GFI.pdf
PDF 1 MB Posted
- Attached to
- SHOCK ENGINEERING SERVICES
- Solicitation number
- N0016720Q0250
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: 1 |
| TextField2: TBD |
| TextField7: Submarine Shock Engineering Services |
| TextField8: TBD |
| DateField1: 03/16/2020 |
| TextField3: 661 |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField3: 2 DAC |
| DateField2: 21 Aug 1998 |
| DateField2: 16 March 2020 |
| DateField2: 15 April 2012 |
| DateField2: 17 June 1996 |
| DateField2: 28 April 1997 |
| DateField2: 17 June 1996 |
| DateField2: 5 May 1995 |
| DateField2: 30 July 2012 |
| DateField2: 23 Aug 1994 |
| DateField2: 15 July 2016 |
| TextField6: 802-6337449 |
| TextField6: 802-6337449 |
| TextField6: 802- 6337447 |
| TextField6: 802-633744 |
| TextField6: 802-6337443 |
| TextField5: NSSN Class Ship Specifications Section 072 (CONFIDENTIAL) |
| TextField5: DISTRO D: NSWCCD Comment Matrix Template |
| TextField5: DISTRO D: Low-Impact (L.I.) Testing, Shipboard Machinery, Equipment, and Systems, Requirements for |
| TextField5: DISTRO D: Low-Impact (L.I.) Testing, Shipboard Machinery, Equipment, and Systems, Requirements for |
| TextField5: DISTRO D: Dynamic Design Analysis Method (DDAM) Procedures; Project Peculiar Document |
| TextField5: Underwater Explosion (UNDEX) Qualification of Submarine Hull Penetrations (CONFIDENTIAL) |
| TextField5: Shock Qualification and Design Guidance for Submarine External Components (CONFIDENTIAL) |
| TextField5: DISTRO A: Shock Tests, H.I. (High-Impact) Shipboard Machinery, Equipment, and Systems, Requirements for |
| TextField5: DISTRO A: Shock Tests, H.I. (High-Impact) Shipboard Machinery, Equipment, and Systems, Requirements for |
| TextField5: Ohio Replacement (OR) Class Ship Specifications Section 072 (CONFIDENTIAL) |
| TextField4: 1 |
| TextField4: 10 |
| TextField4: 9 |
| TextField4: 8 |
| TextField4: 7 |
| TextField4: 6 |
| TextField4: 5 |
| TextField4: 4 |
| TextField4: 3 |
| TextField4: 2 |
File details come from the government source that posted it. Updated .