Gilpin County Community Center Plan Set 100%.pdf

PDF 18 MB Posted

Attached to
Gilpin County Multiple Site Civil Construction
Solicitation number
RFP20250410a
Issued by
Gilpin County, Colorado

About this file

The document is a comprehensive construction plan set for the Gilpin County Community Center located at 250 Norton Road in Black Hawk, Colorado, prepared by Bowman Consulting Group and Cairn Design, LLC. The plan set includes detailed civil engineering drawings, site plans, grading plans, erosion control plans, and architectural specifications for waterproofing and foundation work. The project involves construction and potentially renovation of the community center, with specific focus on foundation waterproofing, drainage improvements, and ensuring proper water infiltration prevention. The drawings are dated 04/09/2025 and include multiple technical sheets covering existing conditions, site layout, grading, erosion control, and waterproofing details.

The plan set indicates a multi-phase approach to waterproofing and foundation preparation, with the base bid including excavation, cleaning of existing foundation, installation of rubberized waterproofing membrane, dimpled board membrane, and foundation drains. There is also a deduct alternate option to extend existing waterproofing to 2 inches above grade, which includes filling and sealing gaps and cracks in the existing foundation. The documents suggest a comprehensive approach to ensuring the structural integrity and water resistance of the community center, with detailed technical specifications for materials, installation methods, and quality control procedures. The project appears to be funded through local government resources, with a focus on thorough preparation and long-term building preservation.

View the file

Other files

File Type Posted
Gilpin County HHS Plan Set 100%.pdf PDF
RFP Civil Construction.pdf PDF
Gilpin County Justice Center Plan Set 100%.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N/A

CO

VE

R

SH

EE

T

C1.0

Know what's below.

before you dig.Call

R

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L td

SITE

4/9/25

G

EN

ER

AL

N O

TE

S

C2.0

GENERAL NOTES GENERAL NOTES (CONT.)

GENERAL EROSION CONTROL NOTES

LEGEND NOTES

PROPOSEDDESCRIPTIONEXISTING

LEGEND

ABBREVIATIONS

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L td

Know what's below.

before you dig.Call

R

ADA NOTES

4/9/25 file:///C:/Program%20Files/Manhole%20Size%20Guidelines/mh-31.exe file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/FES.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/FES.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/TYPE13-CDOT.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-R.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Civil/../Hyperlinks/TYPE-D-INLET.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/FES.pdf file:///R:/VLC-Cadd/Symbols/Hyperlinks/FES.pdf file:///C:/Program%20Files/Manhole%20Size%20Guidelines/mh-31.exe

EX

IS

TI

NG

C O

ND

IT

IO

NS

C3.0

N/A 1" = 20'

Know what's below.

before you dig.Call

R

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L td

1" = 20'

SI

TE

P

LA

N

C4.0

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L td

Know what's below.

before you dig.Call

R

G

RA

DI

NG

P

LA

N

C5.0

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L td

Know what's below.

before you dig.Call

R

ER

O

SI

O

N

CO

NT

RO

L

PL

AN

C6.0

Know what's below.

before you dig.Call

R

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L

ER

O

SI

O

N

CO

NT

RO

L

PL

AN

D

ET

AI

LS

C7.0

G

IL

PI

N

CO

UN

TY

C

O M

M

UN

IT

Y

CE

NT

ER

NO

RT

O

N

RD

, B

LA

CK

H

AW

K, C O

B

LA

C

K H

A W

K C

O

LO

R A

D O

TJN TJN PC

230548-01-001

04/09/2025

R E

V

IS

IO

N

S

P ho ne

3)

-2 w w w

.b ow m an

.c om

C ol e B lv d, S ui te

La ke w oo d, C

O

B ow m an

C on su lti ng G ro up

L

1. ALL WORK IS TO BE PERFORMED IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND

LOCAL CODES. SECURE ALL REQUIRED PERMITS AND APPROVALS PRIOR TO COMMENCEMENT

OF ANY CONSTRUCTION. ALL REFERENCE TO CODE SECTIONS HEREIN REFER TO THE

APPLICABLE CODE W/ LOCAL AMMENDMENTS.

2. THE SUBCONTRACTORS ARE TO EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS BOTH ON THE PLANS AND IN THE FIELD. NOTIFY THE ARCHITECT OF ANY

DISCREPANCIES OR CONFLICTS PRIOR TO PROCEEDING WITH CONSTRUCTION.

3. DO NOT SCALE PRINTS. WRITTEN DIMENSIONS TAKE PRECEDENCE IN ALL CASES. REFER TO

PARTITION TAGS FOR WALL TYPES.

4. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF THE

ARCHITECT AND SHALL NOT BE USED ON ANY OTHER WORK EXCEPT BY AGREEMENT WITH THE

ARCHITECT.

5. DUTY OF COOPERATION: RELEASE OF THESE PLANS ANTICIPATES FURTHER COOPERATION

AMONG THE OWNER, CONTRACTOR, AND ARCHITECT. ALTHOUGH THE ARCHITECT AND THEIR

CONSULTANTS HAVE PERFORMED THEIR SERVICES WITH DUE CARE AND DILIGENCE, THEY

CANNOT GUARANTEE PERFECTION. ANY AMBIGUITY OR DISCREPANCY DISCOVERED SHALL BE

REPORTED IMMEDIATELY TO THE ARCHITECT. FAILURE TO COOPERATE BY NOTIFYING THE

ARCHITECT SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ALL

CONSEQUENCES. CHANGES MADE FROM THE PLANS WITHOUT THE CONSENT OF THE ARCHITECT

ARE UNAUTHORIZED AND SHALL RELIEVE THE ARCHITECT OF RESPONSIBILITY FOR ALL

CONSEQUENCES RESULTING FROM SUCH CHANGES.

6. ALL PRODUCTS SHALL BE INSTALLED PER MANUFACTURERS' RECOMMENDATIONS.

7. ALL WORK TO BE IN ACCORDANCE WITH "GENERAL CONDITIONS OF THE CONTRACT" AND ALL

OTHER CONTRACT DOCUMENTS.

8. CONTRACT DOCUMENTS ALSO INCLUDE THE PROJECT MANUAL AND SPECIFICATIONS, IF

PROVIDED, AS PART OF THESE DRAWINGS IN THEIR ENTIRETY AS IF ATTACHED. THE

CONTRACTOR SHALL INCLUDE ANY WORK REQUIRED TO MAKE THE END RESULT BUILDING

OPERATIONAL AND OCCUPIABLE. IF EQUIPMENT, MATERIAL, AND/OR INTENT ARE NOT

DETAILED IN DRAWINGS OR SPECIFICATIONS, BUT ARE OBVIOUSLY REQUIRED AS INDUSTRY

STANDARD FOR OPERABLE CONDITIONS, THIS WORK SHALL BE INCLUDED IN BASE BID.

9. IF THE OWNER DOES NOT ACCEPT THE CONTRACTOR'S SUBSTITUTED SELECTION, THE ORIGINAL

EQUIPMENT OR MATERIALS CHOSEN BY THE OWNER OR ARCHITECT WILL BE PROVIDED WITH

NO ADDITIONAL COST.

10. DO NOT USE CADMIUM OR CADMIUM-PLATED PRODUCTS OR PRODUCTS CONTAINING

CADMIUM FOR WORK IN PLACE WITHOUT SPECIFIC WRITTEN APPROVAL BY THE OWNER. DO

NOT USE ASBESTOS OR ASBESTOS-CONTAINING PRODUCTS OR ANY OTHER HAZARDOUS

MATERIAL FOR WORK IN PLACE WITHOUT SPECIFIC WRITTEN APPROVAL BY THE OWNER.

11. TYPOGRAPHICAL ERRORS OR ERRORS OF SPELLING SHALL BE BROUGHT TO THE ARCHITECT'S

ATTENTION FOR CLARIFICATION. INTERPRETATION OF THE MEANING OF ABBREVIATIONS OR

MISTYPED OR MISSPELLED WORDS, WITHOUT CLARIFICATION FROM THE ARCHITECT, WILL BE

DONE BY THE CONTRACTOR WITH ACCEPTANCE OF RESPONSIBILITY FOR THAT INTERPRETATION

AND ALL CONSEQUENCES ARRIVING THEREFROM.

12. NOTE: ALL DIMENSIONS ARE TO THE FACE OF WALL , FACE OF UNIT, CENTER LINE OF WALL, OR

CENTER LINE OF UNIT AS INDICATED (TYPICAL UNLESS OTHERWISE INDICATED).

13. THE TERM "PROVIDE" AS USED HEREIN SHALL MEAN THAT CONTRACTOR SHALL FURNISH AND

INSTALL SAID ITEM, CONSTRUCTION, EQUIPMENT, MATERIALS, ETC., FOR A COMPLETE,

FINISHED INSTALLATION.

14. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES DOING

WORK AND COORDINATION WITH OWNER AND OWNER'S SUB-CONTRACTORS REGARDING

INSTALLATION AND PROVISION FOR ALL EQUIPMENT, MATERIALS, AND CONSTRUCTIONS

INDICATED "BY OWNER", "BY OTHERS", OR "BY OWNER'S SEPARATE CONTRACTOR" ON THESE

DOCUMENTS.

15. ALL PROPERTY DAMAGED IN ORDER TO EXECUTE THE REQUIRED CONSTRUCTION SHALL BE

RESTORED TO ITS ORIGINAL CONDITION OR REPLACED, INCLUDING, BUT NOT LIMITED TO,

FINISH, STRUCTURE, EQUIPMENT, FIXTURES, CIRCUITS, PIPING, AND INSULATION.

16. PATCH, REPAIR, AND RESTORE ALL AREAS IMPACTED BY THE WORK TO THEIR ORIGINAL

CONDITION OR TO THAT OF ADJACENT SURFACES.

17. CONDITIONS OF WORK: ALL BIDDERS, CONTRACTORS, AND SUBCONTRACTORS MUST INFORM

THEMSELVES FULLY OF THE CONDITIONS RELATING TO THE CONSTRUCTION OF THE PROJECT

AND THE EMPLOYMENT OF LABOR THEREIN. FAILURE TO DO SO WILL NOT RELIEVE A

CONTRACTOR OF THE OBLIGATION TO FURNISH ALL MATERIAL AND LABOR NECESSARY TO

CARRY OUT THE PROVISIONS OF THE CONTRACT. INSOFAR AS POSSIBLE, THE CONTRACTOR, IN

CARRYING OUT THE WORK, MUST EMPLOY SUCH METHODS OR MEANS AS WILL NOT CAUSE

ANY INTERRUPTION OF OR INTERFERENCE WITH THE WORK OF ANY OTHER CONTRACTOR, OR

THE OWNER'S SCHEDULED USE OF THE BUILDING, AND FURTHERMORE, WILL ACCOMPLISH THE

WORK WITH MINIMAL DAMAGE, DEMOLITION, CUTTING, OR PATCHING TO THE EXISTING

BUILDING.

1805 Sheely Drive

Fort Collins, CO 80526 voice: (970)-286-7968 cairndesignllc.com

GILPIN COUNTY

COMMUNITY

CENTER

BLACKHAWK, CO

As instruments of service, these drawings and the design represented are the permanent property of Cairn Design, LLC. Reproduction or use of these drawings other than for the project intended, without written consent from the Designer, is prohibited.

Unauthorized use will be subject to legal action.

PROJECT:

SHEET TITLE:

ISSUE DATE:

REVISIONS:

PROJECT NO.:

SHEET NO.

BID/PERMIT

04/09/2025

GENERAL PROJECT

NOTES, GENERAL

DEMOLITION NOTES,

AND ABBREVIATIONS

A-01

A.B. - ANCHOR BOLT

A/E - ARCHITECT-ENGINEER

ACT - ACOUSTICAL CEILING TILE

ADA - AMERICANS WITH DISABILITIES ACT

ADD. - ADDITION

ADDL - ADDITIONAL

ADJ - ADJUSTABLE

AL/ALUM - ALUMINUM

ALT - ALTERNATE

ANCH - ANCHOR

ARCH - ARCHITECTURE

ASPH - ASPHALT

AUTO - AUTOMATIC

BALL - BALLAST

BD - BOARD

BLDG - BUILDING

BLK - BLOCK

BM - BEAM

BOTT - BOTTOM

BSMT - BASEMENT

C.J. - CONTROL JOINT

C.L. - CENTER LINE

C.T. - CERAMIC TILE

C.W. - COLD WATER

CAB - CABINET

CARP - CARPET

CEM - CEMENT

CK'D - CHECKED

CL/CLOS/CLO - CLOSET

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

COL - COLUMN

COMP - COMPACT

CONC - CONCRETE

CONF - CONFERENCE

CONN - CONNECTION

CONST - CONSTRUCTION

CONT - CONTINUOUS

CONTR - CONTRACTOR

CORR - CORRIDOR

D.S. - DOWNSPOUT

DBL - DOUBLE

DEMO - DEMOLITION

DESCR - DESCRIPTION

DET/DTL - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DISP - DISPENSER

DISP - DISPOSAL

DIV - DIVIDER

DN - DOWN

DR - DOOR

DWG - DRAWING

EA - EACH

EL - ELEVATION

ELEV - ELEVATOR

ENT - ENTRY OR ENTRANCE

EQ - EQUAL

EQUIP - EQUIPMENT

EWC - ELECTRIC WATER COOLER

EXG/EXIST - EXISTING

EXP - EXPANSION

EXT - EXTERIOR

F.D. - FLOOR DRAIN

F.E. - FIRE EXTINGUISHER

F.F. - FINISH FLOOR

F.O. - FINISHED OPENING

FDN - FOUNDATION

FEM - FEMININE

FIN - FINISH

FL - FLOOR

FLUOR - FLUORESCENT

FR - FRAME

FTG - FOOTING

FURN - FURNISHED/FURNITURE

G.C. - GENERAL CONTRACTOR

GA - GAUGE

GAL/GALV - GALVANIZED

GEN - GENERAL

GL - GLASS

GWB - GYPSUM WALL BOARD

H.C. - HANDICAPPED

H.C. - HOLLOW CORE

H.M. - HOLLOW METAL

H.W. - HOT WATER

HDR - HEADER

HDW - HARDWARE

HOR/HORIZ - HORIZONTAL

HT/HGT/HGHT - HEIGHT

INS/INSUL - INSULATION

INST - INSTALL

INT - INTERIOR

JAN - JANITOR

JT - JOINT

KIT - KITCHEN

LAM - LAMINATED

LAND - LANDING

LAV - LAVATORY

LGMF - LIGHT GAUGE METAL FRAMING

ABBREVIATIONS:

LIM - LIMIT

LIN - LINTEL

LIN. FT. - LINEAR FOOT

LOC - LOCATION

LOUV - LOUVER

M.O. - MASONRY OPENING

MAN./MANUF, - MANUFACTURER

MAR/MARB - MARBLE

MAX - MAXIMUM

MECH - MECHANICAL

MEM/MEMB - MEMBRANE

MIN - MINIMUM

MISC - MISCELLANEOUS

MTL - METAL

MULL - MULLION

N.I.C. - NOT IN CONTRACT

NAP - NAPKIN

NO - NUMBER

NOM - NOMINAL

OFF - OFFICE

O.H. - OPPOSITE HAND

OP'NG - OPENING

P.B. - PARTICLE BOARD

P.T. - PAVER TILE

PART - PARTITION

PER/PERIM - PERIMETER

PL - PLATE

P. LAM - PLASTIC LAMINATE

PLAS - PLASTER

PLY - PLYWOOD

PLYWD - PLYWOOD

PREP - PREPARE/PREPARATION

Q.T. - QUARRY TILE

R.B. - RUBBER BASE

R.D. - ROOF DRAIN

R.O. - ROUGH OPENING

R.O.W. - RIGHT-OF-WAY

R.T. RUBBER TILE

RA/RAD - RADIUS

RECEPT - RECEPTACLE

RECEPT - RECEPTION

REF/REFER - REFERENCE

REFRIG - REFRIGERATOR

REINF - REINFORCE

REM - REMOVABLE

RENO - RENOVATION

REQ/REQD - REQUIRED

RESIL - RESILIENT

RET - RETAIN

RM - ROOM

S. & V. - STAIN AND VARNISH

S.C. - SOLID CORE

SCHED - SCHEDULE/SCHEDULED

S.S. - STAINLESS STEEL

SECT - SECTION

SHT - SHEET

SIM - SIMILAR

SPECS - SPECIFICATIONS

SQ - SQUARE

ST. - STAINLESS

STD - STANDARD

STL - STEEL

STO/STOR - STORAGE

STRUCT - STRUCTURE

SUSP - SUSPEND

SW - SEWER

SYN/SYNTH - SYNTHETIC

SYS - SYSTEM

T. & P. - TEXTURE AND PAINT

T. & Q. - TONGUE AND GROOVE

T.O.F. - TOP OF FOOTING

T.O.W. - TOP OF WALL

T.P. - TOILET PAPER

T.S. - TUBE STEEL

TAM/TAMP - TAMPON

TEMP - TEMPORARY

TERR - TERRAZZO

TEXT - TEXTURE

TYP - TYPICAL

U.C. - UNDERCOUNTER

U.G. - UNDERGROUND

UNO / UON - UNLESS OTHERWISE NOTED

V.C.T. - VINYL TILE

VEN - VENEER

VER - VERIFY

VERT - VERTICAL

VEST - VESTIBULE

VWC - VINYL WALL COVERING

W - STANDARD WIDE-FLANGE SHAPE

W.C. - WATER CLOSET

W.G. - WIRE GLASS

W.W.F. - WELDED WIRE FABRIC

W/ - WITH

W/O - WITHOUT

WD - WOOD

WDW - WINDOW

WT/WGT/WGHT - WEIGHT

GENERAL PROJECT NOTES:

1. THE OVERALL SCOPE OF THIS PROJECT INCLUDES THE VERIFICATION OF SUBGRADE FOUNDATION

WATERPROOFING AND THE INSTALLATION OF WATERPROOFING TO ELIMINATE WATER

INFILTRATION TO THE SUBGRADE INTERIOR OF THE BUILDING.

2. THE SCOPE INCLUDES VERIFICATION OF FOUNDATION WATERPROOFING, INSTALLATION OF

MISSING WATERPROOFING, AND/OR EXTENSION OF THE EXISTING WATERPROOFING.

3. THE BASE BID SHALL INCLUDE EXCAVATION, CLEANING OF EXISTING NON-WATERPROOFED ICF

FOUNDATION, INSTALLATION OF RUBBERIZED WATERPROOFING MEMBRANE, INSTALLATION

OF DIMPLED BOARD MEMBRANE, AND INSTALLATION OF FOUNDATION DRAINS.

4. PROVIDE A DEDUCT ALTERNATE TO PROVIDE ONLY THE EXTENSION OF THE EXISTING

WATERPROOFING TO 2" ABOVE GRADE. THIS SCOPE INCLUDES FILLING AND SEALING ALL GAPS

AND CRACKS IN THE EXISTING FOUNDATION BETWEEN THE EXISTING WATERPROOFING AND 2"

ABOVE GRADE.

GENERAL CONSTRUCTION NOTES:

1805 Sheely Drive

Fort Collins, CO 80526 voice: (970)-286-7968 cairndesignllc.com

GILPIN COUNTY

COMMUNITY

CENTER

BLACKHAWK, CO

As instruments of service, these drawings and the design represented are the permanent property of Cairn Design, LLC. Reproduction or use of these drawings other than for the project intended, without written consent from the Designer, is prohibited.

Unauthorized use will be subject to legal action.

PROJECT:

SHEET TITLE:

ISSUE DATE:

REVISIONS:

ARCHITECTURAL

SPECIFICATIONS

A-02

ARCHITECTURAL SPECIFICATIONS

- DIVISION 01. GENERAL REQUIREMENTS

IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS AND SPECIFICATIONS, THE PLANS SUPERSEDE. IN ADDITION TO THESE

SPECIFICATIONS, REFER TO GENERAL NOTES ON DRAWING SHEETS.

WORKMANSHIP MUST BE OF HIGHEST QUALITY, PERFORMED IN A PROFESSIONAL MANNER AND IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS FOR THE PRODUCT OR MATERIAL BEING SUPPLIED AND/OR INSTALLED.

UNLESS DIRECTED OTHERWISE ON THE PLANS, PROVIDE SHOP DRAWINGS AS INDICATED:

PRODUCT SUBMITTALS AND/OR SHOP DRAWINGS: ELECTRONIC SUBMITTALS ARE ACCEPTABLE AND PREFERRED.

ALL SUBMITTALS, SHOP DRAWINGS SHALL BE DELIVERED TO THE ARCHITECT FOR REVIEW AND DISTRIBUTION.

INSURANCE REQUIREMENTS ARE TO BE AS DETERMINED BY THE GENERAL CONTRACTOR AND/OR THE OWNER'S DESIGNATED

REPRESENTATIVE.

SELF-ADHERING SHEET WATERPROOFING

SECTION 07 13 26

PART 1 GENERAL

1.01SECTION INCLUDES

A. SURFACE PREPARATION.

B. APPLICATION OF ROLLED, SELF-ADHERING SHEET WATERPROOFING MEMBRANE SYSTEM.

1.02QUALITY ASSURANCE

A. INSTALLER QUALIFICATIONS:

1. USE AN EXPERIENCED INSTALLER AND ADEQUATE NUMBER OF SKILLED PERSONNEL WHO ARE THOROUGHLY TRAINED AND

EXPERIENCED IN THE APPLICATION OF SELF-ADHERING SHEET WATERPROOFING MEMBRANES.

B. OBTAIN WATERPROOFING MATERIALS FROM A SINGLE MANUFACTURER REGULARLY ENGAGED IN MANUFACTURING THE

PRODUCT.

C. PROVIDE PRODUCTS WHICH COMPLY WITH ALL STATE AND LOCAL REGULATIONS CONTROLLING USE OF VOLATILE ORGANIC

COMPOUNDS (VOCS).

1.03DELIVERY, STORAGE, AND HANDLING

A. DELIVER MATERIALS TO SITE IN MANUFACTURER'S ORIGINAL, UNOPENED CONTAINERS AND PACKAGING, WITH LABELS CLEARLY

IDENTIFYING PRODUCT NAME AND MANUFACTURER.

B. STORE MATERIALS IN A CLEAN DRY AREA IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

C. STORE ADHESIVES AND PRIMERS AT TEMPERATURES OF 40 DEGREES F (5 DEGREES C) AND ABOVE TO FACILITATE HANDLING.

D. STORE MEMBRANE CARTONS ON PALLETS.

E. DO NOT STORE AT TEMPERATURES ABOVE 90 DEGREES F (32 DEGREES C) FOR EXTENDED PERIODS.

F. KEEP AWAY FROM SPARKS AND FLAMES.

G. COMPLETELY COVER WHEN STORED OUTSIDE. PROTECT FROM RAIN.

H. PROTECT MATERIALS DURING HANDLING AND APPLICATION TO PREVENT DAMAGE OR CONTAMINATION.

I. AVOID USE OF PRODUCTS WHICH CONTAIN TARS, SOLVENTS, PITCHES, POLYSULFIDE POLYMERS, OR PVC MATERIALS THAT MAY

COME INTO CONTACT WITH WATERPROOFING MEMBRANE SYSTEM.

1.04 ENVIRONMENTAL REQUIREMENTS

A. PRODUCT NOT INTENDED FOR USES SUBJECT TO ABUSE OR PERMANENT EXPOSURE TO THE ELEMENTS.

B. PROTECT ROLLS FROM DIRECT SUNLIGHT UNTIL READY FOR USE.

C. DO NOT APPLY STANDARD MEMBRANE WHEN AIR OR SURFACE TEMPERATURES ARE BELOW 40 DEGREES F (4 DEGREES C).

D. DO NOT APPLY TO FROZEN CONCRETE.

PART 2 PRODUCTS

2.01 MATERIALS

A. ROLLED, SELF-ADHERING SHEET WATERPROOFING MEMBRANE: POLYMERIC WATERPROOFING MEMBRANE PROTECTED BY RELEASE PAPER ON POLYETHYLENE CARRIER FILM WITH EXPOSED POLYMERIC MEMBRANE STRIPS ON BOTH SIDES PROTECTED BY

PULL-OFF RELEASE STRIPS.

1. PERFORMANCE BASED SPECIFICATION: WATERPROOFING MEMBRANE SHALL HAVE THE FOLLOWING CHARACTERISTICS:

a. COMPLIANCE: AREMA SPECIFICATION CHAPTER 29 - WATERPROOFING.

b. THICKNESS:

1) CARRIER FILM: 4 MILS.

2) POLYMERIC MEMBRANE: 56 MILS.

c. TENSILE STRENGTH, ASTM D412, DIE C:

1) CARRIER FILM: 5900 PSI (40.71 MPA), MINIMUM.

2) POLYMERIC MEMBRANE: 460 PSI (3.23 MPA), MINIMUM.

d. ELONGATION, ASTM D412, DIE C: POLYMERIC MEMBRANE: 971 % MINIMUM.

e. PEEL ADHESION, ASTM D903: 11.8 LBF/IN. (2068 N/M).

f. LAP ADHESION, ASTM D1876: 8.62 LBF/IN. (1508 N/M).

g. WATER VAPOR PERMEABILITY, ASTM E96, METHOD B: 0.036 PERMS.

h. WATER ABSORPTION, ASTM D570: 0.1 PERCENT, 72 HOURS MAXIMUM.

i. RESISTANCE TO HYDROSTATIC HEAD, ASTM D5385: EQUIVALENT TO 230.9 FEET (70.3 M) OF WATER.

j. PUNCTURE RESISTANCE, ASTM E154: 48.2 LBF (214.6 N).

k. EXPOSURE TO FUNGI, SOIL TEST: PASS, 16 WEEKS.

l. COLOR:

1) CARRIER FILM: WHITE.

2) POLYMERIC MEMBRANE: BLACK.

2. PRODUCTS : MEL-ROL WATERPROOFING SYSTEM BY W.R. MEADOWS, OR EQUAL.

a. MEL-ROL: FOR USE AT TEMPERATURES OF 40OF (4OC) AND ABOVE.

b. MEL-ROL LT (LOW TEMPERATURE): FOR USE AT TEMPERATURES OF 20OF (-7OC) TO 60OF (16OC).

c. MEL-ROL XLT (EXTRA LOW TEMPERATURE): FOR USE AT TEMPERATURES OF 0OF (-18OC) TO 60OF (16OC).

2.02 ACCESSORIES

A. SURFACE CONDITIONER:

1. MEL-PRIME SOLVENT-BASED ADHESIVE.

2. MEL-PRIME W/B WATER-BASED ADHESIVE.

B. FLASHING AND FILLETS: MEL-ROL LIQUID MEMBRANE.

C. TERMINATION SEALANT: POINTING MASTIC.

D. TERMINATION BAR: TERMINATION BAR.

E. CORNER AND DETAILING TAPE: DETAIL STRIP.

F. WATERPROOFING PROTECTION COURSE: PC-2 PROTECTION COURSE OR PERMINATOR 10-MIL OR 15-MIL.

G. ROLLED MATRIX DRAINAGE SYSTEM: MEL-DRAIN ROLLED MATRIX DRAINAGE SYSTEM.

PART 3 EXECUTION

3.01 EXAMINATION

A. EXAMINE SURFACES TO RECEIVE SELF-ADHERING MEMBRANE. NOTIFY COUNTY IF SURFACES ARE NOT ACCEPTABLE. DO NOT BEGIN SURFACE PREPARATION OR APPLICATION UNTIL UNACCEPTABLE CONDITIONS HAVE BEEN CORRECTED. COMMENCEMENT

OF THE WORK SHALL CONSTRUE CONTRACTOR ACCEPTANCE OF CONDITIONS.

