FY19 RFQ Main Dietary Cooling Tower Lines Replacement~3.docx
DOCX document 22 KB Posted
- Solicitation number
- 19-444DHS-DEVDI-B-4060
- Issued by
- Madison County, Illinois
About this file
This document is a Request for Quotation (RFQ) issued by the Murray Developmental Center in Centralia, Illinois. The RFQ is for the replacement of 6-inch metal piping from the cooling tower to the circulation pumps (supply and return) at the Main Dietary Building, with 6-inch Schedule 80 PVC piping. The specified requirements include pump suction and discharge details, vibration eliminators, butterfly valves, and the total length of piping. The bidder must remove the existing piping and install the new PVC piping, as well as perform seal testing and meet all applicable labor regulations. The work must be completed within 10 working days during regular business hours.
The RFQ requires the bidder to provide pricing per unit, brand information, and any relevant comments or remarks. The total bid amount must be valid for 90 days from the requested due date. The contract will be awarded on an all-or-none basis, and the Murray Developmental Center will not be responsible for any lost, stolen, or broken tools, materials, and equipment during the project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotation Bill to: Murray Developmental Center Ship to: Murray Developmental Center, 1535 West McCord, Centralia, Il. 62801 Date: September 28, 2018
Please fill in your information at the bottom of the form as well as your price, brand and any pertinent remarks in the comments columns below. Award may be made on an all-or-none basis.
E-mail (dedra.koehler@illinois.gov) OR fax your bid pricing to 618-532-7464, Attn: Dede Koehler.
| Item Description |
| Qty |
| Your Price per unit |
| Brand & item number |
| Comments/Remarks |
Replace 6” (inch) metal piping from cooling tower to circulation pumps (supply & return) with 6” (inch) Schedule 80 PVC piping at Main Dietary Bldg. (Bldg. 10).
SPECS:
Pump Suction: 6” (inch) flange at pump, 6” (inch) vibration eliminator, 6” (inch) butterfly valve, 132’ (feet) of 6” (inch) pipe, 20’ (feet) of Head, and 16 each of 90-degree couplers.
Pump discharge: 4” (inch) flange at pump, 4” (inch) flex connector, 4” (inch) to 6” (inch) reducer, 6” (inch) butterfly valve, 142’ (feet) of 6” (inch) pipe, 30’ (feet) of Head, and 16 each of 90-degree couplers.
Bidder must remove existing piping from supply and discharge of pump to Marley Cooling Tower and install new Schedule 80 PVC piping and connections, reducers, flanges, butterfly valves, flex connectors, and all associated piping.
Bidder must perform work during normal business hours of 7:00 am to 3:30 pm Monday thru Friday excluding holidays.
Bidder must perform seal testing after installation of piping.
Bidder must provide own tools, materials, and equipment associated with project. W.G. Murray Center will not be held responsible for any lost, stolen, or broken tools, materials and equipment.
Workers must sign in and out at the Boiler House each day they are here; failure to do so may result in non-payment.
Bidder must meet all applicable Illinois Dept. of Labor/OSHA regulations.
Bidder must give Facility Chief Engineer daily report of work progress.
Bidder must perform removal and installation of piping and associated materials within a reasonable time period not exceeding 10 (ten) working days.
BIDDERS MUST INSPECT PRIOR TO BIDDING.
Pricing must be good for 90 days from requested due date.
TOTAL BID: $_______________________
Submitted by:________________________________________________ Phone __________________ Fax: __________________Date: ________________
Company Name : ______________________________________ Address: ___________________________________________________________________
E-mail ________________________________________________________
File details come from the government source that posted it. Updated .