About this file

This performance work statement outlines requirements for mail handling and distribution services at the Germany Aerial Mail Terminal III facility. Key requirements include receiving, processing, sorting, and dispatching all military mail within the European theater and to/from the Continental United States. The contractor must provide facilities, management, equipment, labor, and supervision to receive mail from air carriers and transport trucks according to established schedules, process up to 30% increased volume during peak periods, and dispatch mail on outbound trucks and flights on schedule. The contractor is also responsible for empty equipment storage and return, as well as documentation and reporting of mail volumes and irregularities. The facility must be within 30km of Frankfurt International Airport and accommodate trailer loading/unloading. The government will provide USPS equipment, supplies, and training.

View the file

Other files for this federal contract opportunity

Other files attached to REQUEST FOR INFORMATION - SOURCES SOUGHT - Germany Air Mail Terminal (GAMT) III, newest first.
File Type Posted
GAMT III-Questions RFI_Sources Sought.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1, SOLICITATION NO. FA5641-21-r-xxxx

PERFORMANCE WORK STATEMENT

(PWS)

UNITED STATES AIR FORCES IN EUROPE (USAFE)

GERMANY AERIAL MAIL TERMINAL - III

(GAMT-III)

FOR

MAIL HANDLING AND DISTRIBUTION

SOLICITATION NO. FA5641-21-R-XXXX

14 August 2020

TABLE OF CONTENTS

PAGE

SECTION 1. DESCRIPTION OF SERVICES 3

SECTION 2. SERVICES SUMMARY 13

SECTION 3. UNITED STATES POSTAL SERVICE (USPS)

FURNISHED PROPERTY AND SERVICES 13

SECTION 4. APPENDICES

APPENDIX A: ACRONYMS/TERMS 15

APPENDIX B: HISTORICAL WORKLOAD DATA 16

APPENDIX C: SAMPLE STANDARD TRANSPORTATION MOVEMENT

REQUEST (STMR) 20

APPENDIX D: USPS PROVIDED CONSUMABLES/EQUIPMENT 21

APPENDIX E: REQUIRED REPORTS/CONTRACT DELIVERABLE REQUIREMENTS

LISTS (CDRLS) 24

SECTION 1: DESCRIPTION OF SERVICES

1. OVERVIEW. The GAMT operation is dedicated to providing postal receipt and dispatch of all military mail handling, distribution, postal equipment and supplies originating and destined to and from military, Department of Defense (DoD) civilians and contractor personnel assigned within the European Theater and other Areas of Responsibility. The primary customers serviced through this facility are members assigned to the military forces and civilian components using

Army and Air Force Post Offices (APO). This operation services all military locations within the European Theater, as well as other international destinations and all Continental United

States (CONUS) designated delivery destinations.

2. SPECIFIC REQUIREMENTS.

2.1. The contractor shall process incoming (prograde) and outgoing (retrograde) mail outlined herein and in accordance with (IAW) items listed in Table 2.The contractor shall provide all facilities, management, tools, supplies, equipment, labor and supervisory services necessary to ensure that United States (US) Forces Military mail services are performed IAW documents, manuals, instructions and regulations as prescribed in Table 2 and this PWS.

2.1.1. The contractor shall accept mail from the USPS-contracted airlines Ground

Handling Agency at Frankfurt International Airport, hereinafter referred to as the

‘staging area’.

2.1.2. The contractor shall load and unload loose mailbags, parcels, mail equipment and /or supplies to and from mail trailers.

2.1.3. The contractor shall sort and distribute mail based on end destination (3-digit airport code) and STMR destinations.

2.1.4. The contractor shall perform Automated Military Postal System (AMPS) Dispatching and

Nesting for all prograde, retrograde and truck-to-truck mail. The contractor is not required to place additional labels on prograde and truck-to-truck mail. The contractor shall scan existing labels on mail, if attached, for tracking purposes.

2.1.5. The contractor shall inform the Mail Control Activity (MCA) team once all retrograde mail has been scanned and assigned transportation in AMPS.

2.1.6. The contractor shall operate a central empty equipment depository.

2.1.7. The contractor shall comply with new written (email or memorandum) directions, instructions and regulations within 24 hours of receipt. However, should any publication or form revision cause a change in the contractor’s processes, procedures and/or standards of operation, the contractor shall notify the Contracting Officer Representative (COR) and Contracting

Officer (CO) in writing within 10 calendar days of receipt of the publication or form revisions that cause such changes. The contractor shall receive approval from the CO before incurring an additional cost to the US Government.

2.2. The contractor shall adhere to the documents, manuals, instructions and regulations as prescribed in Table 2.

Table 2

1 USAFE Postal Publications and Policies Listing (maintain all applicable documents IAW the Current Version)

2 USAFE-AFAFRICA GM 2019-36-01, USAFE Air Postal Squadron (AIRPS) Guidance

Memorandum for the postal mission of the United States Air Forces in Europe – Air Forces

Africa

3 DoD Instruction 5200.08, Security of DoD Installations and Resources and the DoD

Physical Security Review Board (PSRB) 4 Zip Code Look up: https://tools.usps.com/go/ZipLookupAction_input

5** USAFE Standardized Pouching and Routings Instructions (SPRINT)

6* European Command Manual (ECM) 4504.1 Transportation Management within USEUCOM Area of Responsibility

7 Defense Transportation Regulation (DTR) 4500.9-R, Part V, DoD Customs and Border

Clearance Policies and Procedures

8 AMPS Dispatching and Nesting System. The Nesting and Dispatching standard operating procedures are available in AMPS Knowledge Management (https://amps.usps.gov)

* Documents are available at USAFE AIRPS, Ramstein AB, in hard copy. All others are available electronically at http://www.dtic.mil/whs/directives/forms/index.htm and https://about.usps.com/forms-publications/welcome.htm or as indicated.