B. APPLY SELF-ADHERING SHEET WATERPROOFING TO CURED CONCRETE SURFACES A MINIMUM OF 3 DAYS AFTER REMOVAL OF

DEBRIS.

3.02 SURFACE PREPARATION

A. PROTECT ADJACENT SURFACES NOT DESIGNATED TO RECEIVE WATERPROOFING.

B. CLEAN AND PREPARE SURFACES TO RECEIVE WATERPROOFING IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

C. DO NOT APPLY WATERPROOFING TO SURFACES UNACCEPTABLE TO MANUFACTURER.

D. CONCRETE AND ICF SURFACES MUST BE CLEAN, SMOOTH AND FREE OF DEBRIS AND STANDING WATER.

E. PATCH ALL HOLES AND VOIDS AND SMOOTH OUT ANY SURFACE MISALIGNMENTS.

F. APPLY ONLY ENOUGH ADHESIVE TO SURFACES THAT WILL BE COVERED WITH SELF-ADHERING MEMBRANE WITHIN ONE WORKING DAY. APPLY ADHESIVE IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDED COVERAGE RATES.

G. INSIDE AND OUTSIDE CORNERS

1. APPLY FILLET BEADS OF TERMINATION SEALANT AT INSIDE CORNERS AND ALLOW TO CURE.

2. APPLY A 9-INCH (23 CM)-WIDE STRIP OF SELF-ADHERING DETAILING MEMBRANE CENTERED OVER INSIDE AND OUTSIDE INSIDE

CORNERS.

H. JOINT REINFORCEMENT

1. FOR STATIC CRACKS AND COLD JOINTS, APPLY A 9-INCH (23 CM)-WIDE STRIP OF SELF-ADHERING DETAILING MEMBRANE

CENTERED OVER THE JOINT.

I. PIPE PENETRATIONS

1. FINGER FLASH PIPE PENETRATIONS WITH A MINIMUM 6-INCH (15 CM) WIDE DETAILING TAPE BY APPLYING 3-INCH (7.6 CM)

FINGERS ONTO SURROUNDING SUBSTRATE AND 3-INCHES (7.6 CM) OF TAPE ONTO PIPE CIRCUMFERENCE, WITH 2-INCH (5 CM) MINIMUM OVERLAP. SEAL ALL EDGES OF FLASHING WITH TERMINATION SEALANT. SEAL ALL TERMINATIONS WITH

TERMINATION SEALANT.

J. SEAL ALL TERMINATIONS AND EXPOSED MEMBRANE EDGES WITH TERMINATION SEALANT.

3.03 APPLICATION

A. PRIMARY MEMBRANE APPLICATION

1. APPLY WATERPROOFING MEMBRANE SYSTEM IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

2. REMOVE RELEASE BACKING PAPER, THEN POSITION THE MEMBRANE AT THE LOWEST POINT. ENSURE THE PROPER OVERLAP

IS MAINTAINED FOR ALL SIDE AND END LAPS.

3. PULL BALANCE OF RELEASE PAPER OFF, THEN PRESS INTO PLACE TO ENSURE FULL CONTACT AND ELIMINATION OF ALL

WRINKLES. ROLL PRESS ENTIRE MEMBRANE AND SEAMS.

4. STAGGER END LAPS AND OVERLAP ALL SEAMS AT LEAST 2 ½ INCHES (6.35 CM).

5. TERMINATE TOP LEADING EDGE OF MEMBRANE WITH TERMINATION BAR AND TERMINATION SEALANT AS REQUIRED.

6. SEAL ALL TERMINATIONS AND NON-FACTORY EDGES WITH TERMINATION SEALANT.

7. INSPECT MEMBRANE BEFORE COVERING AND REPAIR AS NECESSARY. COVER TEARS AND INADEQUATE OVERLAPS WITH

MEMBRANE, EXTENDING 6 INCHES (15 CM) BEYOND AFFECTED AREAS. SEAL ALL SIDES OF PATCHES AND REPAIR AREAS WITH

TERMINATION SEALANT.

3.04 PROTECTION

A. PROTECT MEMBRANE IMMEDIATELY AFTER APPLICATION WITH THE APPLICATION OF DRAINAGE PANEL.

B. BACKFILL IMMEDIATELY USING CARE TO AVOID DAMAGING WATERPROOFING MEMBRANE SYSTEM.

SECTION 07 10 00 –DAMPPROOFING AND WATERPROOFING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. BELOW GRADE WATERPROOFING AND DAMPPROOFING

1.2 RELATED SECTIONS

A. SECTION 07 13 26 - SHEET WATERPROOFING.

B. SECTION 31 20 00 - EARTHWORK

1.3 REFERENCES

A. AATC 127 - WATER RESISTANCE: HYDROSTATIC PRESSURE TEST; 1998.

B. ASTM C 1311 - STANDARD SPECIFICATION FOR SOLVENT RELEASE SEALANTS; 2002.

C. ASTM D 1621 - STANDARD TEST METHOD FOR COMPRESSIVE PROPERTIES OF RIGID CELLULAR PLASTICS; 2004A.

D. ASTM E 96/E 96M - STANDARD TEST METHODS FOR WATER VAPOR TRANSMISSION OF MATERIALS; 2005.

E. CCMC TECHNICAL GUIDE FOR FOUNDATION WALL DRAINAGE SYSTEMS – DIMPLED MEMBRANES. MASTER FORMAT SECTION 02622.1;

(OCT. 11, 2006).

F. CCMC TECHNICAL GUIDE FOR RIGID POLYETHYLENE OR POLYSTYRENE DAMPPROOFING MEMBRANE. MASTER FORMAT SECTION

07111; (OCT. 11, 2001).

G. CGSB 19-GP-14M - SEALING COMPOUND, ONE COMPONENT, BUTYL-POLYISOBUTYLENE POLYMER BASE, SOLVENT CURING; 1984.

R. ICC-ES – EVALUATION GUIDELINES FOR RIGID POLYETHYLENE BELOW GRADE, DAMPPROOFING AND WALL WATERPROOFING

MATERIAL EG 114; (MAR. 1, 2004)

1.4 SUBMITTALS

A. PRODUCT DATA: MANUFACTURER'S DATA SHEETS ON EACH PRODUCT TO BE USED, INCLUDING:

1. PREPARATION INSTRUCTIONS AND RECOMMENDATIONS.

2. STORAGE AND HANDLING REQUIREMENTS AND RECOMMENDATIONS.

3. INSTALLATION METHODS.

4. SPECIMEN WARRANTY.

B. INSTALLER QUALIFICATIONS: INCLUDE MINIMUM OF 5 PROJECT REFERENCES.

C. EXECUTED WARRANTY.

1.5 QUALITY ASSURANCE

A. INSTALLER QUALIFICATIONS: COMPANY SPECIALIZING IN PERFORMING WORK OF THIS TYPE AND APPROVED BY THE MEMBRANE

MANUFACTURER.

B. MANUFACTURER'S FIELD SERVICES: PROVIDE THE SERVICES OF A REPRESENTATIVE ACCREDITED BY THE SHEET MANUFACTURER TO EXAMINE SUBSTRATES BEFORE STARTING INSTALLATION, PERIODICALLY REVIEW INSTALLATION PROCEDURES, AND REVIEW FINAL

INSTALLED SYSTEMS.

1.6 DELIVERY, STORAGE, AND PROTECTION

A. DELIVER PRODUCTS TO PROJECT SITE IN ORIGINAL PACKAGING WITH LABELS INTACT.

B. STORE PRODUCTS IN MANNER ACCEPTABLE TO MEMBRANE MANUFACTURER.

C. WHEN PRODUCTS MUST BE STORED FOR EXTENDED PERIODS, KEEP OUT OF DIRECT SUNLIGHT AND AT TEMPERATURES ABOVE

MINUS 22 DEGREES F (MINUS 30 DEGREES C).

D. STORE AND DISPOSE OF SOLVENT-BASED MATERIALS, AND MATERIALS USED WITH SOLVENT-BASED MATERIALS, IN ACCORDANCE

WITH REQUIREMENTS OF LOCAL AUTHORITIES HAVING JURISDICTION.

1.7 WARRANTY

A. MANUFACTURER’S LIMITED PRODUCT WARRANTY.

PART 2 PRODUCTS

2.1 APPLICATIONS

A. FOUNDATION WALL WATERPROOFING OR DAMPPROOFING: INSTALL MEMBRANE TO ALL WALLS BELOW GRADE, FROM BOTTOM OF

WALL TO GRADE LEVEL, AND IN LOCATIONS INDICATED ON THE DRAWINGS.

2.2 MATERIALS

A. FOUNDATION WALL WATERPROOFING OR DAMPPROOFING MEMBRANE: HIGH DENSITY POLYETHYLENE SHEET, DIMPLED

THROUGHOUT FIELD OF SHEET, WITH FLAT FLANGES ON MANUFACTURED EDGES.

1. A. PRODUCT: DIMPLED MEMBRANE

B. COLOR: BLACK.

C. WORKING TEMPERATURE RANGE: MINUS 22º F (MINUS 30º C) TO 176º F (80º C).

D. DIMPLE HEIGHT: 5/16 INCH (8MM)

E. COMPRESSIVE STRENGTH: ASTM D 1621: APPROXIMATELY 5200 PSF (250 KN/SQ M)

F. FLANGE WIDTH: 2 INCH (50 MM)

G. UV STABILITY: 30 DAYS MAXIMUM UV EXPOSURE, HOWEVER COVER AS SOON AS POSSIBLE

H. MATERIAL QUALITY: MEETING MINIMUM REQUIREMENTS OF CCMC TECHNICAL GUIDE FOR RIGID POLYETHYLENE OR

POLYSTYRENE DAMPPROOFING MEMBRANE.

I. SHEET WIDTH: AS REQUIRED TO RESULT IN AS FEW SEAMS AS POSSIBLE.

J. RECYCLED CONTENT: 60% POST CONSUMER / POST-INDUSTRIAL HDPE

K. SUSTAINABLE DESIGN: VIRGIN CO-EXTRUSION PROCESS, UTILIZING VIRGIN POLYETHYLENE ON THE OUTSIDE LAYERS AND

RECYCLED HDPE IN THE MIDDLE TO PROVIDE LONG-TERM IN SITU PERFORMANCE.

B. ACCESSORIES AS RECOMMENDED BY PRODUCT MANUFACTURER’S INSTALLATION INSTRUCTIONS.

PART 3 EXECUTION

3.1 EXAMINATION

A. VERIFY THAT SUBSTRATES ARE SOUND ENOUGH TO RETAIN FASTENERS AND SUITABLE FOR BONDING OF SEALANT.

B. VERIFY THAT THERE ARE NO ACTIVE LEAKS WITHIN AREA TO BE COVERED.

C. VERIFY THAT PERIMETER FOUNDATION DRAINAGE SYSTEM HAS BEEN PROPERLY INSTALLED.

D. VERIFY THAT FINISH GRADE ELEVATIONS ARE CLEARLY MARKED.

E. DO NOT BEGIN INSTALLATION UNTIL SUBSTRATES HAVE BEEN PROPERLY PREPARED.

F. IF SUBSTRATE PREPARATION IS THE RESPONSIBILITY OF ANOTHER TRADE, NOTIFY ARCHITECT OF UNSATISFACTORY PREPARATION

BEFORE PROCEEDING.

3.2 PREPARATION

A. CLEAN SURFACES "BROOM CLEAN" PRIOR TO INSTALLATION.

B. PREPARE SURFACES USING THE METHODS RECOMMENDED BY THE MANUFACTURER FOR ACHIEVING THE BEST RESULT FOR THE

SUBSTRATE UNDER THE PROJECT CONDITIONS.

1. REMOVE PROJECTIONS LARGER THAN 1/4 INCH (6 MM); REMOVE SHARP EDGES.

2. IN CONCRETE AND MASONRY, PATCH CRACKS AND HOLES SO THAT THEY PROVIDE SUITABLE SUBSTRATE AS RECOMMENDED BY

MEMBRANE MANUFACTURER.

C. MARK A CHALK LINE AT ANTICIPATED GRADE LEVEL ON WALLS PRIOR TO STARTING INSTALLATION.

3.3 INSTALLATION

A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED PROCEDURE.

B. DO NOT INSTALL WHEN:

1. AMBIENT TEMPERATURE IS BELOW MINUS 22 DEGREES F (MINUS 30 DEGREES C).

2. CONCRETE HAS BEEN CURED FOR LESS THAN 3 DAYS.

3. STANDING WATER IS PRESENT.

C. GENERAL SHEET INSTALLATION: START AT LOWEST POINT AND WORK TO TOP, RUNNING LENGTH OF SHEETS HORIZONTALLY AND OVERLAPPING UPPER SHEETS IN SHINGLE FASHION AT LEAST 6 INCHES (150 MM); LAP VERTICAL JOINTS AT LEAST 6 INCHES (150

MM).

1. INSTALL SHEETS WITHOUT GAPS, WRINKLES, CREASES, OR TEARS.

2. ALIGN AND INTERLOCK OVERLAPPING LAYERS.

3. SECURE TO SUBSTRATE AT EDGES AND IN THE FIELD OF THE SHEET USING FASTENERS AND METHODS RECOMMENDED BY SHEET

MANUFACTURER; STAGGER FASTENERS IN ALTERNATE ROWS.

4. FLASH AND SEAL TOP EDGES, AROUND OPENINGS AND PENETRATIONS, AND OTHER LOCATIONS RECOMMENDED BY

MANUFACTURER, IN MANNER RECOMMENDED BY MANUFACTURER.

D. FOUNDATION WALL WATERPROOFING OR DAMPPROOFING: IN ADDITION TO GENERAL SHEET INSTALLATION SPECIFIED ABOVE:

1. INSTALL WITH PROTRUDING DIMPLES ON SIDE FACING SUBSTRATE.

2. UNLESS OTHERWISE INDICATED, FASTEN DIMPLED SHEETS USING SPECIFIED FASTENERS WITH DIMPLED WASHERS INTERLOCKED

WITH SHEET AT NOT MORE THAN 24 INCHES (600 MM) ON CENTER IN A “W” PATTERN.

3. AT TOP, INSTALL WITH FLAT EDGE SECURED WITH MOLD STRIP. FASTEN AT NOT MORE THAN 8 INCHES (200 MM) ON CENTER.

4. AT ALL JOINTS, APPLY CONTINUOUS BEAD OF SEALANT BETWEEN LAYERS AND FASTEN THROUGH BOTH LAYERS WITH SPECIFIED

FASTENERS WITH DIMPLED WASHERS.

5. AT VERTICAL JOINTS, OVERLAP SHEETS AT LEAST 6 INCHES (150 MM) AND INTERLOCK DIMPLES, MAKING FULL CONTACT WITH

SEALANT.

6. AT HORIZONTAL JOINTS, APPLY CONTINUOUS SEALANT BEAD BETWEEN WALL AND TOP FLANGE OF LOWER SHEET AND FASTEN

LOWER SHEET ALONG TOP EDGE; OVERLAP UPPER SHEET OVER FLAT FLANGE OF LOWER SHEET AND FASTEN THROUGH BOTH

SHEETS AT LOWER EDGE OF UPPER SHEET AT 36” (910 MM) ON CENTER.

7. AT INTERRUPTIONS AND PENETRATIONS, APPLY CONTINUOUS BEAD OF SEALANT BETWEEN SHEET AND SUBSTRATE, FASTEN SHEET AROUND ENTIRE OPENING AT NOT MORE THAN 8 INCHES (100 MM) ON CENTER, AND COVER CUT EDGE WITH FLASHING

STRIP SEALED TO WALL AND FASTENED AT NOT MORE THAN 8 INCHES (100 MM) ON CENTER.

8. AT INSIDE AND OUTSIDE CORNERS, INSTALL SHEET AS CLOSE TO SUBSTRATE AS POSSIBLE WITHOUT BREAKING AND FASTEN ALONG BOTH SIDES ENTIRE LENGTH OF CORNER, NOT CLOSER THAN 5 INCHES (125 MM) TO CORNER.

9. AT BOTTOM OF WALLS, EXTEND A SINGLE SHEET FROM WALL OVER FOOTING TO DRAINAGE PIPE.

E. REPAIRS TO DIMPLED SHEET: APPLY PATCH MADE OF SAME MATERIAL INTERLOCKED, WITH CONTINUOUS SEALANT BEAD AROUND

TEAR OR PENETRATION.

3.4 FIELD QUALITY CONTROL

A. PROVIDE THE SERVICES OF A MANUFACTURER'S REPRESENTATIVE TO INSPECT SUBSTRATES FOR SUITABILITY FOR INSTALLATION, TO

REVIEW PROCEDURES DURING CONSTRUCTION, AND TO REVIEW THE FINISHED WORK.

3.5 PROTECTION

A. DO NOT LEAVE INSTALLED MEMBRANE EXPOSED TO SUNLIGHT FOR MORE THAN 30 DAYS AFTER INSTALLATION; TO COVER, COMPLETE BACKFILL OPERATION OR COVER WITH PROTECTION BOARD.

B. PRIOR TO BACKFILLING, INSPECT MEMBRANE FOR TEARS AND OTHER DAMAGE AND REPAIR.

C. TAKE CARE WHEN BACKFILLING TO AVOID DAMAGE TO MEMBRANE; REPLACE MEMBRANE DAMAGED DURING BACKFILLING.

D. PROTECT INSTALLED PRODUCTS UNTIL COMPLETION OF PROJECT.

E. TOUCH-UP, REPAIR OR REPLACE DAMAGED PRODUCTS BEFORE SUBSTANTIAL COMPLETION.

THE CONTRACTOR SHALL PROVIDE THE FOLLOWING SAMPLES, SUBMITTALS AND SHOP DRAWINGS FOR REVIEW AND APPROVAL:

SUBMITTALS:

BUILDING COMPONENTS

WATERPROOFING MATERIALS

CAULKS, MASTICS, ETC.

voice: (970)-286-7968 cairndesignllc.com

GILPIN COUNTY

COMMUNITY

CENTER

BLACKHAWK, CO

As instruments of service, these drawings and the design represented are the permanent property of Cairn Design, LLC. Reproduction or use of these drawings other than for the project intended, without written consent from the Designer, is prohibited.

Unauthorized use will be subject to legal action.

PROJECT:

SHEET TITLE:

ISSUE DATE:

REVISIONS:

ARCHITECTURAL

SPECIFICATIONS

A-03THE CONTRACTOR SHALL PROVIDE THE FOLLOWING SAMPLES, SUBMITTALS AND SHOP DRAWINGS FOR REVIEW AND APPROVAL:

SUBMITTALS:

BUILDING COMPONENTS

WATERPROOFING MATERIALS

CAULKS, MASTICS, ETC.

SECTION 312000 - EARTHWORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

RETAIN OR DELETE THIS ARTICLE IN ALL SECTIONS OF PROJECT MANUAL.

A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT APPLY TO THIS SECTION.

1.2 SUMMARY

A. SECTION INCLUDES:

1. EXCAVATING AND BACKFILLING FOR BUILDINGS AND STRUCTURES.

2. DRAINAGE COURSE FOR CONCRETE SLABS-ON-GRADE.

3. SUBSURFACE DRAINAGE BACKFILL FOR WALLS AND TRENCHES.

B. RELATED REQUIREMENTS:

RETAIN SUBPARAGRAPHS BELOW TO CROSS-REFERENCE REQUIREMENTS CONTRACTOR MIGHT EXPECT TO FIND IN THIS SECTION BUT

ARE SPECIFIED IN OTHER SECTIONS.

1. SEE CIVIL DRAWINGS.

1.3 DEFINITIONS

RETAIN DEFINITIONS REMAINING AFTER THIS SECTION HAS BEEN EDITED. REVISE TO SUIT OFFICE OR LOCAL EARTH-MOVING PRACTICES.

A. BACKFILL: SOIL MATERIAL OR CONTROLLED LOW-STRENGTH MATERIAL USED TO FILL AN EXCAVATION.

1. INITIAL BACKFILL: BACKFILL PLACED BESIDE AND OVER PIPE IN A TRENCH, INCLUDING HAUNCHES TO SUPPORT SIDES OF PIPE.

2. FINAL BACKFILL: BACKFILL PLACED OVER INITIAL BACKFILL TO FILL A TRENCH.

B. BASE COURSE: AGGREGATE LAYER PLACED BETWEEN THE SUBBASE COURSE AND HOT-MIX ASPHALT PAVING.

C. BEDDING COURSE: AGGREGATE LAYER PLACED OVER THE EXCAVATED SUBGRADE IN A TRENCH BEFORE LAYING PIPE.

D. BORROW SOIL: SATISFACTORY SOIL IMPORTED FROM OFF-SITE FOR USE AS FILL OR BACKFILL.

CONSIDER REVISING "DRAINAGE COURSE" PARAGRAPH BELOW AND THROUGHOUT THIS SECTION TO SUIT PROJECT OR OFFICE

STANDARD. SEE EVALUATIONS.

E. DRAINAGE COURSE: AGGREGATE LAYER SUPPORTING THE SLAB-ON-GRADE THAT ALSO MINIMIZES UPWARD CAPILLARY FLOW OF

PORE WATER.

F. EXCAVATION: REMOVAL OF MATERIAL ENCOUNTERED ABOVE SUBGRADE ELEVATIONS AND TO LINES AND DIMENSIONS

INDICATED.

1. AUTHORIZED ADDITIONAL EXCAVATION: EXCAVATION BELOW SUBGRADE ELEVATIONS OR BEYOND INDICATED LINES AND

DIMENSIONS AS REQUIRED.

G. FILL: SOIL MATERIALS USED TO RAISE EXISTING GRADES.

H. STRUCTURES: BUILDINGS, FOOTINGS, FOUNDATIONS, RETAINING WALLS, SLABS, TANKS, CURBS, MECHANICAL AND ELECTRICAL

APPURTENANCES, OR OTHER MAN-MADE STATIONARY FEATURES CONSTRUCTED ABOVE OR BELOW THE GROUND SURFACE.

I. SUBBASE COURSE: AGGREGATE LAYER PLACED BETWEEN THE SUBGRADE AND BASE COURSE FOR HOT-MIX ASPHALT PAVEMENT, OR AGGREGATE LAYER PLACED BETWEEN THE SUBGRADE AND A CEMENT CONCRETE PAVEMENT OR A CEMENT CONCRETE OR

HOT-MIX ASPHALT WALK.

J. SUBGRADE: UPPERMOST SURFACE OF AN EXCAVATION OR THE TOP SURFACE OF A FILL OR BACKFILL IMMEDIATELY BELOW

SUBBASE, DRAINAGE FILL, DRAINAGE COURSE, OR TOPSOIL MATERIALS.

K. UTILITIES: ON-SITE UNDERGROUND PIPES, CONDUITS, DUCTS, AND CABLES AS WELL AS UNDERGROUND SERVICES WITHIN

BUILDINGS.

1.4 ACTION SUBMITTALS

A. PRODUCT DATA: FOR EACH TYPE OF THE FOLLOWING MANUFACTURED PRODUCTS REQUIRED:

1. GEOTEXTILES.

2. CONTROLLED LOW-STRENGTH MATERIAL, INCLUDING DESIGN MIXTURE.

3. GEOFOAM.

4. WARNING TAPES.

1.5 INFORMATIONAL SUBMITTALS

COORDINATE "QUALIFICATION DATA" PARAGRAPH BELOW WITH QUALIFICATION REQUIREMENTS IN SECTION 014000 "QUALITY

REQUIREMENTS" AND AS SUPPLEMENTED IN "QUALITY ASSURANCE" ARTICLE.

A. QUALIFICATION DATA: FOR QUALIFIED TESTING AGENCY.

RETAIN "MATERIAL TEST REPORTS" PARAGRAPH BELOW FOR MATERIAL TEST REPORTS THAT ARE CONTRACTOR'S RESPONSIBILITY.

B. MATERIAL TEST REPORTS: FOR EACH SOIL MATERIAL PROPOSED FOR FILL AND BACKFILL AS FOLLOWS:

RETAIN BOTH SUBPARAGRAPHS BELOW FOR BORROW SOIL MATERIAL. DELETE IF USING ONLY ON-SITE SOIL MATERIAL AND

GEOTECHNICAL REPORT IS SUFFICIENT.

1. CLASSIFICATION ACCORDING TO ASTM D 2487.

2. LABORATORY COMPACTION CURVE ACCORDING TO ASTM D.

RETAIN ONE OR BOTH OF FIRST TWO PARAGRAPHS BELOW IF EXPLOSIVES ARE PERMITTED. RETAIN SECOND PARAGRAPH ONLY IF

SEISMIC SURVEY IS REQUIRED WITH BLASTING.

C. PREEXCAVATION PHOTOGRAPHS OR VIDEOTAPE: SHOW EXISTING CONDITIONS OF ADJOINING CONSTRUCTION AND SITE IMPROVEMENTS, INCLUDING FINISH SURFACES THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY EARTH-MOVING

OPERATIONS. SUBMIT BEFORE EARTH MOVING BEGINS.

1.6 FIELD CONDITIONS

A. TRAFFIC: MINIMIZE INTERFERENCE WITH ADJOINING ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED

FACILITIES DURING EARTH-MOVING OPERATIONS.

1. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION

FROM OWNER AND AUTHORITIES HAVING JURISDICTION.

2. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY OWNER OR AUTHORITIES

HAVING JURISDICTION.

RETAIN "IMPROVEMENTS ON ADJOINING PROPERTY" PARAGRAPH BELOW TO SUIT PROJECT; COORDINATE WITH OWNER.

B. IMPROVEMENTS ON ADJOINING PROPERTY: AUTHORITY FOR PERFORMING EARTH MOVING INDICATED ON PROPERTY ADJOINING

OWNER'S PROPERTY WILL BE OBTAINED BY OWNER BEFORE AWARD OF CONTRACT.

1. DO NOT PROCEED WITH WORK ON ADJOINING PROPERTY UNTIL DIRECTED BY COUNTY.

RETAIN "UTILITY LOCATOR SERVICE" PARAGRAPH BELOW IF REQUIRED AND NOT SPECIFIED IN SECTION 311000 "SITE CLEARING"; REVISE TO SUIT PROJECT. FIRST OPTION IS A GENERIC TERM THAT IS KNOWN IN VARIOUS STATES BY DIFFERENT NAMES LISTED IN THE OTHER

OPTIONS. SEE EVALUATIONS.

C. UTILITY LOCATOR SERVICE: NOTIFY UTILITY LOCATOR SERVICE FOR AREA WHERE PROJECT IS LOCATED BEFORE BEGINNING

EARTH-MOVING OPERATIONS.

PART 2 - PRODUCTS

2.1 GEOTEXTILES

RETAIN "SUBSURFACE DRAINAGE GEOTEXTILE" PARAGRAPH BELOW IF NONWOVEN GEOTEXTILE IS USED IN SUBSURFACE DRAINAGE APPLICATIONS. DELETE PARAGRAPH IF ONLY FACTORY-FABRICATED DRAINAGE PANELS ARE USED AND SPECIFIED IN WATERPROOFING

SECTIONS.

PERFORMANCE REQUIREMENTS IN AASHTO M 288 HAVE BEEN WIDELY ADOPTED BY GEOTEXTILE MANUFACTURERS AND ARE REPEATED BELOW. THE GEOTECHNICAL REPORT MAY ALSO INCLUDE GEOTEXTILE RECOMMENDATIONS. SEE EVALUATIONS FOR LIST OF GEOTEXTILE

MANUFACTURERS.

A. SUBSURFACE DRAINAGE GEOTEXTILE: NONWOVEN NEEDLE-PUNCHED GEOTEXTILE, MANUFACTURED FOR SUBSURFACE DRAINAGE APPLICATIONS, MADE FROM POLYOLEFINS OR POLYESTERS; WITH ELONGATION GREATER THAN 50 PERCENT; COMPLYING WITH

AASHTO M 288.

PART 3 - EXECUTION

3.1 PREPARATION

A. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT, AND OTHER HAZARDS CREATED BY EARTH-MOVING OPERATIONS.

B. PROTECT AND MAINTAIN EROSION AND SEDIMENTATION CONTROLS DURING EARTH-MOVING OPERATIONS.

C. PROTECT SUBGRADES AND FOUNDATION SOILS FROM FREEZING TEMPERATURES AND FROST. REMOVE TEMPORARY PROTECTION

BEFORE PLACING SUBSEQUENT MATERIALS.

3.2 DEWATERING

A. PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING PROJECT SITE AND SURROUNDING AREA.

B. PROTECT SUBGRADES FROM SOFTENING, UNDERMINING, WASHOUT, AND DAMAGE BY RAIN OR WATER ACCUMULATION.

1. REROUTE SURFACE WATER RUNOFF AWAY FROM EXCAVATED AREAS. DO NOT ALLOW WATER TO ACCUMULATE IN

EXCAVATIONS. DO NOT USE EXCAVATED TRENCHES AS TEMPORARY DRAINAGE DITCHES.

3.3 EXCAVATION FOR STRUCTURES

REVISE TOLERANCES IN THIS ARTICLE TO SUIT OFFICE PRACTICE IF APPLICABLE.

A. EXCAVATE TO INDICATED ELEVATIONS AND DIMENSIONS WITHIN A TOLERANCE OF PLUS OR MINUS 1 INCH (25 MM). IF

APPLICABLE, EXTEND EXCAVATIONS A SUFFICIENT DISTANCE FROM STRUCTURES FOR PLACING AND REMOVING WATERPROOFING, FOR INSTALLING SERVICES AND OTHER CONSTRUCTION, AND FOR INSPECTIONS.

3.4 BACKFILL

A. PLACE AND COMPACT BACKFILL IN EXCAVATIONS PROMPTLY, BUT NOT BEFORE COMPLETING THE FOLLOWING:

REVISE SUBPARAGRAPHS BELOW TO SUIT PROJECT.

1. CONSTRUCTION BELOW FINISH GRADE INCLUDING, WHERE APPLICABLE, SUBDRAINAGE, DAMPPROOFING, WATERPROOFING, AND PERIMETER INSULATION.

2. SURVEYING LOCATIONS OF UNDERGROUND UTILITIES FOR RECORD DOCUMENTS.

3. REMOVING TRASH AND DEBRIS.

4. REMOVING TEMPORARY SHORING, BRACING, AND SHEETING.

5. INSTALLING PERMANENT OR TEMPORARY HORIZONTAL BRACING ON HORIZONTALLY SUPPORTED WALLS.

B. PLACE BACKFILL ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE.

3.5 SOIL FILL

A. PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SO FILL MATERIAL WILL

BOND WITH EXISTING MATERIAL.

B. PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS AS FOLLOWS:

REVISE SOIL MATERIALS IN SUBPARAGRAPHS BELOW TO SUIT PROJECT. OTHER SOIL MATERIALS, SUCH AS A DRAINAGE COURSE OR

SUBBASE OR BASE COURSES, MAY STILL BE REQUIRED OVER FILL.

1. UNDER GRASS AND PLANTED AREAS, USE SATISFACTORY SOIL MATERIAL.

2. UNDER WALKS AND PAVEMENTS, USE SATISFACTORY SOIL MATERIAL.

3. UNDER STEPS AND RAMPS, USE ENGINEERED FILL.

4. UNDER BUILDING SLABS, USE ENGINEERED FILL.

RETAIN SUBPARAGRAPH BELOW IF BACKFILL OR FILL BENEATH FOOTINGS AND FOUNDATIONS IS REQUIRED. COORDINATE MATERIAL

SELECTION WITH GEOTECHNICAL ENGINEER'S WRITTEN RECOMMENDATIONS.

5. UNDER FOOTINGS AND FOUNDATIONS, USE ENGINEERED FILL.

C. PLACE SOIL FILL ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE.

3.6 SOIL MOISTURE CONTROL

REVISE PERCENTAGES IN THIS ARTICLE ACCORDING TO GEOTECHNICAL ENGINEER'S WRITTEN RECOMMENDATIONS.

A. UNIFORMLY MOISTEN OR AERATE SUBGRADE AND EACH SUBSEQUENT FILL OR BACKFILL SOIL LAYER BEFORE COMPACTION TO

WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT.

1. DO NOT PLACE BACKFILL OR FILL SOIL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR CONTAIN FROST OR ICE.

IN SUBPARAGRAPH BELOW, REPLACE THE TERM "UNIT WEIGHT" WITH "DENSITY" IF PREFERRED

2. REMOVE AND REPLACE, OR SCARIFY AND AIR DRY, OTHERWISE SATISFACTORY SOIL MATERIAL THAT EXCEEDS OPTIMUM

MOISTURE CONTENT BY 2 PERCENT AND IS TOO WET TO COMPACT TO SPECIFIED DRY UNIT WEIGHT.

3.7 COMPACTION OF SOIL BACKFILLS AND FILLS

REVISE DEPTH OF LAYERS IN FIRST PARAGRAPH BELOW TO SUIT PROJECT.

A. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8 INCHES (200 MM) IN LOOSE DEPTH FOR MATERIAL

COMPACTED BY HEAVY COMPACTION EQUIPMENT AND NOT MORE THAN 4 INCHES (100 MM) IN LOOSE DEPTH FOR MATERIAL

COMPACTED BY HAND-OPERATED TAMPERS.

B. PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS AND UNIFORMLY

ALONG THE FULL LENGTH OF EACH STRUCTURE.

RETAIN ONE OPTION IN PARAGRAPH BELOW BASED ON ASTM LABORATORY-TEST METHOD REQUIRED. REPLACE THE TERM "UNIT

WEIGHT" WITH "DENSITY" IF PREFERRED.

C. COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO

ASTM D 698 OR ASTM D 1557:

RETAIN APPLICABLE SUBPARAGRAPHS BELOW. PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT ARE EXAMPLES ONLY; REVISE TO SUIT PROJECT. DELETE SCARIFYING AND RECOMPACTING EXISTING SUBGRADE WHEN PROOF-ROLLING WILL SUFFICE.

1. UNDER WALKWAYS, SCARIFY AND RECOMPACT TOP 6 INCHES (150 MM) BELOW SUBGRADE AND COMPACT EACH LAYER OF

BACKFILL OR FILL SOIL MATERIAL AT 92 PERCENT.

2. UNDER TURF OR UNPAVED AREAS, SCARIFY AND RECOMPACT TOP 6 INCHES (150 MM) BELOW SUBGRADE AND COMPACT

EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 85 PERCENT.

3.8 SUBSURFACE DRAINAGE

RETAIN "SUBDRAINAGE PIPE," "SUBSURFACE DRAIN," AND "DRAINAGE BACKFILL" PARAGRAPHS BELOW TO SUIT PROJECT; REVISE TO

COORDINATE WITH DRAWINGS. COORDINATE WITH SECTION 312319 "DEWATERING."

RETAIN "SUBSURFACE DRAIN" PARAGRAPH BELOW IF NONWOVEN GEOTEXTILE IS USED IN SUBSURFACE DRAINAGE APPLICATIONS.

DELETE IF ONLY FACTORY-FABRICATED DRAINAGE PANELS ARE USED AND SPECIFIED IN WATERPROOFING SECTIONS.

A. SUBSURFACE DRAIN: PLACE SUBSURFACE DRAINAGE GEOTEXTILE AROUND PERIMETER OF SUBDRAINAGE TRENCH. PLACE A 6-INCH (150-MM) COURSE OF FILTER MATERIAL ON SUBSURFACE DRAINAGE GEOTEXTILE TO SUPPORT SUBDRAINAGE PIPE.

ENCASE SUBDRAINAGE PIPE IN A MINIMUM OF 14 INCHES OF FILTER MATERIAL, PLACED IN COMPACTED LAYERS 6 INCHES THICK, AND WRAP IN SUBSURFACE DRAINAGE GEOTEXTILE, OVERLAPPING SIDES AND ENDS AT LEAST 6 INCHES.

RETAIN "DRAINAGE BACKFILL" PARAGRAPH BELOW IF USING FREE-DRAINING GRANULAR BACKFILL AGAINST WALLS.

B. DRAINAGE BACKFILL: PLACE AND COMPACT FILTER MATERIAL OVER SUBSURFACE DRAIN, IN WIDTH INDICATED, TO WITHIN 12

INCHES (300 MM) OF FINAL SUBGRADE, IN COMPACTED LAYERS 6 INCHES (150 MM) THICK. OVERLAY DRAINAGE BACKFILL WITH ONE LAYER OF SUBSURFACE DRAINAGE GEOTEXTILE, OVERLAPPING SIDES AND ENDS AT LEAST 6 INCHES (150 MM).

3.9 FIELD QUALITY CONTROL

RETAIN "SPECIAL INSPECTIONS" PARAGRAPH BELOW IF SPECIAL INSPECTIONS ARE REQUIRED BY CODE AND REVISE TO SUIT REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. SPECIAL INSPECTION MAY NOT BE NECESSARY FOR FILL LESS THAN 12 INCHES (305 MM) DEEP OR OUTSIDE OF FOUNDATION OR PAVEMENT LIMITS; VERIFY WITH BUILDING CODE AND AUTHORITIES HAVING

JURISDICTION.

A. SPECIAL INSPECTIONS: OWNER WILL ENGAGE A QUALIFIED SPECIAL INSPECTOR TO PERFORM THE FOLLOWING SPECIAL

INSPECTIONS:

1. DETERMINE PRIOR TO PLACEMENT OF FILL THAT SITE HAS BEEN PREPARED IN COMPLIANCE WITH REQUIREMENTS.

2. DETERMINE THAT FILL MATERIAL CLASSIFICATION AND MAXIMUM LIFT THICKNESS COMPLY WITH REQUIREMENTS.

3. DETERMINE, DURING PLACEMENT AND COMPACTION, THAT IN-PLACE DENSITY OF COMPACTED FILL COMPLIES WITH

REQUIREMENTS.

B. TESTING AGENCY: OWNER WILL ENGAGE A QUALIFIED GEOTECHNICAL ENGINEERING TESTING AGENCY TO PERFORM TESTS AND

INSPECTIONS.

REQUIREMENTS IN REMAINING PARAGRAPHS BELOW, IF RETAINED, MAY ACTUALLY EXCEED CODE-REQUIRED SPECIAL INSPECTIONS.

RETAIN FIRST PARAGRAPH BELOW IF APPLICABLE; REVISE TO SUIT PROJECT.

C. ALLOW TESTING AGENCY TO INSPECT AND TEST SUBGRADES AND EACH FILL OR BACKFILL LAYER. PROCEED WITH SUBSEQUENT EARTH MOVING ONLY AFTER TEST RESULTS FOR PREVIOUSLY COMPLETED WORK COMPLY WITH REQUIREMENTS.

RETAIN "FOOTING SUBGRADE" PARAGRAPH BELOW IF APPLICABLE; REVISE TO SUIT PROJECT. IF RETAINING, ADD OTHER FIELD TESTS, SUCH AS CALIFORNIA BEARING RATIO OF SUBGRADES, SUBBASES, AND BASES FOR PAVING, IF REQUIRED.

REVISE FIRST PARAGRAPH BELOW TO SUIT PROJECT.

D. TESTING AGENCY WILL TEST COMPACTION OF SOILS IN PLACE ACCORDING TO ASTM D 1556, ASTM D 2167, ASTM D 2937, AND

ASTM D 6938, AS APPLICABLE. TESTS WILL BE PERFORMED AT THE FOLLOWING LOCATIONS AND FREQUENCIES:

FREQUENCIES OF TESTING IN "PAVED AND BUILDING SLAB AREAS," "FOUNDATION WALL BACKFILL," AND "TRENCH BACKFILL"

SUBPARAGRAPHS BELOW ARE EXAMPLES ONLY; REVISE TO SUIT PROJECT.

1. FOUNDATION WALL BACKFILL: AT EACH COMPACTED BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 100 FEET (30 M) OR

LESS OF WALL LENGTH BUT NO FEWER THAN TWO TESTS.

E. WHEN TESTING AGENCY REPORTS THAT SUBGRADES, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION SPECIFIED, SCARIFY AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL MATERIALS TO DEPTH REQUIRED; RECOMPACT AND

RETEST UNTIL SPECIFIED COMPACTION IS OBTAINED.

voice: (970)-286-7968 cairndesignllc.com

GILPIN COUNTY

COMMUNITY

CENTER

BLACKHAWK, CO

As instruments of service, these drawings and the design represented are the permanent property of Cairn Design, LLC. Reproduction or use of these drawings other than for the project intended, without written consent from the Designer, is prohibited.

Unauthorized use will be subject to legal action.

PROJECT:

SHEET TITLE:

ISSUE DATE:

REVISIONS:

FLOOR PLAN - WATERPROOFING

1"=10'-0"

EXISTING CONDITIONS,

DEMOLITION, AND

NEW WORK PLANS

A-10

KEYED PLAN NOTES:

1. AFTER DEMOLITION OF EXISTING SIDEWALK ALONG THE

EXTERIOR PERIMETER, EXCAVATE AND CONFIRM

WATERPROOFING EXISTS ON EXTERIOR OF ICF

FOUNDATION WALL. IF WATERPROOFING EXISTS,

CONTINUE TO NOTE 2. IF WATERPROOFING DOES NOT

EXIST, EXCAVATE DOWN TO FOOTER AND INSTALL

FOUNDATION DRAIN AND WATERPROOFING.

2. PERIMETER DRAIN LOCATED 6" BELOW GRADE AND

SLOPED TOWARD DAYLIGHT. SEE DETAILS ON A-20.

3. CAP HIGH END OF PERIMETER DRAIN PIPE.

4. PERIMETER DRAIN TO DAYLIGHT. PROVIDE

GRAVEL/RIPRAP AT DISCHARGE TO LIMIT EROSION.

X

AutoCAD SHX Text N voice: (970)-286-7968 cairndesignllc.com

GILPIN COUNTY

COMMUNITY

CENTER

BLACKHAWK, CO

As instruments of service, these drawings and the design represented are the permanent property of Cairn Design, LLC. Reproduction or use of these drawings other than for the project intended, without written consent from the Designer, is prohibited.

Unauthorized use will be subject to legal action.

PROJECT:

SHEET TITLE:

ISSUE DATE:

REVISIONS:

WATERPROOFING DETAILS

NOT TO SCALE

WATERPROOFING

DETAILS

A-20

FILL IN ALL CRACKS AND GAPS

WITH HYDRAULIC CEMENT OR

MASONRY CAULK.

INSTALL LIQUID RUBBER MEMBRANE FROM

2" ABOVE GRADE TO 12" BEYOND EXISTING

WATERPROOFING.

PERFORATED DRAIN PIPE INSTALLED IN WASHED

GRAVEL. 14" DEEP MINIMUM WITH GEO TEXTILE

FILTER FABRIC.

FILL IN ALL CRACKS AND GAPS

WITH HYDRAULIC CEMENT OR

MASONRY CAULK.

INSTALL LIQUID RUBBER MEMBRANE FROM

2" ABOVE GRADE TO 12" BELOW GRADE.

FILL IN ALL CRACKS AND GAPS

WITH HYDRAULIC CEMENT OR

MASONRY CAULK.

FILL IN ALL CRACKS AND GAPS

WITH HYDRAULIC CEMENT OR

MASONRY CAULK.

INSTALL LIQUID RUBBER

MEMBRANE FROM 2" ABOVE

GRADE TO 12" BEYOND EXISTING

WATERPROOFING.

PERFORATED DRAIN PIPE INSTALLED IN WASHED

GRAVEL. 14" DEEP MINIMUM WITH GEO TEXTILE

FILTER FABRIC.

PERFORATED DRAIN PIPE INSTALLED IN WASHED

GRAVEL. 14" DEEP MINIMUM WITH GEO TEXTILE

FILTER FABRIC.

PERFORATED DRAIN PIPE INSTALLED IN WASHED

GRAVEL. 14" DEEP MINIMUM WITH GEO TEXTILE

FILTER FABRIC.

INSTALL LIQUID RUBBER MEMBRANE FROM

2" ABOVE GRADE TO 12" BEYOND EXISTING

WATERPROOFING.

INSTALL LIQUID RUBBER

MEMBRANE FROM 2" ABOVE

GRADE TO FOUNDATION DRAIN IF

NOT INSTALLED.

INSTALL LIQUID RUBBER

MEMBRANE FROM 2" ABOVE

GRADE TO FOUNDATION DRAIN IF

NOT INSTALLED.

INSTALL DIMPLE BOARD

MEMBRANE FROM GRADE TO

FOUNDATION DRAIN IF NOT

INSTALLED.

INSTALL DIMPLE BOARD

MEMBRANE FROM GRADE TO

FOUNDATION DRAIN IF NOT

INSTALLED.

INSTALL LIQUID RUBBER

MEMBRANE FROM 2" ABOVE

GRADE TO FOUNDATION DRAIN IF

NOT INSTALLED.

INSTALL LIQUID RUBBER

MEMBRANE FROM 2" ABOVE

GRADE TO FOUNDATION DRAIN IF

NOT INSTALLED.

INSTALL DIMPLE BOARD

MEMBRANE FROM GRADE TO

FOUNDATION DRAIN IF NOT

INSTALLED.

2025.04.09 Gilpin County CC 100%
C1.0 COVER SHEET
C2.0 GENERAL NOTES
C3.0 EXISTING CONDITIONS
C4.0 SITE PLAN
C5.0 GRADING PLAN
C6.0 EROSION CONTROL PLAN
C7.0 EROSION CONTROL PLAN DETAILS
Gilpin CC Waterproofing
a1.pdf
Sheets and Views
A-01 GENERAL PROJECT NOTES
A-02-03-04_Specs+Notes_2504-A-02 SPECIFICATIONS.pdf
Sheets and Views
A-02 SPECIFICATIONS
A-02-03-04_Specs+Notes_2504-A-03 SPECIFICATIONS (2).pdf
Sheets and Views
A-03 SPECIFICATIONS (2)
2504 Floor Plan-Layout1.pdf
Sheets and Views
Layout1
2504 Floor Plan-Layout1 (2).pdf
Sheets and Views
Layout1 (2)

File details come from the government source that posted it. Updated .