This is a General Conditions and Fee Statement for Invitation to Bid #2005-B: Elections Office Remodel, issued by Fayette County, Georgia. The document outlines the construction project parameters for remodeling the Elections Building, with a construction start date to be determined and a proposed duration that remains unspecified. Bids were to be submitted by 3:00 PM on Wednesday, December 8, 2021. The project scope includes general conditions management, site office expenses, safety requirements, temporary utilities, and general equipment needs. Sherry White serves as the Contract Administrator for the Fayette County Purchasing Department and can be reached at (770) 305-5314 or swhite@fayettecountyga.gov for inquiries. Architect drawings were made available through a SharePoint link provided by the county.

The fee statement section requests detailed pricing information from bidders, including project management labor costs broken down by employee role and commitment level, along with billable rates and total project costs. Bidders are required to provide cost estimates for site office expenses, safety provisions, temporary utilities, and general equipment. The document also requires submission of insurance rates and coverage limits for general liability, excess liability, builder's risk, payment and performance bonds, and current year experience modification rates. All cost line items in the provided template show zero values, indicating this is a blank form for contractor completion. The document does not specify funding sources, set-asides, or incumbent information.

Text of this file

GC and Fee Statement

FAYETTE COUNTY ELECTIONS OFFICE
General Conditions and Fee Statement
ITB 2005-B: Elections Office Remodel
October 18, 2021
Project Assumptions
Construction Start DateTBD
Proposed Duration
General Conditions
Project ManagementEmployee NameWork LocationCommitted to Project
(A)Billable Rate (Month)
(B)Total Project Cost (11*A*B=C)
Example EmployeeJohn Doe50% Office
50% Jobsite30%$ 2,500$ 9,000
Project Executive- 0- 0
Senior Project Manager- 0
Project Manager- 0
Assistant Project Manager- 0
Project Engineer- 0
General Superintendent- 0
Project Superintendent- 0
Assistant Superintendent- 0
Foreman- 0
Safety Engineer- 0
Senior Estimator- 0
Estimator- 0
MEP Coordinator- 0
BIM Specialist- 0
Secretary- 0
Scheduler- 0
Project Accountant- 0
Other- 0
Total Project Management$ - 0

Indicate what costs are included in billable rates above. For example: Labor, workers compensation, trucks, vehicle repairs and maintenance, fuel, etc.

Site Office ExpenseQuantityUnitUnit CostTotal Cost
Job Office Trailer Rental$ - 0$ - 0
Job Office Set-up- 0
Temporary Storage- 0
Office Furniture- 0
Computers / Equipment- 0
Copy Machines / Maintenance- 0
Office Supplies- 0
Janitor / Sanitation Supplies- 0
Postage- 0
First Aid / Medical Treatment- 0
Job signs- 0
013233Progress Photos- 0
Blueprints / Printing- 0
Internet- 0
Cellular Phone Charges- 0
Radio Communications- 0
014000Quality Requirements
016000Product Requirements
017300Execution
017419Construction Waste Mgmt & Disposal
017823Operation and Maintenance Data
017839Project Closeout Documents & Procedures- 0
017900Demonstration & Training
Job Office Computers- 0
Total Site Office Expense$ - 0
SafetyQuantityUnitUnit CostTotal Cost
Safety Incentives$ - 0$ - 0
Fences & Gates- 0
Traffic Control- 0
Fire Protection, Extinguishers- 0
Personal Protective Equipment- 0
Other- 0
Total Safety$ - 0
Temporary Utilities / MiscellaneousQuantityUnitUnit CostTotal Cost
Job Office - Temporary Electric$ - 0$ - 0
Temporary Electric - Building- 0
Water - Field Office- 0
Water - Coolers- 0
Ice and Cups- 0
Temporary Toilets- 0
Temporary Hand Washing Stations
Drug Testing- 0
MIS Charges- 0
Off-site Parking- 0
Other- 0
Total Temporary Utilities / Miscellaneous$ - 0
General EquipmentQuantityUnitUnit CostTotal Cost
Travel Expense$ - 0$ - 0
Pickup Trucks- 0
Small Tools/Expendables- 0
Equipment Rental- 0
Fuel/Oil/Grease- 0
Vehicle Repairs/Maintenance- 0
Other- 0
Total General Equipment$ - 0
Total General Conditions$ - 0
Insurance RatesFee Statement
General Liability (Rate and Coverage Limits)CM Fee (%)
Excess Liability (Rate and Coverage Limits)Change Order Fee (%)
Subcontractor Default Insurance rate (%)
Contractor Controlled Insurance Program (%)
Builder's Risk rate - New Construction (%)
Other Insurance (Please list if applicable)
Payment & Performance Bond rate (%)
Current Year EMR

&"Century Gothic,Regular"&11 &10 image1.png

Other files

File Type Posted
BID FORM —
2005-B Addendum #1 —
Award Information —
#2005-B ITB Elections Building —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .