This document is a Scope of Work (SOW) for janitorial services at the Falcon Power Plant for the International Boundary and Water Commission (IBWC). The contract requires cleaning services two days per week (Mondays and Thursdays) for approximately 3,500 square feet, including operators' control room, three restrooms, three offices, a machine shop area, break room, and kitchenette. The period of performance is from September 30, 2025, to October 1, 2030.
Key requirements include emptying trash, dusting surfaces, sweeping and mopping floors, cleaning windows and blinds, and sanitizing restrooms. The contractor must comply with Department of Homeland Security documentation requirements when entering the facility. Invoices will be submitted monthly to invoices@ibwc.gov, with a fixed monthly price. The procurement is a lowest-price, technically acceptable solicitation under NAICS code 561720 with a $22 million small business size standard. Quotes are due by the posted time on SAM.gov, and the government reserves the right to cancel the solicitation at any time.
Text of this file
SCOPE OF WORK FOR CLEANING SERVICES
FOR THE FALCON POWER PLANT
REQUISITION FY26R5201005
The following cleaning services are to be provided to the International Boundary and Water Commission, United States, at the Falcon Power Plant located at, 1 Reservoir Road, Falcon Heights, TX, 78545.
The Contractor shall provide the service two (2) days per week (Monday & Thursday) excluding Federal Holidays. POP: 9/30/2025 to 10/01/2030.
Please note that the contractor will cross through the port of entry and will have to comply with all Department of Homeland Security document requirements when leaving the Power Plant.
AREA TO BE CLEANED
| 1. | Operators’ Control Room |
| 2. | Three (3) restrooms at Erection Floor |
| 3. | Three (3) offices (Plant Manager, Superintendent & Telephone Room) |
4. One (1) restroom (Machine Shop Area)
| 5. | One (1) Office in Machine Shop (Mechanics & electrician’s Office) |
| 6. | Break Room Area |
7. Operators Kitchenette Area ***Approximately 3,500 square feet to be cleaned***
RESTRICTIONS
DO NOT MOVE FURNITURE, SUCH AS DESKS OR FILE CABINETS OR OTHER HEAVY ITEMS.
DO NOT REMOVE ANY PAPERS FROM THE TOPS OF DESKS.
SERVICES TO BE PERFORMED
| Empty all trash cans and replace plastic bags in trash cans. |
| Dust all desks and tops of copy machine, cabinets, and appliances. |
| Sweep and mop floors, including around the cracks, |
| Dust window blinds and light covers clean all surfaces of windowsills, and Venetian blinds, clean inside and outside of windows. |
5. Clean all restrooms:
a. Wash toilets and basin with detergent and scouring pads
b. Clean mirrors with glass cleaner
| c. | Sweep and mop floors |
| d. | Disinfect all surfaces |
NOTE: Please notify IBWC personnel when supplies are becoming low at least 30 days in advance.
NON-DISCLOSURE
All aspects of this work are considered property of the Government. No release of any information or opinion related to this work is permitted without written authorization of the International Boundary and Water Commission-US Section.
POINT OF CONTACTS:
Technical points of contact for this work is Jesus Guerra, Falcon Power Plant Operations Manager, 956-948-2116
PAYMENTS AND INVOICES:
| · | The monthly invoice shall include a description of the dates service was provided and specific services performed. |
| · | All invoices shall be sent to the USIBWC Finance & Accounting Division (FAD) monthly by email to invoices@ibwc.gov. A copy shall be furnished to the POC. |
| The monthly amount shall be firm fixed priced. |
| Payment shall be made in accordance with contract clause 52.212-4 |
SALARIES AND BENEFITS:
The Contractor and all subcontractors shall be responsible for complying with all Department of Labor requirements and labor wage determinations.
INSPECTION AND ACCEPTANCE
Inspection and Acceptance will occur at Falcon Power Plant Raul Salinas (Superintendent).
END OF SCOPE OF WORK
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Applicable Terms and Conditions.docx | DOCX document | |
| CLIN Structure.xlsx | XLSX spreadsheet | |
| wage determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .