FY26_Striping_Qty_N6_N15_N9010_N54_Price_Schedule.pdf

PDF 242 KB Posted

Attached to
PERMANENT PAVEMENT MARKING
Solicitation number
140A0926Q0040
Issued by

About this file

This document is a pricing template for a Bureau of Indian Affairs pavement marking project at Fort Defiance Agency for Fiscal Year 2026. The project encompasses additional striping quantities across five reservation routes totaling 51 miles, requiring waterborne pavement markings with Type 1 glass beads and reflective paint in 4-inch reflective stripes. The pavement marking work includes 109,803 linear feet of solid yellow lines, 529,200 linear feet of solid white lines, and 270,200 linear feet of broken yellow lines, for a combined total quantity of 909,203 linear feet.

In addition to the primary striping work, the scope includes supplementary pavement markings consisting of 20 right arrows, 40 left arrows, 30 only arrows, and 1,050 linear feet of crosswalk markings. The template contains blank fields for pricing entries at the subtotal level for the main striping work, mobilization costs, and the additional arrows and crosswalk items, with a grand total field at the completion of the pricing schedule. The specific routes marked for work are N6, N15, N9010, N54, and N12, each with defined starting and ending points within the Fort Defiance reservation area.

View the file

Other files

File Type Posted
Sol_140A0926Q0040_Amd_0001.pdf PDF
SOW_FY26_Striping.pdf PDF
B08_Solicitation_Q0040.pdf PDF
IA_-_IEE_Representation_Form.pdf PDF
SCA_15-5477_APACHE___NAVAJO.txt TXT text file
Sol_140A0926Q0040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grand Total= $

Bureau of Indian Affairs

Fort Defiance Agency-BOT Additional Striping Quantities FY26

Route No.

Location

Miles

Solid Yellow (ft)

Solid White (ft)

Broken Yellow (ft)

Remarks/Description

N6 N6/US77 Reservation line to N6/N15 Jct 20 27,963 211,200 105,600 Waterborne Pavement Markings, with Type 1 glass beads, ReflectivePaint (4” Reflective Stripe)

N15 N6/N15 Jct to Greasewood (MP80) 10 26,400 106,000 52,800 Waterborne Pavement Markings, with Type 1 glass beads, ReflectivePaint (4” Reflective Stripe)

N9010 NN9010 Pine Springs School 11 29,040 106,000 58,800 Waterborne Pavement Markings, with Type 1 glass beads, ReflectivePaint (4” Reflective Stripe)

N54 N54/US264 Jct to Fort Defiance 10 26,400 106,000 53,000 Waterborne Pavement Markings, with Type 1 glass beads, ReflectivePaint (4” Reflective Stripe)

N12 N12/US264 Jct to Fort Defiance 10 26,400 106,000 106,000 Waterborne Pavement Markings, with Type 1 glass beads, ReflectivePaint (4” Reflective Stripe)

Total miles = 51 mi 109,803 529,200 270,200

Total Qty= 909,203

Subtotal = $ Mobilization = $ Subtotal = $

Additional Arrows and Crosswalk:

20-Right Arrow

40-Left Arrows

30-Only Arrows

1050 ft (SW)=Crosswalk

Subtotal= $

Grand Total= $

File details come from the government source that posted it. Updated .