Attachment_D_Sched_of_Pricing.Amend_0001.docx

DOCX document 31 KB Posted

Attached to
Haulout, Inspection, Maintenance, Repair Research Vessel
Solicitation number
G15PS00850
Issued by

About this file

Attachment D Schedule of Pricing

View the file

Other files

File Type Posted
Attachment_G.Electrical_Drawing.pdf PDF
Attachment_H.Solicitation_Clauses.Amend_0002.doc DOC document
Sol_G15PS00850_Amd_000002.pdf PDF
Attachment_A_Specification.Amend_0001.docx DOCX document
Sol_G15PS00850_Amd_000001.pdf PDF
Attachment_D_Sched_of_Pricing.docx DOCX document
Attachment_B_Drawings.pdf PDF
Attachment_C_Appendix.doc DOC document
Sol_G15PS00850.pdf PDF
Attachment_E_Release_of_Claims.doc DOC document
Attachment_A_Specification.docx DOCX document
Attachment_F_Past_Performance_Questionnaire.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel Sturgeon

WORK ITEM
PRICE
4
Hauling, Blocking, Launching
6.1
Hull High Pressure Wash and Visual Inspection
OPTION
6.2
Audio-Gauge Hull
6.3
Hull Appendage Leak Test
6.4
Underwater Hull Coating - Inspection
OPTION
6.4a
Repair Underwater Hull Coating
6.5
Inspect Hull Coatin g Above the Waterline
OPTION
6.5a
Repair Hull Coating Above the Waterline
6.6
Inspect Decks and Superstructure Coating System
OPTION
6.6a
Decks and Superstructure, Blasting and Coating
6.7
Tank and Void Inspection
OPTION
6.7a
Tank and Void Coating
7.1
Valve Repair
7.2
Rudders
7.3
Shafts
7.4
Propellers
7.5
Bow Thruster
7.6
Anchor Chain and Wire
7.7
Main Engine Inspection
7.8
Main Gearbox Inspection
7.9
Generator Inspection
8.5
Blast and Paint Transducer Tubes
8.7
Inspect and Test Port Keel Cooler
8.8
Replumb Holding Tanks, Install Tanktender
8.9
Rewire Main Generator to Power Fishing Equipment HPU
8.10
Convert Fishing Equipment Hydraulic System

TOTAL OF ALL ITEMS (INCLUDING OPTION ITEMS)

LABOR RATES

Shipyard Labor
$/hr
Crane/forklift
$/hr
Material Markup
%
Subcontractor Markup
%

Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:

G15PS00850

Attachment D Schedule of Pricing.Amend 0001 Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing

Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:

Planning Quality Assurance Testing Engineering Design Lofting

G14PS00428
Attachment D Schedule of Pricing

Amendment 0002

File details come from the government source that posted it. Updated .