FY21 Piers PWS rev 2 DRAFT.pdf

PDF 923 KB Posted

Attached to
Telecommunication Infrastructure Support Services Federal contract opportunity
Solicitation number
N0018921Q0227
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This performance work statement outlines requirements for fiber optic infrastructure maintenance and repair services supporting piers at Naval Station Norfolk and Joint Expeditionary Base Little Creek. The contractor shall provide routine corrective and preventative maintenance including fault identification, repair parts, and maintenance of fiber risers, distribution centers, and integrated transport nodes. Services include on-call emergency response within four hours on weekdays and six hours otherwise. The contractor must inspect enclosures and perform optical time domain reflectometer testing quarterly. Additional requirements include configuration management, coordination with other contractors, and compliance with security, safety, and environmental standards. The period of performance is 24 months consisting of a base year and one option year.

View the file

Other files for this federal contract opportunity

Other files attached to Telecommunication Infrastructure Support Services, newest first.
File Type Posted
Appendix B Sample Piers Materials.pdf PDF
Appendix C Pier Fiber Riser Maintenance Checklist.pdf PDF
Appendix A Fiber Technician Personnel Qualification.pdf PDF
Sources Sought RFI.pdf PDF
Sources Sought RFI.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

NCTAMS LANT

FIBER OPTIC PLANT MAINTENANCE AND REPAIR SUPPORT SERVICES

FOR

NAVAL STATION NORFOLK AND JOINT EXPEDITIONARY BASE LITTLE CREEK

1.0 INTRODUCTION

Naval Computer and Telecommunications Area Master Station Atlantic (NCTAMS LANT) delivers and defends responsive, resilient, and secure computer and telecommunications systems, providing information superiority for global, maritime and joint forces. NCTAMS LANT provides classified and unclassified voice, messaging, data and video to ships, submarines, aircraft and ground forces operating worldwide in support of Naval and Joint missions.

NCTAMS LANT’s vision is to be a world-class communications infrastructure that ensures information superiority by providing assured command and control to operational forces globally throughout all dimensions of warfare.

2.0 SCOPE OF WORK

The contractor shall provide routine, corrective and preventative maintenance, and support services for the fiber optic telecommunication infrastructure supporting piers located on Naval Station Norfolk (NAVSTA) and Joint

Expeditionary Base Little Creek (JEBLC). The infrastructure is comprised of fiber risers, fiber distribution centers

(FDC), and Integrated Transport Node (ITN) locations. The fiber risers are comprised of Environmental Distribution

Center (EDC) enclosures housing Standard Connector (SC) fiber bulkheads. The bulkheads connect to the Umbilical

Cable Assembly (UCA) pigtail and a hybrid 12MM/12SM fiber trunk connecting to the FDC. The FDC contains a fusion splice point that connects to the feeder cables from the ITN locations.

2.1 Performance Standards

The Contractor shall provide services at or above the specific industry standards and guidelines listed in section 7.11

Standards and References.

2.2 Period of Performance

The performance Period of Performance for this contract is twenty-four months consisting of a base period and one option period each with a duration of 12 months.

2.3 Normal Work Hours

The majority of the work is to be performed during normal Government workdays defined as 0800 – 1630 hours local time in the identified location, excluding weekends and Government holidays (New Year’s Day, Martin Luther

King’s Birthday, President’s Day, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day).

2.4 Contractor Personnel Requirements

The contractor shall provide personnel who are qualified to perform the work described in this PWS in accordance with Appendix A. The Contractor shall bear all costs associated with training and certifying personnel to provide the services required by this PWS. All personnel shall communicate fluently in English, both orally and in writing. All employees who perform work under this contract shall be employees of the Contractor and not employees of the

U.S. Government.

2.4.1 Standards of Behavior

Contractor personnel shall present a neat, clean, and professional appearance as generally observed in a professional setting and shall adhere to the U.S. Navy’s no smoking policy. Smoking is allowed only in designated areas where it does not compromise the rights of non-smokers.

DRAFT

2.4.2 Personnel Removal

Government rules, regulations, laws, directives, and requirements which are issued during the contract term relating to law and order, installation administration, and security on the installation shall be applicable to all contractor employees or representatives who enter the installation. Violation of such rules, regulations, laws, directives, or requirements may result in the command removing personnel from the site. Removal of employees under these circumstances does not relieve the contractor from the obligation to perform under this PWS.

2.4.2.1 Removal by Contracting Officer and/or Commanding Officer

The Contracting Officer and/or Commanding Officer may require the contractor to remove any employee working under this contract from the installation for conduct determined to be contrary to good order, discipline, or installation security. Removal of employees under these circumstances does not relieve the contractor from the obligation to perform under this PWS.

2.5 Contractor Qualification Requirements

The contractor’s maintenance personnel shall be qualified in accordance with Appendix (A) Personnel Qualification

Statement.

2.6 Information Systems Security

Information systems used by contractor personnel will be operated in accordance with DOD 5220.22-M National

Industrial Security Program Operating Manual (NISPOM) and NCTAMSLANTINST 5239.1B.

2.7 Contractor/Subcontractor

The term Contractor used herein shall refer to both the prime Contractor and any subcontractors. The prime

Contractor shall ensure that subcontractors comply with the provisions of this contract.

2.8 Non-Disclosure and Non-Use of Data

This PWS, including all attachments, contract data, and data generated by contractor incidental to performance, shall be considered FOR OFFICIAL USE ONLY (FOUO) before, concurrent with, and after award of and/or performance of the contract (including proposals and contract modifications), and is subject to the restrictions set forth in DFARS

252.204-7000 (August 2013, Disclosure of Information clause) and section 13.0 of this PWS.

2.8.1 Data

All data (including but not limited to Planning, Programming, Budgeting, and Execution (PPBE) documents and data as described in DoD Directive 7045.14, “The Planning, Programming, and Budgeting System,” January 25, 2013), obtained, received, or learned by the Contractor and/or it’s personnel and/or subcontractors as a result of performance of this contract shall be deemed “sensitive” and/or “proprietary” whether or not such data is so designated or marked. The Contractor, it’s personnel and subcontractors shall restrict access to data obtained, received, or learned as a result of performance of this contract to the minimum number of Contractor personnel or subcontractors necessary for performance of this contract. No one who prepares offers, proposals, bids, and/or quotations for Government and/or non-Government procurements shall be involved in direct performance of this contract. The Contractor shall ensure that each of its personnel and subcontractors who obtains, receives, or learns data as a result of performance of this contract understands and complies with this “Non-Disclosure and Non-Use of

Data” clause.

2.8.2 Non-Disclosure of Data

The Contractor and its personnel and subcontractors shall disclose data obtained, received, or learned as a result of performance of this contract only to Contractor personnel directly performing under this contract and to United

States Department of Defense personnel to whom disclosure of such data is required in performance of this contract.

The Contractor, it’s personnel and subcontractors shall not disclose such data to anyone who prepares offers, proposals, bids, and/or quotations for Government and/or non-Government procurements. The Contractor and it’s personnel and subcontractors shall take all steps necessary to prevent disclosure of such data except as specifically permitted herein.

2.8.3 Non-Use of Data

The Contractor and its personnel and subcontractors shall use data obtained, received, or learned as a result of performance of this contract only in direct performance of this contract and for no other purpose. The Contractor, its personnel and subcontractors shall not use or consider such data in the preparation of any offer, proposal, bid, and/or quotation for any Government and/or non-Government procurement. The Contractor, its personnel and subcontractors shall take all steps necessary to prevent use of such data except as specifically permitted herein.

2.8.4 Non-Disclosure/Non-Use Agreements

Before any of the Contractor’s personnel become involved in performance of this contract, the Contractor shall obtain a non-disclosure/non-use agreement signed by that person. The non-disclosure/non-use agreement shall state that:

(1) He/she shall disclose data obtained, received, or learned by him/her as a result of performance of this contract only to Contractor personnel directly performing under this contract and to United States Department of

Defense personnel to whom disclosure of such data is required in performance of this contract.

(2) He/she shall not disclose data obtained, received, or learned as a result of performance of this contract to anyone who prepares offers, proposals, bids, and/or quotations for Government and/or non-Government procurements.

(3) He/she shall use data obtained, received, or learned as a result of performance of this contract only in direct performance of this contract and for no other purpose.

(4) He/she shall not use or consider data obtained, received, or learned as a result of performance of this contract in the preparation of any offer, proposal, bid, and/or quotation for any Government and/or non-Government procurement.

In the event that the Contractor, its personnel, and subcontractors obtain, receive, or learn data of other entities as a result of performance of this contract, the Contractor shall execute a non-disclosure/non-use agreement with each such entity prior to having access to the data provided by the entity.

