This is a Request for Proposal (RFP) from the Naval Facilities Engineering Command, Mid-Atlantic for constructing a new pre-engineered gear storage building at Joint Expeditionary Base Little Creek – Fort Story in Virginia Beach, VA. The project is part of a Multiple Award Construction Contract (MACC) with an estimated price range between $500,000 and $1,000,000, and a 240-calendar day completion timeline. The solicitation is open to multiple pre-qualified contractors, including CJW Contractors, Addon Services LLC, Bay Electric Co, ENCON Desbuild JV3 LLC, Mark Turner Construction, MIG WMJ JV1 LLC, Ocean Construction Services, SAW Eastern JV, VIRTEXCO Corporation, and Within Interior Design.

Key dates include a site visit on August 27th, 2025 at 1030 hours EDT, pre-proposal inquiries due by September 3rd, 2025 at 1400 hours EDT, and proposals due by September 19th, 2025 at 1000 hours EDT. The contract will be awarded on a lowest-price basis, with offerors required to submit a price proposal, acknowledged amendments, bid guarantee, and current VETS 4212 Registration. The project involves providing all supervision, labor, materials, and equipment to construct the gear storage building, with liquidated damages of $205.05 per calendar day of delay and specific insurance and bonding requirements.

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC

9324 VIRGINIA AVE, BLDG Z-140

NAVAL STATION NORFOLK, NORFOLK, VA 23511

POC: Brittany Swan, brittany.t.swan.civ@us.navy.mil

DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE

DELIVERY/INDEFINITE QUANTITY (ID/IQ) MULTIPLE AWARD CONSTRUCTION

CONTRACT (MACC) GENERAL CONSTRUCTION IN THE HAMPTON ROADS, VIRGINIA

AREA OF RESPONSIBLITY

(AOR)

MACC GROUP: ML-C00081

PROPOSED TASK ORDER:

CONSTRUCT NEW PRE – ENGINEERED GEAR STORAGE BUILDING – JEB LITTLE

CREAK, VIRGINIA BEACH, VA

DATE OF SOLICITATION: 20 August 2025

GENERAL CONSTRUCTION FOR HAMPTON ROADS, VIRGINIA MACC CONTRACT

HOLDERS:

N4008524D0030 CJW Contractors, Inc.

13849 Park Center Road, Suite B Herndon, Virginia 20171 POC: Ralph Crews

Email: ralph@cjwcontractors.com anuj@cjwcontractors.com bishnu@cjwcontractors.com bids@cjwcontractors.com

N4008524D0031 Addon Services LLC 1800 Diagonal Road, Suite 600 Alexandria, VA 22314 POC: Robert Pastorelli

RFP Email: NAVFACHR@addonservicesllc.com Contract Mods:

robert.pastorelli@addonservicesllc.com;

prita.abraham@addonservicesllc.com

N4008524D0032 Bay Electric Co, Inc 627 36th Street Newport News, VA 23607 POC: John Biagas

Email: john.biagas@bayelectricco.com Daryl.lanouette@bayelectricco.com Kerri.pennybacker@bayelectricco.com

N4008524D0033 ENCON Desbuild JV3 LLC 8201 Corporate Drive, Suite 720 Hyattsville, MD 20785 POC: Devang Ajmera

Email: devang@enconcorp.org ananthb@desbuild.com

N4008524D0034 Mark Turner Construction 10474 Cobbs Road Glen Allen, VA 23059 POC: Franklin Bowser

Email: fbowser@markturnerconstruction.com aarrowood@markturnerconstruction.com dbennett@markturnerconstruction.com

N4008524D0035

MIG WMJ JV1 LLC

545 South Birdneck Road, Suite 202H Virginia Beach, VA 23451 POC: Jose Gutierrez

Email: jose.g@miggov.com estimating@miggov.com estimating@wmjordan.com

LC-3870 Construct New Pre-Engineered Gear Storage Building RFP: N4008525R0135

WO# 1764116

vjames@markturnerconstruction.com

N4008524D0036 Ocean Construction Services 104 Aragona Boulevard, Suite 101 Virginia Beach, VA 23462 POC: Thor Elmore

Email: thor.elmore@ocsinc.us Kara.canter@ocsinc.us

N4008524D0037 SAW Eastern JV 2876 Guardian Lane, Suite 200 Virginia Beach, VA 23452 POC: Anthony Williams

Email: awilliams@sawcontracting.com Emery.c@easterncoastconstruction.com bids@easterncoastconstruction.com

N4008524D0038 VIRTEXCO Corporation 977 Norfolk Square Norfolk, VA 23502 POC: Donald Adams

Email: estimating@virtexco.com

N4008524D0069 Within Interior Design, Inc. DBA Tazewell Contracting 1008 Granby Street Norfolk, VA 23510 POC: Heather Robinson

Email: hrobinson@tazewellcontracting.com estimating@tazewellcontracting.com

GENERAL REQUIREMENTS

All terms and conditions of N40085-24-D-0030/0031/0032/0033/0034/0035/0036/0037/0038/0069 Indefinite Delivery / Indefinite Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements pertaining to this order. You are responsible for adhering to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue, please contact Brittany Swan at brittany.t.swan.civ@us.navy.mil.

Amendments will be posted directly to PIEE under the ‘Solicitation Module’. Offerors are responsible for referring to this site for any amendments to the RFP. Please check box next to ‘Please notify me of amendments to this solicitation’ to ensure you are notified of any amendments.

The specifications, (ATTACHMENT A), drawings (ATTACHMENT B), and other pertinent documents are posted on https://sam.gov/ under “Attachments/Links.”

NAVFAC RFP No.: N4008525R0135

Title: LC-3870 Construct New Pre-Engineered Gear Storage Building

Location of the work: Joint Expeditionary Base Little Creek – Fort Story, Virginia Beach, VA

The Government intends to award a firm-fixed price task order.

Description of the work: Reference the specifications (ATTACHMENT A) and drawings (ATTACHMENT B). The Contractor shall provide all supervision, labor, material, and equipment required to perform the following work: the work includes construction of a pre-engineered gear storage building and incidental related work.

Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984), all work and options shall be completed within 240 calendar days after award. The days are calculated from date of task order award, and includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance and bonding, and other requirements set forth in the task order/MACC.

Task order award is considered notice to proceed.

***Offerors must consider the total time to complete the project which includes, but not limited to, lead times of supplies, materials, and equipment. If the construction contract duration in the RFP is not feasible, offerors must submit a pre-proposal inquiry (PPI) by the PPI deadline with a proposed construction contract duration and explanation why additional time is needed.***

Estimated Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range is between $500,000 and $1,000,000.

NAICS Code: 236220 – Commercial and Institutional Building Construction

Wage Determination: General Decision Number VA20250167 2/28/2025 (ATTACHMENT C) as of the date of this RFP. Should this wage determination be modified by DoL prior to award, the most current wage determination may be issued via amendment and incorporated into the final task order award.

Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $205.05 for each calendar day of delay until the work is completed or accepted.

Utilities: If Applicable; Refer to the Specifications (ATTACHMENT A).

NOTE: Any Government utility costs will be charged to the Contractor at prevailing rates.

Record Shop Drawings: In accordance with FAR 52.236-21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are also required.

Government Furnished Property: There is no Government Furnished Property.

Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The basis for award will be lowest price.

Bond Requirements: In accordance with FAR 52.228-1

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

In accordance with FAR 28.102-1, the following payment protections are required from the awardee ten

(10) days after date of award: Payment Bond and Performance Bond.

Minimum Insurance Requirements: Offerors shall consider the costs of incorporating the required Minimum Insurance Requirements when submitting proposals. The awardee will be required to demonstrate proof of the following insurance requirements within ten (10) calendar days after award:

Comprehensive general liability: $500,000 per occurrence.

Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage.

Workmen’s compensation as required by Federal and State workers’ compensation and occupational disease laws.

Employer’s liability coverage of $100,000, except in States where workers compensation may not be written by private carriers.

Others as required by state law.

Per FAR 52.228-5, policies must contain an endorsement to the effect of the following:

Any cancellation or any material change in the policies adversely affecting the Government’s interest shall not be effective 1) for such period the laws of the State in which this contract is to be performed prescribe or, 2) until thirty (30) days after the insurer or contractor gives written notice to the Contracting Officer, whichever period is longer.

Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.

OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE

NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS

RESULTING FROM THIS SOLICITATION.

FAR 52.236‐27 Site Visit (Construction)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions

Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for August 27, 2025 at 1030 hours EDT.

(c) Participants will meet on-site at 2001 11th Street, BLDG 3870, Virginia Beach, 23455, VA. JEB Little

Creek – Fort Story (Little Creek site).

This will be the ONLY Government scheduled Site Visit. Please follow the instructions below if you will need base access. Start this process as early as possible as escorts will NOT be available the day of the site visit.

***NOTE: Please inform Brittany Swan at brittany.t.swan.civ@us.navy.mil at your soonest if you will or will not be attending the site visit.

All prospective offerors are urged to attend this site visit. The pre‐proposal site visit will be held for the following purposes: familiarization with the extent and nature of project; explaining concepts involved, specifications, terms and conditions, and unique RFP features. The Government will not provide any verbal answers to any verbal questions posed during the pre‐proposal conference/site visit. Offerors shall submit written questions for any issues that may arise during the conference (see Pre-Proposal Inquiries information below). The Government will provide written responses to any such questions via electronic RFP amendment posted to https://sam.gov.

No minutes of this meeting will be issued. Remarks and explanations addressed during the conference shall not qualify or alter any RFP terms or conditions. The terms and conditions of this RFP will remain unchanged unless amended in writing.

Contractors ARE NOT ALLOWED to use any cameras, tape recorders, or other recording devices during the site visit unless approved by appropriate NAVFAC personnel.

UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) is applicable to this solicitation.

https://www.navfac.navy.mil/products_and_services/ci/about_us/capital_improvements_docume nts.html (ATTACHMENT D)

CONTRACTOR ACCESS FOR THE SITE VISIT:

All Base Access requests must be submitted by the Prime Contractor.

1. SECNAV 5512 form (ATTACHMENT E) and One Day Pass Excel spreadsheet (ATTACHMENT F) via email to usn.jeblc-fs.navfacmidlandnor.mbx.NFECML-PWD- LTLC-ACCESS@us.navy.mil with subject line “ONE DAY PASS REQUEST”.

All requests must be submitted a minimum of 3 business days prior to the site visit.

a) SECNAV 5512 form must be completely filled out. The following sections, (1-4)

Name, (7) Birthdate, (14) SSN, (24) Sponsor Information, (25-26) Employer Name, (28-29) Initials, AND (30) Signature, if not complete, will result in the form being rejected and returned for resubmission.

i) Complete block 24 with the following base sponsor information: Will

Winingear, (757) 817-0000.

ii) Label your forms in the format of last name, first name (ONLY) when submitting; a separate document must be submitted for each individual.

iii) Due to government system restraints, your scanned 5512 form should be 150

– 500 KB’s each to transmit successfully. Any forms submitted close to 1MB or larger will be rejected.

b) ODP spreadsheet should have all highlighted columns completed. The company name is how you will be listed on the CNIC website. Please list your individuals in alphabetical order on your spreadsheet, and no more than 10 individuals per spreadsheet. Label your spreadsheet as ODP – Company Name (ONLY).

2. Use email subject line “ONE DAY PASS REQUEST”; in the body of the email, please state the company name, Title of Project, Contract / Task Order, and the start / end dates for requested access. Please use the site visit date for both start and end dates.

3. If someone is denied clearance, the procurement technician (PT) will be notified and an email with the findings will be sent to you. For follow-up or questions, please contact NAVFACML_PWDLittleCreek-Access@navy.mil. Please check the CNIC website, below, for approval / clearance before sending an inquiry email. NOTE: Website is updated by the Regional Office as individuals are cleared.

https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system.html

4. After receiving clearance, direct individuals to the Pass and ID office with the proper identification (two forms of ID and a copy of the SECNAV 5512). For vehicles, please make sure you have your vehicle registration and proof of insurance.

Contractors ARE NOT ALLOWED to use any cameras, tape recorders, or other recording devices during the site visit unless approved by appropriate NAVFAC personnel.

Pre-Proposal Inquiries (PPIs): PPIs must be submitted electronically via Pre-Proposal Inquiry Form (ATTACHMENT G), to Brittany Swan at brittany.t.swan.civ@us.navy.mil no later than 3 September 2025 at 1400 hours EDT in order to process all inquiries by the proposal due date.

Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. Responses will be published via amendment posted to PIEE.

Proposal Due Date: 19 September 2025 at 1000 hours EDT. LATE PROPOSALS WILL NOT BE

CONSIDERED.

Proposal Delivery Information: PROPOSALS SHALL BE SUBMITTED THROUGH PIEE.

Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized.

*PIEE Submissions:

Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file.

Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via (ATTACHMENT H).

Emailed submissions will not be accepted.

Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.

PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL

NOT BE CONSIDERED.

All required proposal documents shall be submitted in accordance with FAR 15.208. Refer to “Basis for Award” for complete submittal instructions.

BASIS FOR AWARD

1. The proposed task order will be awarded to the responsible offeror offering the best value to the

Government. For this order, the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each offeror on price only.

2. Submittal Requirements and Basis of Evaluation:

a. Offeror shall submit the following:

Cover Page to include:

o RFP Number, RFP Title, Prime Contractor Name, Employer Identification

Number (EIN), Address, Phone Number, Fax Number, DUNS and Cage Code, Point of Contact – Name, Phone Number and Email

Completed and Signed Price Proposal Form (ATTACHMENT J) Acknowledged Amendments (if applicable) (ATTACHMENT J) Bid guarantee Copy of current VETS 4212 Registration

Note: The costs for preparation of task order proposals shall be the responsibility of the offeror and not directly reimbursable.

b. Basis of Evaluation: The Government will evaluate price based on the lump sum price. No provision is made for economic price adjustment. The lump sum price shall be deemed to include all costs required for the specified work, completed in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, disposal, and related items.

Analysis will be performed by one or more of the following techniques:

Comparison of proposed prices received in response to the RFP.

Comparison of proposed prices with the IGE.

Comparison of proposed prices with available historical information.

Comparison of market survey results.

A price, which is found to be unreasonably high or unbalanced in relation to the proposed work and/or Government Estimate may negatively impact the offeror’s evaluation and may result in the proposal not being eligible for award. A proposal that fails to submit pricing as required will be considered unresponsive and will not be evaluated or considered for award.

EVALUATION

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with any or all offerors; and to award the task order to the offeror submitting the lowest price proposal.

2. As stated in the RFP, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

Additional Instructions to Offerors:

1. Pursuant to the basic contract award, offerors are required to submit proposals on all Task Order

Requests for Proposals received from the Government. In the event MACC awardees are unable to submit a proposal, a written explanation is required to be submitted to the contracting officer issuing the RFP within five (5) working days of receipt of the RFP. A contract awardees’ failure to comply with submitting Task Order proposals or appropriate explanations in response to RFPs may result in the Government choosing not to exercise remaining option periods and/or to exercise its termination rights.

2. Offerors are strongly recommended to participate in the site visit, examine specifications, schedule and all instructions. Failure to do so will be at the offeror’s risk.

3. Offers for supplies or services other than those specified will not be considered unless authorized by the RFP.

4. Offerors must state a definite time for delivery of supplies or for performance of services unless otherwise specified in the RFP.

5. Time for completion, if stated as the number of days, includes all calendar days (i.e., Saturdays, Sundays, and holidays) unless otherwise specified.

6. Offerors must adhere to all terms and conditions provided in the Base award for this task order, as well as this Request for Proposal.

THE FOLLOWING PROVISIONS/CLAUSES ARE APPLICABLE TO THIS SOLICITATION:

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)

52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020)

52.204-27 Prohibition on a Bytedance Covered Application (Jun 2023)

52.204-29 Federal Acquisition Supply Chain Security Act Orders—Representation and Disclosures (Dec 2023)

52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec 2023)

52.211-15 Defense Priority and Allocation Requirements (APR 2008)

52.228-15 Performance and Payment Bonds-Construction (Jun 2020)(DEVIATION 2020-O0016)

52.240-1 Prohibition on UAS Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024)

252.204-7024 Notice on the Use of the Supplier Performance Risk System (Mar 2023)

252.225-7059 Prohibition on Certain Procurements from The Xinjiang Uyghur Autonomous Region – Representation (Jun 2023)

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region (Jun 2023)

252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operations - Representation (DEVIATION 2024-O0006, REVISION 1) (Mar 2024)

252.225-7967 Prohibition Regarding Russian Fossil Fuel Operations (DEVIATION 2024-O0006, REVISION 1) (Feb 2024)

PROVISIONS/CLAUSES INCORPORATED BY FULL TEXT

52.211-12 - Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $250.50 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.219-14 Limitations on Subcontracting (DEVIATION 2021-O0008)

Use the following clause in lieu of the Federal Acquisition Regulation (FAR) clause 52.219-14, as prescribed at FAR 19.507(e):

LIMITATIONS ON SUBCONTRACTING (FEB 2023) (DEVIATION 2021-O0008)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are—

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are—

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:

(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.

(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause–

__ By the end of the base term of the contract and then by the end of each subsequent option period; or

X By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

NAVY CONSTRUCTION / FACILITIES MANAGEMENT INVOICE

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

NAVY CONSTRUCTION / FACILITIES MANAGEMENT INVOICE

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N68732

Issue By DoDAAC N40085

Admin DoDAAC** N40085

Inspect By DoDAAC N69352

Ship To Code N/A

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N69352

Accept at Other DoDAAC N/A

LPO DoDAAC N69352

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Inspector: Will Winingear, william.j.winingear.ctr@us.navy.mil LPO: Katherine Dinneen, katherine.l.dinneen.civ@us.navy.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

ATTACHMENTS:

A – Specifications B - Drawings C – Wage Determination (VA20250167 2/28/2025)

D – ECMS

E – SECNAV 5512

F – One Day Pass Request G – PPI Template H – PIEE Solicitation Vendor Access Instructions J – Price Proposal Form

RECAP OF IMPORTANT DATES:

SITE VISIT: August 27th, 2025, at 1030 hours EDT PPI DUE DATE: September 3rd, 2025, at 1400 hours EDT PROPOSAL DUE DATE: September 19th, 2025, at 1000 hours EDT