FY26 PIF SOW Remove-Replace Carpet in 3 Buildings FINAL.docx

DOCX document 20 KB Posted

Attached to
ISD- SP PIF Replace Carpet And Floor Tile In Officer, Horner, and Main Building.
Solicitation number
26-444DHS-ISDIS-B-50174
Issued by
Illinois

About this file

This Scope of Work document outlines a carpet and floor tile replacement project for the Illinois School for the Deaf (ISD), a state agency located in Jacksonville, Illinois. The project involves removing and replacing flooring materials across three buildings: Officer Hall, Horner Hall, and Main Building. Specifically, the work includes removing and replacing approximately 1,970 square feet of carpet in Officer Hall's first floor south end hallways and dayrooms, 1,970 square feet of carpet in Horner Hall's first floor south end hallways and dayrooms, and 1,250 square feet of carpet in two rooms at Main Building's first floor (conference room and security office). Additionally, bidders must install vinyl composite tile to match existing specifications in approximately 900 square feet of dayrooms at the north end of Officer Hall's first floor and 900 square feet at Horner Hall's first floor north end. A mandatory pre-bid meeting is scheduled for November 25, 2025, at 10:00 a.m. at the ISD Main Building, 125 South Webster, Jacksonville, Illinois 62650. The project must be completed by June 30, 2026.

Bidders are required to supply all labor, materials, equipment, tools, and dumpsters necessary to complete the work, including removal and disposal of existing carpet and tack strips, installation of 26-ounce commercial-level loop carpet in blue or the closest available match, installation of matching vinyl composite tile, replacement of vinyl cove base molding as appropriate, installation of new carpet trim and transitions, and daily cleanup of construction debris through final completion. All work must comply with manufacturers' specifications for carpet and tile installation. No pricing terms, set-asides, or funding sources are specified in this Scope of Work document. The project contact is Chris Fairfield, Chief Engineer at the Illinois School for the Deaf, available at (217) 370-6145 or (217) 479-4253.

View the file

Other files

File Type Posted
B-50176-CENTO KOSHER PREPACKAGED MEALS RFP~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work B50174

1.1 Name of Project: Replace Carpet and Floor tile in Officer, Horner, and Main Building.

1.2 Description of Project:

The Illinois School for the Deaf is seeking bidders to remove carpet and replace with carpet and floor tile in 2 of our dorm buildings: Horner and Officer Halls. As well as carpet in 2 rooms at Main Building.

Areas to replace carpet :

Officer 1st floor South end hallways and dayrooms; approx. 1970 sq. ft.

Horner 1st floor South end hallways and dayrooms; approx. 1970 sq. ft.

Main 1st floor conference room and security office; approx.. 1250 sq. ft.

Areas to replace floor tile:

Officer 1st floor North end dayrooms; approx. 900 sq. ft.

Horner 1st floor North end dayrooms; approx. 900 sq. ft.

1.3 Bidders must: Remove and dispose of old carpet, tack strips, etc. Install new 26 oz. commercial level loop carpet in blue color or closest available match to existing. Install vinyl composite tile that is closest match to existing. Replace all vinyl cove base molding, if appropriate. Install new carpet trim and transitions as necessary. Follow all manufacturers specs on installation of carpet and tile. Supply all tools, building materials, equipment, labor and dumpsters to complete the job. Bidder must daily and on final completion of job, clean up all construction debris and materials.

1.4 Pre-Design Work completed to date (or) required: None

1.5 Additional Requirements and/or Conditions:

2 There will be a mandatory pre-bid meeting on 11/25/2025 at 10:00am at the Illinois School for the Deaf, address- 125 S Webster Jacksonville IL 62650, Main Building 1st Floor Conference Room.

1.6 Timeline of Project: Completed by end of 06/30/2026

Chris Fairfield Chief Engineer Illinois School for the Deaf

(217) 370-6145 work cell (217)479-4253 office