Gees Mill Ozone Generator Replacement Constru.pdf
PDF 4 MB Posted
- Attached to
- Gees Mill WTP Ozone Generator Replacement
- Solicitation number
- PE-72200-NONST-2025-000000046
- Issued by
- Peach County, Georgia
About this file
The document is a comprehensive set of construction plans and technical specifications for the Gees Mill Water Treatment Plant (WTP) Ozone Generator Replacement project, prepared for Rockdale Water Resources in Conyers, Georgia. The project involves replacing the existing ozone generator system with a new generator, including associated electrical, piping, and infrastructure modifications. The work is detailed across multiple engineering and electrical drawings dated March 2025, covering generator room plans, contact chamber modifications, electrical interconnections, and installation details. The project will involve removing the existing Ozone Generator No. 2, installing a new generator skid, replacing valves and piping, updating electrical systems, and ensuring compatibility with the existing water treatment plant infrastructure.
The project is located at 3090 Gees Mill Road and will be engineered by Engineering Strategies, Inc. (ESI) from Marietta, Georgia, with electrical design by EDEC, Inc. The scope includes comprehensive system replacement with minimal disruption to the existing water treatment operations, with specific requirements for coordinating shutdowns, replacing ferrous metal components with stainless steel, and maintaining existing system functionality during the upgrade. The project appears to be funded by Rockdale Water Resources, with a focus on modernizing the ozone generation equipment while preserving the operational integrity of the water treatment plant. The technical specifications indicate a detailed approach to equipment replacement, electrical integration, and system performance, suggesting a comprehensive upgrade to the facility's ozone generation capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical Specs _ Gees Mill WTP Ozone Generat.pdf | ||
| 25_03 ITB Gees Mill WTP Ozone Generator Repla.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2018 Microsoft Corporation © 2018 HERE
PROJECT:
GEES MILL WTP OZONE GENERATOR
REPLACEMENT
CONSTRUCTION PLANS FOR:
ROCKDALE WATER RESOURCES
MARCH 2025
PROJECT VICINITY MAP PROJECT LOCATION MAP
CONSULTING ENGINEER:
Phone: (770) 429-0001
THE HOLDER OF THIS DOCUMENT WAIVES ALL CLAIMS AGAINST ESI FOR ANY UNAUTHORIZED CHANGES OR REUSE OF THIS DOCUMENT. THIS DOCUMENT IS AN INSTRUMENT OF SERVICE OF ENGINEERING STRATEGIES, INC. WHO RETAINS ALL RIGHTS OF COMMON LAW, STATUTE AND COPYRIGHT THERETO.
ROCKDALE WATER RESOURCES
PROJECT LOCATION
PROJECT LOCATION
3855 SHALLOWFORD ROAD, SUITE 525
MARIETTA, GA 30062
(770) 429-0001 jfleck Layout1
GENERAL NOTES
1. ALL CONSTRUCTION TO COMPLY WITH ROCKDALE COUNTY STANDARDS.
2. ALL CONSTRUCTION SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT REQUIREMENTS, AND ALL APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT WILL BE GIVEN FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE AFOREMENTIONED ITEMS.
3. LAND DISTURBANCE SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, STAGING, AND UTILITY CONSTRUCTION.
4. THE CONTRACTOR SHALL RESTORE ALL DISTURBED GRAVEL, ASPHALT, OR CONCRETE PAVED AREAS TO PRECONSTRUCTION CONDITIONS AND IN ACCORDANCE WITH APPLICABLE GDOT AND RCDOT
STANDARDS AND REQUIREMENTS.
5. THE SIZE, TYPE, MATERIALS, AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE BASED THE BEST AVAILABLE INFORMATION. SUBSURFACE UTILITY DATA SHOWN IS APPROXIMATE ONLY AND NO GUARANTEE IS MADE THAT ALL UTILITIES AND OTHER FEATURES ARE REPRESENTED ON THE PLANS ARE CORRECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND SIZE OF ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION.
6. THE EXISTING PIPING AND EQUIPMENT SHOWN ARE BASED ON RECORD DRAWINGS OBTAINED FROM ROCKDALE WATER RESOURCES. THE EXACT LOCATION SHALL BE FIELD DETERMINED BY THE
CONTRACTOR AS REQUIRED FOR CONSTRUCTION.
7. IF THE CONTRACTOR ENCOUNTERS CONDITIONS DIFFERENT FROM THOSE SHOWN ON THE PLANS, HE SHALL IMMEDIATELY NOTIFY THE OWNER AND ENGINEER. NO EXISTING PIPING OR EQUIPMENT SHALL BE DISTURBED WITHOUT PROPER AUTHORITY AND THEN ONLY IN SUCH A MANNER AS PRESCRIBED AND APPROVED BY THE OWNER.
8. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING PIPING AND EQUIPMENT FROM DAMAGE. ANY DAMAGE TO EXISTING PIPING AND EQUIPMENT CAUSED BY THE CONTRACTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. EITHER THE CONTRACTOR OR OWNER WILL PERFORM THE REPAIR AT THE DISCRETION OF THE OWNER. NO CLAIMS FOR DAMAGES SHALL BE ALLOWED THE CONTRACTOR ON ACCOUNT OF ANY DELAY OCCASIONED THEREBY.
9. CONTRACTOR IS TO COORDINATE ANY TIE-INS WITH OWNER AND OPERATORS 3 DAYS PRIOR TO EXECUTION. REMEDIATION OF ANY SPILLS OF HAZARDOUS CHEMICALS OR GASES IS THE
CONTRACTORS RESPONSIBILITY.
10. THE CONTRACTOR IS TO SEQUENCE THE PROJECT IN A MANNER THAT ALLOWS FOR THE SHORTEST PERIOD OF SHUTDOWN FOR EXISTING SYSTEMS, AS POSSIBLE. THE MAJORITY OF THE PROJECT IS ABLE TO BE CARRIED OUT WHILE THE EXISTING SYSTEM IS OPERATIONAL OR WHILE IT IS NOT IN USE.
PROJECT DATA:
1. PROJECT NAME: GEES MILL WTP OZONE GENERATOR REPLACEMENT
2. PROJECT LOCATION: PARCEL 0890010009 LAND LOT 364/370/371 DISTRICT 16
3. PROJECT ADDRESS: 3090 GEES MILL ROAD, CONYERS, GA 30013
4. PRESENT AND PROPOSED USE: WATER TREATMENT PLANT
5. OWNER/DEVELOPER: ROCKDALE WATER RESOURCES
958 MILSTEAD AVE., ROOM 321, 3RD FLOOR
CONYERS, GA. 30012
770-278-7450 (DAVID CERVONE)
david.cervone@rockdalecountyga.gov
6. ENGINEER: ENGINEERING STRATEGIES, INC.
3855 SHALLOWFORD RD., SUITE 525
MARIETTA, GA. 30062
(770)-429-0001 - JOHN FLECK, P.E.
jfleck@esi-ga.com
GENERAL
ABBREVIATIONS
°C DEGREES CENTIGRADE
°F DEGREES FAHRENHEIT
AFF ABOVE FINISHED FLOOR
AL, ALU, ALUM ALUMINUM
ALT ALTERNATE
AN ANODIZED
AR AUGER REFUSAL
ASPH ASPHALT
AV AIR VALVE
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BLDG BUILDING
BOT BOTTOM
BT BORING TERMINATED
BTU BRITISH THERMAL UNIT
BV BALL VALVE
C.I.P. OR CIP CAST IRON PIPE
CFM CUBIC FEET PER MINUTE
CHKV CHECK VALVE
CJ CONTROL JOINT
℄ CENTER LINE
CL CLASS
CLJ CONTROL JOINT
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONARY UNIT
CO CLEAN OUT
CON CONCENTRIC
CONC. CONCRETE
CONN CONNECTION
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CP CONTROL PANEL
CPP CORRUGATED PLASTIC PIPE
CPLG COUPLING
CU COPPER PIPE
D.I.P. OR DIP DUCTILE IRON PIPE
DBL DOUBLE
DIA DIAMETER
DIM DIMENSION
DMH DROP MANHOLE
DN DOWN
DO DITTO
DWG DRAWING
E EAST
ECC ECCENTRIC
EF EACH FACE
EFF EFFLUENT
EJ EXPANSION JOINT
EL. OR ELEV ELEVATION
ELEC ELECTRICAL
EOP EDGE OF PAVEMENT
EQUIP EQUIPMENT
EW EACH WAY
EX. OR EXIST. EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FF FINISHED FLOOR
FF FAR FACE
FH FIRE HYDRANT
FIN FINISHED
FL FLOOR
FLOW LINE
FLG. FLANGED
FLRD FLARED
FM FORCE MAIN
FRP FIBER GLASS REINFORCED PIPE
OR FIBER REINFORCED PLASTIC
FT FOOT
FTG FOOTING
GAL GALLON
GALV GALVANIZED
GND GROUND
GPM GALLONS PER MINUTE
GV GATE VALVE
HB HOSE BIBB
HDWL HEADWALL
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSEPOWER OR HIGH POINT
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
HWL HIGH WATER LEVEL
ID INSIDE DIAMETER
INF INFLUENT
INV. INVERT
JT JOINT
K KIP
KW KILOWATT
L LOUVER
L.L. LAND LOT
LB POUND
LF LINEAR FEET
LG LONG
LP LOW POINT
LR LONG RADIUS
LT LEFT
LWL LOW WATER LEVEL
M MOTOR
MATL OR MAT'L MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MJB MECHANICAL JOINT BEND
MLUG MEGA-LUG
MO MASONARY OPENING
MSL MEAN SEA LEVEL
MTL METAL
N NORTH
NC NORMALLY CLOSED
N/F NOW OR FORMERLY
NF NEAR FACE
NO NORMALLY OPEN
N.T.S. NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OVERFLOW
OPNG OPENING
P.E. POLYETHYLENE
P.E.P. POLYETHYLENE PIPE
PE PLAIN END
PLCS PLACES
PLF POUNDS PER LINEAR FOOT
PM PRESSED METAL
POPL. POPLAR TREE
PREFAB PREFABRICATED
PROJ PROJECTION
PROP. PROPOSED
PRV PRESSURE REDUCING VALVE
PS PUMP STATION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAINTED
PVC POLYVINYL CHOLORIDE
R RADIUS
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RED REDUCER
REF REFERENCE
REINF REINFORCED
REQD REQUIRED
RJ RESTRAINED JOINT
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RPM REVOLUTIONS PER MINUTE
RT RIGHT
RTU REMOTE TERMINAL UNIT
S SOUTH
S.S SANITARY SEWER
SBR SEQUENCING BATCH REACTOR
SCH SCHEDULE
SHT SHEET
SIM SIMILAR
SL OR STL STEEL
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL OR SANITARY
SEWER
STD STANDARD
SWGUM SWEETGUM TREE
T TOP
T&B TOP AND BOTTOM
T/STRUCTURE TOP OF STRUCTURE
TB TIE BEAM
TEMP TEMPORARY
THK THICK
TOW TOP OF WALL
TYP. TYPICAL
UN UNLESS NOTED
UNO UNLESS OTHERWISE NOTED
UV ULTRA-VIOLET
VB VALVE BOX
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
VIC VICTAULIC
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WD WOOD
WM WATER MAIN
WT WATER TIGHT
WWF WELDED WIRE FABRIC
YH YARD HYDRANT
VALVE
MAILBOX
FIRE
HYDRANT
METER
FH
MB
PPPOWER POLE
& GUY WIRE
TELEPHONE
POLE
TP
LIGHT POLE LP
TELEPHONE BOX T
TV BOX TV
PROPERTY
CORNER
STANDARD SYMBOLS STANDARD
HATCH PATTERNS
CONCRETE
ASPHALT
EARTH
STANDARD LINE TYPES
EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
FORCE MAIN
SEWER
WATER
FENCE
SILT FENCE - TYPE S
TREELINE/LANDSCAPING
RIGHT-OF-WAY
PROPERTY LINE
NATURAL GAS
OVERHEAD POWER
UNDERGROUND POWER
TELEPHONE
TV
LIMITS OF CONSTRUCTION
FM
S
W
X
FM
S
W
X
G G
OHP OHP
SF SF
R/W R/W
UGP UGP
T T
TV TV
DEMO
CL
L:
\R oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \G
S- N ot es
_L eg en d.
dw g
- 3 /3
/2
4:
P
M B
Y:
J
FL
EC
K
G
EN
ER
AL
N O
TE
S, L
EG
EN
D
, A
BB
R
EV
IA
TI
O N
S
AN
D
SH
EE
T
IN
D
EX
M
AR
C H
BD
L
JR
F
BD
L
BID SET
G
EE
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C T
D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N D
A
TE
SHEET INDEX
SHEET NO. SHEET TITLE
-- COVER
1 GENERAL NOTES, LEGEND, ABBREVIATIONS AND SHEET INDEX
2 OVERALL SITE PLAN
3 EXISTING GENERATOR ROOM PLAN AND SECTION
4 EXISTING CONTACT CHAMBER PLAN
5 PROPOSED GENERATOR ROOM PLAN AND SECTION
6 PROPOSED CONTACT CHAMBER PLAN
7 OZONE GENERATOR P&ID
E-1 ELECTRICAL LEGENDS AND NOTES
E-2 MATERIAL SCHEDULE
E-3 ONE LINE DIAGRAM
E-4 ELECTRICAL PLAN
E-5 INTERCONNECTION WIRING DIAGRAM
E-6 INSTALLATION AND GROUNDING DETAILS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
OZONE CONTACT CHAMBERS
AND DESTRUCTION UNITS
SEE SHEETS 4 AND 6
OZONE GENERATOR AND
ELECTRICAL ROOM
SEE SHEETS 3 AND 5
PROPOSED LAY DOWN AND
EQUIPMENT STORAGE
GEES MILL ROAD
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH THE
FACILITY OPERATION AND MAINTENANCE
PERSONNEL FOR THE EXACT LOCATION FOR
STORING MATERIALS AND EQUIPMENT FOR THE
EXECUTION OF THE WORK. THE CONTRACTOR'S
OPERATIONS SHALL NOT INTERFERE WITH THE
OPERATION OF THE WATER TREATMENT PLANT.
N
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N D
A
TE
oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \C
S- O
VE
R
AL
L
SI
TE
P
LA
N .d w g
- 3 /3
/2
4:
P
M B
Y:
J
FL
EC
K
O
VE
R
AL
L
SI
TE
P
LA
N
M
AR
C H
BD
L
JR
F
BD
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
0 50' 100'
8'-5"
EXISTING OZONE GENERATOR NO. 2
AND EQUIPMENT SKID
(TO BE REMOVED)
EXISTING CONTROL PANEL
(TO BE REMOVED)
EXISTING
CHILLER NO. 2
EXISTING
CHILLER NO. 1
8'-10"
EXISTING OZONE GENERATOR NO.1
(TO REMAIN)
EXISTING CONTROL PANEL
(TO REMAIN)
EXISTING ELECTRICAL
ROOM
EXISTING GENERATOR
ROOM
EXISTING MCC
EXISTING CONCRETE EQUIPMENT PAD
(TO REMAIN)
EXISTING 1/2" SCH 80 PVC
INSTRUMENT AIR LINE
(TO BE REMOVED)
EXISTING ROLL-UP DOOR
(TYP. 2 PLACES)
EXISTING 1-1/2" SCH 80
PVC CHILLER NO.2
SUPPLY
(TO BE REMOVED)EXISTING 1-1/2" SCH 80 PVC
CHILLER NO.2 RETURN
(TO BE REMOVED)
EXISTING 1-1/2" SCH 80
PVC CHILLER NO.2
SUPPLY
(TO REMAIN)
EXISTING 1-1/2" SCH 80
PVC CHILLER NO.2
RETURN
(TO REMAIN)
EXISTING 1" STAINLESS STEEL
OXYGEN SUPPLY
(TO BE REMOVED)
EXISTING 1" STAINLESS STEEL
OZONE FEED
(TO BE REMOVED)
EXISTING 2" STAINLESS STEEL
OXYGEN SUPPLY
EXISTING 2" STAINLESS STEEL
OZONE FEED
EXISTING 2" STAINLESS STEEL
OZONE FEED
EXISTING 2" STAINLESS STEEL
OXYGEN SUPPLY
45KVA 480V-208/120V
TRANSFORMER
50 DP1 50 LP1
50 LP2
50 DP2 50-HCP-1
CP-12
50-MS-EF-7
EXISTING AMBIENT OXYGEN ANALYZER
EXISTING AMBIENT OZONE ANALYZER NO. 2
EXISTING AMBIENT OZONE ANALYZER NO. 1
EXISTING CONDUIT PULL BOX
EXISTING 16" STEEL VENTILATION DUCT
A
EXISTING 2" STAINLESS STEEL
ISOLATION VALVES
EXISTING 1/2" SCH 80 PVC
INSTRUMENT AIR
EXISTING 1" STAINLESS STEEL
OXYGEN SUPPLY
EXISTING 1" STAINLESS STEEL
OZONE FEED
EXISTING 1-1/2" SCH 80 PVC
CHILLER NO.2 SUPPLY
EXISTING 1-1/2" SCH 80 PVC
CHILLER NO.2 RETURN
EXISTING CONTROL PANEL
(TO BE REMOVED)
EXISTING OZONE GENERATOR NO.2
(TO BE REMOVED)
EXISTING EQUIPMENT SKID
(TO BE REMOVED)
EXISTING MAKE-UP WATER TANK
(TO BE REMOVED)
LIMITS OF DEMOLITION
NOTES:
1. OZONE GENERATOR NO. 1 SHALL REMAIN IN
SERVICE FOR THE DURATION OF THE
INSTALLATION OF PROPOSED GENERATOR.
CONTRACTOR SHALL DEMOLISH ALL EXISTING
CONNECTIONS IN A WAY THAT SHALL MINIMIZE
THE REQUIRED SHUT DOWN TIME FOR
GENERATOR NO. 1. CONTRACTOR SHALL
COORDINATE ALL SHUTDOWNS OF GENERATOR
NO.1 WITH ROCKDALE COUNTY WITH A MINIMUM
OF 14 DAYS NOTICE.