The contractor shall maintain all Non-Disclosure and Non-Use of Data agreements required by this clause and shall make such agreements available for immediate inspection by the Contracting Officer.

2.8.5 Requirement to Disclose Data

If the Contractor, its personnel and subcontractors receive a court order requiring disclosure of data obtained, received, or learned as a result of performance of this contract or if the Contractor believes disclosure of such data is otherwise required by law or regulation, the Contractor shall contact the Contracting Officer immediately and fully inform the Contracting Officer of the court order or other requirement prior to any disclosure of data.

2.8.6 Exception

This “Non-Disclosure and Non-Use of Data” clause does not apply to data, which the Contractor can demonstrate, was obtained, received, or learned in a way other than as a result of performance of this contract.

2.8.7 Government Remedy

Any violation of the terms of this “Non-Disclosure and Non-Use of Data” clause is a material and substantial breach of this contract and the Government may, in addition to any other remedy available, terminate this contract, or any part thereof, for cause or default.

2.9 Phase-In/Phase-Out

2.9.1 Phase-In

There will be no formal phase-in period. Contractor may initiate discussions with site points-of-contact (POC) after award but prior to commencement of base period of performance provided there is no additional cost to the

Government.

2.9.2 Phase-Out

The incumbent Contractor shall provide service up to the last day of the contract. There will not be any formal phase-out period. All planned maintenance shall be executed prior to the end of the contract. All final deliverables are due prior to the end of the contract.

3.0 LOCATION OF SERVICES

Services required by this PWS will be performed at NAVSTA, Norfolk, VA and JEBLC, Virginia Beach, VA.

4.0 APPLICABLE DOCUMENTS

4.1 Piers Fiber Prints/Diagrams (available on request)

4.2 Piers As Built Drawings (available on request)

4.3 NCTAMS LANT Security Piers Riser Terminals Lock and Key Control Standard Operating Procedures Oscar

235A (available on request)

4.4 NCTAMS LANT Pier Fiber Optic Riser Maintenance Checklist (Appendix C)

5.0 GOVERNMENT-FURNISHED ITEMS

5.1 Government-Furnished Property

None

5.2 Government-Furnished Facilities

5.3 Government-Furnished Equipment

5.4 Government-Furnished Material (GFM)

5.4.1 The government will provide documents as listed in section 4.0 Applicable Documents

6.0 CONTRACTOR-FURNISHED ITEMS

The contractor shall provide labor, tools, materials, supplies, test equipment, diagnostics, and major and minor components as necessary to restore telecommunication services to the piers to the “normal operating condition”.

The contractor shall furnish everything required to perform the services specified by this PWS to include OEM maintenance support permissions to perform diagnostics, testing, and repair.

6.1 Contractor-Furnished Materials and Supplies

The contractor shall be responsible for ensuring that it maintains, or has a ready supplier for parts (especially emergency parts), supplies and materials required for this PWS performance. Any reconditioned parts used in work to be done under this contract shall be warranted as new. The contractor shall properly dispose of non-serviceable parts to avoid inadvertent reuse. The contractor shall include the cost of materials and supplies, including repair pair materials, as part of the firm-fixed price offer.

Historical Note: Appendix B is a sample listing of parts that may be required for maintenance and repair under this contract. The list is not all inclusive and other similar, common fiber optic parts may need procurement in any given year. The government estimates an annual cost of $10,000 for these parts and materials, and executed this amount in 2019 and 2020.

6.2 Contractor-Furnished Equipment and Tools

The contractor shall provide test and safety equipment (not separately priced). All equipment provided by the contractor shall meet OSHA safety requirements. It shall be the responsibility of the contractor to prevent the operation or attempted operation of electrical equipment or combinations of equipment that require power exceeding the capability of existing building circuits.

6.3 Contractor-Furnished and Contractor-Owned Property

The contractor shall be responsible for the maintenance, repair, calibration and safekeeping of contractor-owned supplies, materials, and equipment and the personal property of contractor employees from loss, damage, or theft.

6.4 Vehicles

The contractor shall provide industry standard contractor owned vehicles suitable for supporting tasks described in this PWS.

6.5 Cell Phones

The contractor shall provide each technician with a cell phone for the performance of tasks described in this PWS.

7.0 SPECIFIC REQUIREMENTS

7.1 Corrective Maintenance

The contractor shall provide on-site corrective maintenance and repair services, which include fault identification, correction, and furnishing of spare parts for repairs of faulty fiber cabling in the event the contractor receives notification from the site POC that there is trouble with the fiber infrastructure. The contractor shall designate a point of contact (POC) and any alternate(s) to receive trouble calls and requests for maintenance service. The current pier fiber plant was installed in summer 2018.

7.2 Emergency Maintenance

The contractor POC(s) shall be available 24/7/365 and be responsible for notifying and dispatching maintenance personnel to the site requiring corrective maintenance or repair service.

7.2.1 After hours repair support may be required if user entities cannot utilize spare fiber infrastructure to meet mission requirements. When notified of an emergency requirement, the contractor shall ensure that qualified technical representatives are on-site within four (4) hours Monday through Friday, and within six (6) hours on weekends and holidays to provide emergency service.

7.2.2 During inclement weather or other circumstances where it is deemed Mission Essential Personnel Only;

contractor personnel will not be required to report.

7.3 Trouble Call Reporting

The site POC will specify whether a trouble call is routine or emergency. In cases involving a total or critical loss of service, the call will state, “THIS IS AN EMERGENCY SERVICE CALL”. There shall be no additional charges for on-site corrective maintenance performed at any time, whether routine or emergency, to include troubleshooting and working with the government for the repair and/or replacement of equipment and components. If the contractor determines a problem is with other vendor equipment, the contractor shall inform the Government who will assume responsibility for corrective action. A failure requiring emergency service at a site is defined as a loss of telecommunication services resulting in an inability to meet mission requirements.

7.3.1 Trouble Call Reporting Methods

The contractor shall provide multiple communication alternatives for site POC in reporting problems to the contractor for corrective maintenance, whether routine or emergency in nature.

7.3.2 Trouble Call Resolution Reporting

After completion of a corrective action, the contractor shall submit a report to the COR within ten (10) working days after resolution. The report shall include the time and date of the initial incident, time contractor was notified, contractor arrival time on site, condition found, corrective action taken, any test results, and contractor departure time from the site.

7.4 Trouble Call, Routine, and Emergency Response Time

Routine Call - The contractor’s maintenance personnel shall arrive on location within the next day’s normal working hours (paragraph 2.3) after receipt of a routine trouble call and provide corrective maintenance.

Emergency Call - The contractor’s maintenance personnel shall arrive on location within four (4) hours Monday through Friday, and within six (6) hours on weekends and holidays after receipt of an “Emergency Service Call” and provide corrective maintenance.

7.5 Trouble Call, Routine, and Emergency Invoicing

All corrective maintenance and trouble call work shall be included in the firm-fixed price quote. If corrective or trouble call work will take less than 8-hours of repair, no advance approval from the KO is required. For repair work anticipated to take longer than 8-hours, the contractor shall receive approval from the KO via the COR to use multiple 4 or 8-hour jobs to accomplish the task. The government reserves the right to pursue other options to complete repair work that exceeds 8-hours per job.

Historical Information: The government estimates that trouble calls will not exceed 40 hours of work per year.

Actual data for 2019 showed 16 hours of recall with 2020 also totaling 16 hours.

7.6 Preventive Maintenance (PM)

7.6.1 The contractor shall provide PM to include but not limited to testing of fiber infrastructure and cleaning pier risers and enclosures. All PMs shall be accomplished once every 4 months.

7.6.1.1 The contractor shall perform inspections in accordance with the NCTAMS LANT Pier Fiber Optic Riser

Maintenance Checklist.

7.6.2 The contractor shall perform inspection of all pier risers and fiber optic patch panels associated with the piers infrastructure. The inspection will verify whether all dust covers are in place for unused fiber ports. If dust covers are missing, the contractor shall clean the bulkhead connection point using a fiber cleaner equivalent to the industry standard listed in section 7.11. After cleaning, the contractor shall perform testing of the fiber to ensure it still meets industry specifications by performing Optical Time-Domain Reflectometer verification testing. Test reports shall be provided to the Base Communications Office Infrastructure Manager, site POC or COR.

7.6.3 Preventive Maintenance Records

The contractor shall maintain a record of all PM services provided. Entries shall include date service provided, type of service provided, and name(s) of the technician(s) performing the PM services. The PM record shall become property of the government.