** SPRINT updates will be received via email or can be found on AMPS Knowledge

Management (https://amps.usps.gov). The contractor shall review SPRINT for updates daily.

3. CONTRACTOR PROVIDED SERVICES. The contractor shall provide Aerial Mail

Terminal (AMT) services to include receiving and dispatching trailers, processing parcels and pouches, managing empty equipment, and managing associated documentation. Historical workload data are identified in Appendix B.

4. RECEIVING AND DISPATCHING MAIL.

4.1. The contractor shall receive and dispatch all commercial air carrier, military transport or commercial trucking mail vehicles 24 hours per day, 7 days per week based on the following schedules:

4.1.1. Commercial air carrier arrival and departure times are specified by the air carriers and will be provided to the contractor by MCA personnel or the Contracting Officer Representative

(COR). The contractor shall receive and dispatch all USPS-contracted airline and surface containers per day.

4.1.2. The STMR arrival/departure schedule (sample at Appendix C) ranges between 25-30 departures and 25-30 arrivals per weekday (Monday-Friday) and 2-10 departures and 2-10 arrivals on each day of the weekend. The STMR arrival times at the contractor facility are estimated times based on driving conditions. The contractor shall receive the trucks at any time during the day as long as mail is processed to meet truck pull and arrival times identified in the STMR schedule. The contractor shall coordinate exact arrival time with the COR. Dispatch time shall coincide with the https://tools.usps.com/go/ZipLookupAction_input https://amps.usps.gov/ http://www.dtic.mil/whs/directives/forms/index.htm https://about.usps.com/forms-publications/welcome.htm https://amps.usps.gov/

STMR schedule.

4.1.3. Special trucking segment schedules may be required during peak mailing period or as otherwise needed based on USPS dispatches or emergency contingency situations.

4.1.4. The contractor shall be prepared to process an approximately 30 percent increase in mail during November through December and up to 80 percent during emergency contingency situations.

4.2. Receiving, Unloading and Documenting Inbound Mail.

4.2.1. The contractor shall receive commercial air carrier mail at the staging area. The COR will retrieve the AV-7 from AMPS to validate weight.

4.2.2. The contractor shall receive ground transported mail at designated spot times as required by the STMR schedule or as coordinated with the COR. The contractor shall maintain accountability of the trailer dispatch via the DD Form 1372, Mail Manifest, according to SPRINT instructions.

4.2.3. The contractor shall receive surface containers as outlined in SPRINT and unload these containers in a timely manner in order to meet the designated pull time IAW the STMR. The COR will use AMPS to validate weight.

4.3. Loading, Delivering and Documenting Outbound Mail.

4.3.1. The contractor shall ensure all commercial air carrier mail is sorted and delivered to the staging area within Carrier Critical Entry Times provided by MCA personnel or the COR. The COR will use the AV-7 to validate weight.

4.3.2. The contractor shall ensure all ground transported mail and equipment is sorted and loaded into trailers waiting for dispatch according to the outbound STMR schedule. The contractor shall load all mail in trailers in such a manner as to prevent damage (e.g., larger and heavier pieces shall be loaded toward the bottom of the trailer). The contractor shall load trailers with mail according to the ZIP code or 3-digit airport code on the receptacle. The contractor shall load express mail, election ballots and letter class mail closest to the trailer doors.

4.3.2.1. The contractor shall prepare the DD Forms 1372 as required by SPRINT. The contractor shall provide a copy of this document to transportation personnel (i.e., vehicle driver).

4.3.2.2. The contractor shall properly seal all trailers with a numbered USPS seal (Postal Service

Identification Number [PSIN] 0817E or 0818A) and the 12 inch security wire tie or lock. The contractor shall annotate the seal numbers on the manifest. The contractor shall load, close, seal and document all trailers in time to meet dispatch times required by the STMR schedule. The driver will sign for the container and seal number as prescribed by DoD 4525.6-M, Department of Defense

Postal Manual.

5. MAIL PROCESSING.

5.1. The contractor shall process mail 24 hours per day, 7 days per week. The contractor shall ensure the accountability, safety, security and integrity of the mail at all times.

5.2. The contractor shall identify the destination of mail by either a 3-digit airport code flight tag

(USPS Tag 135-B), Enhanced Distribution Label (EDL), or ZIP Code. Mixed Working Mail pouches with ZIP code 09060 EDLs shall require further sorting IAW paragraphs 5.9 and 5.10.

5.3. The contractor shall correct parcels and pouches with incorrect EDLs or USPS Tags, or incorrectly nested by the APO, before processing. The contractor shall document discrepancies

IAW paragraph 7.2.

5.4. The contractor shall use the AMPS Dispatching and Nesting system to process all mail.

There is no requirement to place additional labels on prograde and truck-to-truck mail. The contractor shall scan existing labels on mail, if attached, for tracking purposes.

5.5. The contractor shall deliver rifled and dead mail to the COR or MCA personnel before the end of each shift.

5.6. In the event registered mail is encountered during performance, the contractor shall deliver it to the COR or MCA personnel immediately.

5.7. The contractor shall expedite the processing of election ballots and express mail to ensure they are not delayed.

5.8. Prograde Processing. Prograde is mail from Continental United States (CONUS) or other foreign origin points destined to post offices served by the GAMT. Prograde includes mail from a post office served by the GAMT that is destined to another post office served by the GAMT.

5.8.1. The contractor shall stage prograde mail for loading on STMR trailers or USPS-contracted airlines based on 3-digit airport code flight tag, EDL, ZIP code or SPRINT.

5.8.2. The contractor shall deliver missent international mail to the Deutsche Bundespost.

5.8.3. The contractor shall hand over international mail originating from foreign countries to the

Airmail Center Frankfurt (ACF).

5.9. Retrograde Processing. Retrograde is mail originating at a post office served by the

GAMT that is destined to CONUS or other foreign destinations. The contractors shall identify this mail by a 3-digit airport code flight tag, EDL or ZIP code.

5.9.1. The contractor shall sort all mail IAW SPRINT and properly route all mail to the appropriate

APOs, Fleet Post Offices (FPO), Fleet Mail Centers (FMC), military operating units, AMTs and

CONUS destinations.

5.9.2. The contractor shall pre-clear all retrograde mail shipments entering the Defense

Transportation System via Air Mobility Command using a DD Form 1384, Transportation

Control and Movement Document, through the sponsoring shipper service Airlift Clearance

Authority at Ramstein Air Base's Aerial Port. The contractor shall use Transportation Account

Code (TAC) FAAU for Air Force, TAC A2HE for Army and TAC 0002 for all Navy and Marine shipments.

5.10. Mixed Working Pouch Processing. Due to the central processing function of the GAMT, the facility serves as a low volume massing point for APOs and FPOs that do not process enough volume to justify direct pouches. These mixed pouches shall be addressed to the GAMT (ZIP Code

09060) for consolidation IAW SPRINT. The contractor shall sort, process IAW the AMPS

Dispatching and Nesting system and pouch this mail to each destination according to SPRINT and

Navy Mobile Routing message requirements.

5.10.1. During the processing of mixed mail pouches, the contractor shall sort this mail into appropriate breakdown bins or pouches. The contractor shall process all working mail pouches in time to meet the outbound STMR schedule or CONUS retrograde and foreign segment mail outbound dispatch schedule.

5.10.2. The contractor shall enclose sorted parcels, letters and flats in pouches, letter trays and flat tubs and attach EDLs for the intended final destination.

5.10.3. The contractor shall use the ZIP Code Directory, AMPS and SPRINT to properly sort and handle mixed working pouch mail IAW DoD 4525.6-M. The contractor shall contact the COR or

MCA personnel for disposition instructions when proper disposition cannot be determined.

5.11. Damaged Letter/Parcel Procedures. The contractor shall re-wrap parcels or letters received in a damaged condition the same day received. The contractor shall date and stamp or affix appropriate labels showing the parcel was received in a damaged condition and re-wrapped prior to forwarding to the destination.

6. EMPTY EQUIPMENT MANAGEMENT. The GAMT is a depository for excess pouches, plastic tubs/lids, serviceable letter trays/sleeves and postal equipment. APOs dispatch empty equipment (EE) to the GAMT as directed by SPRINT. The contractor shall consolidate and prepare all USPS EE being returned to CONUS.

6.1. The contractor shall coordinate all EE matters with the COR. The contractor shall ensure that there is EE on hand to support APOs served by the GAMT for a minimum of 30 calendar days

(estimated at 5 bundles of each type of equipment per APO). The contractor shall fill requests from

COR for equipment within 1 calendar day of request.

6.2. The contractor shall return excess EE to USPS as follows:

6.2.1. The contractor shall contact the Branch Movement Control Team (BMCT) to receive an

Export Traffic Release (ETR) document for each departing container. The contractor shall provide this document (CDRL A006) to USAFE AIRPS/PT, Joint Military Postal Activity (JMPA) and the

COR upon dispatch of the EE container.

6.2.2. The contractor shall complete a DD Form 1384 IAW ECM 4504.1 Transportation

Management within the USEUCOM Area of Responsibility DTR 4500.9 R, DoD Customs and

Border Clearance Policies and Procedures, and SPRINT.

6.2.3. For excess EE weighing 3,000 kilograms or more, the contractor shall load it in an outbound surface container. For excess EE weighing less than 3,000 kilograms, the contractor shall dispatch this v to the designated USPS-contracted airline.

7. DOCUMENTATION.

7.1. The contractor shall gather the following data from processed mail items using worksheets provided by the COR. The contractor shall complete and provide these worksheets to the COR no later than the 5th calendar day of the following month. See CDRL A003, CDRL A007 and CDRL

A008.

7.1.1. Prograde and Retrograde mail weight.

7.2. The contractor shall daily, by the end of each shift, document and report to the COR all irregularities or discrepancies made by dispatching post offices using a USAFE Form 838, Mail Irregularity Worksheet, according to SPRINT (CDRL A004). The contractor shall report

Postal Offenses via AMPS.

7.3. The contractor shall prepare and submit a Surface Container Report within 48 hours of receipt of the container to JMPA, USAFE AIRPS/PT and the COR (CDRL A005). The contractor shall submit the report online in AMPS or in the format identified by the SPRINT, Attachment 10, Surface Mail Container Receipt Report, if AMPS is unavailable.

7.4. The contractor shall retain file copies of mail dispatch and receipt records. The contractor shall retain and store file copies of mail records as required by the Air Force Records Information

Management System (see Table 7, below). The contractor shall dispose of obsolete records as directed by COR.

7.5. The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of Air Force

System for Award Management (SAM) via a secure data collection site. The contractor shall completely fill in all required data fields at http://www.sam.gov. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY) which runs

1 October through 30 September. While the contractor may report inputs any time during the FY, all data shall be reported no later than 31 October. The contractors may direct questions to the SAM help desk.

Table 7. Air Force Records Information Management System

TABLE RULE RECORD RETENTION

33-34 3 DD Form 1384, Transportation Control and Movement

Document

2 Years

33-34 21 Postal analyses and summaries, Transit Time Information System for Military Mail, Postal Activity Report System and Container Receipt Summaries

6 Months

33-50 6 USAFE Form 838, Mail Irregularity Worksheet 6 Months

8. COOPERATION WITH AUTHORITIES.

8.1. Security/Inspection. The contractor shall allow Bundespolizei, German/US Customs, US

Military Police and USPS/military inspectors access to the GAMT to conduct investigations concerning mail fraud, mail theft, mail tampering, security reviews, bio-hazard, mail bombs or other types of incidents. In addition, the contractor shall fully cooperate with US and local http://www.sam.gov./ government authorities in providing information, resources and access when requested.

8.2. Bio-Environmental. The contractor shall allow military and civilian members of the US and/or local government contracted bio-environmental engineering personnel to access and test mail processing areas for biological or chemical contamination. The contractor shall fully cooperate with US and local government authorities in providing information, resources and access when requested.

8.3. Conformance with Environmental Management Systems. The contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation Environmental Management System (EMS) applicable for this contract. The contractor shall perform work in a manner that: conserves water, energy, as well as other resources to the maximum extent feasible. The contractor shall ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the contractor shall give preference to less toxic materials whenever available that are still reliable for their work. In the event that the work performed by the contactor does not conform/comply with host nation and USAF environmental laws and regulations, the contractor shall take corrective and/or preventative action(s). In the case of noncompliance, the contractor shall respond to 86 Aerospace Medicine Squadron (AMDS) and take corrective action immediately. In the case of a nonconformance, the contractor shall respond to 86 AMDS and take corrective action based on the time schedule established by the EMS coordinator. In addition, the COR shall ensure that contractor employees are aware of the Environmental Management System on at the airport, and how these requirements affect their work performed under this contract. 86 AMDS will provide on-site contractor personnel installation EMS awareness level information.

8.4. Conformance with Environmental Requirements. The contractor shall perform all work in accordance with applicable German and US military environmental laws, regulations, and operating standards, including, but not limited to the Final Governing Standards (FGS) for

Germany.

8.5. Conformance with Host Nation Labor Laws. The contractor shall comply with Host Nation

Labor Laws such as section 613a BGB (German Civil Code) that may apply to this contract for personnel employed in Germany that likely involves the transfer of employment relationships.

Performance of this contract does not confer status accreditation to contractor employees under the

North Atlantic Treaty Organization, Status of Forces Agreement Supplementary Agreement for

Germany.

8.6. The contractor shall comply with Combating Trafficking in Persons guidance IAW Federal

Acquisition Regulation 52.222-50, Combating Trafficking in Person.

9. GENERAL INFORMATION.

9.1. Hours of Operations. The contractor shall receive, process and dispatch mail 24 hours per day, 7 days per week.

9.2. Contract Personnel.

9.2.1. Project Management. The contractor shall provide in writing the name and contact information of the full-time primary Project Manager that is responsible for the performance of work to the COR, COR Supervisor and CO NLT 10 calendar days after contract award in accordance with

CDRL A002. In addition, the contractor shall provide the name and contact information of the person who shall perform as the alternate for the contractor when the Project Manager is absent that is responsible for the performance of work to the COR, COR Supervisor and CO. The contractor shall provide this information to the COR, COR Supervisor and CO NLT 3 calendar days prior to the

Program manager’s absence in accordance with CDRL A002. The Project Manager or the alternate shall have full authority to act on all contract matters related to daily operations of this contract. After normal duty hours, the Project Manager or the alternate shall be available by phone, Monday –

Sunday between 1700 - 1900The position shall at no time be vacant. The Project Manager and alternate that are Non-US citizens shall provide documentation of their proficiency in English equivalent to Cambridge English Proficiency level C2 to the COR, COR Supervisor and CO.

Contractor supervisors that are not US citizens shall provide documentation of their proficiency in

English equivalent to Cambridge English Proficiency level B2 COR, COR Supervisor and CO.

9.2.2. Contractor Security and Personnel Requirements. The contractor shall ensure all personnel employed by the contractor in the performance of this contract, or any representatives of the contractor entering the contractor-operated facility or handling U.S. military mail, shall abide by all security regulations directed by DoD 4525.6-M. In order to receive an airport access badge, personnel shall provide a Good Conduct Certificate (Polizeiliches Führungszeugnis) as proof of no questionable integrity, criminal conviction other than minor traffic offenses, record of postal-related incidents, record of derogatory information or unfavorable conduct that casts doubt on his or her trustworthiness or honesty, history of psychiatric disorder, alcoholism, or drug abuse (unless a medical evaluation determines the condition no longer exists), record of financial irresponsibility, nor record of being removed for cause from a postal position. All contractor employees shall be capable of obtaining an airport access badge based upon their duties and assigned work location.

For all contractor employees that are not US citizens, the contractor shall provide documentation of their proficiency in English equivalent to Cambridge English Proficiency level A2 to COR, COR

Supervisor and CO.

10. TRAINING REQUIREMENTS. The contractor shall ensure each employee is trained

IAW AMPS, DoD 4525.6-M, Postal Manual, and SPRINT governing AMT services prior to operating any government provided USPS equipment and shall maintain training records to validate such training.

10.1. Phase-In. IAW CDRL A001, the contractor shall ensure a smooth and seamless transition to provide continuity of services to all customers. The contractor shall be ready to commence full performance in all contracted areas at the start of the basic contract period. The contractor shall maintain continuous communication with the COR, COR Supervisor, and CO during the transition period. The contractor shall develop and provide the CO an effective phase-in plan addressing all elements including, but not limited to, quality control, security, safety, and contingency, along with milestones for these events in accordance with CDRL A001, NLT 10 calendar days prior to contract award.

10.2. Phase-Out. IAW CDRL A001, the contractor shall work with the COR, COR Supervisor, CO and incoming contractor to ensure a smooth and seamless transition while providing continuity of services to customers. All areas shall be transitioned to permit commencement of full performance at the start of the basic contract period of the follow-on contract. The contractor shall provide the COR, COR Supervisor and COits working relationship details with all subcontractors and with Frankfurt

International Airport for facilities management. The contractor shall turn-in all airport security badges to the appropriate airport authority at least two days prior to departure. The contractor shall identify equipment and material deficiencies including shortages. The contractor shall transfer contingency operations material to the COR. The contractor shall develop and provide the COR, COR Supervisor and CO an effective phase-out plan addressing all elements of phase-out including, but not limited to, quality control, property control, security, safety and contingency, along with milestones for these events in accordance with CDRL A001, NLT 10 calendar days after contract award.

10.3. Initial Training. The Government will provide initial training on USPS equipment to a contractor trainer at the contractor’s facility during the phase-in period at no charge to the contractor. The contractor trainer is responsible for training other contractor employees.

11. CONTRACTOR QUALITY CONTROL. The contractor shall establish and maintain a quality control and inspection system that ensures the GAMT operation is performed IAW this contract, applicable laws and regulations and best commercial practices to cover all services listed in the Services Summary and this PWS. The contractor shall ensure that quality control procedures cover all aspects of contract performance, to include responsibility for surveillance requirement, a description of records to be kept, methods for identifying and preventing defects in the quality of service, and making records of inspections available to the Government upon request.

12. CONTRACT MEETINGS. The contractor shall ensure the Project Manager meets with the

CO, COR, USAFE AIRPS representatives and other government personnel monthly, or as needed within 24 hours of notification, to discuss contract status. Meetings will normally be held at the

Frankfurt International Airport unless the attendees mutually agree to meet elsewhere. The contractor may request a meeting with the Government when the contractor believes such a meeting is necessary. If the Government deems necessary, written minutes of any such meetings may be recorded by the Government and retained in the contract file and signed by the contractor and the

CO. If the contractor does not concur with any portion of the minutes, the contractor shall provide their written non-concurrence to the CO within 5 calendar days following receipt of the minutes.

13. PERFORMANCE OF SERVICES DURING CONTINGENCIES. All contractor services identified in this PWS are essential for performance during crisis declared by the National

Command Authority or Overseas Combatant Commander affecting the European theater of operation. The Government will notify the contractor in writing when such a crisis is declared. The contractor shall provide a contingency plan IAW DFARS Clause 252.237-7024 to the Contracting

Officer with the proposal.

14. CONTRACTOR PROVIDED FACILITIES AND EQUIPMENT. The contractor shall ensure the GAMT facility is located within a 30 kilometer radius of the Frankfurt International

Airport (FRA). If the GAMT is not located on the FRA, the contractor shall continue to receive and dispatch mail at the staging area on the FRA. The GAMT facility shall support the receiving, processing, sorting and distributing of US forces military mail as directed by SPRINT. Regardless of where the GAMT is located, the facility shall meet the processing timelines set forth in the

STMR schedule. The GAMT shall be accessible for delivery by USPS-contracted airlines to load and unload mail directly into or out of the facility if located on FRA. The contractor shall provide restrooms, utilities and maintenance at the GAMT, and is responsible for the upkeep and custodial costs of the GAMT, to include consumable supplies. The contractor shall provide an internet connection to gain access to AMPS for US military and contractor personnel.

14.1. Facility Security Requirements. The contractor shall secure the facility such that only authorized personnel are able to access it. The contractor shall ensure that personnel who carry personal bags into the facility are searched (1) upon arrival to ensure they do not introduce a hazard to the mail system and (2) upon departure to prevent theft.

14.2. Facility Trailer Requirements.

14.2.1. The contractor shall receive and dispatch US military or commercial trailers IAW the STMR truck pull and arrival times, as well as commercial air carrier or surface containers. The contractor shall coordinate trailer docking times with the COR. The contractor shall ensure there is ample space and easy access for parking or staging to meet the STMR schedule. These trucks or trailers may consist of a tractor-trailer combination measuring 60 feet long by 8 feet wide by 11 feet high

(18.29 x 2.44 x 3.35 meters), 40 foot (12.2 meter) STMR trailers, 40-50 foot (12.2 to 15.2 meter) commercial trailers, or smaller STMR vans and trucks. The contractor shall ensure the facility has the space to stage and maneuver 50 air carrier containers to meet the receipt and dispatch of mail volume.

14.2.2. Hardstand and docks are mandatory. The contractor shall load and unload US military or commercial trailers using any means necessary as long as the STMR truck pull and arrival times and mail security requirements are met. Dock heights shall be between 51 inches and 56 inches

(1.296 and 1.422 meters) to meet US Army and commercial trailer heights for 40-50 foot (12.2 to

15.2 meters) trailers. The contractor shall ensure ramps or other load and unload positions are capable of accommodating the loading and unloading of STMRs that utilize light cargo vans without impeding staged trailer operations.

14.2.3. The contractor shall ensure the load and unload areas have outdoor lighting to ensure personnel can safely coordinate truck movement. The contractor shall ensure the trailers are able to load and unload under a covered shelter to prevent weather damage when moving mail.

14.3. Empty Equipment (EE). The contractor shall have a dry location to store EE identified in paragraph 6.

14.4. Office Space. The contractor shall provide a minimum of 120 square meters of empty office space for government personnel located at the GAMT. All office spaces shall have climate control options.

14.4.1. The contractor shall provide office space for nine (9) work stations. The space may be broken into separate rooms as long as one room is capable of accommodating four (4) work stations and is within close proximity to the mail receiving and dispatch area to facilitate timely processing of inbound and outbound trailers. Each work station within the office(s) shall be wired with one telephone drop and at least four electrical outlets.

14.4.2. The contractor shall provide official government parking to support these offices for a minimum of 10 vehicles within 100 meters of the processing facility.

14.5. Transportation Network Delays. The contractor shall hold mail during periods where the transportation network conditions prevent the unimpeded flow of mail. The contractor shall notify the COR if delays occur due to transportation network conditions.

14.6. Container Scale. The contractor shall provide a calibrated trailer or container scale at the

GAMT facility for government or USPS-contracted airline use in support of this contract. The contractor shall calibrate all weight scales and provide the calibration certificate(s) to the COR and the COR supervisor in accordance with CDRL A009.

SECTION 2: SERVICES SUMMARY (SS)

SS Performance Objective PWS Para. Performance Threshold

1 Process Prograde and

Retrograde Mail

5.8 and 5.9 Process 95% of prograde and retrograde ordinary mail daily into trucks/trailers or staged in GAMT facility, ready for the first scheduled outbound

STMR(s) or flight(s). Remaining 5% processed and staged for the next available outbound

STMR(s) or flight(s).

2 Process Mixed Working

Pouches

5.10 Process 100% of mixed working pouches daily into

trucks/trailers or staged in GAMT facility, ready for the first scheduled outbound STMR(s) or flight(s).

3 Unload Inbound

Trucks/Trailers

4.1 and 4.2 Unload 100% of mail in time to meet the designated critical entry/exit times and pull times IAW with STMR schedule.

4 Load and Document

Outbound Trucks/Trailers

4.1 and 4.3 Load 100% of mail on trucks/trailers prior to pull times. Prepare dispatch documents as required by SPRINT and provide completed mail manifests 100% of the time.

SECTION 3. USPS FURNISHED PROPERTY AND SERVICES

1. The Government will provide the contractor USPS-unique supply, forms, and equipment items as outlined in Appendix D. The contractor shall maintain a minimum 3 month supply of these items in stock. The contractor shall submit a written request(s) to replenish supply items to the

COR with a minimum 3 months lead-time to re-stock items.

2. The contractor shall use and maintain the AMPS Dispatching and Nesting system.

3. The contractor shall use the computer provided by the USPS to access AMPS. The contractor shall procure an internet connection at access AMPS. (Reference paragraph 14).

4. The Government will provide the contractor with electronic updates to USPS and DoD instructions that are not publically available.

5. The contractor shall return all USPS furnished equipment and unused supplies at the completion of the contract to the COR.

SECTION 4: APPENDICES APPENDIX

A: ACRONYMS/TERMS

ACF – Airmail Center Frankfurt AIRPS – Air Postal Squadron AFAFRICA – United States Air Forces Africa

AMPS- Automated Military Postal System AMT

– Aerial Mail Terminal

APO – Army/Air Force Post Office

BMCT – Branch Movement Control Team

CDRL – Contract Data Requirements List

CO – Contracting Officer

COR – Contracting Officer Representative

CONUS – Continental United States

DoD – Department of Defense

DTR – Defense Transportation Regulation

EDL – Enhanced Distribution Label

EE – Empty Equipment

ETR – Export Traffic Release

EUCOM – European Command

FRA – Frankfurt/Main International Airport

GAMT – Germany Aerial Mail Terminal IAW –

In Accordance With

IDS – Intra-Theater Delivery System

JMPA – Joint Military Postal Activity

MCA – Mail Control Activity

PS – Postal Service

PSIN – Postal Service Identification Number

PWS – Performance Work Statement

SAM – System for Award Management SPRINT –

Standard Pouching and Routing Instructions

STMR – Standard Transportation Movement Request

TAC – Transportation Account Code

USAFE – United States Air Forces in Europe

USPS – United States Postal Service

ZIP – Zone Improvement Plan

APPENDIX B: HISTORICAL WORKLOAD DATA

TABLE B1. ORDINARY MAIL HISTORICAL WORKLOAD DATA

2016 2017 2018 2019

Total Yearly Kilograms 10,646,980 9,661,838 9,419,095 9,441,921

Prograde Kilograms 5,983,072 6,388,778 6,373,585 6,499,831

Retrograde Kilograms 1,244,670 1,976,601 2,089,528 2,011,046

Surface/EE/IDS Kilograms 1,238,968 1,206,254 1,144,046 931,043

Daily Kilograms *29,169 *26,470 *26,759 *26,824

*The contractor shall calculate daily kilograms in a Mail Data Collection Worksheet provided by the COR by taking the sum of the following daily volumes: prograde and retrograde mail weight as documented on the Postal Service (PS) Form 2942-A, AV- 7 Delivery List; IDS mail weight; the surface container mail as documented in AMPS; and the DD Forms 1372 and 1384.

CHART B2. ORDINARY MAIL HISTORICAL WORKLOAD DATA (OCT – JAN)

2016 2017 2018 2019

October

Kilograms 807,628 750,320 763,777 807,990

November

Kilograms 898,234 976,075 910,719 952,421

December

Kilograms 1,166,504 1,136,547 1,099,767 1,150,679

January

Kilograms 750,320 744,997 774,010 844,974

TABLE B3. MIXED WORKING BAG HISTORICAL WORKLOAD DATA

Daily Number of Bags 60-80

Estimated number of pieces based on 80 bags:

Letters

Flats

Small Boxes

8,000

5,000

The CORs will validate the contractor’s monthly volume (kilograms) using AMPS, DD

Forms 1372 and 1384, and locally generated data sheets.

APPENDIX C: SAMPLE STANDARD TRANSPORTATION MOVEMENT REQUEST

(STMR)

TABLE C1 - SAMPLE OUTBOUND STMR SCHEDULE

GERMANY AMT STMR OUTBOUND SCHEDULE

OUTBOUND to APOs

STMR SAT

NO. DESTINATION PULL ARRIVE FREQUENCY Pull

104 104 & MUNNS RR 2400 0930 MON - FRI

705 /

714 SHAPE / BRUSSELS 0130 0800 MON & THU

261 MUNNS 214/261 (DHL) 0500 1030 M - W - F

214 MUNNS 214 Only (DHL) 0500 1030 Tue & Thu

46 STUTTGART 046 (DHL) 0730 1030 MON - FRI

107 STUTTGART 107 (DHL) 0730 1030 MON - FRI

128 STUTTGART Patch(DHL) 0800 1100 MON - FRI

752 BRUNSSUM 0900 1430 MON - FRI

094 RAMSTEIN IMR MIXED 0900 1100 M-Th-Sat 1115

053 GARMISCH (DHL) 1000 1530 MON - FRI

173 HOHENFELS (DHL) 1100 1500 MON - FRI

112 VILSECK (DHL) 1100 1530 MON - FRI

114 GRAFENWOEHR (DHL) 1130 1600 MON - FRI

126 SPANGDAHLEM 1130 1530 MON-SAT

264 KATTERBACH 1145 1515 MON - TUE

264 KATTERBACH 1145 1515 WED - FRI

46 STUTTGART (DHL) 1300 1530 MON - FRI

107 STUTTGART (DHL) 1300 1530 MON - FRI

034 BAUMHOLDER (DHL) 1300 1500 MON - SAT

012 RAMSTEIN APO 1300 1500 EVERYDAY

140 ILLESHEIM (DHL) 1315 1645 MON - FRI

67 Rhine Ordnance Bks (DHL) 1315 1500 MON - FRI

095 /

200 GERMERSHEIM GAD (DHL) 1315 1500 MON - FRI

142 SEMBACH (DHL) 1330 1530 MON - -WED

142 SEMBACH (DHL) 1330 1530 THU - FRI

180 LANDSTUHL (DHL) 1330 1545 MON - WED

180 LANDSTUHL (DHL) 1330 1545 THU - FRI

227 Kleber Kaserne (DHL) 1345 1530 MON - FRI

011 DARMSTADT (DHL) 1400 1500 MON - FRI

021 KAPAUN 1430 1730 MON-FRI

96 WIESBADEN (DHL) 1445 1545 MON - TUE

96 WIESBADEN (DHL) 1445 1545 WED - FRI

634 STEFANIVEIKO AB GR Tue & Thu

STMR 094 IMR New Pull time for Saturday Ops

EFFECTIVE - 1 APR 2020

(1) Departure time (Pull) from GAMT

(2) Arrival time (Arrive) at destination

TABLE C2 - SAMPLE INBOUND STMR SCHEDULE

GERMANY AMT COMBINED STMR SCHEDULE

INBOUND from APOs

STMR SAT

NO. ORIGIN Pull ARRIVE FREQUENCY ARRIVE

214 MUNNS 214 Only (DHL) 1100 1200 Tue & Thu

214 MUNNS 214/261 (DHL) 1100 1400 M - W - F

094 RAMSTEIN IMR 1200 1400 M-Th-Sat 1615

011 DARMSTADT (DHL) 1600 1700 MON - FRI

104 104 & MUNNS RR 1315 1700 MON - FRI

095 /

200 GERMERSHEIM GAD (DHL) 1530 1715 MON - FRI

67 Rhine Ordnance Bks (DHL) 1600 1815 MON - FRI

227 Kleber Kaserne (DHL) 1630 1815 MON - FRI

180 LANDSTUHL (DHL) 1645 1845 MON - FRI

142 SEMBACH (DHL) 1700 1900 MON - FRI

096 WIESBADEN (DHL) 1830 1930 MON - FRI

021 KAPAUN 1730 1930 MON - FRI

173 HOHENFELS (DHL) 1600 2000 MON - FRI

264 KATTERBACH (DHL) 1630 2000 MON - FRI

034 BAUMHOLDER (DHL) 1700 2000 MON - SAT

126 SPANGDAHLEM 1630 1915 MON - SAT

128 STUTTGART PATCH (DHL) 1800 2030 MON - FRI

012 RAMSTEIN APO 1900 2100 MON - SAT

140 ILLESHEIM (DHL) 1730 2100 MON - FRI

112 VILSECK (DHL) 1630 2100 MON - FRI

053 GARMISCH (DHL) 1630 2200 MON - FRI

752 BRUNSSUM 1630 2230 MON - FRI

705/ 714 SHAPE/BRUSSELS 1530 2230 TUE & FRI

114 GRAFENWOEHR (DHL) 1700 2130 MON - FRI

EFFECTIVE - 1 APR 2020

(1) Departure (Pull) from military post office

(2) Arrival (Arrive) at GAMT

APPENDIX D: USPS PROVIDED , EQUIPMENT, , SUPPLIES AND FORMS

The Contractor shall submit to the COR all requisitions for USPS, Supplies and Forms as identified in PUB 223 using the PS Form 7380. The contractor shall maintain a three months’ supply of supplies and forms on hand.

TABLE D2. USPS PROVIDED EQUIPMENT

USPS

Equipment Description Unit of

Issue

Quantity provided to contractor

Quantity for return to

USPS upon contract completion

USPS EQUIP AMPS Dispatching and Nesting

System

EA 5 5

CONTRACT NUMBER: FA5641-16-R-0001

APPENDIX E: REQUIRED REPORTS/CDRLs

CDRL Title Reference Remarks Frequency Format Distribution

A001 Phase-In and Phase-Out

Plans Paragraph 10.1 and 10.2

Provide NLT 10 calendar days after contract award One Time

Government, Electronic Format

COR, COR

Supervisor, CO

A002

Project Manager and

Alternate

Paragraph 9.2.1

Provide name of Project Manager

(PM) NLT 10 calendar days prior to contract award and contact details of delegated PM NLT 3 days prior to absence of primary PM; include

English proficiency certificate.

As Required

, Electronic

Format

Supervisor, CO

A003

Prograde and

Retrograde Mail

Processing Report

Paragraph 7.1

Provide NLT 5th calendar day of the following month

Monthly

Government, Electronic, rovided by COR

COR

A004

Mail Irregularity Report

Paragraph 7.2

Daily at the end of each shift

Daily

Electronic, USAFE

Form 838 Provided by COR

A005

Surface Container

Report

Paragraph 7.3

Complete in AMPS after each arriving container within 48 hours of receipt of the container, or alternate method

IAW SPRINT if AMPS is not available

Provided by COR

USAFE

AIRPS/PT,

JMPA, COR

A006

Empty Equipment

Management Export

Traffic Release (ETR)

Paragraph 6.2.1

Provided for each departing container

Provided by

BMCT

USAFE

AIRPS/PT,

JMPA, COR

A007 Mail Data Contractor

Collection Worksheet

Paragraph 7.1 Provide NLT 5th calendar day of the following month Monthly

Electronic, Provided by COR

Supervisor

A008

Mixed Working Bags

Worksheet

Paragraph 7.1 Provide NLT 5th calendar day of the following month

Monthly

Provided by COR

A009

Scale Calibration

Paragraph 14.6

Provide certificate NLT 10 calendar days after contract start date and NLT

10 Jan annually.

Annually

Contractor, Electronic Format

Supervisor

File details come from the government source that posted it. Updated .