REQUEST FOR COMPETITIVE BIDS AND PROPOSALS FOR INTERNAL CONNECTIONS
Solicitation number
PE-68910-NONST-2026-000000042
Issued by
Lamar County, Georgia

About this file

Summary

This is a pricing spreadsheet and scope of work for a Request for Competitive Bids and Proposals for Internal Connections submitted by Liberty County School System in Georgia. The RFP solicits network equipment and installation services, with a mandatory walkthrough scheduled for February 24, 2026, at 3:00 PM at Liberty Elementary in Midway, Georgia. The bid submission deadline is March 10, 2026, at 2:00 PM EST, with all questions due by March 2, 2026, at 12:00 PM ET. The installation period is scheduled from July 6, 2026, through July 24, 2026. The project includes procurement of Cisco Meraki switching equipment, UPS units, power supplies, and associated networking components, with estimated quantities including two C9300X-12Y switches, 28 C9300L-48P-4X switches, 156 MS225-48FP switches, 9 MS225-24P switches, 78 UPS units, and various cables and transceivers. The district reserves the right to adjust quantities and timeframes as needed.

Vendors must provide complete pricing including installation, configuration, labor, shipping, taxes, and all other fees to be considered for E-Rate funding. The vendor is responsible for on-site network engineering support, equipment installation and configuration, migration of existing configurations, removal and proper disposition of replaced equipment, daily progress reporting, and troubleshooting of any damaged infrastructure during installation. The scope requires after-hours and weekend installation unless pre-arranged with the district, with only one switch stack permitted offline at a time. All pricing formulas and calculations are the vendor's responsibility to verify and confirm. The RFP specifies that functionally equivalent products are acceptable if they are interoperable and compatible with the existing Meraki network infrastructure. The district will apply the Lowest Corresponding Price (LCP) standard in accordance with FCC E-Rate regulations to ensure competitive pricing.

View the file

Other files

File Type Posted
FY2026GA_LibertyCountySchoolSystem_RFP_Catego.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directions

LIBERTY COUNTY SCHOOL SYSTEM

DIRECTIONS FOR THE PRICING SPREADSHEET:

Please fill in the following spreadsheets with Description of Products, Part Numbers (if applicable), Quantity, and Price for the items proposed by your company.

Additional line items or parts may be added if needed to reflect a complete proposal.

Formulas included in the spreadsheet are for convenience only - each bidder is required to confirm that the pricing and formulas are correct.

Please include this pricing workbook in a digital format with the RFP response.

LOWEST CORRESPONDING PRICE (LCP):

Lowest corresponding price is defined as the lowest price that a service provider charges to nonresidential customers who are similarly situated to a particular applicant (school, library, or consortium) for similar services. See 47 C.F.R. § 54.500.

Service providers cannot charge applicants a price above the LCP for E-rate Program services. See 47 C.F.R. § 54.511(b).

This ensures that: 1) service providers do not charge applicants more than they would charge their other customers for the same services. See First Report and Order, 12 FCC Rcd 8776, 9031-32, para. 484; and 2) any lack of experience in negotiating in a service market does not prevent applicants from receiving competitive prices. See First Report and Order, 12 FCC Rcd 8776, 9031, para. 484.

A service provider – regardless of the size of the company or the category of service provided – must ensure that the LCP is provided to applicants. The applicant is not obligated to ask for it, but must receive it. See 1996 Universal Service Order, 12 FCC Rcd 87, 383, para. 540.

MANDATORY WALKTHROUGH DATE

There will be a mandatory bid meeting for this RFP.

WALKTHROUGH: February 24, 2026 to begin at 3:00 PM at Liberty Elementary, 600 Edgewater Drive, Midway, GA 31320

Vendor Information and SPIN

SERVICE PROVIDER INFORMATION

COMPANY NAME:

E-RATE SPIN NUMBER

ADDRESS:

CITY, STATE ZIP:

Company Contact:
(This person must be able to answer questions about the quote submitted.)

Contact Phone:

Contact Email:

IMPORTANT INSTALL & CONFIG INFO

Installation Instructions:

1. Vendor will provide on-site network engineer to assist Liberty technical team with the configuration of new switching equipment into existing infrastructure during the physical installation.

2. The vendor is responsible for installation of all equipment including stacking cables, power cables and fiber uplinks.

3. Vendor is responsible for the migration of switch and routing configuration from original equipment to new equipment.

4. After-hours and weekend installation is required unless pre-arranged and approved by the district. Daytime installation will only be permitted when the school is not being occupied or utilized for any function. Exact dates and times will not be determined until the project is started.

5. Existing switches/switch cabling/adaptors must be removed and taken to a designated area in the central office at 200 Bradwell Street, Hinesville, GA.

6. Existing UPS units and rail kits must be removed and discarded.

7. UPS must be mounted using rails kits at the bottom of the rack unless otherwise directed.

8. Some UPS units may be wall mounted. Vendor will be responsible for any additional mounting brackets if unable to use the included hardware.

9. All unused equipment must be taken to a designated area in the central office at 200 Bradwell Street, Hinesville, GA.

10. Boxes, packaging, and other installation debris must be discarded. School dumpsters may be used. All packaging must be broken down prior to disposing of in school dumpsters. UPS units may not be disposed of in school dumpsters. Vendor is responsible for the appropriate disposition of all UPS units in accordance with local laws.

11. Vendor will be responsible for handling all replacements of defective and inoperable equipment until the project is completed.

12. Vendor is responsible for troubleshooting and repairing any fiber or copper ethernet cables that are damaged during installation of new switching equipment.

13. Daily progress spreadsheets including, school, room number, switch serial number, and physical stacking order, with switch one being the top switch in the stack.

14. Vendor will be responsible for installation and mounting of all purchased equipment. This includes restoring patch cabling and installing all power cables.

15. All cables must be appropriately trained and secured using district approved cable management techniques.

16. All switching and UPS equipment must be labeled with device information determined by the district. All labeling must be approved by the district prior to installation.

17. Only one switch stack may be taken offline at a time. Vendor may not take the next stack offline until the prior stack has been completed and online.

MANDATORY WALKTHROUGH DATE

There will be a mandatory bid meeting for this RFP.

WALKTHROUGH: February 24, 2026 to begin at 3:00 PM at Liberty Elementary, 600 Edgewater Drive, Midway, GA 31320

The installation period will be from 7/6/2026 through 7/24/2026.

Bill of Materials

Liberty County School System
The District will accept Functionaly Equivalent Products

Equivalent Products must be Interoperable and Compatible with Existing Meraki Network

NETWORK EQUIPMENT
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
C9300X-12Y-MCisco Meraki Catalyst 9300X-12Y - switch - 12 ports - managed - rack-mountable2$0.00$0.00
C9300X-NM-8Y-M-OCisco Meraki - expansion module - Gigabit Ethernet / 10Gb Ethernet / 25Gb Ethernet SFP28 x 82$0.00$0.00
LIC-C9300-24E-3YCisco Meraki Enterprise - subscription license (3 years) - 24 ports2$0.00$0.00
PWR-C1-715WACP-M-OCisco Meraki - power supply - hot-plug - 715 Watt2$0.00$0.00
C9300L-48P-4X-MCisco Meraki Catalyst 9300L-48P-4X - switch - 48 ports - managed - rack-mountable28$0.00$0.00
LIC-C9300-48E-3YCisco Meraki Enterprise - subscription license (3 years) - 1 license28$0.00$0.00
PWR-C11900WACP-M-OCisco Meraki - power supply - hot-plug - 1900 Watt5$0.00$0.00
MA-PWR-CORD-US-FRCisco Meraki US Power Cord37$0.00$0.00
C9300L-STKKIT2-M-OCisco Stack Kit for Catalyst 9300L Switch21$0.00$0.00
STACK-T1-50CM-M-OCisco Meraki stacking cable - 50 cm9$0.00$0.00
STACK-T3A-1M-MCisco Meraki stacking cable - 1 m5$0.00$0.00
SFP-10G-LR-SCisco - SFP+ transceiver module - 10GbE14$0.00$0.00
GLC-SX-MMDCisco - SFP (mini-GBIC) MM fiber transceiver module - 1GbE34$0.00$0.00
GLC-TECisco - SFP (mini-GBIC) RJ45 transceiver module - 1GbE12$0.00$0.00
MS225-48FP-HWCisco Meraki Cloud Managed MS225-48FP - switch - 48 ports - managed - rack-mountable156$0.00$0.00
MS225-24P-HWCisco Meraki Cloud Managed MS225-24P - switch - 24 ports - managed - rack-mountable9$0.00$0.00
SMART1500LCDXNCEaton Tripp Lite Series 1440VA 1050W 120V Line-Int. Rack Mounted UPS Remote Monitoring 10 Outlets Ext Run LCD 2U68$0.00$0.00
SMART750LCDNCEaton Tripp Lite series 750VA 475W 120V Rack Mounted UPS with Remote Monitoring AVR 8x 5-15R Outlets LCD, 5-15P 2U10$0.00$0.00
InstallationSee tab labeled "IMPORTANT INSTALL & CONFIG INFO" for the Statement of Work Associated with the Installation Services1$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
The quantities shown on the spreadsheets are estimates. The District reserves the right to increase or decrease quantities or timeframes as is needed to meet District needs.
Please include all part numbers being proposed, even if not included above. Feel free to correct any existing part numbers if different in the proposed solution
If licensing or other items are required for the solution being proposed, please include.
Please add additional rows if necessary.
The Service Provider is responsible for pricing and formulas in this spreadsheet.

File details come from the government source that posted it. Updated .