FOR POWDER COATING REFERENCE.pdf
PDF 2 MB Posted
- Attached to
- ACC TRSS Det 9 - Powder Coating BPA
- Solicitation number
- FY27PowderCoatingBPA
About this file
DOCUMENT SUMMARY
This is a technical drawing package consisting of nine pages of engineering blueprints prepared by Luke Air Force Base, Detachment 9, Air Combat Command Training Support Squadron. The drawings are proprietary and confidential, depicting various assemblies for a "FOCNINER" project with powder coat finish specifications.
The package includes detailed technical specifications for seven primary assemblies: Frame Assembly (FOCNINER.2162.000.001), Screen Door Subassembly (FOCNINER.2162.000.002.014), Side Door Assembly (FOCNINER.2162.000.003), Solar Door Assembly (FOCNINER.2162.000.005), BPU Enclosure Assembly (FOCNINER.2162.000.001.B), Top Door Assembly (FOCNINER.206.025.005), General Side Door Assembly (FOCNINER.206.025.007), another Side Door Assembly variant (FOCNINER.206.025.003), and Battery Door Assembly (FOCNINER.206.025.002). Each drawing provides isometric, front, right, and top orthographic views with precise dimensional specifications in inches, tolerance standards (X.XXX = ±0.005, X.X = ±0.03125, X.XX = ±0.015625, angles = ±1°), hardware callouts, and manufacturing notes. The drawings were prepared by Michael Andrew with a release date of 10/27/2026 and include revision histories documenting design modifications such as door size reductions for powder coating tolerance and hardware updates. All assemblies are designated for powder coat review and finish.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical Clarifications.pdf | ||
| Det 9 Powder Coating SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROHIBITED.
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
30.27
36.25
REV DESCRIPTION EDITOR DATE
- RELEASE CMA XX/XX/XXXX
FRONT RIGHT
TOP
ISO
POWDER COAT REVIEW
UNLESS OTHERWISE
QTY: 1
FOLLOWS:
X.XXX = ±0.005
DIMENSIONS ARE IN INCHES
REV
1:15
AIR COMBAT COMMAND
TOLERANCES ARE AS
SPECIFIED:
MICHAEL ANDREW
DRAWN BY:
DETACHMENT 9
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL
B
DATE:
FINISH
ANGLES = ±1°
SHEET
DESCRIPTION
10/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
41.46
1.19
R10.35
3.00
40.27
FOCNINER.2162.000.001FRAME ASSEMBLY
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
1:3
REV
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
DESCRIPTION
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
POWDER COAT REVIEWANGLES = ±1°
10/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
REV DESCRIPTION EDITOR DATE
A DOOR SIZE REDUCED TO INCREASE
TOLERANCE FOR POWDER COATING CMA 8/27/2025
.33
1.38
.06
FOCNINER.2162.000.002.014Screen Door Subassembly
A
FRONT
16.49
14.93
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
7.
.77
5.05 5.40
8.38 11.42 14.46 17.44
26.39
.0
.2
.3
.1
6.
8.
0.
3.
.1
.6
1.
4.
20.22
XXXX
FOCNINER.2162.000.003SIDE DOOR ASSEMBLY
A
28.23
3.66
25.50
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
1:8 3 OF 9
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
DESCRIPTION
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
REV
POWDER COAT REVIEWANGLES = ±1°
10/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
REV DESCRIPTION EDITOR DATE
A UPDATED VARIOUS HARDWARE
CALLOUTS CMA 05/19/2026
ISO
RIGHTFRONT
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
26.18
19.74
3.
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
1:6
REV
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
POWDER COAT REVIEWANGLES = ±1°
10/27/2026
PART NUMBERQTY: DESCRIPTION
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
A CHANGED FEET CMA 07/10/2025
3.66
FOCNINER.2162.000.005SOLAR DOOR ASSEMBLY
FRONT RIGHT
27.55
1.10
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
2.56
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
REV
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
DESCRIPTION
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
1:15
POWDER COAT REVIEWANGLES = ±1°
10/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
XXXX
FOCNINER.2162.000.001BPU ENCLOSURE ASSEMBLY
B
ISO
37.84
2.50
40.26
32.38
3.20
38.10
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
8.
.9
3.00
9.85
16.69
23.54
30.38
33.38
.0
32.45
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
REV
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
ANGLES = ±1°
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
DESCRIPTION
POWDER COAT REVIEW
1:610/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
ISO
XXXX
FOCNINER.206.025.005TOP DOOR ASSM
A
REV DESCRIPTION EDITOR DATE
A ADDED SCREW GASKETS AND SWITCHED
TO BUTTON HEAD FASTENERS CMA 09/16/2026
.25
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
1:7
REV
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
ANGLES = ±1°
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
DESCRIPTION
POWDER COAT REVIEW
7 OF 910/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
XXXX
FOCNINER.206.025.007GEN SIDE DOOR ASSM
XXXX
3.44
FRONT
28.00
.25
RIGHT
22.57
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
DESCRIPTION
1:7
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
REV
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
POWDER COAT REVIEWANGLES = ±1°
10/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
DETAIL F
SCALE 2 : 7
.96
DETAIL G
SCALE 2 : 7
2.79
RIGHT
TOP
FRONT
PLEASE NOTE FEET ARE IDENTICAL
AND ARE OFFSET ON PURPOSE
FOR CLEARANCE IN ASSEMBLY
XXXX
FOCNINER.206.025.003SIDE DOOR ASSM
XXXX
25.75
F G
28.00
.25
DRAWING IS THE SOLE PROPERTY OF
LUKE AFB DET 9 ACC TRSS. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
LUKE AFB DET 9 ACC TRSS IS
PROPRIETARY AND CONFIDENTIAL
3RD ANGLE PROJECTION
ASSEMBLE
APPROVAL TYPE QUANTITYDATE
INSPECTION - QUALITY CHECK
CUT / PUNCH
TIMESAVE / DEBURR
FORM
HARDWARE
INITIALS
NOTES:
19.85
X.XXX = ±0.005
FOLLOWS:
DIMENSIONS ARE IN INCHES
REV
MICHAEL ANDREW B
TOLERANCES ARE AS
SPECIFIED:
DATE:
DRAWN BY:
UNLESS OTHERWISE
ANGLES = ±1°
TRAINING SUPPORT SQUADRON LUKE AFB, AZ
SIZE
SCALE
PROJECT
MATERIAL FINISH SHEET
AIR COMBAT COMMAND
DETACHMENT 9
QTY:
DESCRIPTION
POWDER COAT REVIEW
1:510/27/2026
PART NUMBER
A A
B B
X. = ±0.0625 X.X = ±0.03125
X.XX = ±0.015625
ISO
21.00
R.38
.63 .25
XXXX
FOCNINER.206.025.002BATTERY DOOR ASSM
XXXX
.34
File details come from the government source that posted it. Updated .