About this file

This is a Geotechnical Engineering Report prepared by RABA KISTNER Consultants, Inc. for the City of Edinburg, Texas, concerning proposed road improvements along Alberta Road in Edinburg, Hidalgo County, Texas. The report documents subsurface exploration and pavement design recommendations for approximately 11,930 feet of roadway reconstruction extending from U.S. Expressway 281 South Frontage Road to approximately 1,500 feet east of N. 2nd Street. The study, conducted on May 13-14, 2021, included twelve soil borings drilled to approximately 10 feet below ground surface, along with laboratory testing including Standard Penetration Tests, Atterberg limits analysis, sulfate content determinations, and lime series testing. The proposed pavement section consists of 8 inches of lime-treated subgrade, 10 inches of flexible base material, and 2 inches of hot-mix asphaltic concrete surface course, designed for a 20-year service life with an estimated capacity of 120,000 Equivalent Single Axle Loads (approximately 6 tractor-trailer trucks per day).

The report identifies the predominant subsurface soils as plastic lean clay with an assigned California Bearing Ratio value of 3 for design purposes. Groundwater was encountered at depths of 4 to 6 feet in two borings but not in the remaining ten. Sulfate content testing yielded results of approximately 2,300-2,320 parts per million, below the 3,000 ppm threshold of concern for sulfate-induced heave. The report recommends hydrated lime treatment of the upper 8 inches of subgrade at approximately 2 percent by weight to reduce plasticity and increase soil strength, along with detailed specifications for subgrade preparation, drainage management, select fill materials, and flexible base course installation. Construction materials engineering and testing services by RABA KISTNER are recommended during construction to monitor compliance with specifications and address variations in subsurface conditions encountered during excavation and pavement construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEOTECHNICAL ENGINEERING STUDY

FOR

PROPOSED ALBERTA ROAD IMPROVEMENTS

EDINBURG, HIDALGO COUNTY, TEXA

GEOTECHNICAL ENGINEERING STUDY

For

PROPOSED ALBERTA ROAD IMPROVEMENTS

EDINBURG, HIDALGO COUNTY, TEXAS

Prepared for

CITY OF EDINBURG

Edinburg, Texas

Prepared by

RABA KISTNER CONSULTANTS, INC.

McAllen, Texas

PROJECT NO. AMA21-017-00 (Revised)

June 10, 2021

Project No. AMA21-017-00 (Revised)

TABLE OF CONTENTS

i

INTRODUCTION

PROJECT DESCRIPTION

LIMITATIONS

BORINGS AND LABORATORY TESTS

GENERAL SITE CONDITIONS

SITE DESCRIPTION

SITE GEOLOGY

STRATIGRAPHY

GROUNDWATER

PAVEMENT SUBSURFACE DISTRESS OBSERVATIONS

PAVEMENT RECOMMENDATIONS

SUBGRADE CONDITIONS

SULFATE CORROSION POTENTIAL

LIME TREATMENT OF SUBGRADE

DESIGN INFORMATION

PAVEMENT CONSTRUCTION CONSIDERATIONS

SUBGRADE PREPARATION

DRAINAGE CONSIDERATIONS

LIME TREATMEMENT OF SUBGRADE

SELECT FILL

FLEXIBLE BASE COURSE

ASPHALTIC CONCRETE SURFACE COURSE

EXCAVATION SLOPING AND BENCHING

EXCAVATION EQUIPMENT

CONSTRUCTION RELATED SERVICES

CONSTRUCTION MATERIALS ENGINEERING AND TESTING SERVICES

TABLE OF CONTENTS

ii

BUDGETING FOR CONSTRUCTION TESTING

ATTACHMENTS

Boring Location Map Logs of Borings Key to Terms and Symbols Results of Soil Sample Analyses Important Information About Your Geotechnical Engineering Report

INTRODUCTION

RABA KISTNER Consultants, Inc. (RKCI) has completed the authorized subsurface exploration and pavement recommendations for the proposed road improvements along Alberta Road in Edinburg, Hidalgo County, Texas. This report briefly describes the procedures utilized during this study and presents our findings, as well as pavement design and construction guidelines.

PROJECT DESCRIPTION

It is our understanding that the proposed project includes the reconstruction of an approximately 11,930 ft long, segment of Alberta Road from U.S Expressway 281 South Frontage Road to the east to about 1,500 ft east of N. 2rd Street to the west in Edinburg, Hidalgo County, Texas. We understand that the proposed road alignment is planned to consist of a flexible (asphalt) pavement system and/or rigid (concrete) pavement.

LIMITATIONS

This engineering report has been prepared in accordance with accepted Geotechnical Engineering practices in the region of South Texas for the use of City of Edinburg (CLIENT) and its representatives for design purposes. This report may not contain sufficient information for purposes of other parties or other uses and is not intended for use in determining construction means and methods.

The recommendations submitted in this report are based on the data obtained from twelve borings drilled along the proposed road alignment, our understanding of the project information provided to us by the CLIENT, and the assumption that site grading will result in only minor changes in the topography existing at the time of our study. If the project information described in this report is incorrect, is altered, or if new information is available, we should be retained to review and modify our recommendations.

This report may not reflect the actual variations of the subsurface conditions across or within the subject road. The nature and extent of variations across or within the subject road may not become evident until construction commences. The construction process itself may also alter subsurface conditions. If variations appear evident at the time of construction, it may be necessary to reevaluate our recommendations after performing on-site observations and tests to establish the engineering impact of the variations.

The scope of our Geotechnical Engineering Study does not include an environmental assessment of the air, soil, rock, or water conditions either on or adjacent to the road alignment. No environmental opinions are presented in this report. RKCI’s scope of work does not include the investigation, detection, or design related to the prevention of any biological pollutants. The term “biological pollutants” includes, but is not limited to, mold, fungi, spores, bacteria, and viruses, and the byproduct of any such biological organisms.

If final grade elevations are significantly different from the grades existing at the time of our study (more than plus or minus 1 ft), our office should be informed about these changes. If needed and/or desired, we will reexamine our analyses and make supplemental recommendations.

BORINGS AND LABORATORY TESTS

Subsurface conditions along the subject road were evaluated by twelve borings (designated as “P-”), drilled on May 13, 2021 and May 14, 2021, at the locations shown on the Boring Location Map, Figure 1.

The boring locations are approximate and were located in the field by an RKCI representative, based on an aerial map titled “Alberta Road Improvements” received by our office via electronic-mail attachment by the CLIENT on February 3, 2021. The borings were drilled to a depth of about 10 ft each below the ground surface elevations existing at the time of our study. The borings were drilled using a truck-mounted, rotary-drilling rig and augured utilizing straight flight augers. The upper two inches of the borings were filled with cold-mix asphalt up to the existing asphalt-paved surface level. During the drilling operations, Split-Spoon (with Standard Penetration Test, SPT) samples were collected.

The SPT samples were obtained in accordance with accepted standard practices and the penetration test results are presented as “blows per foot” on the boring logs. Representative portions of the samples were sealed in containers to reduce moisture loss, labeled, packaged, and transported to our laboratory for subsequent testing and classification.

In the laboratory, each sample was evaluated and visually classified by a member of our Geotechnical Engineering staff in general accordance with the Unified Soil Classification System (USCS). The geotechnical engineering properties of the strata were evaluated by the following laboratory tests: natural moisture content, Atterberg limits, sulfate content determinations, lime series determinations, and percent passing a No. 200 sieve determinations.

With the exception of the laboratory sulfate determinations and lime series tests, the results of the field and laboratory tests are presented in graphical or numerical form on the boring logs illustrated on Figures 2 through 13. A key to the classification of terms and symbols used on the logs is presented on Figure 14. The results of the laboratory and field testing are also tabulated on Figure 15 for ease of reference.

The corrosion potential of the subsurface soils to concrete and uncoated steel was preliminarily evaluated by conducting two laboratory sulfate content tests on bulk soil samples obtained within the proposed road from an approximate depth of about 2 ft below the ground surface elevations existing at the time of our study. The laboratory test results are presented and discussed in a subsequent section of this report.

SPT results are noted as “blows per ft” on the boring logs and on Figure 15, where “blows per ft” refers to the number of blows by a falling 140-lb (pound) hammer required for 1 ft of penetration into the subsurface materials.

Samples will be retained in our laboratory for 30 days after submittal of this report. Other arrangements may be provided at the written request of the CLIENT.

GENERAL SITE CONDITIONS

SITE DESCRIPTION

The subject site for the proposed road alignment is located along Alberta Road from U.S. Expressway 281 South Frontage Road to the east to about 1,500 ft east of N. 2nd Street to the west in Edinburg, Hidalgo County, Texas. At the time of our field operations, the proposed road alignment can generally be described as an existing paved road. The topography is relatively flat with a visually estimated vertical relief of less than 3 ft. Surface drainage is visually estimated to be fair.

SITE GEOLOGY

A cursory review of the Geologic Atlas of Texas (McAllen-Brownsville Sheet, dated 1976), published by the Bureau of Economic Geology at the University of Texas at Austin, indicates that the subject site appears to be located within the Lissie Formation consisting of clays, silts, sands, gravel, and caliche deposits of the Quaternary epoch (Pleistocene period).

According to the Soil Survey of Hidalgo County, Texas, published by the United States Department of Agriculture - Soil Conservation Service, in cooperation with the Texas Agricultural Experiment Station, the project site appears to be located within the Hidalgo and Raymondville-Hidalgo soil associations consisting of deep, moderately permeable soils that typically have a dark grayish brown sandy clay loam surface layer and deep slowly moderately permeable soils that typically have a gray or dark grayish brown clay loam or sandy clay loam surface layer, respectively. The corresponding soil symbols appears to 28, 31, and 52, Hidalgo sandy clay loam, Hidalgo-Urban land complex, and Raymondville clay loam, respectively.

STRATIGRAPHY

It should be noted that the borings were drilled along the subject road alignment. The existing hot mix asphaltic concrete (HMAC) thickness was measured to range from about 1-1/2 to 5 inches, while the flexible base material (FBM) thickness underlying the HMAC was measured to range from about 5 to 12 inches. In addition, the apparent presence of lime was detected in Boring P-7 within the subgrade clay material layer located directly beneath the FBM, using phenolphthalein solution (a color indicator method).

The subsurface stratigraphy at this site can be described by two generalized strata. The stratum has been designated by grouping soils that possess similar physical and engineering characteristics. The boring logs should be consulted for more specific stratigraphic information. The lines designating the interfaces between strata on the boring logs represent approximate boundaries. Transitions between strata may be gradual.

Stratum I consists of dark brown, loose, clayey sand soils. This stratum was noted in Boring P-2 and P-10 from the ground surface elevation existing at the time of our study, extending down to a depth of about 2.5 ft. Moisture contents were measured to range from about 17 to 24 percent.

Two percent passing the No. 200 sieve tests demonstrates percent fines of 42 and 47 percent.

SPT N-values ranging from 7 blows to 8 blows per foot of penetration were measured for this stratum. These soils may be classified as SC soils in general accordance with the USCS.

Stratum II consists of light brown to dark brown, soft to very stiff, lean clay with sand soils and sandy lean clay soils. This stratum was encountered in the borings from the ground surface elevation existing at the time of our study, extending down to at least the termination depth of the borings. In Borings P-2 and P-10, this stratum was noted from beneath Stratum l soils.

Moisture contents were measured to range from about 13 to 29 percent. This stratum is classified as moderately plastic to plastic, with measured plasticity indices ranging from 13 to 30 percent.

Percent passing the No. 200 sieve tests demonstrate percent fines ranging from 55 to 83 percent.

SPT N-values ranging from 3 blows to 22 blows per foot of penetration were measured for this stratum. These soils are classified as CL soils in general accordance with the USCS.

GROUNDWATER

Groundwater was observed in the Borings P-4 and P-8, at depths of about 6 ft and 4 ft, respectively, below the ground surface elevation existing at the time of our study. Groundwater was not observed in the remaining borings, either during or immediately upon completion of the drilling operations. These borings remained dry during the field exploration phase.

It is possible for groundwater to exist beneath this site on a transient basis following periods of precipitation. Fluctuations in groundwater levels occur due to variations in rainfall and surface water run-off. The construction process itself may also cause variations in the groundwater level. Based on the findings in the borings and on our experience in this region, we believe that groundwater seepage encountered during site earthwork activities and shallow foundation construction may be controlled using temporary earthen berm and conventional sump-and-pump dewatering methods.

PAVEMENT SUBSURFACE DISTRESS OBSERVATIONS

Below are the photographs of some of the surface pavement distresses observed along the subject road alignment during our drilling operations:

Photograph 1 – Road Segment from U.S. Expressway 281 South Frontage Road to S. Sugar Road.

Photographs 2 and 3 – Road Segment from S. Sugar Road to N. Jackson Road

Photographs 4 through 6 – Road Segment from N. Jackson Road to N. McColl Road

PAVEMENT RECOMMENDATIONS

Flexible pavement recommendation for 20-year design period is presented in this report. Drainage conditions will have a significant impact on long-term performance, particularly where permeable base materials are utilized in the pavement section. Drainage considerations are discussed in more detail in a subsequent section of this report.

SUBGRADE CONDITIONS

A single generalized subgrade condition has been assumed for this site. The predominant subgrade soils used in developing the pavement sections for this project are the plastic, lean clay soils. On the basis of our past experience with similar subsurface conditions in this area, a design California Bearing Ratio (CBR) value of 3 was assigned for the proposed road alignment in order to evaluate the pavement components.

SULFATE CORROSION POTENTIAL

The potential of soluble sulfates in the subgrade clay soils within the study area was preliminary evaluated by conducting two laboratory sulfate content tests. This tests were conducted on bulk soil specimens obtained within the proposed road alignment from a depth of about 2 ft below the ground surface elevations existing at the time of our study. The laboratory test result indicates sulfate content values of about 2300 and 2320 parts per million (ppm). On the basis of these sulfate content test results, the tested on-site clay soils do not appear to have a potential to cause sulfate-induced heave. Typically, the concentration of soluble sulfate on soils becomes a concern when the concentration reaches about 3,000 ppm and higher. The sulfate concentration in soils may vary over short distances, and as such, additional testing is recommended at the time of construction to confirm the concentration of sulfates in the exposed subgrade soils within the subject pavement areas.

LIME TREATMENT OF SUBGRADE

In general, the subgrade soils at this site are moderately plastic to plastic in nature and can be difficult to work with, particularly during periods of inclement weather. The strength properties of the moderately plastic to plastic subgrade soils may be increased by treating the upper 8 inches with hydrated lime. A sufficient quantity of hydrated lime should be mixed with the subgrade soils to decrease the plasticity index of the soil-lime mixture to 18 or less and to increase the pH of the soil-lime mixture to at least 12.4.

The laboratory lime series testing performed for the subgrade clays indicates an optimum hydrated lime content of about 2 percent (Please refer to Figures 16 and 17 of the Attachments for the lime series test results). For construction purposes, we recommend that the percent of hydrated lime treatment be determined by appropriate laboratory testing at the time of construction.

DESIGN INFORMATION

We understand that the proposed street alignment will meet the pavement thickness requirements provided in the 2014 City of Edinburg Standard Manual for collector street section. Please refer to the table below for the required thicknesses stated in the aforementioned document. As such, we understand that the following pavement section is planned to be used for the proposed road alignment.

Pavement Area

LTS

(in.)

FBM

(in.)

HMAC

(in.)

Alberta Road 8 10 2

Where: LTS = Lime-Treated Subgrade FBM = Flexible Base Material HMAC = Hot-Mix Asphaltic Concrete Surface Course

On the basis of an assumed CBR value, the traffic capacities for the pavement sections presented on the following table were estimated by calculating the number of Equivalent Single Axle Loads (ESAL's) that could be supported by the proposed road alignment. The following table summarizes the pavement section in accordance with the 2014 City of Edinburg Standard Manual for collector street section and the corresponding estimated traffic capacity. These calculations were made following the American Association of State Highway and Transportation Officials (AASHTO). The pavement design and analyses performed are based directly on the 1993 and 1997 editions of the “Guide for the Design of Pavement Structures” by AASHTO.

Pavement Area LTS (in.)

FBM

(in.)

HMAC

(in.)

Estimated ESAL’s

Alberta Road 8 10 2 120,000

Where: LTS = Lime-Treated Subgrade FBM = Flexible Base Material HMAC = Hot-Mix Asphaltic Concrete Surface Course

The estimated ESAL’s presented above equates to about 6 tractor-trailer trucks per day for 20-year design period, for the proposed road alignment.

PAVEMENT CONSTRUCTION CONSIDERATIONS

SUBGRADE PREPARATION

Areas to support pavements should be stripped of all existing hot mix asphaltic concrete (HMAC), vegetation and/or organic topsoil, extending a minimum of 2 ft beyond the pavement perimeters. Upon completion of site stripping activities, the exposed subgrade should be thoroughly proofrolled in order to locate and densify any weak, compressible zones. A minimum of 5 passes of a fully-loaded dump truck or a similar heavily-loaded piece of construction equipment should be used for planning purposes.

Proofrolling operations should be observed by the Geotechnical Engineer or his representative to document subgrade condition and preparation. Weak or soft areas identified during proofrolling should be removed and replaced with a suitable, compacted select fill in accordance with the recommendations presented under the Select Fill subsection of this section of the report. Proofrolling operations and any excavation/backfill activities should be observed by RKCI representatives to document subgrade condition and preparation.

Upon completion of the proofrolling operations and just prior to lime treatment, the exposed subgrade should be moisture-conditioned by scarifying to a minimum depth of 8 in. and recompacting to a minimum of 98 percent of the maximum dry density as determined from the American Society for Testing and Materials (ASTM) D698, Compaction Test. The moisture content of the subgrade should be maintained within the range between the optimum moisture content to three percentage points above the optimum moisture content until the final lift of fill is permanently covered.

DRAINAGE CONSIDERATIONS

As with any soil-supported structure, the satisfactory performance of a pavement system is contingent on the provision of adequate surface and subsurface drainage. Insufficient drainage which allows saturation of the pavement subgrade and/or the supporting granular pavement materials will greatly reduce the performance and service life of the pavement systems.

Surface and subsurface drainage considerations crucial to the performance of pavements at this site include (but are not limited to) the following:

1) Any known natural or man-made subsurface seepage at the site which may occur at sufficiently shallow depths as to influence moisture contents within the subgrades should be intercepted by drainage ditches or below grade French drains.

2) Final site grading should eliminate isolated depressions adjacent to curbs, which may allow surface water to pond and infiltrate into the underlying soils. Curbs should completely penetrate flexible base materials and should be installed to sufficient depth to reduce infiltration of water beneath the curbs.

3) Pavement surfaces should be maintained to help minimize surface ponding and to provide rapid sealing of any developing cracks. These measures will help reduce infiltration of surface water downward through the pavement section.

LIME TREATMEMENT OF SUBGRADE

If and where implemented, lime treatment of the subgrade soils should be in accordance with the TxDOT 2014 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges, Item 260, Lime Treatment (Road Mixed). Lime-treated subgrade soils should be compacted to a minimum of 95 percent of the maximum dry density at a moisture content within the range of two percentage points below the optimum moisture content to two percentage points above the optimum moisture content as determined by ASTM D1557.

SELECT FILL

If utilized, materials used as select fill for final site grading preferably should be crushed stone or gravel aggregate. We recommend that materials specified for use as select fill meet the TxDOT 2014 Standard Specification for Construction and Maintenance of Highways, Streets, and Bridges, Item 247, Flexible Base, Type A through Type E, Grades 1, 2, 3, and 5.

Alternatively, the following soils, as classified according to the USCS, may be considered satisfactory for use as select fill materials along this site: SC, GC, CL, and combinations of these soils. In addition to the USCS classification, alternative select fill materials shall have a maximum liquid limit of 40 percent, a plasticity index between 7 and 18 percent, and a maximum particle size not exceeding 4 inches or one-half the loose lift thickness, whichever is smaller. In addition, if these materials are utilized, grain size analyses and Atterberg Limits must be performed during placement at a minimum rate of one test each per 5,000 cubic yards of material due to the high degree of variability associated with pit-run materials.

If the above listed alternative materials are being considered for bidding purposes, the materials should be submitted to the Geotechnical Engineer for pre-approval at a minimum of 10 working days or more prior to the bid date. Failure to do so will be the responsibility of the General Contractor. The General Contractor will also be responsible for ensuring that the properties of all delivered alternate select fill materials are similar to those of the pre-approved submittal. It should also be noted that when using alternative fill materials, difficulties may be experienced with respect to moisture control during and subsequent to fill placement, as well as with erosion, particularly when exposed to inclement weather.

This may result in sloughing of beam trenches and/or pumping of the fill materials.

Soils classified as CH, MH, ML, SM, GM, OH, OL, and Pt under the USCS and not meeting the alternative select fill material requirements, are not considered suitable for use as select fill materials at this site. The native soils along the proposed road alignment are not considered suitable for use as select fill materials.

Select fill should be placed in loose lifts not exceeding 8 in. in thickness and compacted to at least 98 percent of maximum dry density as determined by ASTM D698. The moisture content of the fill should be maintained within the range of two percentage points below the optimum moisture content to two percentage points above the optimum moisture content until the final lift of fill is permanently covered.

The select fill should be properly compacted in accordance with these recommendations and tested by RKCI personnel for compaction as specified.

