General Arrangement.pdf

PDF 2 MB Posted

Attached to
TUGCON Voyage Charter Federal contract opportunity
Solicitation number
N3220525R4075
Issued by
Department of the Navy Military Sealift Command

About this file

The file is a General Arrangement technical drawing for a US Navy YRBM (Yard Repair Boat Maintenance) vessel, detailing a comprehensive multi-deck ship design. The technical drawing, created by Conrad Shipyard, LLC, shows a vessel with principal characteristics of 151'-4" length, 49'-4" beam, and 14'-1" depth, with a design draft of 6'-6". The drawing includes five detailed deck plans (bottom shell, hold, 01 deck, main deck, 02 deck, 03 deck, 04 deck) and an inboard profile, illustrating the vessel's internal layout and spatial configuration across multiple decks. The design incorporates various functional spaces including berthing areas, storage rooms, mechanical spaces, and administrative areas, with precise measurements and structural details mapped out in a 1/8" = 1'-0" scale.

View the file

Other files for this federal contract opportunity

Other files attached to TUGCON Voyage Charter, newest first.
File Type Posted
Mooring_Towing Foundation.pdf PDF
Mooring_Towing Arrangement.pdf PDF
Topside Arrangement.pdf PDF
25R4075 RFP.pdf PDF
Towing Procedures.pdf PDF
2015-0213 Rev. 37.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOW VIEW

1/8" = 1'-0"

PROFILE

1/8" = 1'-0"

ZONE

REVISIONS

DESCRIPTIONREV DATE BY

A 17A 1. REVISED QUARTER DECK ARRANGEMENT.

9C 2. REVISED STAIR WIDTH IN FWD TWR BETWEEN HOLD AND MAIN DECK.

15A 3. ADDED STEEL BHD AROUND GALLEY STOREROOM.

22/05/11 ARB

6 5 4 3 2 1

A

B

C

D

6 5 4 3 2 1

A

B

C

D

LENGTH MOLDED: 151'-4"

LENGTH OVERALL: 151'-10 5/8"

BEAM MOLDED: 49'-4"

BEAM OVERALL: 49'-11 3/8"

DEPTH: 14'-1"

DESIGN DRAFT: 6'-6"

FRAME SPACING: 24"

PRINCIPLE CHARACTERISTICS

℄SHIP

SHEET REVISIONS

SHEET 1 2 3 4 5

REV D D D D D

ALL INFORMATION CONTAINED IN OR

DISCLOSED BY THIS DOCUMENT IS THE

EXCLUSIVE PROPERTY OF

CONRAD SHIPYARD, LLC.

SUCH INFORMATION IS FURNISHED ON

A CONFIDENTIAL BASIS WITH THE

EXPRESS UNDERSTANDING THAT IT

WILL NOT BE COPIED IN ANY MANNER,

USED FOR MANUFACTURE, SOLD,

TRANSFERRED OR DISCLOSED TO

OTHERS WITHOUT THE EXPRESS

WRITTEN CONSENT OF CONRAD

SHIPYARD, LLC.

© CONRAD SHIPYARD, LLC 2022

OF

SCALE:

NAVSEA DWG NO: SHEET REVISION

DATE:

SWBS:CAGE CODE:

5GE25

SIZE:

D

DATEDRAWN BY

DATECHKD BY

DATEAPPVD

DATEAPPVD

A.B.S.

DATEAPPVD

U.S.C.G.

DATEAPPVD

SUPSHIPS

HULL NO:

SEE HULL APPLICABILITY TABLE

CONRAD DWG NO:

151'-4" X 49'-4" X 14'-1" US Navy YRBM

GENERAL ARRANGEMENT

601 8921064 1 5 C1401-601-F1 22/04/18 1/8"=1'-0"

D

ARB 22/04/18

BRB 22/04/18

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

C1401 YRBM 57 & ON

JOB NUMBER HULL NUMBER

HULL APPLICABILITY TABLE

10C 4. REVISED FREEZE AND CHILL STOREROOM SIZE AND ARRANGEMENT.

VAR 5. REVISED AREA MEASUREMENTS TO IMPERIAL.

B 17A 1. REVISED QUARTER DECK ARRANGEMENT.

9C 2. REVISED STAIR WIDTH IN STAIR TWR #1 BETWEEN HOLD AND MAIN DECK.

15A 3. ADDED STEEL BHD AROUND GALLEY STOREROOM.

22/06/13 ARB

VAR 4. ADDED KICK-OUT PANELS TO REQUIRED SPACES IN ACCORDANCE

WITH COMMENTS RECEIVED FROM NAVSEA DATED 03-JUNE-2022

VAR 5. UPDATED CONNECTION STATION BASED ON DESIGN REVISIONS.

VAR 6. ADDED WT BOUNDARY CALLOUTS IN ACCORDANCE WITH COMMENTS

RECEIVED FROM NAVSEA DATED 03-JUNE-2022.

VAR 7. ADDED SECONDARY STAIR FROM 03 TO 04 DECK.

VAR 8. ADDED BERP FOR REMOVAL OF BULK LAUNDRY EQUIPMENT.

24C 9. REVISED STAIR TOWER #3 LAYOUT ON 03 DECK.

21C 10. REVISED STAIR TOWER #1 LAYOUT ON 03 DECK.

B 5,8

C VAR 1. REVISED EQUIPMENT WITH VENDOR FURNISHED INFORMATION.

17A 2. REVISED AREA IWO BOSN STWG FOR VENTILATION REQUIREMENTS.

VAR 3. ADDED VESTIBULES TO ACCOMODATE DOOR SWING CHANGE REQUEST.

22/08/19 ARB

16A 4. RELOCATED CLEANING GEAR LOCKER IN ENLISTED MESS.

ZONE

REVISIONS

DESCRIPTIONREV DATE BY

D 16A 1. REVISED SCULLERY BASED ON UPDATED VENDOR INFORMATION.

VAR 2. REVISED HANDRAILS BASED ON DESIGN DEVELOPMENT.

22D 3. ADDED LER AC CONDENSERS BASED ON GOVT COMMENTS.

22/09/28 ARB

D

BOTTOM SHELL PLAN

HOLD PLAN

1/8" = 1'-0"

A

B

C

D

A

B

C

D

12 11 10 9 8 7

12 11 10 9 8 7

℄SHIP

℄SHIP

OF

SCALE:

NAVSEA DWG NO: SHEET REVISION

DATE:

SWBS:CAGE CODE:

5GE25

SIZE:

D

DATEDRAWN BY

DATECHKD BY

DATEAPPVD

DATEAPPVD

A.B.S.

DATEAPPVD

U.S.C.G.

DATEAPPVD

SUPSHIPS

HULL NO:

SEE HULL APPLICABILITY TABLE

CONRAD DWG NO:

151'-4" X 49'-4" X 14'-1"

601 8921064 2 5

D

ARB 22/04/18

BRB 22/04/18

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

A 2,4,5

B 2,4,6

B

C 1,3

01 DECK

MAIN DECK

1/8" = 1'-0"

MEAT PREP

VE

G

P R

EP

A

B

C

D

A

B

C

D

18 17 16 15 14 13

18 17 16 15 14 13

℄SHIP

℄SHIP

OF

SCALE:

NAVSEA DWG NO: SHEET REVISION

DATE:

SWBS:CAGE CODE:

5GE25

SIZE:

D

DATEDRAWN BY

DATECHKD BY

DATEAPPVD

DATEAPPVD

A.B.S.

DATEAPPVD

U.S.C.G.

DATEAPPVD

SUPSHIPS

HULL NO:

SEE HULL APPLICABILITY TABLE

CONRAD DWG NO:

151'-4" X 49'-4" X 14'-1"

601 8921064 3 5

D

ARB 22/04/18

BRB 22/04/18

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

A 1,3,5

A

B 4,8

B 1,2,3,5,6

C 1,2,4

C 1,3

02 DECK

03 DECK

1/8" = 1'-0"

A

B

C

D

A

B

C

D

24 23 22 21 20 19

24 23 22 21 20 19

℄SHIP

℄SHIP

OF

SCALE:

NAVSEA DWG NO: SHEET REVISION

DATE:

SWBS:CAGE CODE:

5GE25

SIZE:

D

DATEDRAWN BY

DATECHKD BY

DATEAPPVD

DATEAPPVD

A.B.S.

DATEAPPVD

U.S.C.G.

DATEAPPVD

SUPSHIPS

HULL NO:

SEE HULL APPLICABILITY TABLE

CONRAD DWG NO:

151'-4" X 49'-4" X 14'-1"

601 8921064 4 5

D

ARB 22/04/18

BRB 22/04/18

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

A

A

B 4,6,7,9,10

B 4,6,7,9,10

C 1,3

C 1,3

04 DECK

INBOARD PROFILE @CL

1/8" = 1'-0"

A

B

C

D

A

B

C

D

30 29 28 27 26 25

30 29 28 27 26 25

℄SHIP

OF

SCALE:

NAVSEA DWG NO: SHEET REVISION

DATE:

SWBS:CAGE CODE:

5GE25

SIZE:

D

DATEDRAWN BY

DATECHKD BY

DATEAPPVD

DATEAPPVD

A.B.S.

DATEAPPVD

U.S.C.G.

DATEAPPVD

SUPSHIPS

HULL NO:

SEE HULL APPLICABILITY TABLE

CONRAD DWG NO:

151'-4" X 49'-4" X 14'-1"

601 8921064 5 5

D

ARB 22/04/18

BRB 22/04/18

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

- YY/MM/DD

B 7,10

C

Sht1
Sheets and Views
Sht1
Sht2
Sheets and Views
Sht2
Sht3
Sheets and Views
Sht3
Sht4
Sheets and Views
Sht4
Sht5
Sheets and Views
Sht5

File details come from the government source that posted it. Updated .