Attachment_6_-_Well_Construction_Schematics.pdf

PDF 195 KB Posted

Attached to
The drilling of two test boreholes for use as monitor wells
Solicitation number
G15PS00497
Issued by

About this file

Well Construction Schematics

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Well Construction Schematics

Figure 3. Schematic of drilled borehole at end of Phase 1 (drilling of open hole for testing).

Figure 4. Schematic of monitoring well after end of Phase 2 (well reconstruction as monitoring well).

Bibliography

U.S. Environmental Protection Agency, 2014 (updated), North Penn Area 1: accessed 5 November 2014 at http://epa.gov/reg3hwmd/super/sites/PAD096834494/index.htm.

File details come from the government source that posted it. Updated .