7.6.3.1 The contractor shall provide PM records to site POC/COR on monthly basis.

7.6.3.2 The contractor shall provide test results as required by site POC/COR.

7.7 Configuration Management

7.7.1 The contractor will notify the BCO Infrastructure Manager or site POC of any fiber jumper that is unlabeled.

7.7.2 In coordination with the BCO infrastructure manager, end-point information and circuit ID’s will be determined and the contractor shall place a standard cable label with circuit ID and end user information.

7.8 Cooperation with Other Contractors

Contractor shall cooperate and coordinate with the Government or other contractors when requested by the site

POC. This may include but not limited to troubleshooting, testing, and fiber identification.

7.9 Access

The Government will permit contractor access to Navy bases and equipment locations, subject to security regulations.

7.9.1 Base Access

For base access, contractors shall be required to participate in the access control program Defense Biometric

Identification System (DBIDS), sponsored by Commander, Navy Installations Command (CNIC). All participants in the DBIDS Program are subject to comprehensive background screenings with ongoing additional screenings throughout the year.

Further information regarding DBIDS can be found at https://www.cnic.navy.mil/om/dbids.html.

7.9.2 Building Access

Building access is dependent upon each Navy Base building access requirements. Contractors shall contact the site points of contact to obtain building access requirements of equipment locations.

7.10 Pre-Existing Conditions

Contractor shall identify and provide a written report of any pre-existing conditions within thirty (30) calendar days of start performance period. Government personnel will validate the contractor’s findings and record any discrepancies. Discrepancies not resolved between the contractor and site POC/COR shall be negotiated between the government Contracting Officer (KO) and contractor concerning pre-existing condition findings. How and whether to remedy pre-existing conditions is at the Navy’s discretion. The absence of an official written report by the contractor within the specified timeframe shall indicate there are no “pre-existing conditions.

7.11 Lock and Key Control

Contractor shall comply with NCTAMS LANT Security Piers Riser Terminals Lock and Key Control Standard

Operating Procedures Oscar 235A.

7.12 Standards and References

All work to be performed in conjunction with this PWS shall be in accordance with the appropriate applicable documents. The work shall also comply with all Federal and U.S. Navy policies and regulations applying to telecommunication and electrical installations including the National Electric Code. The following is a partial list of documents, which are applicable to this PWS; however, it may not be inclusive of all DOD or Industrial directives, which may be applicable to some specific tasks. In that case, the latest and highest authority level documentation will take precedence.

7.12.1 MIL-STD-188-154A, Subsystem, Equipment, and Interface Standards for Common Long Haul and Tactical

Telecommunications Control Facilities

7.12.2 COMSPAWAR M-4720.1, Shore Installation Process Handbook (V4.0), 12 November 2014

7.12.3 MIL-STD-188-124B N3, Grounding, Bonding, and Shielding for Electronic Common Long Haul/Tactical

Communications Systems including Ground based Communications - Electronics Facilities and Equipment

7.12.4 NFPA 70, National Electrical Code; current addition MIL-HDBK-419A, Vol. 2, Grounding, Bonding, and

Shielding for Electronic Equipment and Facilities

7.12.5 ANSI/TIA/EIA-568B; Commercial Building Telecommunications Cabling Standard

7.12.6 ANSI/TIA/EIA-569A, Commercial Building Standard for Telecommunications Pathways and Spaces

7.12.7 ANSI/TIA/EIA-606, Administrative Standard for the Telecommunications Infrastructure of Commercial

Buildings

7.12.8 NSTISSAM TEMPEST/2-95, 12 December 1995 with Amendment NSTISSAM

7.12.9 TEMPEST/2-95A of February 2000 Incorporated, Red/Black Installation Guidance

7.12.10 USN/USMC IA PUB 5239-22, OCTOBER 2003, Protected Distribution Systems (PDS)

7.12.11 TIA/EIA 607, Grounding and Bonding Requirements for Telecommunications in Commercial Buildings

7.12.12 TIA/EIA 568-B.1, Commercial Building Telecommunications Wiring Standard

7.12.13 Unified Facilities Criteria (UFC)-3-580-01, Telecommunications Building Cabling System Planning and

Design

7.12.14 Naval Station Norfolk and Joint Expeditionary Base Little Creek ISP/OSP Installation Design Drawings

7.12.15 NCTAMS LANT Instructions/Policies and Standard Operating Procedures (SOPs) related to OSP/ISP, e.g., manhole access policy, cable labeling schema, etc.

7.12.16 OPNAVINST 5100.23G, CH-1, Navy Safety and Occupational Health Program

7.12.17 DOA Technical Criteria for the Installation of Information Infrastructure Architecture (I3A)

7.13 Meetings

Contractor shall participate in regularly scheduled meetings with the COR on the status of the overall performance and execution of the contract. Example meeting agenda items are preventive maintenance, trouble tickets, invoices, and other pertinent areas.

An initial kick-off meeting shall be scheduled within one-week of start of contract performance. Further meetings will be scheduled by the COR, as needed, with a frequency of no more than one meeting per month. The contractor shall provide a list of any action items taken from any meeting and status of outstanding action items to the COR no later than five (5) working days after any scheduled meeting.

7.14 Status Reports

The contractor shall provide a monthly status report that provides planned maintenance for the next two months by date and pier riser, identifies any maintenance in the next two months that requires an Authorized Service

Interruption (ASI), and provides a status of remaining funds on the current contract period. This report shall be submitted by the 1st of each month.

8.0 CLEARANCES, PASSES, AND SECURITY REGULATIONS

8.1 Security Clearance and Special Requirements

U.S. citizenship is required of all Contractor personnel. Contractor functions involve delivery of service to support the Department of the Navy mission requiring confidence or trust; position designation is at the Non-Critical

Sensitive level. Position requires access to sensitive information, including user level access to DON or DOD unclassified networks or information systems and critical infrastructure. This contract does not require a DD Form

254 "Contract Security Classification Specification." The Security Manager, NCTAMS LANT Code N00SM, via the COR, is the point-of-contact regarding issues for site access and for any security matters.

Proof of security clearance shall be provided to the Government prior to the Government granting unescorted access to work spaces.

8.2 Information and Personnel Security:

Contractor shall ensure that no individual will have access to classified and/or sensitive information, or be assigned to sensitive duties unless a favorable personnel security determination has been made and adjudicated by the

Department of Defense Consolidated Adjudication Facility and recorded within the Joint Personnel Adjudication

System/Joint Clearance and Access Verification System. Contractor will ensure that all Periodic Reinvestigations for Personnel Security Clearance Renewals, as required per policy, are conducted within the required scope.

Contractors shall ensure that all of their employees show their company/CAGE affiliation in the JPAS record.

A “Secret” clearance is not required, contractors may be escorted to any classified areas in a sanitized mode, and/or spaces requiring access are not at the Secret/TS level and therefore do not need a clearance but are trust positions.

In accordance with the NISPOM and SECNAV M-5510.30, positions are designated as Non-Critical Sensitive - IT

Level II (user level access); duties involve delivery of service to support the DON mission requiring a high level of confidence or trust. A National Agency Check with Local Agency and Credit Checks (NACLC) or equivalent suitability (hereafter referred to as "background investigations") shall be conducted on all employees assigned.

Requests for NACLCs based upon this provision shall be submitted in a format (approved by the Government) by the contractor facility security manager for processing through the NCTAMS LANT Security Manager N00SM.

Personnel not receiving a favorable determination based upon NACLC results under this program may be denied site access by the Commanding Officer, NCTAMS LANT, and lose the ability to perform job assignments on the contract. This circumstance shall not relieve the contractor from obligation to perform under this PWS.

Contractor personnel shall have the personnel security background investigation, as specified in the statement of work, at work performance start date. Proof of favorable security background investigation shall be provided to the

Government, as recorded within the Joint Personnel Adjudication System/Joint Clearance and Access Verification

System, prior to the Government granting unescorted access to work spaces.

8.3 Host Command Security Regulations

The contractor shall comply with host command security regulations while on the premises and for obtaining personnel identification/vehicle passes. Certifications of need-for-access to the base may be coordinated with the site POC.

9.0 SAFETY

The contractor shall comply with all Federal Occupational Safety and Health Administration (OSHA), State, local and base safety requirements whichever is the most stringent. The contractor shall also comply with all Federal, State, local and base regulations pertaining to the environment, including but not limited to, water, air, solid waste, and noise pollution.

9.1 Unsafe/Hazardous Safety Conditions

The contractor shall notify the site POC (i.e. email, voice mail or facsimile) of any unsafe or hazardous safety conditions within 30 minutes of becoming aware of the condition and inform him or her in writing within one workday. If the condition is within the scope of the contractor’s responsibility as set forth in this PWS the contractor shall correct the unsafe condition immediately and notify the site POC.

9.2 Injuries

The contractor shall notify the site POC (i.e. email, voice mail, or facsimile) (CDRL A009) within 2 hours of the occurrence of all types of injuries sustained by a contractor employee arising from the performance of this PWS.

The contractor shall provide a detailed written report within 24 hours. (CDRL A010)

10.0 ENVIRONMENTAL PROGRAM REQUIREMENTS

The Contractor shall ensure that all environmental programs/provisions meet Federal, State, local, Chief of Naval

Operations (CNO), Host Command and NCTAMS LANT requirements.

11.0 SANITATION AND CLEANLINESS

The contractor shall maintain the workspace in a neat, clean, orderly, and sanitary condition. The premises shall be kept free at all times from accumulations of waste material or debris resulting from work performed under this contract. All areas will be subject to fire safety and health inspections by Government personnel. The contractor shall dispose of all trash generated as the result of the performance of this PWS. Trash may be discarded in

Government provided refuse collection receptacles.

12.0 QUALITY CONTROL AND SURVEILLANCE

12.1 Contractor Quality Control

The Contractor shall maintain an inspection system and quality control program, covering the services under this

PWS. The design of the inspection system is left to the Contractor's discretion and relates to the Government's quality assurance program and provides the desired quality control.

12.2 Government Quality Assurance Surveillance

The Government will inspect and monitor the Contractor's performance. Techniques may include announced and unannounced inspections, zone inspections, Operational Readiness Inspections, planned and random sampling, and customer complaints.

13.0 CONTRACT DATA DELIVERABLES

13.1 All data deliverables shall prominently show the following statement:

DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only; Contractor Performance

Evaluation; March 2015. Other requests shall be referred to Commanding Officer, Naval Computer and

Telecommunications Area Master Station Atlantic, Attn Regional Plans and Projects Department, Code N5/N8, 9625 Moffett Avenue, Norfolk, VA 23511-2784.

13.2 Unauthorized Distribution of Contract Data

Contractor is specifically NOT authorized to distribute technical data to any DoD agency or activity or commercial entity other than those set forth in paragraph 13.0 of this PWS and the Contracting Officer.

13.3 Contract Deliverable Report List (CDRL)

13.3.1 A001 – Monthly report of completed preventive maintenance (7.6.3.1)

13.3.2 A002 – As needed, After Action Report for Corrective Maintenance (7.3.2)

13.3.3 A003 – Monthly Status Report (7.14)

13.3.4 A004 – As needed, Meeting Action Items (7.13)

13.3.5 A005 – As needed, Notification of Unlabeled Fiber Jumper (7.7.1)

13.4 The contractor shall provide test results as required by site POC/COR.

14.0 INVOICING

14.1 Monthly Invoicing

Contractor shall invoice in arrears for the previous month. The invoicing period shall be from the first day of the month to the last day of the month. The invoices are due NLT the 15th calendar day after end of previous monthly invoicing period. The invoice shall reflect the following data:

Line/subline item number

Amount being invoiced (current invoicing period)

Amount invoiced (cumulative)

Total of all invoiced costs (current invoicing period)

Total of all invoiced costs (cumulative)

Identification of Period of Performance (month)

14.2 Electronic Submission of Invoices for Payment

Pursuant to DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (JUN 2012), contractor shall submit payment requests using the Wide Area WorkFlow-Receipt and Acceptance (WAWF-RA).

Information regarding WAWF-RA is available on the Internet at https://wawf.eb.mil.

15.0 POINTS OF CONTACT

15.1 Contracting Officer’s Representative (COR), Plans, Programs & Requirements Department (N5/N8)

Lemar Blount

Plans, Programs & Requirements Department

9625 Moffett Avenue

Norfolk, VA 23511-2784

Commercial Telephone # 757-443-9068 or DSN 646-9068 https://rmb.ogden.disa.mil/

E-mail address: lemar.blount@navy.mil

15.2 Site POC

Matthew Rice

External Support, Base Communications Office

9625 Moffett Avenue

Norfolk, VA 23511-2784

Commercial Telephone # 757-443-9617 or DSN 646-9617

E-mail address: matthew.t.rice@navy.mil

File details come from the government source that posted it. Updated .