This is a Statement of Work for the procurement of one new Simplex Atlas-Megawatt Trailer Load Bank or an approved equivalent product, issued March 3, 2026, in accordance with FAR 52.211-6 for a "Brand Name or Equal" procurement. The equipment is required to provide mobile, high-capacity load testing for electrical power systems at Shaw Air Force Base, Building 302, Shaw AFB, South Carolina 29152. The vendor must deliver a complete, fully assembled, and operational unit within 60 days from contract award. The procurement includes delivery of the load bank unit, operator's manual with all technical documentation, and warranty documentation, all due by the specified delivery date.
The salient characteristics establish minimum performance and physical requirements, including maximum capacity of 750 kW at 208/416V 3-phase and 667 kW at 240V 1-phase; dual voltage 240/480V AC 3-phase rating; operation capability at 50, 60, and 400 Hz; minimum full load amperage of 2404A at 240V and 1202A at 480V; digital control system with 5.0 kW or finer load step resolution; minimum 27,700 CFM cooling airflow; maximum ambient operating temperature of 120°F; 3-wire plus ground power connection; and a minimum 12-month manufacturer's warranty. The trailer must conform to Federal and DOT standards, include ICC 12V electric lights with 7-pole connector, dual electric and mechanical parking brakes, adjustable height hitch with 3-inch pintle ring, safety chains, electric break-away system, and dual axles with ST205-75-R14 tires or equivalent. Total combined weight shall not exceed 4,000 pounds and total dimensions shall not exceed 98 inches height by 84 inches width by 180 inches length. Vendors proposing an "or equal" product must submit comprehensive technical documentation including a completed compliance matrix, manufacturer's product data sheet, technical drawings, operator's manual, warranty statement, and marketing brochure. Upon delivery, function testing will be conducted by government personnel using a 277/480V generator provided by Power Pro, with a 10K forklift available for offloading. Technical contact: TSgt Marshall Tipton at 803-895-9662 or marshall.tipton@us.af.mil; Contracting Officer: Cesar Tapia-Caballero at 803-895-9744 or cesar.tapia-caballero@us.af.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026 RFQ - Oral - Generator Load Bank.pdf | ||
| Salient Characteristics.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Brand Name or Equal
Project: Procurement of Simplex Atlas-Megawatt Trailer Load Bank or Equal
Date: March 3, 2026
1.0 Introduction & Background
This Statement of Work (SOW) outlines the requirement for the procurement of one (1) Simplex Atlas-Megawatt Trailer Load Bank, or an equivalent product that meets the salient characteristics outlined herein. This equipment is necessary to provide mobile, high-capacity load testing for various electrical power systems and ensure the reliability and performance of power generation equipment. This is a "Brand Name or Equal" procurement in accordance with FAR 52.211-6.
2.0 Scope of Work
The vendor shall provide one (1) new Simplex Atlas-Megawatt Trailer Load Bank or an equivalent product that meets or exceeds all salient characteristics specified in Section
3.0 of this SOW. The scope includes the delivery of a complete, fully assembled, and operational unit to the specified location.
If proposing an "or equal" product, the vendor must provide sufficient technical documentation with their proposal to demonstrate that the proposed product meets or exceeds all listed salient characteristics.
3.0 Salient Characteristics (Brand Name or Equal)
The Government's requirement is for the Simplex Atlas-Megawatt Trailer Load Bank. If proposing an "equal" product, the proposed product must meet or exceed all of the following salient physical, functional, and performance characteristics:
Characteristic Minimum Requirement
Max Capacity @ 208/416V 3Ph
Must be at least 750 kW
Max Capacity @ 240V 1Ph
Must be at least 667 kW
Load Voltage Rating Must be rated for dual voltage 240/480V AC, 3-Phase, and be operational at any voltage up to 480V AC for both 1-Phase and 3-Phase applications.
Frequency Must be capable of operation at 50, 60, and 400 Hz.
Full Load Amperage Must be rated for a minimum of 2404A at 240V and 1202A at 480V.
Load Step Control Must feature a digital control system with a load step resolution of 5.0 kW or finer.
Control/Cooling Power
Must have user-selectable internal or external control power capability, compatible with 230/460V 3Ph 60 Hz and 190/380V 3Ph 50 Hz, and include an external power cord of at least 15 feet.
Cooling System Must provide a minimum of 27,700 CFM of airflow.
Operating Temperatures
Must be rated for a maximum ambient air intake of 120°F.
Power Connection Must utilize a 3-wire plus ground connection configuration.
Trailer Construction Must conform to all applicable Federal and Department of Transportation (DOT) standards for highway use.
Trailer Lights Must be equipped with ICC 12V electric lights, including stop, turn, and brake lights, with a 7-pole connector.
Trailer Brakes Must be equipped with both electric and mechanical parking brakes.
Trailer-Vehicle Connections
Must include an adjustable height hitch (3" pintle ring), safety chains, and an electric break-away system.
Trailer Axles and Tires
Must have dual axles with ST205-75-R14 tires or equivalent load rating.
Total Weight (Combined)
Shall not exceed 4,000 lbs.
Total Dimensions (Combined)
Shall not exceed 98" (H) x 84" (W) x 180" (L).
Warranty Must include a minimum 12-month manufacturer's warranty.
4.0 Period of Performance
The work shall be completed within 60 days from the date of contract award.
5.0 Place of Performance & Delivery
The fully assembled and operational unit shall be delivered to the following address:
Bldg. 302 Shaw AFB, SC, 29152
Upon delivery, function test to the load bank will be conducted to ensure full functionality and operation. Power Pro will provide 277/480 V generator with its own fuel source before accepting the new load bank and trailer.
A 10K forklift will be available for the government to offload the equipment.
6.0 Deliverables
Item # Deliverable Quantity Due Date
1 Simplex Atlas-Megawatt Trailer Load Bank or Approved Equal 1 TBD
2 Operator's Manual and all Technical Documentation 1 With Delivery
3 Warranty Documentation 1 With Delivery
7.0 Acceptance Criteria
The government will accept the deliverable upon verification that:
• The delivered unit is new and undamaged.
• The unit meets or exceeds all salient characteristics detailed in Section 3.0.
• All components, including the trailer, lights, brakes, and hitches, are present and fully functional.
• All required documentation has been received.
8.0 Point of Contact
Technical Point of Contact:
TSgt Marshall Tipton NCOIC Generator Systems) 803-895-9662 marshall.tipton@us.af.mil
Contracting Point of Contact:
Cesar Tapia-Caballero, Contracting Officer 803-895-9744 cesar.tapia-caballero@us.af.mil
Attachment A: Technical Documentation Requirements for "Or Equal" Proposals
1.0 General Instructions
Vendors submitting a proposal for a product they deem "equal" to the brand name (Simplex Atlas-Megawatt Trailer Load Bank) must provide comprehensive technical documentation with their submission. The purpose of this documentation is to provide sufficient detail for the Government's technical evaluation team to definitively determine if the proposed product meets or exceeds all salient characteristics listed in the Statement of Work (SOW).
Failure to provide the required documentation may result in the proposal being considered technically unacceptable. The burden of proof for equivalency rests entirely with the vendor.
2.0 Salient Characteristics Compliance Matrix
The vendor must complete the following compliance matrix. For each characteristic, the vendor shall:
1. Check the appropriate box: "Meets" or "Exceeds."
2. Provide a specific value, rating, or a "Yes/No" answer in the "Proposed Product Specification" column.
3. Reference the exact page number(s) in the supporting technical documentation where this specification can be verified.
Salient Characteristic Meets Exceeds Proposed Product Specification
Documentation Page Reference
Max Capacity @ 208/416V 3Ph
☐ ☐ e.g., "760 kW" e.g., "Spec Sheet, p. 2"
Max Capacity @ 240V 1Ph ☐ ☐
Load Voltage Rating ☐ ☐
Frequency Capability ☐ ☐
Full Load Amperage ☐ ☐
Load Step Control & Resolution
Control/Cooling Power ☐ ☐
Cooling System Airflow
(CFM)
Max Operating Temperature ☐ ☐
Power Connection Type ☐ ☐
Trailer Conformance to DOT Standards
☐ ☐ e.g., "Yes" e.g., "Brochure, p. 4"
Trailer Lights ☐ ☐
Trailer Brakes ☐ ☐
Trailer-Vehicle Connections ☐ ☐
Trailer Axles and Tires ☐ ☐
Total Combined Weight (lbs) ☐ ☐
Total Combined Dimensions (HxWxL)
Warranty Duration (Months) ☐ ☐
3.0 Required Supporting Documentation
The following documents for the proposed "or equal" product are mandatory and must be included with the proposal:
1. Manufacturer's Product Data Sheet / Specification Sheet: A published document detailing all technical specifications, performance data, and operating parameters.
2. Technical Drawings: Manufacturer's drawings showing the overall dimensions of the load bank and the complete trailer assembly (Height, Width, and Length).
3. Operator's Manual: The user manual for the proposed product, which should corroborate operational features such as the digital control system.
4. Warranty Statement: The manufacturer's official, unedited warranty document detailing the terms and duration of coverage.
5. Marketing Brochure (if available): General product brochure that may contain additional information on construction, features, and compliance with standards.
4.0 Submission Format
All technical documentation shall be:
• Submitted as a single, consolidated PDF file, separate from the price proposal.
• Clearly labeled as "Technical Documentation for [Proposed Product Name]".
• The Compliance Matrix (Section 2.0) should be the first section of this PDF file.
• All pages in the supporting documentation should be clearly numbered to correspond with the references provided in the compliance matrix.
File details come from the government source that posted it. Updated .