FLEXIBLE BASE COURSE

The flexible base course should consist of material conforming to TxDOT 2014 Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, Item 247, Flexible Base, Type A through Type E, Grades 1, 2, 3, and 5. The flexible base course should be placed in lifts with a maximum compacted thickness of 8 in. and compacted to a minimum of 95 percent of the maximum dry density as determined by ASTM D1557. The moisture content of the base course materials should be maintained within the range of three percentage points below the optimum moisture content to three percentage points above the optimum moisture content until permanently covered.

ASPHALTIC CONCRETE SURFACE COURSE

The asphaltic concrete surface course should conform to TxDOT 2014 Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, Item 341, Dense-Graded Hot-Mix Asphalt, Type D. The asphaltic concrete should be compacted to a minimum of 92 percent of the maximum theoretical specific gravity (Rice) of the mixture determined according to Test Method Tex-227- F. Pavement specimens, which shall be either cores or sections of asphaltic pavement, will be tested according to Test Method Tex-207-F. The nuclear-density gauge or other methods which correlate satisfactorily with results obtained from project roadway specimens may be used when approved by the Engineer. Unless otherwise shown on the plans, the Contractor shall be responsible for obtaining the required roadway specimens at their expense and in a manner and at locations selected by the Engineer.

EXCAVATION SLOPING AND BENCHING

Excavations that extend to or below a depth of 5 ft below construction grade shall require the General Contractor to develop a trench safety plan to protect personnel entering the trench or trench vicinity. The collection of specific geotechnical data and the development of such a plan, which could include designs for sloping and benching or various types of temporary shoring, is beyond the scope of the current study.

Any such designs and safety plans shall be developed in accordance with current Occupational Safety and Health Administration (OSHA) guidelines and other applicable industry standards.

EXCAVATION EQUIPMENT

Our boring logs are not intended for use in determining construction means and methods and may therefore be misleading if used for that purpose. We recommend that General Contractors and their subcontractors interested in bidding on the work perform their own tests in the form of test pits to determine the quantities of the different materials to be excavated, as well as the preferred excavation methods and equipment for this site.

CONSTRUCTION RELATED SERVICES

CONSTRUCTION MATERIALS ENGINEERING AND TESTING SERVICES

As presented in the attachment to this report, Important Information About Your Geotechnical Engineering Report, subsurface conditions can vary across a project site. The conditions described in this report are based on interpolations derived from a limited number of data points. Variations will be encountered during construction, and only the geotechnical design engineer will be able to determine if these conditions are different than those assumed for design.

Construction problems resulting from variations or anomalies in subsurface conditions are among the most prevalent on construction projects and often lead to delays, changes, cost overruns, and disputes.

These variations and anomalies can best be addressed if the geotechnical engineer of record, RABA KISTNER, is retained to perform the construction materials engineering and testing services during the construction of the project. This is because:

RKCI has an intimate understanding of the geotechnical engineering report’s findings and recommendations. RKCI understands how the report should be interpreted and can provide such interpretations on site, on the CLIENT’s behalf.

RKCI knows what subsurface conditions are anticipated at the site.

RKCI is familiar with the goals of the CLIENT and the project’s design professionals, having worked with them in the development of the project’s geotechnical workscope. This enables RKCI to suggest remedial measures (when needed) which help meet others’ requirements.

RKCI has a vested interest in client satisfaction, and thus assigns qualified personnel whose principal concern is client satisfaction. This concern is exhibited by the manner in which contractors’ work is tested, evaluated and reported, and in selection of alternative approaches when such may become necessary.

RKCI cannot be held accountable for problems which result due to misinterpretation of our findings or recommendations when we are not on hand to provide the interpretation which is required.

BUDGETING FOR CONSTRUCTION TESTING

Appropriate budgets need to be developed for the required construction materials engineering and testing services. At the appropriate time before construction, we advise that RKCI and the project designers meet and jointly develop the testing budgets, as well as review the testing specifications as it pertains to this project.

Once the construction testing budget and scope of work are finalized, we encourage a preconstruction meeting with the selected General Contractor to review the scope of work to make sure it is consistent with the construction means and methods proposed by the contractor. RKCI looks forward to the opportunity to provide continued support on this project, and would welcome the opportunity to meet with the Project Team to develop both a scope and budget for these services.

The following figures are attached and complete this report:

Figure 1 Boring Location Map Figures 2 through 13 Logs of Borings Figure 14 Key to Terms and Symbols Figure 15 Results of Soil Sample Analyses

Figures 16 and 17 Lime Series Curves (Based on Laboratory pH Determinations)

ATTACHMENTS

REVISIONS:

A L O

N G

L B

E R

T

R

O A

D

E D

I N

B U

R G

H

I D

A L G

O

C

O U

N T

Y

T

E X

A S

800 E. Hackberry Avenue McAllen, Texas 78501

(956)682-5332 TEL

(956)682-5487 FAX

www.rkci.com

Engineering Testing Environmental

Facilities Infrastructure

TBPE Firm F-3257

P-1

P-2

P-3

P-4

P-5

P-6

P-7

P-8 P-9

P-10

P-11 P-12

I

C

E

X

P

R

E

S

S

W

Y

ALBERTA ROAD

ALBERTA ROAD

ALBERTA ROAD

S

C

L O

S N

E

B

L V

D

S

S

U G

D

S

J A

C K

S O

N

R

D

S

M

C C

O L L

R

D

W TRENTON RD

Hot-Mix Asphaltic Concrete (HMAC) - 1-1/2 in.

Flexible Base Material (FBM) - 7-1/2 in.

SANDY LEAN CLAY (CL)

stiff to firm to very stiff, brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-1

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/13/2021

D

EP

TH

, F

T

10.0 ft 5/13/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 2 in.

Flexible Base Material (FBM) - 12 in.

CLAYEY SAND (SC)

loose, dark brown, with calcareous material

SANDY LEAN CLAY (CL)

soft to firm to stiff, light brown

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-2

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/14/2021

D

EP

TH

, F

T

10.0 ft 5/14/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Flexible Base Material (FBM) - 8 in.

LEAN CLAY WITH SAND (CL)

firm to very stiff, dark brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-3

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/13/2021

D

EP

TH

, F

T

10.0 ft 5/13/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 3 in.

LEAN CLAY WITH SAND (CL)

firm to stiff, dark brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

During the drilling operations, groundwater was encountered at a depth of about 6 ft.

LOG OF BORING NO. P-4

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

6 ft 5/14/2021

D

EP

TH

, F

T

10.0 ft 5/14/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 2-1/2

Flexible Base Material (FBM) - 6-1/2 in.

LEAN CLAY WITH SAND (CL)

firm to stiff, dark brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-5

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/13/2021

D

EP

TH

, F

T

10.0 ft 5/13/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Flexible Base Material (FBM) - 9 in.

SANDY LEAN CLAY (CL)

stiff to firm, dark brown to light brown, with calcareous material

LEAN CLAY WITH SAND (CL)

stiff to very stiff, light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-6

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/14/2021

D

EP

TH

, F

T

10.0 ft 5/14/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 5 in.

SANDY LEAN CLAY (CL)

stiff to firm to stiff, brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-7

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/13/2021

D

EP

TH

, F

T

10.0 ft 5/13/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 3 in.

Flexible Base Material (FBM) - 6 in.

SANDY LEAN CLAY (CL)

stiff, dark brown to brown, with calcareous material

LEAN CLAY WITH SAND (CL)

stiff to firm, brown

Boring terminated at a depth of about 10 ft.

NOTES:

During the drilling operations, groundwater was encountered at a depth of about 4 ft.

LOG OF BORING NO. P-8

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

4 ft 5/14/2021

D

EP

TH

, F

T

10.0 ft 5/14/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Flexible Base Material (FBM) - 7 in.

LEAN CLAY WITH SAND (CL)

firm to stiff, dark brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-9

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/13/2021

D

EP

TH

, F

T

10.0 ft 5/13/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 3-1/2

Flexible Base Material (FBM) - 7 in.

CLAYEY SAND (SC)

loose, dark brown, with calcareous material

SANDY LEAN CLAY (CL)

stiff to very stiff to stiff, dark brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-10

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/14/2021

D

EP

TH

, F

T

10.0 ft 5/14/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Hot-Mix Asphaltic Concrete (HMAC) - 4 in.

Flexible Base Material (FBM) - 5 in.

SANDY LEAN CLAY (CL)

stiff, dark brown to light brown, with calcareous material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-11

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/13/2021

D

EP

TH

, F

T

10.0 ft 5/13/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

Flexible Base Material (FBM) - 9 in.

SANDY LEAN CLAY (CL)

firm, dark brown to light brown, with calcareous material

LEAN CLAY WITH SAND (CL)

firm to stiff, light brown, with calcaroeus material

Boring terminated at a depth of about 10 ft.

NOTES:

Upon completion of the drilling operations, the boring was observed dry.

LOG OF BORING NO. P-12

PL

A

ST

IC

IT

Y

IN

D

EX

SURFACE ELEVATION: Existing Grade, ft

Straight Flight Auger

-2

DRILLING

METHOD: LOCATION:

PLASTIC

LIMIT

LIQUID

LIMIT

WATER

CONTENT

BL

O

W S

PE

R

FT

10 20 30 40 50 60 70 80

DESCRIPTION OF MATERIAL

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

SHEAR STRENGTH, TONS/FT2

U N

IT

D

RY

W

EI

G

H T, p cf

See Figure 1

N O

TE

: T

H

ES

E

LO

G S

SH

O

U

LD

N O

T

BE

U

SE

D S

EP

AR

AT

EL

Y

FR

O M

T H

E

PR

O

JE

CT

R

EP

O

RT

DEPTH DRILLED:

DATE DRILLED:

DEPTH TO WATER:

DATE MEASURED:

SY

M

BO

L

SA

M

PL

ES

Proposed Alberta Road Improvements Along Alberta Road

Edinburg, Hidalgo County, Texas

DRY

5/14/2021

D

EP

TH

, F

T

10.0 ft 5/14/2021

AMA21-017-00

PROJ. No.:

FIGURE:

TBPE Firm Registration No. F-3257

PROJECT NO. AMA21-017-00

CLAY-SHALE

SAMPLE TYPES

NO INFORMATION

BLANK PIPE

ASPHALT

IGNEOUS

LIMESTONE

FILL

GEOPROBE

SAMPLER

TEXAS CONE

PENETROMETER

DISTURBED

METAMORPHIC

MARL

MUD

ROTARY

NO

RECOVERY SPLIT BARREL

SPLIT SPOONNX CORE

SHELBY TUBE

CALCAREOUS

CLAY

CLAYEY

GRAVEL

GRAVELLY

WELL CONSTRUCTION AND PLUGGING MATERIALS

SILTSTONE

CALICHE

CONGLOMERATE

AIR

ROTARY

GRAB

SAMPLE

DOLOMITE

BENTONITE

CORE

SOIL TERMS OTHER

NOTE: VALUES SYMBOLIZED ON BORING LOGS REPRESENT SHEAR

STRENGTHS UNLESS OTHERWISE NOTED

BASE

KEY TO TERMS AND SYMBOLS

CUTTINGS

SAND

SANDY

SILT

SILTY

CHALK

STRENGTH TEST TYPES

CEMENT GROUT GRAVEL

SAND

POCKET PENETROMETER

TORVANE

UNCONFINED COMPRESSION

TRIAXIAL COMPRESSION

UNCONSOLIDATED-UNDRAINED

TRIAXIAL COMPRESSION

CONSOLIDATED-UNDRAINED

BRICKS /

PAVERS

SCREEN

MATERIAL TYPES

VOLCLAY

SANDSTONE

SHALE

ROCK TERMS

WASTE

CONCRETE/CEMENT

PEAT

BENTONITE &

CUTTINGS

CONCRETE/CEMENT

CLAYSTONE

ROTOSONIC

-DAMAGED

ROTOSONIC

-INTACT

PITCHER

FIGURE 14aREVISED 04/2012

KEY TO TERMS AND SYMBOLS (CONT'D)

TERMINOLOGY

RELATIVE DENSITY PLASTICITYCOHESIVE STRENGTH

Penetration Resistance

Blows per ft Degree of Plasticity

Plasticity Index

Relative Density

Resistance Blows per ft

Very Loose

Loose

Medium Dense

Dense

Very Dense

Consistency Cohesion

TSF

Benzene

Toluene

Ethylbenzene

Total Xylenes

Total BTEX

Total Petroleum Hydrocarbons

Not Detected

Not Analyzed

Not Recorded/No Recovery

Organic Vapor Analyzer

Parts Per Million

Very Soft

Soft

Firm

Stiff

Very Stiff

Hard

0.125

0.25

0.5

1.0

0.125

0.25

0.5

1.0

2.0

2.0

None

Low

Moderate

Plastic

Highly Plastic

ABBREVIATIONS

Qam, Qas, Qal

Qat

Qbc

Qt

Qao

Qle

Q-Tu

Ewi

Emi

Mc

EI

Kknm

Kpg

Kau

Kef

Kbu

Kdr

Kft

Kgt

Kep

Kek

Kes

Kew

Kgr

Kgru

Kgrl

Kh

Quaternary Alluvium

Low Terrace Deposits

Beaumont Formation

Fluviatile Terrace Deposits

Seymour Formation

Leona Formation

Uvalde Gravel

Wilcox Formation

Midway Group

Catahoula Formation

Laredo Formation

Navarro Group and Marlbrook Marl

Pecan Gap Chalk

Austin Chalk

Eagle Ford Shale

Buda Limestone

Del Rio Clay

Fort Terrett Member

Georgetown Formation

Person Formation

Kainer Formation

Escondido Formation

Walnut Formation

Glen Rose Formation

Upper Glen Rose Formation

Lower Glen Rose Formation

Hensell Sand

B

T

E

X

BTEX

TPH

ND

NA

NR

OVA

ppm

Terms used in this report to describe soils with regard to their consistency or conditions are in general accordance with the discussion presented in Article 45 of SOILS MECHANICS IN ENGINEERING PRACTICE, Terzaghi and Peck, John Wiley & Sons, Inc., 1967, using the most reliable information available from the field and laboratory investigations. Terms used for describing soils according to their texture or grain size distribution are in accordance with the UNIFIED SOIL CLASSIFICATION SYSTEM, as described in American Society for Testing and Materials D2487-06 and D2488-00, Volume 04.08, Soil and Rock; Dimension Stone;

Geosynthetics; 2005.

The depths shown on the boring logs are not exact, and have been estimated to the nearest half-foot. Depth measurements may be presented in a manner that implies greater precision in depth measurement, i.e 6.71 meters. The reader should understand and interpret this information only within the stated half-foot tolerance on depth measurements.

FIGURE 14bREVISED 04/2012

KEY TO TERMS AND SYMBOLS (CONT'D)

TERMINOLOGY

SOIL STRUCTURE

SAMPLING METHODS

Having planes of weakness that appear slick and glossy.

Containing shrinkage or relief cracks, often filled with fine sand or silt; usually more or less vertical.

Inclusion of material of different texture that is smaller than the diameter of the sample.

Inclusion less than 1/8 inch thick extending through the sample.

Inclusion 1/8 inch to 3 inches thick extending through the sample.

Inclusion greater than 3 inches thick extending through the sample.

Soil sample composed of alternating partings or seams of different soil type.

Soil sample composed of alternating layers of different soil type.

Soil sample composed of pockets of different soil type and layered or laminated structure is not evident.

Having appreciable quantities of carbonate.

Having more than 50% carbonate content.

Slickensided Fissured Pocket Parting Seam Layer Laminated Interlayered Intermixed Calcareous Carbonate

RELATIVELY UNDISTURBED SAMPLING

NOTE: To avoid damage to sampling tools, driving is limited to 50 blows during or after seating interval.

STANDARD PENETRATION TEST (SPT)

Cohesive soil samples are to be collected using three-inch thin-walled tubes in general accordance with the Standard Practice for Thin-Walled Tube Sampling of Soils (ASTM D1587) and granular soil samples are to be collected using two-inch split-barrel samplers in general accordance with the Standard Method for Penetration Test and Split-Barrel Sampling of Soils (ASTM D1586). Cohesive soil samples may be extruded on-site when appropriate handling and storage techniques maintain sample integrity and moisture content.

Description

25 blows drove sampler 12 inches, after initial 6 inches of seating.

50 blows drove sampler 7 inches, after initial 6 inches of seating.

50 blows drove sampler 3 inches during initial 6-inch seating interval.

Blows Per Foot

50/7" Ref/3"

FIGURE 14c

A 2-in.-OD, 1-3/8-in.-ID split spoon sampler is driven 1.5 ft into undisturbed soil with a 140-pound hammer free falling 30 in.

After the sampler is seated 6 in. into undisturbed soil, the number of blows required to drive the sampler the last 12 in. is the Standard Penetration Resistance or "N" value, which is recorded as blows per foot as described below.

REVISED 04/2012

SPLIT-BARREL SAMPLER DRIVING RECORD

P-1 0.8 to 2.3 12 16 36 19 17 CL

2.5 to 4.0 6 18 60

5.0 to 6.5 6 18 39 21 18 CL

8.5 to 10.0 22 20 70

P-2 1.2 to 2.7 8 24 47

2.6 to 4.1 3 20 38 20 18 CL

5.0 to 6.5 7 19

8.5 to 10.0 9 24 50 24 26 CL

P-3 0.8 to 2.3 5 19 71

2.5 to 4.0 6 20 39 20 19 CL

5.0 to 6.5 16 20 73

8.5 to 10.0 15 22

P-4 0.9 to 2.4 5 22 33 18 15 CL

2.5 to 4.0 3 25 80

5.0 to 6.5 9 23 43 21 22 CL

8.5 to 10.0 14 21

P-5 0.8 to 2.3 8 21 31 17 14 CL

2.5 to 4.0 4 20 71

5.0 to 6.5 9 20

8.5 to 10.0 6 26

P-6 0.9 to 2.4 9 13 58

2.5 to 4.0 5 23

5.0 to 6.5 10 19 44 21 23 CL

8.5 to 10.0 22 23 74

P-7 1.1 to 2.6 9 17 35 21 14 CL

2.6 to 4.1 7 20 71

5.0 to 6.5 10 19

8.5 to 10.0 14 21

P-8 0.8 to 2.3 9 15 55

2.5 to 4.0 29 35 19 16 CL

5.0 to 6.5 9 22 83

8.5 to 10.0 7 23 49 20 29 CL

P-9 0.8 to 2.3 8 18 33 18 15 CL

2.5 to 4.0 6 21 73

5.0 to 6.5 15 17

8.5 to 10.0 14 20

P-10 0.9 to 2.4 7 17 42

2.5 to 4.0 11 20

5.0 to 6.5 18 16 43 17 26 CL

Plasticity Index

Liquid Limit

PP = Pocket Penetrometer TV = Torvane UC = Unconfined Compression FV = Field Vane

Plastic Limit

Water Content

Dry Unit Weight

(pcf)

PROJECT NAME:

FILE NAME: AMA21-017-00.GPJ

USCS % -200

Sieve

Shear Strength

(tsf)

Strength Test

Boring No.

6/4/2021

UU = Unconsolidated Undrained Triaxial

Sample Depth

(ft)

CU = Consolidated Undrained Triaxial

Proposed Alberta Road Improvements Along Alberta Road Edinburg, Hidalgo County, Texas

RESULTS OF SOIL SAMPLE ANALYSES

Blows per ft

CNBD = Cound Not Be Determined

FIGURE 15a

P-10 8.5 to 10.0 12 20

P-11 0.8 to 2.3 10 19 56

2.5 to 4.0 8 23 50 22 28 CL

5.0 to 6.5 11 20 70

8.5 to 10.0 7 20 49 19 30 CL

P-12 0.9 to 2.4 7 15 27 14 13 CL

2.5 to 4.0 5 18 57

5.0 to 6.5 6 19 34 18 16 CL

8.5 to 10.0 15 19 75

Plasticity Index

Liquid Limit

PP = Pocket Penetrometer TV = Torvane UC = Unconfined Compression FV = Field Vane

Plastic Limit

Water Content

Dry Unit Weight

(pcf)

PROJECT NAME:

FILE NAME: AMA21-017-00.GPJ

USCS % -200

Sieve

Shear Strength

(tsf)

Strength Test

Boring No.

6/4/2021

UU = Unconsolidated Undrained Triaxial

Sample Depth

(ft)

CU = Consolidated Undrained Triaxial

Proposed Alberta Road Improvements Along Alberta Road Edinburg, Hidalgo County, Texas

RESULTS OF SOIL SAMPLE ANALYSES

Blows per ft

CNBD = Cound Not Be Determined

FIGURE 15b

Project No. AMA21-017-00

Figure 16

0 1 2 3 4 pH

Percent Lime (%)

Lime Series Determination

Project No. AMA21-017-00

Figure 17

0 1 2 3 4 pH

Percent Lime (%)

Lime Series Determination

Geotechnical-Engineering Report

Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a civil engineer may not fulfill the needs of a constructor — a construction contractor — or even another civil engineer. Because each geotechnical- engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. No one except you should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one

— not even you — should apply this report for any purpose or project except the one originally contemplated.

Read the Full Report Serious problems have occurred because those relying on a geotechnical-engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only.

Geotechnical Engineers Base Each Report on a Unique Set of Project-Specific Factors Geotechnical engineers consider many unique, project-specific factors when establishing the scope of a study. Typical factors include: the client’s goals, objectives, and risk-management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates otherwise, do not rely on a geotechnical-engineering report that was:

•not prepared for you;
•not prepared for your project;
•not prepared for the specific site explored; or

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .