General_Conditions.pdf
PDF 611 KB Posted
- Attached to
- OVERBROOK SEAWALL REPLACEMENT
- Solicitation number
- 252729AMS
- Issued by
- Sarasota County, Florida
About this file
The document is a comprehensive set of General Conditions for a construction contract with Sarasota County, Florida, specifically related to the Overbrook Seawall Replacement project. These General Conditions outline the contractual terms, responsibilities, and expectations for the contractor, covering the entire lifecycle of the construction project from pre-construction activities through final completion and acceptance. The document details procedures for project management, including pre-construction conferences, scheduling, work performance, materials and equipment standards, inspections, payments, changes to the contract, claims resolution, and warranty provisions.
The contract includes provisions for progress payments, with 5% retainage held until project completion, and allows for payment for stored materials with proper documentation. The contractor is required to provide comprehensive documentation, including manufacturer's instructions, as-built drawings, and maintenance manuals. The contract term is governed by specific timelines for substantial and final completion, with potential liquidated damages for delays. The contractor must maintain strict quality control, adhere to safety regulations, protect environmental resources, and provide warranties for materials and workmanship for a minimum of one year from the date of final completion. The document also outlines detailed processes for handling changes, resolving disputes, and managing potential additional work through Interim Field Change Agreements (IFCAs) or Contract Amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans.pdf | ||
| Project_Map.pdf | ||
| Technical_Specifications.pdf | ||
| Project_Documents_252729AMS.pdf | ||
| Other_Contract_Forms.pdf | ||
| NRCS_Hurricane_Ian_Repair_Grant_Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
CONDITIONS
Rev.6/21/23 GC-Page 2 of 63 General Conditions
INDEX
GENERAL CONDITIONS
ARTICLE SUBJECT PAGE
1.0 Definitions and Terms
1.1 General 6
2.0 Contractor Requirements
2.1 General 9
3.0 Contract Documents 9
3.1 Contract Documents
3.2 Intent
3.3 Conformed Contract Documents
3.4 Construction Plans/Drawings
3.5 Amending and Supplementing Contract Documents
3.6 Reference Standards
3.7 Reuse of Documents
4.0 Pre-Construction Activities 12
4.1 Pre-Construction Conference
4.2 Preliminary Schedules Submission and Acceptance
4.3 Notice to Proceed
4.4 Earthmoving Permit
4.5 Notifications
4.6 Audio-Visual Pre-Construction Record
4.7 Communications/Notices
5.0 Progress and Control of the Work 15
5.1 Timely Performance of the Work
5.2 Sequence of Work
5.3 Temporary Facilities/ Staging and Storage Area(s)
5.4 Use of Jobsite and Other Areas
5.5 Mobilization
5.6 Work Hours
5.7 Reimbursements to the County for Unscheduled Work Hours
5.8 Progress Meetings
5.9 Construction/Progress Schedule
5.10 As-Built Documents
5.11 Permits, Licenses, Taxes, and Laws and Regulations
5.12 Work within the County/State Rights-of-Ways
5.13 Open Excavations
5.14 Erosion Control
5.15 Maintenance of Traffic (MOT)
5.16 Subsurface and Physical Conditions
5.17 Existing Underground Facilities
5.18 Quality Control
5.19 Materials, Equipment, and Workmanship
5.20 Inspection and Testing of Materials and Equipment
5.21 Sanitary Regulations
5.22 Safety and Health Regulations/Protection of Property
Rev.6/21/23 GC-Page 3 of 63 General Conditions
5.23 Hazardous Environmental Conditions
5.24 Salvaged Equipment and Materials
5.25 Clean-Up and Disposal
6.0 County’s Rights 30
6.1 County Access to Work
6.2 County May Stop Work
6.3 County May Correct Defective Work
6.4 Right to Retain Defective Work
6.5 County May Suspend Work
6.6 County May Terminate for Cause
6.7 County May Terminate for Convenience
6.8 Partial Utilization
6.9 Project Audit
7.0 Contractor’s Rights and Responsibilities 34
7.1 General
7.2 Supervision and Superintendency
7.3 Subcontractors and Material Suppliers
7.4 Labor
7.5 Reporting Discrepancies
7.6 Project Layout
7.7 Coordination with Other Contractors
7.8 Emergencies
7.9 Patent Fees and Royalties
7.10 Safety Representative
7.11 Hazard Communication Program
7.12 Risk of Loss
7.13 Protection and Restoration of Public and Private Property
7.14 Protection of Environmental Resources
7.15 Protection of Historic and Archeological Resources
7.16 FPL Service
7.17 Utility Services
8.0 County’s Responsibilities and Duties 39
8.1 Status of the Construction Project Manager
8.2 Review and Approval of the Work
8.3 Resolution of Discrepancies
8.4 Recommendation of Progress Payments
8.5 Inspection and Examination of the Work
8.6 Project Representative/Inspector
8.7 Right to Reject Defective Work
8.8 Shop Drawings, Product Data, and Samples
8.9 “Or Equal” and Substitutions
8.10 Claims
8.11 Recommendation of Substantial Completion and Final Payment
8.12 Cooperation
8.13 Availability of Lands for Work
8.14 Survey/Project Controls
Rev.6/21/23 GC-Page 4 of 63 General Conditions
9.0 Work by Others 45
9.1 Construction by the County or by Separate Contractors
10.0 Cost of the Work 45
10.1 Lump Sum Work
10.2 Unit Price Work
10.3 Allowances
11.0 Changes, Delays, and Time Extensions 47
11.1 Changes in the Work
11.2 Interim Field Change Agreement (IFCA)/Contract Amendment
11.3 Change in Contract Price
11.4 Change in Contract Times
11.5 Delays and Time Extensions
11.6 Notice to Surety
12.0 Claims and Damages 52
12.1 Time of Claim
12.2 Value of Claim
12.3 Claim Form
12.4 Claims for Contract Price and Contract Times Adjustment
12.5 Continuation of the Work
12.6 County’s Action
13.0 Payments to Contractor and Completion 53
13.1 General
13.2 Supporting Documentation
13.3 Progress Payments
13.4 Payment for Stored Materials and Equipment
13.5 Retainage
13.6 County May Withhold Payments
13.7 Liquidated Damages
13.8 Prompt Payment
13.9 Substantial Completion
13.10 Final Inspection
13.11 Final Acceptance
13.12 Release of Liens
13.13 Final Payment
13.14 Final Completion Delayed
14.0 Manufacturer's Instructions and Services 59
14.1 Manufacturer’s Instruction, Service and Parts Manual
14.2 Manufacturer’s Supervision
15.0 Warranty and Guarantee Provisions 60
15.1 Warranty and Guarantee Provisions
Rev.6/21/23 GC-Page 5 of 63 General Conditions
16.0 Miscellaneous 61
16.1 Certified Chemicals
16.2 Fuel Adjustments
16.3 Equipment Maintenance
16.4 Spill Prevention/Containment
16.5 Disposal of Pollutants
Attachment 1 Project Sign Template 62
Rev.6/21/23 GC-Page 6 of 63 General Conditions
GENERAL CONDITIONS
1.0 DEFINITIONS AND TERMS
1.1 Wherever used in the Contract and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural, as well as pronouns used in their place. This list is not meant to be all inclusive, as other terms may be defined elsewhere in the Contract Documents printed with initial capital letters.
ADDENDA: Written or graphic instruments issued prior to the opening of bids which clarify, correct, or change the Contract Documents.
ADMINISTRATIVE AGENT: The County staff person acting as the County’s authorized representative, responsible for the performance and final acceptance of the Work. This agent, named in the Construction Contract, has responsibility for Contract Document interpretations, Contractor compliance with the terms of the Contract, and resolutions in cases of Contract Document discrepancies, claims, disputes, and non-compliance.
APPLICATION FOR PAYMENT: The form acceptable to the County which is to be used by the Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract.
CLAIM: A written demand or assertion by the County or the Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract.
CONFORMED CONTRACT DOCUMENTS: The formal Contract Documents prepared by the County, incorporating all addenda, completed bid form, Performance and Payment Bond, Insurance Certificate(s), and other forms required by the Contract into a bound set of final documents which will be exclusively used and recognized during the construction of the Work. Each set of Conformed Contract Documents will be so labeled and sequentially numbered as to be readily identifiable as copies of the authentic Contract Documents.
CONSTRUCTION CONTRACT: The written contract executed by the County and the Contractor for the performance of the Work, which incorporates by reference all Contract Documents.
CONSTRUCTION PLANS/DRAWINGS: A set of drawings prepared and/or approved by the Engineer/Architect of Record, which graphically shows the scope, extent, and character of the work to be furnished and performed by the Contractor. Shop Drawings and other Contractor submittals are not Construction Plans/Drawings as so defined.
CONSTRUCTION/PROGRESS SCHEDULE: A time schedule prepared and submitted by the Contractor on an approved form and in the County’s contract management software in an approved compatible format, describing the sequence and duration of activities comprising the Contractor’s plan to accomplish the Work within the prescribed Contract Times.
CONSTRUCTION PROJECT MANAGER: Authorized County representative with specific responsibilities and duties as defined by the County for management of specified portions of the Contract.
Rev.6/21/23 GC-Page 7 of 63 General Conditions
CONTRACT: The totality of the Contract Documents and the Construction Contract.
CONTRACT AMENDMENT: A form of Contract Modification requiring formal Sarasota County Commission approval.
CONTRACT DOCUMENTS: All documents listed in Article III of the Construction Contract.
CONTRACT MODIFICATION: A document signed by the County and the Contractor authorizing an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Contract.
CONTRACT PRICE: The Contractor’s bid price accepted by the County, including or excluding additive or deductive alternates, as stipulated in Article II of the Construction Contract.
CONTRACT TIMES: The number of calendar days stipulated in Article IX of the Construction Contract provided to the Contractor to achieve Milestones (as stipulated), Substantial Completion, and Final Completion of the Work, as defined herein.
CONTRACTOR: The person, firm, or corporation who executed the Construction Contract with the County, and who is responsible for the completion of the Work.
COUNTY: Political subdivision of the State of Florida including the Sarasota County Commission, the entity with whom the Contractor has entered into the Contract and for whom the Work is to be performed, including the County Engineer or designated representative.
DAY: The word “day” means a calendar day of 24 hours measured from midnight to the next midnight.
EFFECTIVE DATE OF THE CONTRACT: The date the Construction Contract is approved and signed by the County, on which date the Contract becomes effective.
ENGINEER/ARCHITECT OF RECORD: The person, firm or corporation registered in the State of Florida as a professional engineer/architect, or professional engineering/architectural company, responsible for the preparation and approval of the Construction Plans/Drawings and Technical Specifications; the permitting of the project with federal, state, and local agencies having jurisdiction over the Work; and for certification that the Work completed was in substantial conformance with the approved plans and specifications, and/or noting and recording exceptions that did not substantially affect the functionality or quality of the Work required for its intended use. The Engineer/Architect of Record may be one or more persons, firms, or corporations.
EPA: Environmental Protection Agency
FDA: Food and Drug Administration
FDEP: Florida Department of Environmental Protection
FDOT: Florida Department of Transportation
FIELD ADJUSTMENT: A minor modification to the Construction Plans/Drawings directed by the County, which may involve a structure location or quantity change as may be found desirable to avoid any obstructions, interference with existing structures, or for other reasons that would benefit the Work, without causing or creating a scope change to the Work.
Rev.6/21/23 GC-Page 8 of 63 General Conditions
FINAL COMPLETION AND ACCEPTANCE: The date when the Work is completed and approved by the County and the Contractor, including completion of all Punch List items, submittal of approved as-built drawings, and completion of all other project close-out requirements, all as defined in the Contract Documents and in accordance with Florida Statutes §218.735. Evidence witnessing this date will be issued in the Notice of Final Acceptance Certificate.
INTERIM FIELD CHANGE AGREEMENT (IFCA): A form of Contract Modification within the general scope of the Contract, which does not result in the Contract Price exceeding the amount stipulated in the Construction Contract. This Contract document, approved and signed by the County and the Contractor, authorizes an addition, deletion, or revision in the Work or an allocation of the Contract contingency or adjustment to the Contract Times, issued on or after the Effective Date of the Contract.
JOBSITE: Lands or areas indicated in the Contract Documents as being furnished by the County upon which the Work is to be performed, including rights-of-ways and easements for access thereto, and such other lands indicated by the County which are designated for the use of the Contractor.
MILESTONE: A principal event or Work item, specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work.
NOTICE: A formal written correspondence rendered by the Contractor or the County for the purposes of providing notice to the parties of transmittals, requesting information, conditions discovered, pending actions, claims, and other actions pursuant to the Contract requirements.
NOTICE TO PROCEED: A written notice given by the County to the Contractor fixing the date on which the Contract Times will commence to run and on which date the Contractor shall start to perform the Work under the Contract. The Notice to Proceed will fix the dates of Milestones, where applicable, Substantial Completion, and Final Completion of the Contract, based on the stipulated Contract Times.
“OR EQUAL”/SUBSTITUTION: An item reviewed and approved by the County following the Effective Date of the Contract based on the Contractor’s submittal of alternates or substitutions for equipment/supplies/materials in response to the Technical Specifications denoting the item by a brand name followed by the term “or equal”.
PROJECT: The entire construction or installation to be performed which the Work under this Contract may be the whole or part.
PROJECT REPRESENTATIVE (PR)/INSPECTOR: Authorized field representative of the County, responsible for periodic oversight of the Work, with specific duties and limitations as outlined in these General Conditions.
SCHEDULE OF SUBMITTALS: A schedule of submittals required by the Contract Documents prepared and maintained by the Contractor, of required submittals and the time requirements to support scheduled performance of related Work activities.
SCHEDULE OF VALUES: A cost schedule prepared and maintained by the Contractor, allocating portions of the Contract Price to various Lump Sum items of the Work as defined in the Contract Documents, and used as the basis for reviewing and approving the Contractor’s application for payment.
SHOP DRAWINGS: All drawings, diagrams, illustrations, schedules, and other data
Rev.6/21/23 GC-Page 9 of 63 General Conditions or information which are specifically prepared or assembled by or for the Contractor and submitted by the Contractor to illustrate some portion of the Work.
SUBCONTRACTOR: An individual or entity having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the Work.
SUBSTANTIAL COMPLETION: Occurs when the Work is sufficiently complete, in accordance with the Contract Documents, so that the Project or specified part of the Project can be utilized for the purpose for which it was intended. The date of Substantial Completion will be evidenced in writing by the “Certificate of Substantial Completion”, approved and signed by the Contractor and the County’s Administrative Agent.
SUPPLEMENTAL GENERAL CONDITIONS: That part of the Contract Documents which amends or supplements these General Conditions.
SURETY: Any person, firm, or corporation that has executed as Surety the Contractor's Bid Bond and/or Performance and Payment Bond securing the performance of the Construction Contract.
TECHNICAL SPECIFICATIONS: That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto.
UNDERGROUND FACILITIES: All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other facilities or attachments, and encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone, or other communications, cable television, water, wastewater, reuse water, storm water, other liquids or chemicals, or traffic or other control systems.
USDA: United States Department of Agriculture
WORK: The entire construction required to be provided under the Contract. Work includes and is the result of performing or providing all plant, labor, equipment, tools, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.
2.0 CONTRACTOR REQUIREMENTS
2.1 GENERAL: The Work covered by the Contract Documents includes the furnishing of all plant, labor, equipment, tools, materials and performing all operations and construction work, including all appurtenant work, in accordance with the Contract Documents. The Contractor shall perform all operations, construction, and incidentals necessary to complete the Work in a turnkey condition. The Contractor may subcontract a portion of the Work, but shall perform with its own organization work amounting to not less than 51% of the total Contract Price.
3.0 CONTRACT DOCUMENTS
3.1 CONTRACT DOCUMENTS: The Contract Documents and the Construction Contract comprise the entire contract between the County and Contractor.
3.2 INTENT:
A. It is the intent of the Contract Documents to describe the Work (or part thereof) to be constructed by the Contractor, which results in a complete and functional
Rev.6/21/23 GC-Page 10 of 63 General Conditions product. Any plant, labor, materials, equipment, tools, and services that may be reasonably inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended results will be provided whether or not specifically called for at no additional cost to the County.
B. The several parts of the Contract are intended to be complementary in describing the Work and the responsibilities of the Contractor and the County and any requirements stipulated in one part of the Contract is as binding on the parties as though occurring in all. In the event there are any conflicting provisions or requirements in the Contract, the provisions and requirements of the Contract shall take the following order of precedence:
1. Contract Amendments
2. Construction Contract
3. IFCAs
4. Special Conditions
5. Supplemental General Conditions
6. General Conditions
7. Technical Specifications
8. Construction Plans/Drawings
In case of a discrepancy concerning dimension, quantity, and location, graphic drawings will take precedence over the specifications; explanatory notes on the drawings will take precedence over conflicting drawn indications; and large scale details will take precedence over smaller scaled drawings. In case of discrepancy concerning quality and/or quantity within the documents, the Contractor shall include the better quality and/or the greater quantity, unless otherwise determined in writing by the County.
Interpretations and resolution of discrepancies within the Contract Documents shall be made solely by the County’s Administrative Agent and issued in writing upon receipt of the Contractor’s written request.
C. The Contractor shall fully comply with all requirements of the Contract. No verbal agreement or conversation with any agent or employee of the County, Construction Project Manager or the Engineer/Architect of Record either before or after the execution of the Construction Contract shall affect or modify any of the terms or obligations contained in the Contract.
D. The Contractor shall provide temporary utility service to any businesses or dwellings affected during the construction of this Project.
3.3 CONFORMED CONTRACT DOCUMENTS: Following award of the Contract, the County will prepare the Conformed Contract Documents, providing one originally signed and executed hard copy set to the Contractor. The Contractor will have access to an electronic version of the Conformed Contract Documents through the County’s e-Builder system. One complete set of Construction Plans/Drawings and Technical Specifications shall be maintained at the Jobsite for as-built drawings preparation by the Contractor and shall be available for review by the County at all times.
Rev.6/21/23 GC-Page 11 of 63 General Conditions
3.4 CONSTRUCTION PLANS/DRAWINGS:
A. Refer to Article III of the Construction Contract for the list of Construction Plans/Drawings.
B. The general character and scope of the work is illustrated by the Construction Plans/Drawings. These drawings, which show the scope, extent and character of the work to be furnished and performed by the Contractor have been prepared and/or approved by the Engineer/Architect of Record, and are referred to in the Contract Documents. Shop drawings are not Construction Plans/Drawings as so defined.
C. Checking of Drawings and Dimensions:
1) The Contractor shall check all drawings immediately upon their receipt and shall promptly notify the County in writing of any discrepancies. Anything shown on the drawings and not mentioned in the Technical Specifications, or mentioned in the Technical Specifications and not shown on the drawings, shall be of like effect as if shown or mentioned in both.
2) Figures marked on all drawings shall, in general, be followed in preference to scale measurements. Large-scale drawings shall, in general, govern small-scale drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby. When dimensions on the drawings are affected by the type of equipment selected, the Contractor shall adjust such dimensions as conditions may require, upon written notification and approval of the County.
3.5 AMENDING AND SUPPLEMENTING CONTRACT DOCUMENTS:
A. The Contract may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by an IFCA or a Contract Amendment.
B. The requirements of the Contract may be supplemented and minor variations and deviations in the Work may be authorized by a written interpretation or clarification, or by a Field Adjustment as directed by the County.
3.6 REFERENCE STANDARDS:
A. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to laws or regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or laws or regulations in effect on the Effective Date of the Contract, except as may be otherwise specifically stated in the Contract.
B. No provision of any such standard, specification, manual, or any instruction of a manufacturer or supplier shall be effective to change the duties or responsibilities of the County or the Contractor or any of their Subcontractors, consultants, agents, or employees from those set forth in the Contract. No such provision or instruction shall be effective to assign to the County or any of their authorized representatives, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract.
Rev.6/21/23 GC-Page 12 of 63 General Conditions
3.7 REUSE OF DOCUMENTS:
A. The Contractor and any Subcontractor or supplier or other individual or entity performing or furnishing all or any portion of the Work, shall not:
1) Have or acquire any title to or ownership rights in any of the drawings, specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of the Engineer/Architect of Record or the Engineer/Architect of Record’s consultants, including electronic media editions.
2) Reuse any of such drawings, specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of the County and the Engineer/Architect of Record and specific written verification or adaption by the Engineer/Architect of Record.
B. The prohibition of this paragraph will survive final payment, or termination of the Contract. Nothing herein shall preclude the Contractor from retaining copies of the Contract Documents for record purposes.
4.0 PRE-CONSTRUCTION ACTIVITIES
4.1 PRE-CONSTRUCTION CONFERENCE:
A. Following award of the Contract, the County may schedule a pre-construction conference. Attendees of the conference shall be the Contractor and the Contractors proposed superintendent, the County and authorized representative(s), utility company representatives, and other interested parties.
B. The pre-construction conference is intended to establish a working understanding among the parties, and to review work schedules, procedures for handling shop drawings and other submissions, processing of progress payments, and such other matters as may be pertinent to the Work. The Contractor shall submit, for approval by the County, a summary of the proposed work approach, a preliminary Schedule of Values, a preliminary Submittals Schedule, a preliminary Construction/Progress Schedule, emergency contact phone numbers, Labor and Equipment Rate Schedule (excluding overhead and profit), and any other information as required for the pre-construction conference.
4.2 PRELIMINARY SCHEDULES SUBMISSION AND ACCEPTANCE:
A. SCHEDULE OF VALUES:
1) This schedule includes quantities and prices for all Lump Sum bid items, which when added together equal the Lump Sum Contract Price for each such item bid, and subdivides the Lump Sum items into component parts in sufficient detail to serve as the basis for the review and approval of progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each Lump Sum item of Work bid.
2) The Contractor’s Schedule of Values will be acceptable to the County as to form and substance if it provides a reasonable allocation of the Lump Sum Contract Prices to component parts of the Lump Sum item of Work.
Rev.6/21/23 GC-Page 13 of 63 General Conditions
B. SUBMITTALS SCHEDULE:
1) This schedule, which is incorporated into the Construction/Progress Schedule, provides for the review and acceptance of the Contractor’s submittals required by the Contract Documents, and must provide sufficient time for the County review so as to comply with the Contract Times.
2) This schedule shall also include any Contractor proposed substitutions/”or equal” products requiring review by and approval of the County. The Contractor shall provide a minimum of 15 days in the Construction/ Progress Schedule for such product review.
3) The Contractor’s schedule of submittals will be acceptable to the County if it provides for a workable arrangement for reviewing and processing the required submittals as shown on the Progress Schedule.
C. CONSTRUCTION/PROGRESS SCHEDULE:
1) This construction schedule, prepared in a critical path format, indicating the times (numbers of days or dates) for starting and completing the various items and stages of the Work, including the scheduling of any Milestones specified in the Contract Documents, Substantial Completion, and Final Completion. The initial submittal shall, at a minimum, indicate the late start dates and late finish dates required to meet the Contract Times.
2) The Contractor’s Progress Schedule will be acceptable to the County if it provides for an orderly progression of the Work to completion within the Contract Times. Such acceptance will not impose on the County responsibility for the Progress Schedule, for sequencing, scheduling, or progress of the Work, nor interfere with or relieve the Contractor from the Contractor’s full responsibility therefore.
D. The County will provide the Contractor with its comments to the above schedules. No Progress Payment will be made to the Contractor until acceptable schedules are submitted to the County.
4.3 NOTICE TO PROCEED: A written Notice will be provided to the Contractor by the County affirming the date on which the Contract Times will commence to run. The date of the Notice to Proceed generally begins the Contract Times unless another date is otherwise agreed to by the County and the Contractor and is the date on which the Contractor shall start to perform the Contractor’s obligations under this Contract. This Notice to Proceed will also set the completion dates for Milestones (where applicable), Substantial Completion, and Final Completion of the Work. No work shall commence at the Jobsite prior to the date on which the Contract Times commence to run.
4.4 EARTH MOVING PERMIT:
A. Temporary storage and stockpiling of materials resulting from earthmoving activities on private property will require a permit based on the Sarasota County Earthmoving Ordinance. The Contractor is responsible for obtaining an Earthmoving Permit prior to commencing construction, in the event the Contractor plans on storing and stockpiling such materials on private property.
B. Earthmoving activities, such as excavating, hauling, receiving, and stockpiling, performed in connection with a Sarasota County construction or maintenance project, and performed within and upon County owned property and rights-of-ways, is authorized under the Sarasota County Earthmoving Ordinance as an
Rev.6/21/23 GC-Page 14 of 63 General Conditions exemption. These activities, however, may be subject to certain submittals per the Earthmoving Ordinance. The Contractor is responsible for determining what, if any, submittals are required in order to comply with the Earthmoving Ordinance.
4.5 NOTIFICATIONS:
A. Notice to the County: The Contractor shall give the County five days advanced written notice of the date scheduled to commence Work under this Contract in order that required County actions may be started sufficiently in advance of the Contractor's operations. This Notice to the County shall be given within the time frame of the issuance of the Notice to Proceed.
B. Notification of Utility Companies: The Contractor shall notify the utility companies and agencies well ahead of the proposed Work. The Contractor shall cooperate with all affected utility companies and provide schedules, etc., when requested.
C. Emergency Vehicle Notification: The Contractor shall notify the police, fire department, and ambulance services of the proposed construction schedule one week in advance of the proposed Work.
D. Resident Notification: The Contractor will provide notification to all residents affected by, and adjacent to the Work. The notification will be delivered no less than one week prior to construction commencement. Notices shall be hand-delivered door to door to the properties first affected by the construction;
thereafter properties to be affected within five days of construction shall receive notice thereof. The door hanger format shall be developed by the County for use by the Contractor.
4.6 AUDIO-VISUAL PRE-CONSTRUCTION RECORD: Prior to commencing the Work, the Contractor shall have a continuous color audio-video record in digital video format taken at and around the Jobsite, and along the length of the proposed Work, to serve as a record of pre-construction conditions. No construction shall begin prior to review and acceptance of the digital videos covering the Work area(s) by the County.
The County shall have the authority to reject all or any portion of the audio-video recordings not conforming to the specifications and order that it be redone at no additional charge. The Contractor shall promptly reschedule the re-recording of unacceptable coverage after being notified. The County will designate those areas, if any, to be omitted from or added to the audio-video coverage. The audio-video recordings shall not be made more than thirty days prior to construction start. All audio/video recordings and written records related to the recordings shall become property of the County. Submittals of pre- and post-construction digital video recordings will be as specified in the Contract Documents.
4.7 COMMUNICATIONS/NOTICES:
A. Communications: Except as otherwise provided in the Contract, the County and the Contractor shall endeavor to communicate to each other on matters arising out of or relating to the management of the Work. Communications by and with the County’s consultants shall be through the County. Communications by and with Subcontractors and material suppliers shall be through the Contractor.
Communications by and with separate contractors shall be through the County.
B. Notices: All forms of notices given by the Contractor or the County must be in writing, and delivered to the other party in the manner of and within the time
Rev.6/21/23 GC-Page 15 of 63 General Conditions prescribed by the Contract Documents. If a written notice is not presented in a timely manner, it is presumed not to have been given.
5.0 PROGRESS AND CONTROL OF THE WORK
5.1 TIMELY PERFORMANCE OF THE WORK:
A. Time limits stated in the Construction Contract are of the essence of the Contract. By executing the Contract, the Contractor confirms that the Contract Times stated in the Construction Contract are reasonable periods for performing the Work.
B. The Contractor shall execute the Work in such time and with such forces of workers, materials, equipment, and tools as are required to complete the Work as contemplated in the Contract Documents and detailed in the current Construction/Progress Schedule. If at any time the workers, materials, equipment, and tools used are insufficient or improper for securing the quality of work required, or the required rate of progress, the Contractor shall increase its efficiency and improve the quality of its work to comply with the Contract Documents and as is necessary to complete the Work within the Contract Times.
5.2 SEQUENCE OF WORK:
A. The Contractor shall schedule the Work as set forth in the Contract Documents, and where shown, perform the Work in stages as indicated in the Contract Documents.
B. The Contractor shall submit a Work sequence schedule/plan to the County for review prior to any construction activity. This Work sequencing, once approved, shall be reflected in the Construction/Progress Schedule. The Contractor shall take into consideration any special conditions, restrictions and allowances identified in the Contract Documents, when developing the sequence schedule and implementing the Work.
C. Special conditions, restrictions and allowances may be required to minimize inconvenience to the general public and to expedite the restoration efforts.
5.3 TEMPORARY FACILITIES/STAGING AND STORAGE AREA(S):
A. The Contractor shall provide adequate facilities at every stage of performing the Work.
B. The types of facilities and utility services required for general temporary use at the Jobsite may include the following (other specific services may be required for specific construction methods or operations):
1) Water service (potable for certain uses).
2) Portable sanitary facilities.
3) Drainage and run-off control facilities.
4) Compressed air service.
5) Electric power service.
C. In setting up temporary facilities, the Contractor shall:
1) Follow all applicable codes and ordinances that may govern the permitting and inspection by governing authorities in establishing the temporary facilities.
Rev.6/21/23 GC-Page 16 of 63 General Conditions
2) Comply with pollution and environmental protection regulations for the use of water and other services, and for the discharge of wastes and storm water drainage from the Work area.
3) Enforce strict discipline in the use of utility services. Limit availability to essential uses, so as to minimize waste. Do not allow the installations to be abused or endangered.
4) Provide adequate signs, fences, barricades, and flashing lights, and take all necessary precautions for the protection of the Work area and the safety of the public.
D. Staging and Storage Areas:
1) The Contractor’s attention is directed to the County requirements involving permitting for Earth Moving activities. (See Article 4 – Pre-Construction Activities).
2) The Contractor shall be responsible for locating, securing, and paying for staging and storage areas located outside of the County owned property and rights-of-ways.
3) Prior to utilization of such area (including proposed areas within the Project limits, County owned property and rights of ways), Contractor shall submit to the County for review and approval a staging and storage area usage plan including, but not limited to:
a. A detailed site plan outlining all properties that will be utilized. The site plan shall be designed to provide protection of, and minimize disruption to, adjoining properties.
b. A minimum ten-foot setback will be maintained along all property boundaries. This area will not be utilized for any Project purpose to include driving or parking. This setback also applies along any right of way line.
c. A plan for daily clean up, dust control and regular removal of trash, garbage or any other odor producing material.
d. Identification of all uses on the property (e.g. material locations and proposed heights, equipment staging, construction trailers)
e. Provide for protection from adverse noise, odor, and visual impacts by providing appropriate fencing and/or screening measures.
4) The staging area will be surrounded by a privacy fence. The fence will be a minimum of eight feet high or the height of stored material, whichever is greater. The fence will obstruct the view into the staging area on all sides, and including along any right of way line, if directed by the County.
5) Hours of operation at the staging area shall be no greater than work hours approved for the Project. Traffic (ingress and egress) shall be directed away from residential properties.
6) In the event the County determines the Contractor’s staging area activities have become disruptive to adjoining properties, the Contractor shall immediately take necessary steps to eliminate the disruption. The County may revise requirements specified herein based on specific Project circumstances and information submitted by the Contractor in the site plan.
Rev.6/21/23 GC-Page 17 of 63 General Conditions
7) In addition to the site and storage plan required above, the Contractor shall obtain the required County Temporary Use Permit for proposed staging and storage areas not on County owned property or rights of ways.
8) A proposed staging and storage area that abuts a residential property and has been used for staging under an approved County Temporary Use Permit at any time within the last 36 months cannot be used for staging prior to expiration of such period.
E. Storage of Materials:
1) All materials, supplies and equipment, including the County supplied materials, supplies and equipment, intended for use in the Work shall be suitably stored by the Contractor at the Contractor’s expense, to prevent damage from exposure to the elements of nature, mixture with foreign substances, vandalism or theft, or other cause. The Contractor shall take all precautions against any such damage occurrence and shall be responsible for damage resulting there from. Delivered materials shall be stored in a manner recommended by the manufacturer or supplier and acceptable to the County before any payment will be made.
2) The County will refuse to accept, or sample for testing any materials, supplies or equipment that have been improperly stored or have become contaminated in any way. Materials found unfit for use shall not be incorporated in the Work and shall immediately be removed from the Jobsite.
3) All materials removed from the Jobsite for disposal as called for in the Contract Documents or directed by the County, shall be performed in a legal manner in conformance with all local, State, and Federal laws and regulations.
5.4 USE OF JOBSITE AND OTHER AREAS:
A. The Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Jobsite and other areas permitted by laws and regulations, and shall not unreasonably encumber the Jobsite and other areas with construction equipment or other materials or equipment. The Contractor shall allow use of the Jobsite by other contractors, by the County, and by the public, as applicable.
B. The Contractor shall keep the Jobsite free of rubbish and waste materials on a continual basis and shall restore to their original condition those portions of the Jobsite disrupted by the construction.
5.5 MOBILIZATION:
A. The Contractor shall mobilize as required for the proper performance and completion of the Work.
B. Project Sign(s):
1) General: The Contractor shall erect one sign as shown in Attachment 1 of the General Conditions. The Contractor shall follow Florida Statutes Ch. 556, Underground Facility Damage Prevention and Safety Act procedures, as required. The Contractor shall include the funding sources which will be provided by the Project Manager. Relationship of lettering size will be similar to that depicted on the sign template. The background shall be white.
Rev.6/21/23 GC-Page 18 of 63 General Conditions
Seasons are defined as:
Winter = December, January, February Spring = March, April, May Summer = June, July, August Fall =September, October, November
The sign shall be the property of the Contractor for the duration of the Project and shall be maintained by the Contractor. The Contractor shall be responsible for the relocation of the signs during the progress of construction as directed by the County.
2) Project Sign Location: The project sign shall be placed at locations designated by the County.
3) Project Sign Construction:
a. The Project sign shall be constructed of exterior-grade plywood sheeting. Posts shall be 4” x 4” square and 12 feet long-pressure treated lumber.
b. The sign face dimensions shall be five feet wide by three feet high by one-half inch thick.
c. Upon completion of the Contract, the Contractor shall remove and return the sign and supports and restore the site to the satisfaction of the County.
4) Project Sign Content:
The County shall supply the Contractor with a digital template for use in ordering the sign. This will take place at the Pre-Construction Meeting or within ten days thereafter.
5.6 WORK HOURS:
A. Regular working hours are defined as up to ten hours per day, Monday through Friday, beginning no earlier than 7:00 A.M. and ending no later than 5:00 P.M., excluding Saturdays, Sundays, and Holidays.
B. Requests for approval by the County to work other than regular working hours must be submitted to the County at least 48 hours prior to any proposed weekend work or scheduled extended workweek hours.
C. Unforeseen unscheduled work hours on weekdays will be permitted provided that the work is justified, and a two-hour notice is provided to the County.
Maintenance and cleanup may be performed during hours other than regular working hours.
5.7 REIMBURSEMENTS TO THE COUNTY FOR UNSCHEDULED WORK HOURS: The Contractor shall reimburse the County for additional construction management and/or inspection costs incurred as a result of unscheduled work in excess of regular working hours. At the County's option, unscheduled work costs may either be deducted from the Contractor's monthly payment request or deducted from the Contractor's retainage prior to release of final payment. Construction management/inspection costs shall be as follows: Overtime and Saturday rates shall be at 1.5 times the prevailing staff rates; and Sunday and holiday rates will be at 2 times the prevailing staff rates.
Rev.6/21/23 GC-Page 19 of 63 General Conditions
5.8 PROGRESS MEETINGS:
A. On days and at a location mutually agreed upon at the pre-construction conference, regular progress meetings shall be held at the Jobsite, at the County’s designated office, or at the Contractor’s project office, to review the progress of the Work, identify any issues and potential delays or problems, review any required project submittals, review progress payment applications, and discuss other issues that may arise.
5.9 CONSTRUCTION/PROGRESS SCHEDULE:
A. The Contractor shall adhere to the currently accepted Construction/Progress Schedule as it may be adjusted from time to time as provided below, and as may be further detailed in the Contract Documents.
1) Schedule adjustments with no change in Contract Times: The Contractor shall submit to the County for acceptance, proposed adjustments in the Construction/Progress Schedule that will not result in changing the Contract Times. Such adjustments, if accepted, shall be incorporated into a revised Progress Schedule which will be submitted with the Contractor’s next progress payment application.
2) Proposed schedule adjustments with a change in Contract Times: Proposed changes to the Construction/Progress Schedule that will change the Contract Times shall be submitted in accordance with the requirements of Article 11. Adjustments in Contract Times may only be made by an IFCA or Contract Amendment.
5.10 AS-BUILT DOCUMENTS:
A. The Contractor shall maintain in a safe place at the Jobsite one record set of Conformed Contract Documents, IFCAs, Contract Amendments, and written interpretations and clarifications in good order and annotated to show changes made during construction.
B. All approved shop drawings, product data sheets, and samples, are to be made available to the County at all times during the progress of the Work.
C. During the progress of the Work, the Contractor shall maintain accurate daily written records of the Work performed and conditions of the Work.
D. The record set of Construction Plans/Drawings, which will become the “as-built” drawings, shall be “red-lined” by the Contractor to show all changes in the Work, including approved materials and equipment changes and approved changes in horizontal and vertical alignments made during the course of the Work. All locations and dimensions shall be referenced by two point swing-ties taken from permanent, readily identifiable reference points, such as building walls and corners, columns, utility poles, hydrants, and valves. All depths or elevations are to be taken from finished floors, finished grades, or from permanent benchmarks shown on the Construction Plans/Drawings.
E. Prior to approval of the Contractor’s monthly payment applications, the County shall review the as-built drawings to ensure that they are up-to-date, and accurate. The County may withhold progress payments should the review reveal that the as-built drawings have not been properly maintained.
F. Upon completion of the Work, and as a pre-requisite to Final Completion and Acceptance, these as-built drawings shall be delivered in good condition to the County.
Rev.6/21/23 GC-Page 20 of 63 General Conditions
G. The Contractor shall be held responsible for the accuracy of the as-built drawings, and shall bear any costs incurred in finding utilities or other concealed or buried Work items, as a result of incorrect data furnished by the Contractor.
The review of the as-built drawings by the County does not relieve the Contractor from obligations under the Contract, and for providing the necessary information on Work completed for the Engineer/Architect of Record’s certification.
H. The following requirements apply to utility projects:
1) The Contractor shall maintain, during the progress of the Project, accurate records of the location, length and elevation of all new and existing pipelines and appurtenances. Information to be shown for utility mains shall include the location of all crosses, tees, wyes, bends, valves, curb stops, meter boxes, hydrants, stub-outs, blow-offs, air release valves, etc., by using a two point swing measurement from permanent physical features that can readily be found on the drawing and in the field, in a table format.
2) The Contractor shall furnish as-built top of pipe elevations and finish grade for top of trench for all utility mains at maximum intervals of 100 feet and at all utility crossings, service connections, gravity and vacuum laterals, at all fittings and valves, and all changes in grade and pipe type. For directional drilled utility mains, the as-built top of pipe elevations shall be recorded every rod length change and plotted on the plan and profile drawing sheets.
In addition, the Contractor shall reference all new utility mains by the distance to the right-of-way or property markers.
3) All visible utility features shall be surveyed using conventional and/or GPS equipment at survey grade level and in accordance with Sarasota County Survey/GPS Standards. The recorded/blue booked GPS control monument, recorded benchmark elevation, and the vertical datum used shall be as noted on the Construction Plans. Coordinates shall be based on the State Plane, Florida West 1983.
5.11 PERMITS, LICENSES, TAXES, AND LAWS AND REGULATIONS:
A. Unless otherwise provided in the Contract, the Contractor shall obtain and pay for all necessary permits and licenses required by Federal, State, and local agencies having jurisdiction over the Work, prior to the start of construction.
The Contractor shall adhere to the permit conditions provided in the permits issued by all such agencies and shall post all permits in a conspicuous location at the Jobsite.
B. The Contractor shall pay all sales, consumer, use and other similar taxes required by the laws and regulations of the place where the Work is performed.
C. The Contractor shall give all notices and comply with all laws, ordinances, rules, and regulations related to the Work.
D. When applicable, a permit fee allowance will be established to cover the expenses of the permits, as indicated in the Bid Form. Permit fees will be paid at actual cost for the permit required and identified in the Contract Documents.
The Contract Price shall include the amount of the allowance. Payment under this allowance shall be based on receipts of permit fees presented to the County. No payments shall be made for administrative or other costs of the Contractor.
Rev.6/21/23 GC-Page 21 of 63 General Conditions
The permit fee allowance line item can only be used for permit fees and cannot be transferred to contingency or other line item costs. Any remainder will be retained by the County.
5.12 WORK WITHIN THE COUNTY/STATE RIGHTS-OF-WAYS:
A. The Contractor shall refer to the latest revised editions of the Sarasota County Mobility standards, and FDOT specifications and regulations for all work within the County and state rights-of-way.
B. Contractor shall apply for, pay, and obtain the necessary city, County, and state Right-of-Way Permit(s) prior to the start of any Work within a public right-of-way.
C. All private and public right-of way, which…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .