General Requirements.pdf
PDF 547 KB Posted
- Solicitation number
- N4008525R0096
About this file
This document is a Request for Proposal (RFP) for replacing water-to-water heat pumps at the Navy Reserve Center located at Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, VA. The project involves replacing existing HVAC equipment, conducting HVAC testing and balancing, performing electrical modifications, and completing related incidental work. The government intends to award a firm-fixed price task order with an estimated price range between $250,000 and $500,000, and a contract duration of 180 calendar days after award.
The solicitation is issued under a Multiple Award Construction Contract (MACC) with five contract holders: Davcon Inc, Fastbreak General Contractors, McKenzie Construction & Site Development, Succor-PC&C JV, and Within Interior Design/Tazewell Contracting. Key dates include a mandatory site visit on July 29th, 2025 at 1000 hours, pre-proposal inquiries due by August 11th, 2025 at 1400 hours, and proposals due by August 25th, 2025 at 1400 hours. The contract is classified under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors, and will use Wage Determination Number VA20250167.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC
PUBLIC WORKS DEPARTMENT LITTLE CREEK – FORT STORY
FACILITIES ENGINEERING AND ACQUISITION DIVISION
1450 Gator Boulevard Suite 100, Building 3165, Virginia Beach, Virginia 23459-8616
POC: Olivia Egress, olivia.g.egress.civ@us.navy.mil, 757-462-1019
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE
DELIVERY/INDEFINITE QUANTITY (ID/IQ) MULTIPLE AWARD CONSTRUCTION
CONTRACT (MACC) GENERAL CONSTRUCTION IN THE HAMPTON ROADS, VIRGINIA
AREA OF RESPONSIBLITY (AOR)
MACC GROUP: ML-C00083
SOLICITATION NUMBER: N4008525R0096
BUILDING CB 125, BLAST/PAINT FACILITY-MODERNIZE ELECTRICAL SYSTEM
JEB LITTLE CREEK - FORT STORY, VIRGINIA BEACH, VIRGINIA
DATE OF SOLICITATION: 07/23/2025
GENERAL CONSTRUCTION FOR HAMPTON ROADS, VIRGINIA MACC CONTRACT
HOLDERS:
N4008524D2508 Davcon Inc 240 London Bridge Rd Virginia Beach, VA 23454 POC: Doug Davis
Email: ddavis@davconva.com swatts@davconva.com
N4008524D2509 Fastbreak General Contractors 135 Kings Way Hampton, VA 23669 POC: Ray Miles
Email: rmiles@fastbreakgc.com tmhendrix@fastbreakgc.com accounting@Fastbreakgc.com
N4008524D2510 McKenzie Construction & Site Development 2301 Calvert Street NW Washington DC 20008 POC: Oliver Fernandez
Email: odf3@mckenzieconst.com victoria@mckenzieconst.com
N4008524D2511 Succor-PC&C JV 13230 Lovers Lane Culpeper, VA 22701 POC: Heather Cahoon and Ben Phillips
Email: heather.cahoon@succorbuilt.com ben.phillips@phillipscandc.com
N4008524D2512 Within Interior Design, Inc. DBA Tazewell Contracting 1008 Granby Street Norfolk, VA 23510 POC: Heather Robinson
Email: hrobinson@tazewellcontracting.com
NAVY RESERVE CENTER- REPLACE
WATER TO WATER HEAT PUMPS
RFP: N4008525R0096
WO# 1672941
thalman@tazewellcontracting.com estimating@tazewellcontracting.com
RFP: N4008525R0096
WO# 1672941
GENERAL REQUIREMENTS
All terms and conditions of N40085-24-D 2508/2509/2510/2511/2512 Indefinite Delivery / Indefinite Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements to this order. You are responsible for adhering to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue, please contact Olivia Egress at Olivia.g.egress.civ@us.navy.mil.
Amendments will be posted directly to PIEE under the ‘Solicitation Module’. Offerors are responsible for referring to this site for any amendments to the RFP. Please check box next to ‘Please notify me of amendments to this solicitation’ to ensure you are notified of any amendments.
The specifications (ATTACHMENT A), drawings (ATTACHMENT B), and other pertinent documents are posted on PIEE under Attachments/Links.”
NAVFAC RFP No.: N4008525R0096
Title: BUILDING LC-1, NAVY RESERVE CENTER- REPLACE WATER-TO-WATER HEAT
PUMPS
Location of the work: Joint Expeditionary Base Little Creek – Fort Story, (Little Creek Site), Virginia Beach, VA
The Government intends to award a firm-fixed price task order.
Description of the work: Reference the specifications (ATTACHMENT A) and (ATTACHMENT B) for drawings. The Contractor shall provide all supervision, labor, material, and equipment as required to perform the following work: Replacing of existing HVAC equipment, HVAC testing and balancing, electrical modifications and incidental related work.
Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984), all work and options shall be completed within 180 calendar days after award. The days are calculated from date of task order award, and includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance and bonding, and other requirements set forth in the task order/MACC.
Task order award is considered notice to proceed.
***Offerors must consider the total time to complete the project which includes, but not limited to, lead times of supplies, materials, and equipment. If the construction contract duration in the RFP is not feasible, offerors must submit a pre-proposal inquiry (PPI) by the PPI deadline with a proposed construction contract duration and explanation why additional time is needed.***
Estimated Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range is between $250,000 and $500,000.
NAICS Code: 238220 – Plumbing, Heating, and Air- Conditioning Contractors
PSC: Z2JZ
Wage Determination: General Decision Number VA20250167 02/28/2025 (ATTACHMENT C) as of
RFP: N4008525R0096
WO# 1672941
the date of this RFP. Should this wage determination be modified by DoL prior to award, the most current wage determination will be issued via amendment and incorporated into the final task order award.
Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $126.41 for each calendar day of delay until the work is completed or accepted.
Utilities: Contractor is responsible for utilities unless otherwise specified in the specifications.
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) is applicable to this solicitation.
https://www.navfac.navy.mil/Portals/68/Documents/Business-Lines/Design-and- Construction/ci_ecms_080719_Contractor%20User_v4.1.pdf
VA Sales Tax: Contractors can fill out and use Form ST-12, Commonweatlh of Virginia Sales and Use Tax Certificate of Exemption, as the Navy is a qualifying Federal agency. This form can be given to subcontractors for use to purchase materials for this specific solicitation/contract number. As a result, Bidder shall NOT include Virginia Sales and Use Taxes in their Bid Price. Bidder shall, however, include all, if any, APPLICABLE Federal and Local taxes in their bid price. A tax exempt number will not be provided. https://www.tax.virginia.gov/sites/default/files/taxforms/exemption-certificates/any/st-12-any.pdf
Record Shop Drawings: In accordance with FAR 52.236-21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are also required.
Government Furnished Property: There is no Government Furnished Property.
Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The basis for the award will be low price.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.
In accordance with FAR 28.102-1, the following payment protections are required from the awardee ten
(10) days after date of award: Payment Bond and Performance Bond.
Minimum Insurance Requirements: Offerors shall consider the costs of incorporating the required Minimum Insurance Requirements when submitting proposals. The awardee will be required to demonstrate proof of the following insurance requirements within ten (10) calendar days after the award:
Comprehensive general liability: $500,000 per occurrence.
Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage.
Workmen’s compensation as required by Federal and State workers’ compensation and occupational disease laws.
Employer’s liability coverage of $100,000, except in States where workers compensation may not
RFP: N4008525R0096
WO# 1672941
be written by private carriers.
Others as required by state law.
Per FAR 52.228-5, policies must contain an endorsement to the effect of the following:
Any cancellation or any material change in the policies adversely affecting the Government’s interest shall not be effective 1) for such period the laws of the State in which this contract is to be performed prescribe or, 2) until thirty (30) days after the insurer or contractor gives written notice to the Contracting Officer, whichever period is longer.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE
NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS
RESULTING FROM THIS SOLICITATION.
FAR 52.236‐27 Site Visit (Construction)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions
Affecting the Work, will be included in any contract awarded as a result of this solicitation.
Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit: July 29th, 2025, at 1000 hours EDT.
(c) Participants will meet: Participants will meet on-site at 1000 One Navy Road, BLDG 001, JEB Little
Creek-Fort Story (Little Creek Site), Virginia Beach, VA. Attendees may meet in front of the mechanical room at the backyard of Building 001.
This will be the ONLY Government scheduled Site Visit. Please follow the instructions below if you will need base access. Start this process as early as possible as escorts will not be available the day of the site visit.
***NOTE: Please inform Olivia Egress at Olivia.g.egress.civ@us.navy.mil at your soonest if you will or will not be attending the site visit.
All prospective offerors are urged to attend this site visit. The pre‐proposal site visit will be held for the following purposes: familiarization with the extent and nature of project; explaining concepts involved, specifications, terms and conditions, and unique RFP features. The Government will not provide any verbal answers to any verbal questions posed during the pre‐proposal conference/site visit. Offerors shall submit written questions for any issues that may arise during the conference (see Pre-Proposal Inquiries information below). The Government will provide written responses to any such questions via electronic RFP amendment posted to PIEE.
No minutes of this meeting will be issued. Remarks and explanations addressed during the conference shall not qualify or alter any RFP terms or conditions. The terms and conditions of this RFP will remain unchanged unless amended in writing.
Contractors ARE NOT ALLOWED to use any cameras, tape recorders, or other recording devices during
RFP: N4008525R0096
WO# 1672941
the site visit unless approved by appropriate NAVFAC personnel.
CONTRACTOR ACCESS FOR THE SITE VISIT:
All Base Access requests must be submitted via email to NAVFACML_PWDLittleCreek- Access@navy.mil. It is the responsibility of the Prime Contractor to submit all requests.
Refer to Attachment D for Installation Access Requirements
Pre-Proposal Inquiries (PPIs): PPIs must be submitted electronically via Pre-Proposal Inquiry Form (ATTACHMENT G), to Olivia Egress at Olivia.g.egress.civ@us.navy.mil no later than 11 August 2025 at 1400 hours EDT in order to process all inquiries by the proposal due date.
Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. Responses will be published via amendment posted to PIEE.
Proposal Due Date: 25 August 2025 at 1400 hours EDT. LATE PROPOSALS WILL NOT BE
CONSIDERED.
Proposal Delivery Information: PROPOSALS SHALL BE SUBMITTED THROUGH PIEE.
Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized.
*PIEE Submissions:
Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation.
Electronic proposal submissions should be no larger than 1.9 GB per file.
Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via ATTACHMENT F.
Emailed submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.
PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL
NOT BE CONSIDERED.
All required proposal documents shall be submitted in accordance with FAR 15.208. Refer to “Basis for Award” for complete submittal instructions.
RFP: N4008525R0096
WO# 1672941
BASIS FOR AWARD
1. The proposed task order will be awarded to the responsible offeror offering the best value to the
Government. For this order, the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each offeror on price only.
2. Submittal Requirements and Basis of Evaluation:
a. Offeror shall submit the following:
Cover Page to include:
o RFP Number, RFP Title, Prime Contractor Name, Employer Identification
Number (EIN), Address, Phone Number, Fax Number, DUNS and Cage Code, Point of Contact – Name, Phone Number and Email
Completed and Signed Price Proposal Form (ATTACHMENT E) Bid guarantee Copy of current VETS 4212 Registration
Note: The costs for preparation of task order proposals shall be the responsibility of the offeror and not directly reimbursable.
b. Basis of Evaluation: The Government will evaluate price based on the lump sum price. No provision is made for economic price adjustment. The lump sum price shall be deemed to include all costs required for the specified work, completed in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, disposal, and related items.
Analysis will be performed by one or more of the following techniques:
Comparison of proposed prices received in response to the RFP.
Comparison of proposed prices with the IGE.
Comparison of proposed prices with available historical information.
Comparison of market survey results.
A price, which is found to be unreasonably high or unbalanced in relation to the proposed work and/or Government Estimate may negatively impact the offeror’s evaluation and may result in the proposal not being eligible for award. A proposal that fails to submit pricing as required will be considered unresponsive and will not be evaluated or considered for award.
EVALUATION
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to the award of the contract; to negotiate with any or all offerors; and to award the task order to the offeror submitting the lowest price proposal.
2. As stated in the RFP, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306 (a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be
RFP: N4008525R0096
WO# 1672941
necessary.
Additional Instructions to Offerors:
1. Pursuant to the basic contract award, offerors are required to submit proposals on all Task Order
Requests for Proposals received from the Government. In the event MACC awardees are unable to submit a proposal, a written explanation is required to be submitted to the contracting officer issuing the RFP within five (5) working days of receipt of the RFP. A contract awardees’ failure to comply with submitting Task Order proposals or appropriate explanations in response to RFPs may result in the Government choosing not to exercise the remaining option periods and/or to exercise its termination rights.
2. Offerors are strongly recommended to participate in the site visit, examine specifications, schedule and all instructions. Failure to do so will be at the offeror’s risk.
3. Offers for supplies or services other than those specified will not be considered unless authorized by the RFP.
4. Offerors must state a definite time for delivery of supplies or for performance of services unless otherwise specified in the RFP.
5. Time for completion, if stated as the number of days, includes all calendar days (i.e., Saturdays, Sundays, and holidays) unless otherwise specified.
6. Offerors must adhere to all terms and conditions provided in the Base award for this task order, as well as this Request for Proposal.
RFP: N4008525R0096
WO# 1672941
THE FOLLOWING PROVISIONS/CLAUSES ARE APPLICABLE TO THIS SOLICITATION:
PROVISIONS/CLAUSES INCORPORATED BY REFERENCE
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)
52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020)
52.204-27 Prohibition on a Bytedance Covered Application (Jun 2023)
52.204-29 Federal Acquisition Supply Chain Security Act Orders—Representation and Disclosures (Dec 2023)
52.240-1 Prohibition on UAS Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024)
252.204-7024 Notice on the Use of the Supplier Performance Risk System (Mar 2023)
252.225-7059 Prohibition on Certain Procurements from The Xinjiang Uyghur Autonomous Region – Representation (Jun 2023)
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region (Jun 2023)
252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (DEVIATION 2024-O0006, REVISION 1) (Mar 2024)
252.225-7967 Prohibition Regarding Russian Fossil Fuel Operations (DEVIATION 2024-O0006, REVISION 1) (Feb 2024)
PROVISIONS/CLAUSES INCORPORATED BY FULL TEXT
52.211-12 - Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $250.50 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
RFP: N4008525R0096
WO# 1672941
52.219-14 Limitations on Subcontracting (DEVIATION 2021-O0008)
Use the following clause in lieu of the Federal Acquisition Regulation (FAR) clause 52.219-14, as prescribed at FAR 19.507(e):
LIMITATIONS ON SUBCONTRACTING (FEB 2023) (DEVIATION 2021-O0008)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification
RFP: N4008525R0096
WO# 1672941
System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:
(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.
(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause–
__ By the end of the base term of the contract and then by the end of each subsequent option period; or
X By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
RFP: N4008525R0096
WO# 1672941
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF.
Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at
RFP: N4008525R0096
WO# 1672941
https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
NAVY CONSTRUCTION / FACILITIES MANAGEMENT INVOICE
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
NAVY CONSTRUCTION / FACILITIES MANAGEMENT INVOICE
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N68732
Issue By DoDAAC N40085
Admin DoDAAC** N40085
RFP: N4008525R0096
WO# 1672941
Inspect By DoDAAC N69352
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N69352
Accept at Other DoDAAC N/A
LPO DoDAAC N69352
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Inspector: Josh Primeaux, joshua.r.primeaux.mil@us.navy.mil LPO: Katherine Dinneen, katherine.l.dinneen.civ@us.navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
RFP: N4008525R0096
WO# 1672941
ATTACHMENTS:
A – Specifications B – Drawings C – Wage Determination VA20250167 28FEB25 D – Installation Access Requirements E – Price Proposal Form
F – PIEE_VENDOR_ACCESS_INSTRUCTIONS
G – Pre-Proposal Inquiry Form H– Solicitation Provisions
I – NEPA
RECAP OF IMPORTANT DATES:
SITE VISIT: July 29th, 2025, at 1000 hours PPI DUE DATE: August 11th, 2025, at 1400 hours PROPOSAL DUE DATE: August 25th, 2025, at 1400 hours
File details come from the government source that posted it. Updated .