FY26 HVAC B469 Cooling Tower Salient Characteristics.pdf
PDF 108 KB Posted
- Attached to
- HVAC Cooling Tower Federal contract opportunity
- Solicitation number
- FA441826Q0008
About this file
This document is a Salient Characteristics specification for a federal cooling tower procurement issued by the Department of the Air Force, Headquarters 628th Air Base Wing (AMC) at Joint Base Charleston, South Carolina, dated 11 December 2025.
The requirement is for an open circuit induced-draft vertical discharge cooling tower, specified as EVAPCO MODEL AT 29-4K21 or equivalent, to be delivered for Government installation. The cooling tower must meet specific design and operational parameters: design conditions of 95°F dry bulb / 80.7°F wet bulb, water inlet/outlet temperatures of 95°F / 85°F, and water flow capacity of 1,418.1 gpm. The equipment must feature 316 stainless steel construction for both the cold water basin and upper components, a 5-probe electronic water level control package, stainless steel basin heaters with contactor and transformer rated to 0°F, fan vibration switch, sump sweeper piping with high flow eductors, fan motor shaft grounding rings, and VFD service-rated fan motors (Variable Frequency Drives not included). The maximum footprint dimension is 9' x 23'. The contractor must include a 5-year Parts/Labor Warranty and provide factory start-up and commissioning services through a manufacturer representative.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
CUI
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 628TH AIR BASE WING (AMC)
JOINT BASE CHARLESTON SC
Salient characteristics
FY26 HVAC(AB) B469 Cooling Tower
Joint Base Charleston Air Base
South Carolina
11 December 2025
Salient characteristics:
Open Circuit Induced-draft Vertical Discharge Cooling Tower, EVAPCO MODEL AT 29-4K21 or equivalent
Delivered for Government installation.
Include 5 year Parts/Labor Warranty, Factory Start-up and Commissioning from Manufacturer Rep.
Equipment Requirements:
-Design conditions: 95°F db / 80.7°F wb -Water in/out: 95°F / 85°F -Water Flow: 1,418.1 gpm -316 stainless steel cold water basin -316 stainless steel upper -5-probe electronic water level control package -Stainless steel basin heaters, heater package contactor w/ transformer and disconnect (rated to 0°F) -Fan vibration switch -Sump sweeper piping (high flow eductors) -Fan motor shaft grounding rings -VFD service-rated fan motors (VFDs NOT included) -9’ x 23’ MAX DIMENSION footprint
Equipment Requirements: