRAWN NOT TO 4.
553.030001).
WILL NEED TO PROVIDE A COFFERDAM (ITEM 553.020001) AND TURBIDITY CURTAIN (ITEM
PERMIT RESTRICTIONS FOR WORKING IN THE WET, IT IS ANTICIPATED THAT THE CONTRACTOR
PROVISIONS ARE MET. HOWEVER DUE TO THE PRACTICALITY OF MEETING ALL OF THE NATIONWIDE
THE CONTRACTOR WILL NOT BE REQUIRED TO DE- WATER EXCAVATIONS IF ALL PERMIT 3.
LISTED HEREIN.
TO THE SPECIFIC DRAWING THEY ARE PLACED ON, ALSO SUPPLEMENT THE GENERAL NOTES
ADDITIONAL NOTES MAY BE FOUND ON SUBSEQUENT DRAWINGS. SUCH NOTES, WHILE PERTAINING 2.
EFFECT FOR THIS PROJECT, INCLUDING ALL APPLICABLE NYSDOT STANDARD SHEETS.
ENGINEERING, DATED SEPT 1, 2024 WITH CURRENT ADDITIONS AND MODIFICATIONS, SHALL BE IN
MATERIALS". NEW YORK STATE DEPARTMENT OF TRANSPORTATION (NYSDOT) OFFICE OF
MATERIAL AND CONSTRUCTION SPECIFICATIONS: "STANDARD SPECIFICATIONS, CONSTRUCTION AND 1.
UNION AVE EXT
SITE DAILY.
BE RESTORED/SECURED EVERYDAY. NO ADDITIONAL PAYMENT WILL BE MADE TO SECURE THE
EASE OF CONSTRUCTION AND TO CREATE THE ACCESS ROAD. ALL BREACHES IN THE FENCE MUST
THE SITE IS SURROUNDED BY FENCING AND IT MAYBE NECESSARY TO REMOVE SECTIONS FOR 5.
WITH STONE ARMOR.
HAY OR STRAW IMMEDIATELY FOLLOWING FINAL GRADING, EXCEPT WHERE GRADE IS FINISHED
SEEDED WITH AN APPROPRIATE MIX OF ANNUAL AND PERENNIAL GRASS SEED AND MULCHED WITH
ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THIS PROJECT SHALL BE GRADED AND 4.
TRANSITION TO THE OVERLY STEEPENED EXISTING GRADES, AOBE.
TRANSITIONAL SLOPES MAY REQUIRE LIGHT STONE FILL, ITEM 620.03, TO ALLOW THE
THE FINISHED GRADE SHALL BE FEATHERED INTO THOSE WHICH EXIST ADJACENT TO IT. THESE 3.
THE SOIL SLOPE ABOVE IT HAS BEEN STABILIZED.
THE FAILED SOIL AND DEBRIS ALONG THE TOE OF THE SLOPE SHALL ONLY BE REMOVED AFTER 2.
WHAT IS EXCAVATED CAN BE FILLED WITHIN THE SAME DAY OF WORK.
EXCAVATION SHALL BE STAGED FOR A DRY PERIOD AND PROGRESSED IN A MANNER SUCH THAT 1.
BRIDGES CULVERTSPIN
J
N A
G E
R D
E S I
P E
R V I S
O R
COUNTY:
P R
O J
E
N A
G E
R D
E S I G
N D
R A
F T I N
G C
H E
C K
C H
E C
K
ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
F I
S
A
T E
T I
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, DRAWING NO.
SHEET NO.
REGION:
C
C O
R N
W E
L L
R
J O
B I N
S
D
I
NFOETATS
SEFORP
DE
SN
E
CI
L
1.oN
EPNAM
N
E E
R G
SLECX
E
KRO
YWE
RE
E
NIGNE
LANOI
C
NI
NES
RE
RO
GREENMAN - PEDERSEN, INC
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS
C A
D D
G J
E S
R c p h g n n .d g n r j o b i n
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 600
Albany, NY 12205
C
C O
R N
W E
L L
A
L A
N D
R Y
R
J O
B I
FULTON
TREATMENT FACILITY
JOINT WASTEWATER
GLOVERSVILLE-JOHNSTOWN
GLOVERSVILLE-JOHNSTOWN JOINT WASTEWATER TREATMENT FACILITY
R
J O
B I N
E
S N
Y D
E R
PURCHASE ORDER NUMBER
CITY OF JOHNSTOWN
GJJWTF EMERGENCY SLOPE REPAIR
14081-A
ON: 9/17/2024
AFFIX SEAL:
518.453.9431 GPINET.COM
BRIDGES CULVERTSPIN
J
N A
G E
R D
E S I
P E
R V I S
O R
COUNTY:
P R
O J
E
N A
G E
R D
E S I G
N D
R A
F T I N
G C
H E
C K
C H
E C
K
ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
F I
S
A
T E
T I
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, DRAWING NO.
SHEET NO.
REGION:
C
C O
R N
W E
L L
R
J O
B I N
S
D
I
NFOETATS
SEFORP
DE
SN
E
CI
L
1.oN
EPNAM
N
E E
R G
SLECX
E
KRO
YWE
RE
E
NIGNE
LANOI
C
NI
NES
RE
RO
GREENMAN - PEDERSEN, INC
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS
C A
D D
G J
E S
R c p h t y p .d g n r j o b i n
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 600
Albany, NY 12205
C
C O
R N
W E
L L
A
L A
N D
R Y
R
J O
B I
JOINT WASTEWATER
GLOVERSVILLE-JOHNSTOWN
GLOVERSVILLE-JOHNSTOWN JOINT WASTEWATER TREATMENT FACILITY
R
J O
B I N
E
S N
Y D
E R
PURCHASE ORDER NUMBER
CITY OF JOHNSTOWN
GJJWTF EMERGENCY SLOPE REPAIR
14081-A
ON: 9/17/2024
AFFIX SEAL:
NOT TO SCALE
ITEM 620.03
2'-0" LIGHT STONE FILL
FINISHED GRADE
SEE NOTES 1 AND 2
EARTHWORK BENCHING (TYP)
R = 2'-0" ROUND VERTICAL CURVE
GRADE (TYP)
EXISTING
NOT TO SCALE
OR AOBE
LEVEL
c
1.5 u TO STA AR 2+10uSTA AR 0+95
SLOPE REPAIR SECTION
NOT TO SCALE
OR AOBE
LEVEL
c
1.5
1.5 u TO STA AR 0+95uSTA AR 0+18
ITEM 209.2301
TEMPORARY 12"
SEDIMENT FILTER LOG -
TEMPORARY HILL ACCESS ROAD
ITEM 201.06
AND GRUBBING
LIMITS OF CLEARING
CONSTRUCTION ENTRANCE, ITEM 209.22
EXISTING BEDROCK ELEV.
BOTTOM OF STREAM/ APROX
12'-0"
ITEM 203.02 (TYP)
EXCAVATION
UNCLASSIFIED
BANK (SEE NOTE 5)
EXISTING UTILITY DUCT
FILL ITEM 620.14020009
3'-0" EXTRA HEAVY STONE
ORDINARY HIGH WATER (OHW)
ITEM 304.12
LIMITS OF FILL,
TOE OF SLOPE
2'-0" MIN
1.5 & (FLATTER)
ROADWAY
EXISTING
ITEM 610.1605
4" TURF ESTABLISHMENT - PERFORMANCE
553.04010006
PAID UNDER ITEM
PROTECTION MAT
TEMPORARY GROUND
4' (TYP)
ASSUMED BEDROCK
FENCING, ITEM 607.61000005
REMOVE AND RESET CHAIN LINK
ITEM 553.020001
COFFERDAM (TYPE 2),
ITEM 209.1501
(TEMPORARY),
TURBIDITY CURTAIN
20'-0" MAX
ITEM 201.06
AND GRUBBING
LIMITS OF CLEARING
20'-0" MAX
VEGETATED SLOPE (TYP)
EXISTING TREE AND
VEGETATED SLOPE (TYP)
EXISTING TREE AND
ACCESS ROAD
12'-0"
ACCESS ROAD
12'-0"
ALL COST OF REMOVAL PAID UNDER ITEM 203.02
REMOVE ALL ORGANIC MATERIAL WITHIN FAILURE,
PAYMENT MADE UNDER ITEM 203.02
REMOVE FAILED SLOPE MATERIAL
BE PERFORMED BY OTHERS IF REQUIRED.
FILL WITH SUBBASE, ANY RESTORATION WILL
ASPHALT RESTORATION - CONTRACTOR SHALL
HCL
HCL
TEMPORARY ACCESS ROAD WITHIN FLOOD PLAIN
EDGE OF WETLAND
MADE UNDER ITEM 203.02
BEDROCK EXCAVATION PAYMENT
620.14020009.
MIN EMBEDED IN ROCK) ITEM
HEAVY STONE KEYWAY, (1'-0"
6' WIDE BY 3' DEEP EXTRA
TYP-1TYPICAL SECTIONS
ITEM UNIT DESCRIPTION
UNIT
NOTES:
DESCRIPTION ITEM
CY
CY
LS
LF
CY
LF
SF
SY
CY
LS
CONTRACTOR SHALL NOT DRIVE HEAVY EQUIPMENT OVER THIS UTILITY DUCT BANK.
CONTRACTOR SHALL TAKE GREAT CARE AS TO NOT EXPOSE THESE UTILITIES. 5)
203.02 OR 209.22.
REMAIN AS PART OF PERMANENT REPAIR AOBE. COST INCLUDED AS PART OF ITEMS
SUITABLE EMBANKMENT MATERIAL REMOVED OR PLACED FOR ACCESS ROAD MAY 4.
BE REMOVED, COST INCLUDED UNDER ITEM 203.02.
COMPONENTS OF ACCESS ROAD NOT COMPATIBLE WITH FINAL SLOPE REPAIR SHALL 3.
SHALL BE DETERMINED BY CONTRACTOR.
CONSTRUCTION AND SLOPE REPAIR CONSTRUCTION PHASING. CONSTRUCTION PHASING
BENCHING PLAN SHALL BE COMPATIBLE WITH TEMPORARY ACCESS ROAD 2.
SLOPE AND BE COMPLETED VIA CONTRACTOR'S MEANS AND METHODS.
EARTHWORK BENCHING SHALL BE PROGRESSED FROM TOE OF SLOPE TO TOP OF 1.
620.14020009
620.03
610.1605
EXTRA HEAVY STONE, TYPE B
STONE FILLING (LIGHT)
4" TURF ESTABLISHMENT PERFORMANCE
607.61000005
553.04010006
553.020001
304.12
209.2301
209.22
209.1501
203.02
201.06
REMOVE AND RESET CHAIN LINK FENCING
TEMPORARY RIVER ACCESS
COFFERDAMS (TYPE 2)
SUBBASE COURSE, TYPE 2
SEDIMENT FILTER LOG - TEMPORARY 12"
STABILIZED CONSTRUCTION ACCESS
TURBIDITY CURTAIN - TEMPORARY
UNCLASSIFIED EXCAVATION AND DISPOSAL
CLEARING AND GRUBBING
GNP-1
GENERAL PLAN
OF THE COE NATIONWIDE PERMIT 13 AND USAGE PERMIT SECURED FOR THIS PROJECT.
ADDITIONAL WETLAND OR STREAM IMPACTS THAN WHAT AS ALLOWED UNDER THE CONDITIONS
THE CONTRACTORS ACCESS ROAD ALIGNMENT SHOWN, SHALL NOT RESULT IN ANY 3)
PART OF HIS OR HER MEANS AND METHODS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL ACCESS ROAD LAYOUT AND PROFILE AS
THE TEMPORARY ACCESS ROAD ALIGNMENT SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY. 2)
TO BE MADE UNDER ITEM 553.04010006.
ACCORDANCE WITH THE PERMITS. PAYMENT FOR TEMPORARY CROSSING AND LAY DOWN AREA
CONCRETE BARRIER MAY BE USED AS A TEMPORARY CROSSING OR LAY DOWN AREA IN
CANNOT BE STOCKPILED IN THE STREAM. CRANE MATS ON TOP OF MAFIA BLOCKS OR
TRACKED EQUIPMENT OR OTHER APPROVED METHODS. MATERIAL FOR SLOPE RESTORATION
THE CONTRACTOR IS ALLOWED TO WORK IN THE STREAM USING CLEAN NON-LEAKING 1)
NOTES:
WILL BE PERFORMED BY OTHERS IF REQUIRED.
ASPHALT RESTORATION - CONTRACTOR SHALL FILL WITH SUBBASE, ANY RESTORATION 6)
REPLACEMENT POSTS SHALL BE INCLUDED IN THE COST FOR THIS PAYMENT ITEM.
CONCRETE AND CLEANED, THE CONTRACTOR SHALL REPLACE THE POST IN-KIND.
NEW FOOTING. IF THE POSTS CANNOT BE SUCCESSFULLY EXTRACTED FROM THE EXISTING
EXISTING CONCRETE SHALL BE REMOVED SUFFICIENTLY FOR POSTS TO BE RESET IN THE
CONSTRUCTION DEBRIS. FENCE POSTS SHALL BE CLEANED FOR REUSE; ALL REMNANTS OF
CONCRETE FOR INDIVIDUAL POST FOOTINGS SHALL BE EXTRACTED AND REMOVED AS
THE CONTRACTOR SHALL CAREFULLY REMOVE THE EXISTING CHAIN LINK FENCE. THE 5)
SHALL BE RESPONSIBLE FOR THE COST OF THESE REPAIRS.
ACTIVITIES SHALL BE REPLACED IN KIND OR WITH AN APPROVED EQUAL. THE CONTRACTOR
ANY PUBLIC OR PRIVATE FACILITY DAMAGED AS A RESULT OF CONSTRUCTION 4)
0+00
ACCESS ROAD
TEMPORARY WETLAND
KEYWAY
STONE
LOCATION AOBE
ACCESS ROAD
TEMPORARY HILL
OF PAVEMENT
ROADWAY EDGE
BOTTOM OF HILL
(SEE NOTE 1)
STREAM CROSSING CAYADUTTA CREEK
RETAINING WALL
EXISTING
287'-0"43'-0" 35'-0"
STA 2
+10
STA 1
+68
12'- 0"
STA 0+95
STA 0+18
" 5
ORDINARY HIGH WATER
APPROXIMATE EDGE OF
EDGE OF STREAM AND
PROPOSED TOE OF SLOPE
UNDER ITEM 553.04010006
PROTECTION MAT PAID FOR
PLACE TEMPORARY GROUND
620.14020009
STONE FILL,
EXTRA HEAVY
ITEM 620.03
LIGHT STONE FILL,
LIMITS OF WETLAND
ITEM 209.22
ENTRANCE,
CONSTRUCTION
FLOW
FENCE ITEM 209.13
TEMPORARY SILT
ITEM 209.1501
(TEMPORARY),
TURBIDITY CURTAIN
ITEM 553.020001
COFFERDAM (TYPE 2),
B-1
B-2
WINGWALL
BRIDGE ABUTMENT/
INSTALLED UP TO
STONE FILL
FENCING, ITEM 607.61000005
REMOVE AND RESET CHAIN LINK
DUCT BANK
EXISTING UNDERGROUND
(TYP)
AND CLEARING AND GRUBBING
20'-0" LIMITS OF DISTURBANCE
607.61000005 (SEE NOTE 5)
LINK FENCING, ITEM
REMOVE AND RESET CHAIN
(SEE NOTE 6)
ROADWAY PAVEMENT
BRIDGES CULVERTSPIN
J
N A
G E
R D E S
IG
N
S
U P E
R V
IS
O R
COUNTY:
P R
O J E
N A
G E
R D E S
IG
N D
R A F T
IN
G C
H E
C K
C H E
C K
ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
F
IL
M E
U S E
R
D A T E T
IM
E
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, DRAWING NO.
SHEET NO.
REGION:
C
C O
R N
W E L L
R J
O B
IN
S
D
I
NFOETATS
SEFORP
DE
SN
E
CI
L
1.oN
EPNAM
N
E E
R G
SLECX
E
KRO
YWE
RE
E
NIGNE
LANOI
C
NI
NES
RE
RO
GREENMAN - PEDERSEN, INC
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS
C A
D D
G J E S
R c p h g n p 1.
d g n r j o b in
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 600
Albany, NY 12205
C
C O
R N
W E L L
A
L A
N D
R Y
R J
O
IN
JOINT WASTEWATER
GLOVERSVILLE-JOHNSTOWN
GLOVERSVILLE-JOHNSTOWN JOINT WASTEWATER TREATMENT FACILITY
R J
O B
IN
E
S N
Y D E
R
PURCHASE ORDER NUMBER
CITY OF JOHNSTOWN
GJJWTF EMERGENCY SLOPE REPAIR
14081-A
ON: 9/17/2024
AFFIX SEAL:
| GJESR_cph_cov-1 |
| GJESR_cph_gnn-1 |
| GJESR_cph_typ-1 |
| GJESR_cph_gnp-1 |
File details come from the government source that posted it. Updated .