About this file
This document outlines the Pennsylvania Game Commission's (PGC) Fiscal Year 2024 requirement for the removal of woven wire deer exclosure fencing on multiple State Game Land properties in the Northcentral Region. The requested services include the furnishing of all labor, tools, equipment, and materials to dismantle and remove approximately 24,098 linear feet of fencing across four fence locations in Lycoming and Tioga counties. The contract period is from July 10, 2024, to June 30, 2025, with all work to be completed by the termination date. An optional site inspection tour is highly encouraged, and bidders must submit their bids via the PA Supplier Portal by July 2, 2024, at 2:00 PM. The contract will be awarded on a line-item basis, and the successful contractor must provide a $2,500 performance security deposit per line item. Payment will be on a reimbursement basis for the actual linear feet of fencing removed, as measured by a PGC Forestry Division employee.
The pricing for the project must include all labor, equipment, tools, insurance, materials disposal, and other items necessary for the completion of the project. The PGC reserves the right to reject any or all bids and award contracts as it determines to be in the best interest of the Commission. Bidders must provide three references of similar work performed within the previous two years to demonstrate their qualifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Worker Protection Form .docx | DOCX document | |
| FY24 Deer Fence Removal NC Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY2024
PENNSYLVANIA GAME COMMISSION
FORESTRY DIVISION
DEER DETERENT FENCE EXCLOSURE REMOVAL
GENERAL SPECIFICATIONS
I. SCOPE OF WORK:
A. The Pennsylvania Game Commission, Bureau of Wildlife Habitat Management, Forestry Division, requires woven wire deer exclosure fence removal. Services shall include, but not be limited to, the furnishing of all labor, superintendence, tools, equipment, and materials removal for the dismantling of woven wire deer exclosure fence as per attached Fence Removal Specifications (Attachment 1).
B. Any technical aspects of this bid, including order of fence removal should be directed to the Regional Forester as identified below. Administrative aspects of this bid should be directed to Paul Weiss, PA Game Commission Chief Forester, at telephone no. 717/787-4250 (x72039). Questions specific to the bidding process should be directed to the PGC Purchasing and Procurement Division at telephone no. 717/787-6594.
II. CONTRACT TASKS:
A. Project Location(s):
1. Approximately 24,098 linear feet perimeter of Woven Wire Fence on numerous blocks on the State Game Lands identified on the attached maps.
2. Counties Included:
NC Region – Lycoming, Tioga
III. SITE INSPECTION AND ASSISTANCE:
An optional site inspection tour for each fence removal location is highly encouraged and may be conducted by contacting the Regional Forester to make an appointment:
Northcentral Region Gary Glick, RF PO Box 5038 Jersey Shore, PA 17740 570-398-4744
IV. CONTRACT REQUIREMENTS:
A. The contractor agrees to comply with all items in Attachment 1, Fence Removal Specifications.
V. INSURANCE REQUIREMENTS:
A. The contractor will provide Workmen’s Compensation insurance sufficient to cover all the employees of contractor working to fulfill this contract.
B. Comprehensive General Liability Insurance, including bodily injury and property damage insurance, to protect the Commonwealth and the contractor from claims arising out of the performance of the contract. The amount of bodily injury insurance shall not be less than $300,000.00 for injury to or death of persons per occurrence. The amount of Property Damage Insurance shall not be less than $300,000.00 per occurrence.
Such policies shall name the Commonwealth as an additional insured. Prior to the commencement of work under this contract, the contractor must provide the Commonwealth with current Certificates of Insurance. These Certificates shall contain a provision that coverages afforded under the policy shall not be canceled or changed until at least thirty (30) days prior written notice has been given to the Commonwealth.
VI. HOLD HARMLESS:
A. The contractor shall be responsible for and agrees to indemnify and hold harmless the Commonwealth from and against damages to property or injuries (including death) to any persons and other losses, damages, expenses, claims, demands, suits, and actions by any party against the Commonwealth in connection with the work performed by the contractor.
VII. BIDDING
A. RECEIVING AND OPENING BIDS - The bid shall be awarded on a line item basis. Bids must be submitted via the PA Supplier Portal, to be found at www.pasupplierportal.state.pa.us Faxed bids and mailed bids will NOT be accepted.
Bids will be publicly opened on July 2nd, 2024 at 2:00 PM., at the Pennsylvania Game Commission, 2001 Elmerton Ave., Harrisburg, PA 17110-9797.
The price per linear foot of fencing shall include all labor, equipment, tools, insurance, materials disposal and all items necessary for the completion of the project.
Prices bid shall be in dollar and cents only.
B. BID RESULTS - Bidders can obtain results at www.emarketplace.state.pa.us/bidtabs.aspx
The posted results will contain the information of the apparent bidders, and all bids are under review until final award of the purchase order.
Quantities herein are only estimates and may increase or decrease dependent upon the needs of the Commission. Operator shall be paid at the unit price bid for actual services performed.
http://www.pasupplierportal.state.pa.us/ http://www.pasupplierportal.state.pa.us/
The Commission reserves the right to reject any or all bids and award contracts as it determines to be in the best interest of the Commission.
Bidder may bid on all location sites; however, bid will be awarded on a line item basis.
VIII. PERFORMANCE SECURITY:
A. As further guarantee of faithful performance of the conditions set forth in this contract, the Contractor hereby agrees to furnish the Commission with Certified Check, Savings Account, Irrevocable Letter of Credit, or other security acceptable to the Pennsylvania Game Commission, in the sum of $2,500.00 per Line Item (Each Region is a Line Item).
ANY SECURITY POSTED MUST HAVE AN EXPIRATION DATE A MINIMUM OF ONE YEAR
BEYOND THE EXPIRATION DATE OF THE CONTRACT.
B. Performance Security is due no later than 30 days after written notice of the bid award. Time is of the essence with regard to the provision of Performance Security. At the option of the PGC, failure to provide an acceptable Surety within 30 days will result in cancellation of the contract and the PGC may declare the bidder ineligible on future projects.
C. It is further agreed that any performance bond guarantees the complete and faithful performance of this contract and full compliance with the conditions set forth herein, particularly as to construction repairs, restorations or other conditions to be performed and the Principal and Surety shall in no way be released or either of them, their executors, administrators, successors or assigns from their liability hereunder, notice to the Surety or Sureties of any such repair involving construction restoration and conditions to be performed, and extension or forbearance hereof being hereby waived.
D. Failure to comply with any of the conditions of the contract herein mentioned shall result in cancellation of the agreement and forfeiture of the performance bond to cover damages sustained by the Commission. The Commission may declare the Contractor ineligible to bid on future contracts.
IX. OPERATOR REFERENCES
After bid opening and prior to awarding the Purchase Order(s), the Commission has the right to request three (3) references (name, addresses and telephone numbers) of similar work performed in the previous two (2) years as proof of qualifications to perform the work involved in the project(s).
X. CONTRACT TERM:
A. The contract term shall commence July 10, 2024 and terminate June 30, 2025. All work must be completed by the termination date.
XI. PAYMENT TERMS:
A. Payment shall be on a reimbursement basis for actual linear feet removed as measured by a Forestry Division employee
XII. INVOICES
Original invoices must be sent to:
Commonwealth of PA – PO Invoices P.O.Box 69180 Harrisburg, PA 17106
A copy of all invoices must be sent to:
Paul Weiss Chief, Forestry Division Pennsylvania Game Commission Bureau of Wildlife Habitat Management 2001 Elmerton Avenue Harrisburg, PA 17110-9797
All invoices must have the Purchase Order Number, as well as the Operator’s SAP Vendor Number on the invoice. The name and address listed on the purchase order must also be on each invoice.
Failure to provide this information may result in a delay of payment.
XIII. PURCHASE ORDER(S) TERMINATION
The Commonwealth may terminate the Purchase Order(s) for its convenience if the Commonwealth determines termination to be in its best interest. Operator shall be paid for work completed.
ATTACHMENT 1
FENCE REMOVAL SPECIFICATIONS
A. WOVEN WIRE FENCE REMOVAL
1. All woven wire fence must be removed from all trees, posts, and supports.
2. All fence supports used to secure the wires to trees must be removed. All nails and staples used to fasten fence or fence supports to trees must be removed.
Nails/staples are not to be pounded into trees.
3. All free standing wooden posts, metal posts, or other supports must be removed in their entirety. If removing the entire post is not possible then they must be cut clean through with a chain saw flush to the ground.
4. All nails and staples used to fasten fence to wooden fence posts must be removed.
5. All walk-through and vehicle gates must be removed.
6. All signs must be removed.
7. Materials specified to be retained by the PGC will be placed as instructed by the Regional Forester.
8. All additional material not retained by PGC becomes the responsibility of the operator and must be completely removed from Pennsylvania Game Commission property and disposed of properly.
B. EROSION AND SEDIMENTATION CONTROL
1. Equipment will not be operated when ground conditions are such that excessive damage will result.
2. The contractor will be required to repair areas that become rutted due to work, install waterbars in areas that are of sufficient slope that erosion may occur.
3. All disturbed areas must be seeded with 15 pounds/acre of a mix consisting of 5 pounds Trophy Blend Deer Clover or White Clover with innoculant and 10 pounds redtop. In addition, 200 pounds/acre of 10/20/20 must be spread in areas to be seeded. Disturbed areas that may be prone to erosion and/or sedimentation along the fence line must be mulched with straw.
C. DEBRIS AND GARBAGE
1. The contractor will remove all trash and garbage generated during the completing of this contract. This is to include all materials generated from the removal of the fence and items generated from the personal use by the contractor's employees.
D. WORK SCHEDULE
1. The contractor will notify the Regional Forester as listed in the contract three days prior to the beginning of each fence removal project.
2. The contractor may work at times other than the schedule of the Regional Forester.
3. The contractor may be present at the final inspection.
4. The following are NON-WORK days for the contract period:
a. All Saturdays in the months of October, November, December, and January.
b. The opening day and all Saturdays during spring turkey season, including the youth day.
c. The four days of general statewide bear season
d. The entire statewide general firearms deer season.
e. The opening day of the flintlock muzzleloader season.
PGC 2024-2025 Deer Fence Removal
Line 1 - NC Region – 24,098 feet – 4 fences
Region SGL Project Name Perimeter Acres Additional Instructions
75 Dunkin Donut 6,068 43 Remove all Man & Vehicle Gates 208 Big Rock - Block 1 5,420 31 Remove all Man & Vehicle Gates 208 Big Rock - Block 2 8,030 40 Remove all Man & Vehicle Gates 37 Woodstove - Block 6 4,580 29 Remove all Man & Vehicle Gates
Total 4 24,098 143
NC
PGC FY24-25 Woven Wire Fence Removal
| FY 21 FENCE REMOVAL COVER |
| FY 21 General SPECIFICATIONS Fence Removal |
| FY 21 Deer Fence Removal Specifications-Att 1 |
| FY 21 Deer Fence Removal _line item summary |
| fence removal matrix |
| Fence Remove |
| FY 23 fence removal_71823.pdf |
| FENCE REMOVAL |
| FY24 Fence Removal Matrix.pdf |
| FENCE REMOVAL |
File details come from the government source that posted it. Updated .