2. PRIOR TO REMOVAL OF OZONE GENERATOR NO. 2,
THE CONTRACTOR SHALL CONFIRM ALL ISOLATION
VALVES ON THE COMMON PIPING BETWEEN THE
TWO OZONE GENERATORS ARE CLOSED SO NO
PROCESS FLUIDS ESCAPE THE SYSTEM WHEN THE
GENERATOR IS REMOVED AND THE PIPING IS
DISCONNECTED.
3. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS
NECESSARY DURING THE DEMOLITION WHEN
CUTTING PIPING AND OTHER MATERIALS THAT
MAY CAUSE SPARKS TO ENSURE THERE IS NO
HIGH OXYGEN OR OZONE CONCENTRATIONS
PRESENT, WHICH MAY IGNITE FROM THE CUTTING
WORK.
4. CONTRACTOR SHALL COORDINATE WITH
ROCKDALE WATER RESOURCES ON THE ITEMS OF
EQUIPMENT THEY WANT TO KEEP FROM THE
EXISTING OZONE GENERATOR. ALL EQUIPMENT
IDENTIFIED TO BE KEPT, SHALL BE CAREFULLY
REMOVED AND PROVIDED TO THE PLANT
OPERATIONS PERSONNEL. ALL OTHER
DEMOLISHED MATERIALS AND EQUIPMENT SHALL
BECOME THE PROPERTY OF THE CONTRACTOR
AND BE DISPOSED OF IN A LEGAL MANNER.
N
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N D
A
TE
GENERATOR ROOM PLAN
1/4" = 1'-0" oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \M
S-
EX
IS
TI
N G
G
EN
ER
AT
O R
P
LA
N A
N D
S
EC
TI
O
N .d w g
- 3 /3
/2
4:
P
M B
Y:
J
FL
EC
K
EX
IS
TI
N
G G
EN
ER
AT
O
R R
O O
M P
LA
N
A N
D
SE
C
TI
O N
M
AR
C H
BD
L
JR
F
BD
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
SCALE:
GENERATOR SECTION
A 3/8" = 1'-0"
EXISTING 2" STAINLESS STEEL BALL VALVE
AND SPOOL PIECE
(TO BE REPLACED)
EXISTING 2" STAINLESS STEEL BALL VALVE
AND SPOOL PIECE
(TO BE REPLACED)
EXISTING 2" STAINLESS STEEL
OZONE HEADER
EXISTING 2" STAINLESS STEEL
OZONE HEADER FROM GENERATOR
ROOM
EXISTING 2" STAINLESS STEEL
OZONE DROP AND DIFFUSER
EXISTING 2" STAINLESS STEEL
OZONE DROP AND DIFFUSER
EXISTING OZONE DESTRUCTION UNITS AND FILTERS
TYP. 3 PLACES
EXISTING OZONE AIR AND VACUUM VALVES
TYP. 2 PLACES
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N D
A
TE
UPPER CONTACT CHAMBER PLAN
1/4" = 1'-0" oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \M
S-
EX
IS
TI
N G
G
EN
ER
AT
O R
P
LA
N A
N D
S
EC
TI
O
N .d w g
- 3 /3
/2
4:
P
M B
Y:
J
FL
EC
K
EX
IS
TI
N
G C
O N
TA
C
T C
H
AM
BE
R
P
LA
N
M
AR
C H
BD
L
JR
F
BD
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
N
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH THE FACILITY OPERATION AND MAINTENANCE
PERSONNEL FOR ISOLATING THE NECESSARY PORTIONS OF THE OZONE CONTACT CHAMBER
FOR THE REMOVAL AND REPLACEMENT OF THE EXISTING BALL VALVES.
2. CONTRACTOR SHALL FIELD VERIFY THE REQUIRED COMPONENTS FOR REPLACEMENT OF THE
EXISTING BALL VALVES PRIOR TO ORDERING MATERIALS. IT IS ACCEPTABLE TO ELIMINATE
THE NEW SPOOL PIECE IF IT IS NOT REQUIRED FOR COMPLETING THE VALVE REPLACEMENT.
EXISTING
CHILLER NO. 2
(SEE NOTE 1)
EXISTING
CHILLER NO. 1
EXISTING OZONE GENERATOR NO.1
EXISTING CONTROL PANEL
EXISTING ELECTRICAL
ROOM
EXISTING GENERATOR
ROOM
EXISTING MCC
EXISTING CONCRETE EQUIPMENT PAD
CAPPED 1/2" SCH 80 PVC
INSTRUMENT AIR LINE
EXISTING ROLL-UP DOOR
(TYP. 2 PLACES)
PROPOSED 1-1/2" SCH 80
PVC CHILLER NO.2 SUPPLY
PROPOSED 1-1/2" SCH 80 PVC
CHILLER NO.2 RETURN
EXISTING 1-1/2" SCH 80
PVC CHILLER NO.2
SUPPLYEXISTING 1-1/2" SCH 80
PVC CHILLER NO.2
RETURN
PROPOSED 1" STAINLESS STEEL
OXYGEN CONNECTION
FOR FUTURE GENERATOR
PROPOSED 1" STAINLESS STEEL
OZONE FEED
EXISTING 2" STAINLESS STEEL
OXYGEN SUPPLY
EXISTING 2" STAINLESS STEEL
OZONE FEED
EXISTING 2" STAINLESS STEEL
OZONE FEED
EXISTING 2" STAINLESS STEEL
OXYGEN SUPPLY
45KVA 480V-208/120V
TRANSFORMER
50 DP1 50 LP1
50 LP2
50 DP2 50-HCP-1
CP-12
50-MS-EF-7
EXISTING AMBIENT OXYGEN ANALYZER
EXISTING AMBIENT OZONE ANALYZER NO. 2
EXISTING AMBIENT OZONE ANALYZER NO. 1
EXISTING CONDUIT PULL BOX
EXISTING 16" STEEL VENTILATION DUCT
PROPOSED OZONE GENERATOR NO.2
PROPOSED CONTROL PANEL
A
FUTURE OZONE GENERATOR
SKID
PROPOSED 1" STAINLESS STEEL
OZONE CONNECTION
FOR FUTURE GENERATOR
PROPOSED AIR COMPRESSOR
PROPOSED 1/4" STAINLESS STEEL
AIR LINE TO OZONE GENERATOR
PROPOSED 1" STAINLESS STEEL
OZONE FEED
PROPOSED 1" STAINLESS STEEL
OXYGEN SUPPLY
PROPOSED 1-1/2" SCH 80 PVC
CHILLER NO.2 SUPPLY
PROPOSED 1-1/2" SCH 80 PVC
CHILLER NO.2 RETURN
PROPOSED OZONE GENERATOR
LIMITS OF PROPOSED GENERATOR SKID
FROM MANUFACTURER
FUTURE OZONE GENERATOR
AND SKID FROM MANUFACTURER
PROPOSED 1" X 3 4" STAINLESS REDUCER
FOR 3 4" FLG CONNECTION AT GENERATOR
PROPOSED 1" X 3 4" STAINLESS REDUCER
FOR 3 4" FLG CONNECTION AT GENERATOR
PROPOSED 1-1/2" X 1" SCH 80 PVC REDUCER
FOR 1" FLG CONNECTION AT GENERATOR
PROPOSED 1-1/2" X 1" SCH 80 PVC REDUCER
FOR 1" FLG CONNECTION AT GENERATOR
NOTES:
1. CONTRACTOR SHALL INSPECT BOTH CHILLERS
AND THE ENTIRE CHILLED WATER CIRCULATION
SYSTEM TO IDENTIFY ANY FERROUS METAL
MATERIALS WHICH ARE IN CONTACT WITH THE
CHILLED WATER. ALL MATERIALS IDENTIFIED AS
CONTAINING FERROUS METAL SHALL BE
REMOVED AND REPLACED WITH TYPE 316
STAINLESS STEEL COMPONENTS, INCLUDING
PUMPS, PIPING, FITTINGS, AND VALVES.
COOLING WATER CIRCULATION PUMP SHALL BE
REMOVED AND REPLACED WITH A TYPE 316
STAINLESS STEEL CIRCULATION PUMP PER
MANUFACTURER RECOMMENDATIONS. COSTS
FOR LABOR, MATERIALS AND EQUIPMENT FOR
THIS WORK SHALL BE COVERED BY THE
ASSOCIATED ALLOWANCE ITEM.
2. FINAL CONNECTIONS TO THE OZONE
GENERATOR AND VALVE TREE SHALL BE
PERFORMED BY THE MANUFACTURER.
CONTRACTOR SHALL COORDINATE FINAL
CONNECTIONS WITH THE MANUFACTURER WITH
A MINIMUM OF 30 DAYS NOTICE.
3. ALL UTILITIES SHOWN ARE DRAWN TO THE BEST
APPROXIMATE LOCATION. THE CONTRACTOR
SHALL VERIFY LOCATIONS BEFORE BEGINNING
WORK AND FIELD ROUTE ALL CONNECTIONS TO
THE PROPOSED GENERATOR AND VALVE TREE.
4. PROPOSED EXTENSIONS OF CHILLER SUPPLY
AND RETURN PIPING SHALL BE FIELD ROUTED IN
THE GENERAL ARRANGEMENT SHOWN.
CONTRACTOR SHALL PROVIDE ALL REQUIRED
FITTINGS, VALVES, AND PIPE SUPPORTS
REQUIRED FOR PROPER INSTALLATION AND
OPERATION IN ACCORDANCE WITH THE
MANUFACTURER'S REQUIREMENTS AND THE
SPECIFICATIONS.
4. PROPOSED EXTENSIONS OF OXYGEN SUPPLY
AND OZONE FEED PIPING SHALL BE FIELD
ROUTED IN THE GENERAL ARRANGEMENT
SHOWN. CONTRACTOR SHALL PROVIDE ALL
REQUIRED FITTINGS, VALVES, AND PIPE
SUPPORTS REQUIRED FOR PROPER
INSTALLATION AND OPERATION IN ACCORDANCE
WITH THE MANUFACTURER'S REQUIREMENTS
AND THE SPECIFICATIONS.
5. CONTRACTOR IS RESPONSIBLE FOR FURNISHING
AND INSTALLING ALL PIPING AND VALVES
BETWEEN THE PROPOSED VALVE ASSEMBLY
AND THE EXISTING PIPING.
6. CONTRACTOR SHALL PROVIDE INSULATION ON
CHILLED WATER SUPPLY AND RETURN PIPING
MATCHING THE EXISTING INSULATION.
N
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N
D oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \M
S-
PR
O
PO
SE
D
G
EN
ER
AT
O R
P
LA
N A
N D
S
EC
TI
O
N .d w g
- 3 /1
8/
:1
PM
B
Y:
J
FL
EC
K
PR
O
PO
SE
D G
EN
ER
AT
O
R R
O O
M P
LA
N
A N
D
SE
C
TI
O N
M
AR
C H
BD
L
JR
F
B D
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
GENERATOR ROOM PLAN
1/4" = 1'-0"
SCALE:
GENERATOR SECTION
A 3/8" = 1'-0"
EXISTING OZONE DESTRUCT
UNITS AND FILTERS
TYP. 3 PLACES
(SEE NOTE 3)
PROPOSED 2" STAINLESS STEEL BALL VALVE
AND SPOOL PIECE
PROPOSED 2" STAINLESS STEEL BALL VALVE
AND SPOOL PIECE
EXISTING 2" STAINLESS STEEL
OZONE HEADER
EXISTING 2" STAINLESS STEEL
OZONE HEADER FROM GENERATOR
ROOM
EXISTING 2" STAINLESS STEEL
OZONE DROP AND DIFFUSER
EXISTING 2" STAINLESS STEEL
OZONE DROP AND DIFFUSER
EXISTING OZONE AIR AND VACUUM VALVES
TYP. 2 PLACES
N
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N D oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \M
S-
PR
O
PO
SE
D
G
EN
ER
AT
O R
P
LA
N A
N D
S
EC
TI
O
N .d w g
- 3 /3
/2
4:
P
M B
Y:
J
FL
EC
K
PR
O
PO
SE
D C
O N
TA
C
T C
H
AM
BE
R
P
LA
N
M
AR
C H
BD
L
JR
F
BD
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
UPPER CONTACT CHAMBER PLAN
1/4" = 1'-0"
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH THE FACILITY OPERATION AND MAINTENANCE
PERSONNEL FOR ISOLATING THE NECESSARY PORTIONS OF THE OZONE CONTACT CHAMBER
FOR THE REMOVAL AND REPLACEMENT OF THE EXISTING BALL VALVES.
2. CONTRACTOR SHALL FIELD VERIFY THE REQUIRED COMPONENTS FOR REPLACEMENT OF THE
EXISTING BALL VALVES PRIOR TO ORDERING MATERIALS. IT IS ACCEPTABLE TO ELIMINATE
THE NEW SPOOL PIECE IF IT IS NOT REQUIRED FOR COMPLETING THE VALVE REPLACEMENT.
3. CONTRACTOR SHALL REMOVE AND REPLACE THE FILTER MEDIA IN THE FILTER CHAMBERS ON
THE THREE OZONE DESTRUCT UNITS. NEW MEDIA SHALL MEET THE MANUFACTURERS
SPECIFICATIONS.
M
M M
M
DRAIN
50 PSIG
VENT TO OUTDOOR
ATMOSPHERE
150 LB/DAY @ 10% WT
400VAC/3pH/60HZ 28.8KW
VENT TO OUTDOOR
ATMOSPHERE
MBV
BV
BV
BV BV
BV
BV
MBV MBV
MBV
BV
2"
2"
4"
2"
4"
4"
2" FLEX
1" FLEX
1" FLEX
2" FLEX
1 2" F
LE
X
1"1"
COMPRESSED O2 @ 26 PSIG
FROM O2 PRESSURE REGULATION MANIFOLD
CHILLER WATER RETURN
(LOW PRESSURE ZONE) TO CHILLERS
CHILLER WATER SUPPLY
(HIGH PRESSURE ZONE) FROM CHILLERS
OZONATED GAS TO
OZONE DIFFUSION SYSTEM
PLUG
PC-BV
TO/FROM
MOCP
PC-FV
8118A
PC-OG
PC-BFP
PC-BV
PC-BV
PC-CV
PC-PRV
PC-AE
PC-AIT
PC-MV
PC-BV
PC-BV
PC-CV
PC-BV
PC-FV
8118C
PC-FV
8118B
PC-AIT
8118B
PC-BV
PC-AE
8118A
TO/FROM
MOCP
TO/FROM
MOCP
TO
MOCP
TO
MOCP
TO/FROM
MOCP
TO/FROM
MOCP
TO/FROM
OD6CP
0-1 PPM
AMBIENT OZONE
GAS ANALYZER
HIGH
OZONE
MCC CB
(BY OTHERS)
STEP-DOWN
TRANSFORMER
MCC CB
(BY OTHERS)
PC-XF
OG-1
MFC
XFRM
45 KVA
480/3
400/3
4 "
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N D oc kd al e
C ou nt y\
G ee s M ill O zo ne
G en er at or R ep la ce m en t\D w g\
Sh ee ts \M
S-
PR
O
PO
SE
D
G
EN
ER
AT
O R
P
ID
.d w g
- 3
/3 /2
4:
P M
B Y:
J
FL
EC
K
O
ZO
N E
G
EN
ER
AT
O R
P &I
D
M
AR
C H
BD
L
JR
F
BD
S M
IL
L
W
TP
O
ZO
N E
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
BA
R
B
EL
O W
IS
" L O
N G
F O
R
SC
AL
ES
S H
O W
N O
N T
H
IS
S H
EE
T.
IF
N
O T
1" L
O N
G O
N T
H
IS
S H
EE
T, AD
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
1"
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T D
AT
E:
M
AR
C H
D
ES
IG
N
ED
B
Y:
D
R
AW
N B
Y:
R
EV
IE
W
ED
B Y:
R
EV
IS
IO
N
D A
TE
SUITE A
4120 CHATTAHOOCHEE TRACE
TEL. (770) 493-8685
DULUTH, GEORGIA 30097
EDEC
EDEC, INC.
EL
EC
TR
IC
AL
L
EG
EN
D S
AN
D
N O
TE
S
E-1
VC AZVC
S M
IL
L
O
ZO
N E
W
TP
G
EN
ER
AT
O R
R
EP
LA
C
EM
EN
T
R O
C
KD
AL
E
W
AT
ER
R
ES
O
U R
C
ES
Z
PROFESSIONAL
No. 22613
A
IGROE
G DERETSIGE
R
E
N G I N E E RALEC
AY CH I K
AutoCAD SHX Text
LOW VOLTAGE POWER CIRCUIT AND BREAKER DRAWOUT TYPE, FRAME TRIP SHOWN
AutoCAD SHX Text
MOLDED CASE CIRCUIT BREAKER, FRAME AND TRIP ID SHOWN
AutoCAD SHX Text
DISCONNECT OR ISOLATING SWITCH: CONTINUOUS RATING SHOWN
AutoCAD SHX Text
MAGNETIC-ONLY CIRCUIT BREAKER (MCP), DRAWOUT TYPE, WITH CURRENT RATING
AutoCAD SHX Text
FUSED SWITCH: FUSE AND SWITCH CONTINUOUS RATINGS SHOWN
AutoCAD SHX Text
POWER TRANSFORMER: PRIMARY & SECONDARY VOLTAGES, %Z, SIZE SHOWN
AutoCAD SHX Text POTENTIAL TRANSFORMER PRIMARY & SECONDARY VOLTAGES & WINDINGS SHOWN. (x) UNITS
AutoCAD SHX Text CURRENT TRANSFORMER: RATIO SHOWN (3 INDICATES NO. OF CT'S) METER SWITCH, xS: AS - AMMETER SWITCH VS - VOLTMETER SWITCH FS - FREQUENCY SWITCH
AutoCAD SHX Text METER: A - AMMETER - AMMETER AMMETER W - WATTMETER - WATTMETER WATTMETER KWH - WATT-HOUR METER - WATT-HOUR METER WATT-HOUR METER F - FREQUENCY METER - FREQUENCY METER FREQUENCY METER VAR - VAR METER - VAR METER VAR METER V - VOLTMETER- VOLTMETERVOLTMETER
AutoCAD SHX Text
FULL VOLTAGE, NON-REVERSING MAGNETIC MOTOR STARTER. NEMA SIZE INDICATED
AutoCAD SHX Text
FULL VOLTAGE, REVERSING MAGNETIC MOTOR STARTER. NEMA SIZE INDICATED
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE. NEMA SIZE INDICATED
AutoCAD SHX Text
REDUCED VOLTAGE SOLID STATE DRIVE (SOFT START). NEMA SIZE INDICATED
AutoCAD SHX Text CABLE TAG: P - POWER CABLE - POWER CABLE POWER CABLE C - CONTROL CABLE - CONTROL CABLE CONTROL CABLE S - SHIELDED SIGNAL CABLE- SHIELDED SIGNAL CABLESHIELDED SIGNAL CABLE
AutoCAD SHX Text
DS-XXX
AutoCAD SHX Text
MCP-XXX
AutoCAD SHX Text
FS-XXX
AutoCAD SHX Text
XS
AutoCAD SHX Text
PT
AutoCAD SHX Text
FVR
AutoCAD SHX Text
SIZE X
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text
MTS-XXX
AutoCAD SHX Text
P-XXX-X
AutoCAD SHX Text
PBD A-1,3,5
AutoCAD SHX Text RACEWAY OR WIRING SYSTEM BELOW FLOOR LEVEL, ABOVE CEILING, HIDDEN, OR EXISTING CABLE/CONDUIT. (UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
SCHEMATIC DIAGRAM FIELD WIRING. (UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
ONE LINE DIAGRAM EQUIPMENT ENCLOSURE. (UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
MANUAL TRANSFER SWITCH
AutoCAD SHX Text
GENERATOR RECEPTACLE
AutoCAD SHX Text
MOTOR (HP AS SHOWN, PHASES AS REQUIRED)
AutoCAD SHX Text RACEWAY OR WIRING SYSTEM ABOVE FLOOR LEVEL BELOW CEILING, EXPOSED. (UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
HOME RUN - SEE PANELBOARD SCHEDULE FOR CIRCUIT INFORMATION
AutoCAD SHX Text
EXAMPLE: HOME TO PANELBOARD PBD A, CIRCUITS 1, 3, AND 5
AutoCAD SHX Text
LIGHTNING ARRESTOR AND GROUND
AutoCAD SHX Text
ONE LINE DIAGRAM SYMBOLS
AutoCAD SHX Text AR ALARM RELAY ALARM RELAY AS AMMETER SELECTOR SWITCH AMMETER SELECTOR SWITCH A, AMP AMP(S), AMPERE(S) AMP(S), AMPERE(S) AC ALTERNATING CURRENT ALTERNATING CURRENT AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AHAP AS HIGH AS POSSIBLE AS HIGH AS POSSIBLE AIC AMPS INTERRUPTING CAPACITY, AMPS INTERRUPTING CAPACITY, SYMM. AL ALUMINUM ALUMINUM AT AMPERE TRIP AMPERE TRIP AF AMPERE FRAME AMPERE FRAME AUTO AUTOMATIC AUTOMATIC AUX AUXILIARY AUXILIARY AWG AMERICAN WIRE GAUGE AMERICAN WIRE GAUGE BC BARE COPPER CONDUCTOR BARE COPPER CONDUCTOR BKR BREAKER BREAKER C CONDUCTOR/CONTACTOR CONDUCTOR/CONTACTOR CB CIRCUIT BREAKER CIRCUIT BREAKER CJB CIRCUIT JUNCTION BOX CIRCUIT JUNCTION BOX CKT CIRCUIT CIRCUIT CLG CEILING CEILING CR CONTROL RELAY CONTROL RELAY CND CONDUIT CONDUIT CONC CONCRETE CONCRETE CS CONTROL SWITCH CONTROL SWITCH CONT CONTROL CONTROL CPT CONTROL POWER TRANSFORMER CONTROL POWER TRANSFORMER CT CURRENT TRANSFORMER CURRENT TRANSFORMER CU COPPER COPPER D DIAMETER DIAMETER DB DUCT BANK DUCT BANK DC DIRECT CURRENT DIRECT CURRENT DET DETAIL DETAIL DIAG DIAGRAM DIAGRAM DPSH DIFFERENTIAL PRESSURE SWITCH DIFFERENTIAL PRESSURE SWITCH DS DISCONNECT SWITCH DISCONNECT SWITCH DWG DRAWING DRAWING EA EACH EACH EC ELECTRICAL CONTRACTOR ELECTRICAL CONTRACTOR EF EXHAUST FAN EXHAUST FAN EL ELEVATION ELEVATION ELEC ELECTRIC(AL) ELECTRIC(AL) EMER EMERGENCY EMERGENCY ENCL ENCLOSURE/ENCLOSED ENCLOSURE/ENCLOSED EP EXPLOSION PROOF EQUIP. EXPLOSION PROOF EQUIP. EX, E EXISTING EXISTING FCP FURNISHED WITH EQUIPMENT FURNISHED WITH EQUIPMENT PANEL FDR FEEDER FEEDER FLA FULL LOAD AMPS FULL LOAD AMPS FPP FIBER OPTIC DISTRIBUTION PANEL FIBER OPTIC DISTRIBUTION PANEL FS FLOW SWITCH FLOW SWITCH FU FUSE FUSE FUT FUTURE FUTURE FVNR FULL VOLTAGE NON-REVERSING FULL VOLTAGE NON-REVERSING FVR FULL VOLTAGE REVERSING FULL VOLTAGE REVERSING GALV GALVANIZED GALVANIZED GEN GENERATOR GENERATOR GFR GROUND FAULT RELAY GROUND FAULT RELAY GRD GROUND GROUND GRS GALVANIZED RIGID STEEL GALVANIZED RIGID STEEL H HIGH HIGH HGT HEIGHT HEIGHT HH HANDHOLE HANDHOLE HID HIGH INTENSITY DISCHARGE HIGH INTENSITY DISCHARGE HP HORSEPOWER HORSEPOWER HS HAND STATION (SWITCH) HAND STATION (SWITCH) HVAC HEATING, VENTILATION AND AIR HEATING, VENTILATION AND AIR CONDITIONING HZ HERTZ (CYCLES PER SECOND) HERTZ (CYCLES PER SECOND) HOA HAND/OFF/AUTO HAND/OFF/AUTO HOR HAND/OFF/REVERSE HAND/OFF/REVERSE HMH HIGH VOLTAGE MANHOLE HIGH VOLTAGE MANHOLE ID INSIDE DIAMETER INSIDE DIAMETER IMC INDIVIDUAL MOTOR CONTROLLER INDIVIDUAL MOTOR CONTROLLER INTLK INTERLOCK INTERLOCK INST INSTANTANEOUS INSTANTANEOUS INSTR INSTRUMENT INSTRUMENT I/O INPUT-OUTPUT INPUT-OUTPUT JB JUNCTION BOX JUNCTION BOX KV KILOVOLT KILOVOLT KVA KILOVOLT-AMPERE KILOVOLT-AMPERE KVAR KILOVOLT-AMPERE REACTIVE KILOVOLT-AMPERE REACTIVE KW KILOWATT KILOWATT KWH KILOWATT-HOUR KILOWATT-HOUR KAIC KILO AMPERE INTERRUPTING KILO AMPERE INTERRUPTING CURRENT L-O-R LOCAL-OFF-REMOTE LOCAL-OFF-REMOTE L LONG LONG LC LIGHTING CONTACTOR LIGHTING CONTACTOR LCP LOCAL CONTROL PANEL LOCAL CONTROL PANEL LP LIGHTING PANEL LIGHTING PANEL LOS LOCK-OUT STOP LOCK-OUT STOP LSIG LONG, SHORT, INSTANTANEOUS LONG, SHORT, INSTANTANEOUS TRIP SETTING AND GROUND FAULT PROTECTION LSL LEVEL SWITCH LOW LEVEL SWITCH LOW LSO LIMIT SWITCH OPEN LIMIT SWITCH OPEN LSC LIMIT SWITCH CLOSED LIMIT SWITCH CLOSED LTG LIGHTING LIGHTING LV LOW VOLTAGE LOW VOLTAGE LSH LEVEL SWITCH HIGHLEVEL SWITCH HIGH
AutoCAD SHX Text M MOTOR CONTACTOR MOTOR CONTACTOR mA MILLIAMPERE MILLIAMPERE MAX MAXIMUM MAXIMUM MCB MAIN CIRCUIT BREAKER MAIN CIRCUIT BREAKER MCC MOTOR CONTROL CENTER MOTOR CONTROL CENTER MCP MOTOR CONTROL PANEL/MOTOR CIRCUIT MOTOR CONTROL PANEL/MOTOR CIRCUIT PROTECTOR MECH MECHANICAL MECHANICAL MFR MANUFACTURE(R) MANUFACTURE(R) MH MANHOLE MANHOLE MIC MICROPHONE MICROPHONE MIN MINIMUM MINIMUM MISC MISCELLANEOUS MISCELLANEOUS mM MILLIMETER MILLIMETER mV MILLIVOLT MILLIVOLT MCM MILLI CIRCULAR MILLS MILLI CIRCULAR MILLS MOP MOTOR OPERATOR PANEL MOTOR OPERATOR PANEL MPR MOTOR PROTECTION RELAY MOTOR PROTECTION RELAY MCB MAIN CIRCUIT BREAKER MAIN CIRCUIT BREAKER MTR MOTOR MOTOR MVS MEDIUM VOLTAGE STARTER MEDIUM VOLTAGE STARTER N/A NOT APPLICABLE NOT APPLICABLE NC NORMALLY CLOSED NORMALLY CLOSED NEUT,N NEUTRAL NEUTRAL NF NON-FUSED NON-FUSED NIC NOT IN CONTRACT NOT IN CONTRACT NO NORMALLY OPEN NORMALLY OPEN NOM NOMINAL NOMINAL NP NAMEPLATE NAMEPLATE NTS NOT TO SCALE NOT TO SCALE OC ON CENTER ON CENTER OD OUTSIDE DIAMETER OUTSIDE DIAMETER OH OVERHEAD OVERHEAD OL's OVERLOADS OVERLOADS OT OIL TIGHT OIL TIGHT P POLE POLE PA PUBLIC ADDRESS PUBLIC ADDRESS PB PUSHBUTTON, PULLBOX PUSHBUTTON, PULLBOX PE PHOTO ELECTRIC CELL PHOTO ELECTRIC CELL PF POWER FACTOR POWER FACTOR PH PHASE PHASE PJB POWER JUNCTION BOX POWER JUNCTION BOX PLC PROGRAMMABLE LOGIC CONTROLLER PROGRAMMABLE LOGIC CONTROLLER PNL PANEL PANEL PP POWER PANEL POWER PANEL PR PAIR PAIR PRI PRIMARY PRIMARY PS PRESSURE SWITCH PRESSURE SWITCH PT POTENTIAL TRANSFORMER POTENTIAL TRANSFORMER PVC POLYVINYL CHLORIDE POLYVINYL CHLORIDE PWR POWER POWER QSH SHEAR PIN LIMIT SWITCH SHEAR PIN LIMIT SWITCH RCPT RECEPTACLE RECEPTACLE RCT REACTOR REACTOR REF REFERENCE REQ'D REQUIRED REFERENCE REQ'D REQUIRED RMS ROOT MEAN SQUARE ROOT MEAN SQUARE RTD RESISTANCE TEMPERATURE DETECTOR RESISTANCE TEMPERATURE DETECTOR SCH SCHEDULE SCHEDULE SE SPEED SENSOR SPEED SENSOR SEC SECONDARY SECONDARY SEL SELECTOR SELECTOR SER SERVICE ENTRANCE RATED SERVICE ENTRANCE RATED SPDT SINGLE POLE DOUBLE THROW SINGLE POLE DOUBLE THROW SPEC SPECIFICATION SPECIFICATION SPHTR MOTOR SPACE HEATER MOTOR SPACE HEATER SPKR SPEAKER SPEAKER SS STAINLESS STEEL STAINLESS STEEL SSL SPEED SWITCH SPEED SWITCH SUB SUBSTATION SUBSTATION SW SWITCH SWITCH SYMM SYMMETRICAL SYMMETRICAL SYS SYSTEM SYSTEM SV SOLENOID OPERATED VALVE SOLENOID OPERATED VALVE SPB SIGNAL PULL BOX SIGNAL PULL BOX TB TERMINAL BOX TERMINAL BOX TEL TELEPHONE TELEPHONE TEMP TEMPERATURE TEMPERATURE TFR TRANSFORMER TRANSFORMER TH THERMOSTAT THERMOSTAT TJB TERMINAL JUNCTION BOX TERMINAL JUNCTION BOX TSH TEMPERATURE SWITCH HIGH TEMPERATURE SWITCH HIGH TV TELEVISION TELEVISION TYP TYPICAL TYPICAL TR TIMING RELAY TIMING RELAY TVSS TRANSIENT VOLTAGE SURGE TRANSIENT VOLTAGE SURGE SUPPRESSOR TSP TWISTED SHIELDED PAIR TWISTED SHIELDED PAIR UG UNDERGROUND UNDERGROUND UH UNIT HEATER UNIT HEATER UON UNLESS OTHERWISE NOTED UNLESS OTHERWISE NOTED V VOLT VOLT VA VOLT AMPERE VOLT AMPERE VAR VOLT AMPERE REACTIVE VOLT AMPERE REACTIVE VFD VARIABLE FREQUENCY DRIVE VARIABLE FREQUENCY DRIVE VSH VIBRATION SWITCH VIBRATION SWITCH W WATT, WIRE, WIDE WATT, WIRE, WIDE W/ WITH WITH W/O WITHOUT WITHOUT WE WEIGHT LOAD CELL WEIGHT LOAD CELL WIT WEIGHT INDICATING TRANSMITTER WEIGHT INDICATING TRANSMITTER WP WEATHERPROOF WEATHERPROOF XL WARNING HORN/LIGHT WARNING HORN/LIGHT XT ANEMOMETER ANEMOMETER ZS POSITION (LIMIT) SWITCH POSITION (LIMIT) SWITCH ZSO POSITION (LIMIT) SWITCH OPEN POSITION (LIMIT) SWITCH OPEN ZSC POSITION (LIMIT) SWITCH CLOSED POSITION (LIMIT) SWITCH CLOSED ZT POSITION TRANSMITTERPOSITION TRANSMITTER
AutoCAD SHX Text
GENERAL ABBREVIATIONS
AutoCAD SHX Text GROUND ROD, 3/4" x 10'-0", COPPERCLAD (UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
GROUND ROD AND TEST WELL
AutoCAD SHX Text
COMPRESSION TYPE GROUNDING BOND TO MOTOR CASING OR EQUIPMENT
AutoCAD SHX Text
EXOTHERMIC TYPE GROUNDING BOND TO CABLE OR CONCRETE REBAR OR RISER
AutoCAD SHX Text
MOTOR STARTER, INDIVIDUAL -- NOT LOCATED IN AN MCC OR SIMILAR GROUP ASSEMBLY
AutoCAD SHX Text COMBINATION MOTOR STARTER/DISCONNECT INDIVIDUAL -- NOT LOCATED IN AN MCC OR SIMILAR GROUP ASSEMBLY
AutoCAD SHX Text DISCONNECT SWITCH. DISCONNECT SWITCHES ARE HEAVY DUTY, SINGLE THROW, WITH NEMA 4X ENCLOSURE UNLESS OTHERWISE NOTED. MOUNT AT 4'-8" TO CENTER OF DISCONNECT.
AutoCAD SHX Text
START/STOP HAND STATION MOUNTED TO HANDRAIL (NEMA 4X UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
DUPLEX 120V RECEPTACLE, 120V, 20A, 1P. MOUNT 6" ABOVE COUNTER, DESK, OR CABINET.
AutoCAD SHX Text TELEPHONE BOX. MOUNT 18" A.F.F., INSTALL A 1/2" CONDUIT FROM BOX TO 6" ABOVE CEILING. PROVIDE PULL CORD FOR FUTURE CONNECTIONS AS REQUIRED.
AutoCAD SHX Text 60A, 480V, 3PH WELDING RECEPTACLE WITH INTERLOCKED 60A (NEMA 4X FUSED DISCONNECT SWITCH UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
FUSED DISCONNECT, NON-FUSED. PROVISION FOR CLASS R FUSES.
AutoCAD SHX Text
FIELD INSTRUMENT CONNECTION
AutoCAD SHX Text
120V, 20A, 1P TOGGLE SWITCH
AutoCAD SHX Text
MOTOR CONNECTION
AutoCAD SHX Text [BLANK] = 1P TOGGLE SWITCH 1P TOGGLE SWITCH 2 = 2P TOGGLE SWITCH = 2P TOGGLE SWITCH 2P TOGGLE SWITCH 3 = 3P TOGGLE SWITCH = 3P TOGGLE SWITCH 3P TOGGLE SWITCH D = SLIDE DIMMER = SLIDE DIMMER SLIDE DIMMER M = MOTOR RATED = MOTOR RATED MOTOR RATED S = TOGGLE WITH OCCUPANCY SENSOR = TOGGLE WITH OCCUPANCY SENSOR TOGGLE WITH OCCUPANCY SENSOR
AutoCAD SHX Text GFCI DUPLEX 120V RECEPTACLE, 120V, 20A, 1P. MOUNT 6" ABOVE COUNTER, DESK, OR CABINET.
AutoCAD SHX Text QUADRAPLEX 120V RECEPTACLE, 120V, 20A, 1P. MOUNT 6" ABOVE COUNTER, DESK, OR CABINET.
AutoCAD SHX Text
RECESSED FLOOR JUNCTION BOX
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text
JB
AutoCAD SHX Text X
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
CIRCUIT AND RACEWAY SYMBOLS
AutoCAD SHX Text
PLAN DRAWING SYMBOLS
AutoCAD SHX Text
GROUNDING SYMBOLS
AutoCAD SHX Text
METER
AutoCAD SHX Text
CB-XXX
AutoCAD SHX Text
CB-XXX
AutoCAD SHX Text
TFR-XXX
AutoCAD SHX Text
M-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XXHP
AutoCAD SHX Text
VFD-XXX
AutoCAD SHX Text
XXHP
AutoCAD SHX Text
RVSS-XXX
AutoCAD SHX Text
SCHEMATIC DIAGRAM SYMBOLS
AutoCAD SHX Text CIRCUIT BREAKER, THERMAL-MAGNETIC UNLESS OTHERWISE NOTED, WITH FRAME SIZE AND TRIP RATING
AutoCAD SHX Text
MAGNETIC-ONLY CIRCUIT BREAKER (MCP), WITH CURRENT RATING
AutoCAD SHX Text TERMINAL POINT FOR OUTGOING CONDUCTORS, WITH IDENTIFICATION. "XX" DENOTES CONTRACTOR ASSIGNED.
AutoCAD SHX Text DISCONNECT SWITCH. RATING OPTIONAL. 30 AMP, 600V RATED MINIMUM UNLESS OTHERWISE NOTED.
AutoCAD SHX Text CONTROL POWER TRANSFORMER, PRIMARY AND SECONDARY VOLTAGE SHOWN. SIZE AS SHOWN OR SPECIFIED.
AutoCAD SHX Text
CURRENT TRANSFORMER. PRIMARY/SECONDARY TURNS RATIO AS SHOWN.
AutoCAD SHX Text FUSE DISCONNECT SWITCH. RATING OPTIONAL. 30 AMP, 600V MINIMUM UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
A = AMBER B = BLUE G = GREEN R = RED W = WHITE
AutoCAD SHX Text
XXA
AutoCAD SHX Text
MCPXXX-XX
AutoCAD SHX Text
XXA
AutoCAD SHX Text
FUXXX-XX
AutoCAD SHX Text
DSXXX-XX
AutoCAD SHX Text
XXXA
AutoCAD SHX Text
XXA
AutoCAD SHX Text
FUXXX-XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
M-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
MSR-XXX
AutoCAD SHX Text
OL-XXX
AutoCAD SHX Text
M-XXX
AutoCAD SHX Text
LSXXX-XX
AutoCAD SHX Text
PSXXX-XX
AutoCAD SHX Text
TSXXX-XX
AutoCAD SHX Text
LSXXX-XX
AutoCAD SHX Text
PSXXX-XX
AutoCAD SHX Text
TSXXX-XX
AutoCAD SHX Text
FSXXX-XX
AutoCAD SHX Text
FSXXX-XX
AutoCAD SHX Text
FLTXXX-XX
AutoCAD SHX Text
FLTXXX-XX
AutoCAD SHX Text
PRSXXX-XX
AutoCAD SHX Text
PRSXXX-XX
AutoCAD SHX Text
PCSXXX-XX
AutoCAD SHX Text
PCSXXX-XX
AutoCAD SHX Text
SVXXX-XX
AutoCAD SHX Text
PBXXX-XX
AutoCAD SHX Text
PBXXX-XX
AutoCAD SHX Text
OX
AutoCAD SHX Text
SSXXX-XX
AutoCAD SHX Text
OX
AutoCAD SHX Text
SSXXX-XX
AutoCAD SHX Text
LTXXX-XX
AutoCAD SHX Text X
AutoCAD SHX Text
CRXXX-XX
AutoCAD SHX Text
CRXXX-XX
AutoCAD SHX Text
ALXXX-XX
AutoCAD SHX Text
AHXXX-XX
AutoCAD SHX Text X1
AutoCAD SHX Text X2
AutoCAD SHX Text
TFRXXX-XX
AutoCAD SHX Text H2
AutoCAD SHX Text H1
AutoCAD SHX Text C.T.
AutoCAD SHX Text
CTXXX-XX
AutoCAD SHX Text
CONDUCTORS CONNECTED
AutoCAD SHX Text
CONDUCTORS NOT CONNECTED
AutoCAD SHX Text
CONNECTION POINT
AutoCAD SHX Text
FUSE WITH SIZE AND OPTIONAL IDENTIFICATION.
AutoCAD SHX Text
MOTOR (HP AS SHOWN, PHASES AS REQUIRED)
AutoCAD SHX Text
MOTOR STARTER COIL
AutoCAD SHX Text
THERMAL MOTOR OVERLOAD
AutoCAD SHX Text
MOTOR CONTACT
AutoCAD SHX Text
LIMIT SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
PRESSURE SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
TEMPERATURE SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
FLOW SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
LEVEL SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
PROXIMITY SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
PULLCORD SWITCH NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
MOMENTARY PUSHBUTTON NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
PILOT LIGHT X = LENS COLOR
AutoCAD SHX Text
CONTROL RELAY
AutoCAD SHX Text
CONTROL RELAY CONTACT NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
ALARM LIGHT
AutoCAD SHX Text
ALARM HORN
AutoCAD SHX Text
XX
AutoCAD SHX Text
SELECTOR SWITCH NORMALLY NORMALLY CLOSED AND NORMALLY OPEN
AutoCAD SHX Text
XXA
AutoCAD SHX Text
CBXXX-XX
AutoCAD SHX Text
CRXXX-XX
AutoCAD SHX Text
FVNR
AutoCAD SHX Text
SIZE X
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
GROUNDING CONDUCTOR (EXPOSED), #4/0 AWG INSULATED COPPER
AutoCAD SHX Text
GROUNDING CONDUCTOR (CONCEALED), #4/0 AWG BARE COPPER
AutoCAD SHX Text
CCTV CAMERA
AutoCAD SHX Text DUPLEX ETHERNET CAT-6 BOX FOR DATA AND VOIP SERVICE. MOUNT 18" A.F.F., INSTALL A 1/2" CONDUIT FROM BOX TO 6" ABOVE CEILING. PROVIDE PULL CORD FOR FUTURE CONNECTIONS AS REQUIRED.
AutoCAD SHX Text Gx
AutoCAD SHX Text GENERATOR TAG: G - EQUIPMENT TO RUN OFF GENERATOR X - STEP NUMBER FOR EQUIPMENT STARTING OFF THE GENERATOR
AutoCAD SHX Text
SMOKE DETECTOR, 120VAC RATED
AutoCAD SHX Text
FIRE ALARM SYMBOLS
AutoCAD SHX Text S
AutoCAD SHX Text
GG
AutoCAD SHX Text
GG
AutoCAD SHX Text NOTES: 1. SCOPE: SCOPE: A. FURNISH ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE FURNISH ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE LABOR, MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE LABOR, MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE MATERIAL, EQUIPMENT AND TOOLS REQUIRED TO COMPLETE EQUIPMENT AND TOOLS REQUIRED TO COMPLETE EQUIPMENT AND TOOLS REQUIRED TO COMPLETE AND TOOLS REQUIRED TO COMPLETE AND TOOLS REQUIRED TO COMPLETE TOOLS REQUIRED TO COMPLETE TOOLS REQUIRED TO COMPLETE REQUIRED TO COMPLETE REQUIRED TO COMPLETE TO COMPLETE TO COMPLETE COMPLETE COMPLETE INSTALLATION OF THE ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, OF THE ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, OF THE ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, THE ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, THE ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, ELECTRICAL SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, SYSTEM INCLUDING BUT NOT LIMITED TO WIRING, INCLUDING BUT NOT LIMITED TO WIRING, INCLUDING BUT NOT LIMITED TO WIRING, BUT NOT LIMITED TO WIRING, BUT NOT LIMITED TO WIRING, NOT LIMITED TO WIRING, NOT LIMITED TO WIRING, LIMITED TO WIRING, LIMITED TO WIRING, TO WIRING, TO WIRING, WIRING, WIRING, BOXES, LIGHT FIXTURES, PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND LIGHT FIXTURES, PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND LIGHT FIXTURES, PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND FIXTURES, PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND FIXTURES, PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND PANELS, SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND SWITCHES, RECEPTACLES, DISCONNECTS, STARTERS, AND RECEPTACLES, DISCONNECTS, STARTERS, AND RECEPTACLES, DISCONNECTS, STARTERS, AND DISCONNECTS, STARTERS, AND DISCONNECTS, STARTERS, AND STARTERS, AND STARTERS, AND AND AND ALL OTHER WORK INDICATED ON THE DRAWINGS OR AS SPECIFIED HEREIN. B. OBTAIN ALL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL OBTAIN ALL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL ALL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL ALL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL PERMITS, INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL INSPECTIONS, AND APPROVALS AS REQUIRED BY THE LOCAL AND APPROVALS AS REQUIRED BY THE LOCAL AND APPROVALS AS REQUIRED BY THE LOCAL APPROVALS AS REQUIRED BY THE LOCAL APPROVALS AS REQUIRED BY THE LOCAL AS REQUIRED BY THE LOCAL AS REQUIRED BY THE LOCAL REQUIRED BY THE LOCAL REQUIRED BY THE LOCAL BY THE LOCAL BY THE LOCAL THE LOCAL THE LOCAL LOCAL LOCAL AUTHORITIES HAVING JURISDICTION AND DELIVER CERTIFICATE OF APPROVAL TO THE HAVING JURISDICTION AND DELIVER CERTIFICATE OF APPROVAL TO THE HAVING JURISDICTION AND DELIVER CERTIFICATE OF APPROVAL TO THE JURISDICTION AND DELIVER CERTIFICATE OF APPROVAL TO THE JURISDICTION AND DELIVER CERTIFICATE OF APPROVAL TO THE AND DELIVER CERTIFICATE OF APPROVAL TO THE AND DELIVER CERTIFICATE OF APPROVAL TO THE DELIVER CERTIFICATE OF APPROVAL TO THE DELIVER CERTIFICATE OF APPROVAL TO THE CERTIFICATE OF APPROVAL TO THE CERTIFICATE OF APPROVAL TO THE OF APPROVAL TO THE OF APPROVAL TO THE APPROVAL TO THE APPROVAL TO THE TO THE TO THE THE THE GENERAL CONTRACTOR. ALL ASSOCIATED FEES SHALL BE PAID BY THE CONTRACTOR. C. ALL MATERIALS AND EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS ALL MATERIALS AND EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS MATERIALS AND EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS MATERIALS AND EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS AND EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS AND EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS EQUIPMENT OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS OF THE ELECTRICAL SYSTEM NECESSARY FOR ITS THE ELECTRICAL SYSTEM NECESSARY FOR ITS THE ELECTRICAL SYSTEM NECESSARY FOR ITS ELECTRICAL SYSTEM NECESSARY FOR ITS ELECTRICAL SYSTEM NECESSARY FOR ITS SYSTEM NECESSARY FOR ITS SYSTEM NECESSARY FOR ITS NECESSARY FOR ITS NECESSARY FOR ITS FOR ITS FOR ITS ITS ITS PROPER AND SAFE OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT AND SAFE OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT AND SAFE OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT SAFE OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT SAFE OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT OPERATION OR OTHERWISE REQUIRED BY CODE, BUT NOT OR OTHERWISE REQUIRED BY CODE, BUT NOT OR OTHERWISE REQUIRED BY CODE, BUT NOT OTHERWISE REQUIRED BY CODE, BUT NOT OTHERWISE REQUIRED BY CODE, BUT NOT REQUIRED BY CODE, BUT NOT REQUIRED BY CODE, BUT NOT BY CODE, BUT NOT BY CODE, BUT NOT CODE, BUT NOT CODE, BUT NOT BUT NOT BUT NOT NOT NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND MENTIONED OR SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND MENTIONED OR SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND OR SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND OR SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND ON THE DRAWINGS, SHALL BE FURNISHED AND ON THE DRAWINGS, SHALL BE FURNISHED AND THE DRAWINGS, SHALL BE FURNISHED AND THE DRAWINGS, SHALL BE FURNISHED AND DRAWINGS, SHALL BE FURNISHED AND DRAWINGS, SHALL BE FURNISHED AND SHALL BE FURNISHED AND SHALL BE FURNISHED AND BE FURNISHED AND BE FURNISHED AND FURNISHED AND FURNISHED AND AND AND INSTALLED WITHOUT ADDITIONAL CHARGE. D. WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL IN ACCORDANCE WITH THE LATEST EDITION OF NATIONAL ACCORDANCE WITH THE LATEST EDITION OF NATIONAL ACCORDANCE WITH THE LATEST EDITION OF NATIONAL WITH THE LATEST EDITION OF NATIONAL WITH THE LATEST EDITION OF NATIONAL THE LATEST EDITION OF NATIONAL THE LATEST EDITION OF NATIONAL LATEST EDITION OF NATIONAL LATEST EDITION OF NATIONAL EDITION OF NATIONAL EDITION OF NATIONAL OF NATIONAL OF NATIONAL NATIONAL NATIONAL ELECTRICAL CODE, THE LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED CODE, THE LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED CODE, THE LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED THE LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED THE LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED LATEST STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED STANDARD BUILDING CODE, ANY OTHER LOCALLY ADOPTED BUILDING CODE, ANY OTHER LOCALLY ADOPTED BUILDING CODE, ANY OTHER LOCALLY ADOPTED CODE, ANY OTHER LOCALLY ADOPTED CODE, ANY OTHER LOCALLY ADOPTED ANY OTHER LOCALLY ADOPTED ANY OTHER LOCALLY ADOPTED OTHER LOCALLY ADOPTED OTHER LOCALLY ADOPTED LOCALLY ADOPTED LOCALLY ADOPTED ADOPTED ADOPTED CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. 2. ALL SUBSTITUTIONS FOR EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER ALL SUBSTITUTIONS FOR EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER SUBSTITUTIONS FOR EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER SUBSTITUTIONS FOR EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER FOR EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER FOR EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER EQUIPMENT AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER AND MATERIAL SHALL BE SUBMITTED TO THE ENGINEER MATERIAL SHALL BE SUBMITTED TO THE ENGINEER MATERIAL SHALL BE SUBMITTED TO THE ENGINEER SHALL BE SUBMITTED TO THE ENGINEER SHALL BE SUBMITTED TO THE ENGINEER BE SUBMITTED TO THE ENGINEER BE SUBMITTED TO THE ENGINEER SUBMITTED TO THE ENGINEER SUBMITTED TO THE ENGINEER TO THE ENGINEER TO THE ENGINEER THE ENGINEER THE ENGINEER ENGINEER ENGINEER FOR REVIEW PRIOR TO PURCHASING. 3. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE THE CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE COORDINATE ALL WORK WITH ALL OTHER TRADES. IT IS THE ALL WORK WITH ALL OTHER TRADES. IT IS THE ALL WORK WITH ALL OTHER TRADES. IT IS THE WORK WITH ALL OTHER TRADES. IT IS THE WORK WITH ALL OTHER TRADES. IT IS THE WITH ALL OTHER TRADES. IT IS THE WITH ALL OTHER TRADES. IT IS THE ALL OTHER TRADES. IT IS THE ALL OTHER TRADES. IT IS THE OTHER TRADES. IT IS THE OTHER TRADES. IT IS THE TRADES. IT IS THE TRADES. IT IS THE IT IS THE IT IS THE IS THE IS THE THE THE RESPONSIBILITY OF CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, OF CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, OF CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, TO VERIFY THE ACTUAL LOCATION OF EQUIPMENT, VERIFY THE ACTUAL LOCATION OF EQUIPMENT, VERIFY THE ACTUAL LOCATION OF EQUIPMENT, THE ACTUAL LOCATION OF EQUIPMENT, THE ACTUAL LOCATION OF EQUIPMENT, ACTUAL LOCATION OF EQUIPMENT, ACTUAL LOCATION OF EQUIPMENT, LOCATION OF EQUIPMENT, LOCATION OF EQUIPMENT, OF EQUIPMENT, OF EQUIPMENT, EQUIPMENT, EQUIPMENT, DUCTWORK, PIPING, ETC. AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT PIPING, ETC. AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT PIPING, ETC. AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT ETC. AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT ETC. AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT AND COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT COORDINATED THE INSTALLATION ACCORDINGLY. THE EQUIPMENT THE INSTALLATION ACCORDINGLY. THE EQUIPMENT THE INSTALLATION ACCORDINGLY. THE EQUIPMENT INSTALLATION ACCORDINGLY. THE EQUIPMENT INSTALLATION ACCORDINGLY. THE EQUIPMENT ACCORDINGLY. THE EQUIPMENT ACCORDINGLY. THE EQUIPMENT THE EQUIPMENT THE EQUIPMENT EQUIPMENT EQUIPMENT WIRING SHALL INCLUDE ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER SHALL INCLUDE ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER SHALL INCLUDE ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER INCLUDE ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER INCLUDE ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER ALL NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER NECESSARY CABLES AND CONDUIT REQUIRED FOR THE PROPER CABLES AND CONDUIT REQUIRED FOR THE PROPER CABLES AND CONDUIT REQUIRED FOR THE PROPER AND CONDUIT REQUIRED FOR THE PROPER AND CONDUIT REQUIRED FOR THE PROPER CONDUIT REQUIRED FOR THE PROPER CONDUIT REQUIRED FOR THE PROPER REQUIRED FOR THE PROPER REQUIRED FOR THE PROPER FOR THE PROPER FOR THE PROPER THE PROPER THE PROPER PROPER PROPER AND SAFE EQUIPMENT OPERATION. 4. THE CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE THE CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE SHALL CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE SHALL CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE CONFIRM ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE ALL DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE DIMENSIONS AND DISTANCES IN THE FIELD. IN CASE AND DISTANCES IN THE FIELD. IN CASE AND DISTANCES IN THE FIELD. IN CASE DISTANCES IN THE FIELD. IN CASE DISTANCES IN THE FIELD. IN CASE IN THE FIELD. IN CASE IN THE FIELD. IN CASE THE FIELD. IN CASE THE FIELD.