FY26 SOW Acquisition and Installation of the Dock Leveler (002).docx
DOCX document 47 KB Posted
- Attached to
- 30 LRS Dock Leveler
- Solicitation number
- F4D3C36076A001
About this file
This is a Statement of Work (SOW) for the acquisition and installation of a dock leveler at Vandenberg Space Force Base (VSFB). The requirement encompasses the complete removal of an existing dock leveler, installation of a new dock leveler system, and provision of training on proper use of the equipment. The contractor must supply all necessary labor, equipment, supplies, materials, transportation, supervision, and support to complete the project.
This is a small business set-aside solicitation issued by the Department of the Air Force Space Command under Solicitation Number FA461026P0029 as a Request for Quotation (RFQ). The applicable NAICS code is 811310 with a size standard of $12.5 million and PSC code J039. This is a commercial supply contract prepared under FAR Part 12. Responses should follow the attached RFQ format in PDF or Excel. The Government reserves the right to award some or all line items and to cancel the solicitation at any time without obligation to reimburse response costs. Specific response dates and award dates are not included in this SOW document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dock Leveler Replacement.docx | DOCX document | |
| Attch 1 - Wage Determination 2015-5647 Rev 27_29 April 2026 (1).pdf | ||
| Combo RFQ_RFO_Dock Leveler.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPACE FORCE, VANDENBERG
ACQUISITION & INSTALLATION OF DOCK LEVELER
for the
30 LRS
Statement of Work
16 MAR 2026
1.0 BACKGROUND
30 LRS requires the installation of a dock leveler to support safe, efficient, and reliable loading and unloading operations at its facility. A dock leveler is a mechanical device designed to bridge the height and distance gap between the building’s loading dock and a truck or trailer. Without a properly functioning dock leveler, personnel must navigate uneven surfaces and inconsistent trailer heights, which slows material‑handling operations and increases the risk of injury, equipment damage, and cargo instability.
Upgrading this equipment is essential to sustaining 30 LRS’s operational tempo, improving workplace safety, and ensuring logistics activities can be executed efficiently and without interruption.
2.0 OBJECTIVES:
The objective of this project is to furnish and install new dock‑leveling equipment that enables 30 LRS to safely and efficiently bridge the gap between the facility’s loading dock and a wide variety of truck and trailer types. The new dock leveler will support faster loading and unloading operations, improve material‑handling efficiency, and ensure a smooth transition surface for forklifts and other equipment.
Specifically, this project will:
1. Furnish and install one (1) 6' × 8' hydraulic dock leveler with a dynamic capacity of 40,000 pounds, including all required bumpers and accessories.
2. Provide dock‑bridging capability that accommodates varying truck heights and configurations, ensuring safe and reliable loading and unloading operations.
3. Enhance operational throughput by reducing delays caused by uneven trailer heights and manual adjustments, thereby improving overall logistics efficiency.
3.0 SCOPE OF WORK
The contractor shall provide all labor, tools, materials, equipment, safety measures, supervision, and all associated permits required by Vandenberg SFB to complete the work described in this Statement of Work. All work shall comply with applicable federal, state, and local codes, manufacturer specifications, and installation best practices.
The work includes, but is not limited to, the following:
3.1 Furnish and Install New Dock Leveler
· Furnish and install one (1) 6 ft × 8 ft hydraulic dock leveler with a dynamic capacity of 40,000 pounds, including bumpers and all necessary mounting hardware.
· Verify that the installed leveler provides a safe and smooth transition between the dock and various truck/trailer heights.
· Remove properly of one (1) existing dock leveler.
· Install the dock leveler in accordance with manufacturer instructions, ensuring proper alignment, anchoring, and operational performance.
3.2. Training in Operation and Safety Procedures
The contractor shall provide training to designated LRS personnel on the proper operation, safety features, and routine maintenance procedures of the newly installed hydraulic dock leveler. Training shall include hands‑on demonstration, review of manufacturer instructions, and guidance on safe loading and unloading practices to ensure personnel can operate the equipment effectively and safely.
3.3 Workmanship and Safety
· All work shall be performed by qualified personnel experienced in dock equipment installation.
· The contractor shall maintain a clean and safe work environment throughout the project.
· All work shall be completed in a continuous work period unless otherwise approved by the Government.
3.4 Warranties
· Only written manufacturer or Seller warranties apply
· All other warranties are disclaimed
3.5 Compliance Requirement
· Adherence to all installation security policies.
· Compliance with AFOSH safety standards.
· Daily communication with the Government Project Manager.
· Completion of work subject to Government inspection and final approval.
4. Contractor Responsibilities The contractor shall be responsible for the complete and compliant execution of all work associated with the installation of the new dock leveler. Responsibilities include, but are not limited to:
4.1 Project Execution
· Provide all labor, tools, materials, equipment, supervision, and safety measures required to perform the work.
· Furnish and install one (1) 6’ × 8’ hydraulic dock leveler with a 40,000‑pound dynamic capacity, including bumpers and all required accessories.
· Remove the existing dock leveler in accordance with applicable regulations.
· Ensure all work is performed in accordance with manufacturer specifications, industry standards, and Vandenberg SFB requirements.
4.2 Compliance & Safety
· Adhere to all installation security policies and access control procedures.
· Comply with all AFOSH safety standards and maintain a safe work environment at all times.
· Ensure all personnel entering the installation meet base access requirements.
4.3 Communication & Coordination
· Maintain daily communication with the Government Project Manager regarding progress, scheduling, and any issues affecting performance.
· Coordinate site access, deliveries, and work sequencing to minimize disruption to base operations.
4.4 Quality Assurance
· Ensure all work meets required quality standards and is ready for Government inspection.
· Correct any deficiencies identified during inspection at no additional cost to the Government.
· Provide all manufacturer documentation, warranty information, and installation records upon completion.
5.0 CUSTOMER (GOVERNMENT) RESPONSIBILITIES
The Government shall support the contractor’s performance by providing the following:
5.1 Site Access & Coordination
· Provide access to the work site during agreed‑upon working hours.
· Ensure the contractor has the necessary escort support if required by base policy.
· Identify the Government Project Manager who will serve as the primary point of contact.
5.2 Operational Support
· Coordinate with facility personnel to ensure the work area is available and free of obstructions during installation.
· Notify the contractor of any base‑wide restrictions, outages, or operational constraints that may affect performance.
5.3 Review & Acceptance
· Conduct inspections of completed work in a timely manner.
· Provide acceptance, feedback, or deficiency notices promptly to avoid delays.
· Approve final installation once all requirements have been met.
5.4 Government-Furnished Property (if applicable)
· The Government will not provide equipment, utilities, or materials for this project.
· In the event of an emergency, only essential lifesaving and life‑support measures will be provided.
6.0 DISPOSAL / ENVIROMENT FACTORS
The contractor shall perform all work in a manner that minimizes environmental impact and complies with all applicable federal, state, local, and Vandenberg SFB environmental regulations. All waste materials generated during demolition, installation, and cleanup activities shall be handled, transported, and disposed of in accordance with base requirements and environmental protection standards.
a. Construction Debris and Waste Management
· All debris generated from demolition, cutting, grinding, concrete removal, or installation activities shall be collected and removed from the site daily or staged in a designated area approved by Vandenberg SFB.
· Concrete slurry, dust, and wastewater shall be contained and prevented from entering storm drains, soil, or surrounding areas.
· Cleanup shall include slurry removal and broom‑swept surfaces; however, removal of pre‑existing warehouse dust is not included.
b. Environmental Protection Measures
· The contractor shall implement appropriate controls to prevent spills, contamination, or environmental damage during equipment removal and installation.
· Any hydraulic fluids, lubricants, or chemicals used during installation shall be handled in accordance with applicable environmental regulations.
· If a spill occurs, the contractor shall immediately contain, clean, and report the incident per Vandenberg SFB environmental protocols.
c. Recycling and Material Handling
· Metal components, packaging materials, and other recyclable items shall be separated and recycled whenever feasible.
· Waste shall not be burned, buried, or abandoned on site.
· The contractor shall maintain documentation of disposal or recycling upon request.
d. Protection of Adjacent Areas
· The contractor shall ensure that dust, debris, and construction activities do not impact adjacent work areas, equipment, or personnel.
· Work shall be performed in a manner that prevents damage to existing structures, pavement, and utilities.
8. Delivery, Time Frame, and Security Requirements
8.1 Delivery and Scheduling
· The contractor shall coordinate all delivery activities with Vandenberg Space Force Base (VSFB) personnel to ensure compliance with base access procedures and minimize disruption to ongoing operations.
· Delivery of the dock leveler, materials, and equipment shall occur within the agreed‑upon project schedule and during normal base operating hours unless otherwise approved by the Government.
· The contractor shall notify the Government at least 72 hours in advance of any planned deliveries to allow for gate access processing and scheduling.
· All deliveries must arrive at the designated entry control point (ECP) and follow VSFB traffic and routing instructions.
· The contractor must ensure that all technician(s) requiring access to Vandenberg Space Force Base are preapproved in accordance with base entry requirements
8.2 Time Frame for Work
· All work shall be performed within the project timeline established in the approved schedule.
· Work shall occur during normal duty hours unless otherwise coordinated with VSFB.
· Any delays caused by contractor personnel, equipment issues, or failure to meet access requirements shall be the responsibility of the contractor.
· The contractor shall maintain continuous progress once work begins, ensuring timely completion installation.
8.3. Security and Base Access
· Contractor shall adhere to current installation security policies.
· Contractor personnel shall comply with all VSFB safety, security, and traffic regulations.
· Personnel shall remain within authorized work areas and shall not enter restricted zones.
· Photography is prohibited unless explicitly authorized by VSFB.
· VSFB reserves the right to deny access to or remove any contractor personnel who fail to comply with installation rules or pose a security concern.
· The contractor shall provide replacement personnel at no additional cost to the Government.
9 POINTS OF CONTACT:
NAME: Ronnie Lujano TITLE: 30LRS Asset Management Supervisor
ORGANIZATION: 30 LRS/ LGRMS
CONTACT INFO: (805) 606-1812
ronnie.lujano.1@spaceforce.mil
10 INVOICE REVIEWER IN WIDE AREA WORK FLOW
NAME: Leonor Osorio TITLE: 30 LRS Resource Advisor
ORGANIZATION: 30LRS/LGLO
CONTACT INFO: 805-606-4768
leonor.osorio@spaceforce.mil
Statement of Work
ACQUISITION & INSTALLATION OF DOCK LEVELER
File details come from the government source that posted it. Updated .