FY 22 SOW REPFAC.pdf

PDF 248 KB Posted

Attached to
Landscaping service Beverly, MA Federal contract opportunity
Solicitation number
70Z02422QBOST0161
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to Landscaping service Beverly, MA, newest first.
File Type Posted
70Z02422QBOST0161_Questions and Answers.pdf PDF
SF30 70Z02422CBOST0161 0002.pdf PDF
SF30 70Z02422QBOST0161 0001.pdf PDF
FY 22 SOW BEVERLY HOUSING.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LANDSCAPING SERVICES FIRST COAST GUARD DISTRICT

REPRESENTATIONAL FACILITY

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

SPECIFICATIONS FOR

LANDSCAPING SERVICES

FIRST COAST GUARD DISTRICT

7 March 2022

1 BAYVIEW AVENUE

BEVERLY, MASSACHUSETTS

01915

POINT OF CONTACT:

Procurement & Contracting:

Name: SKC Shane Barwick

Unit: USCG Station Gloucester

PH: 978-283-0705

E-mail: Shane.A.Barwick@uscg.mil

Contracting Officer’s Representative (COR):

Name: Mark Sperry

Unit: USCG BASE BOSTON

PH: (617) 557-9078

E-mail: Mark.D.Sperry@uscg.mil

Part 1 SCOPE OF WORK

1.1 GENERAL

The scope of work is for seasonal landscaping of grounds (~1.8 acres) at the First

Coast Guard District Representational Facility in Beverly, MA.

1.1 EXCLUSIONS

The Government reserves the right to perform all grounds maintenance services not stipulated or described herein by separate contract or with Government employees.

1.3 TERM AND DURATION

Provide the labor, service, materials and equipment necessary in performance of the contract for the period starting 01 April 2022 and ending 30 November 2022.

1.4 LOCATION

The work shall be located within the confines of the First Coast Guard District

Representational Facility in Beverly, MA. 1 Bayview Avenue, Beverly

Massachusetts

1.5 MANAGEMENT

The Contractor shall be responsible for the management of the total landscaping effort within the designated areas. This is to include the planning and programming of all services described herein, supervision and performance of those services, and compliance with all record and reporting requirements.

1.6 HOURS OF WORK

file://///D01MS-BCDBOF08B/Public/Base_Boston/BSU_Boston/Facilities/Contracting%20&%20Planning%20Office/1.%20Small%20Projects%20&%20SMAs%20(DO%20NOT%20MOVE)/4.%20REPFAC%20Projects/REPFAC%20LANDSCAPING/SCOPE/Shane.A.Barwick@uscg.mil file:///C:/Users/SABarwick/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/5NQCMADF/Mark.D.Sperry@uscg.mil

The work described herein shall be performed between the hours of 08:00 AM and

4:00 PM local time Monday through Friday, excluding Government Holidays. Work outside of the specified hours must be approved by the Contracting Officer or his/her representative prior to start of work.

1.7 COORDINATION OF WORK

The work described herein is to be conducted at a family residence of the District

Commander and the Contractor shall coordinate all performances of work with the

Special Command Aide prior to commencing all servicing.

1.8 GOVERNMENT FURNISHED UTILITIES

The Government shall provide reasonable and finite amounts of potable water and electrical power necessary to complete work described herein.

1.9 CONTRACTORS QUALIFICATIONS

The contractor shall have a minimum of three years experience in the Grounds

Maintenance work or General Landscaping.

1.10 CERTIFICATE OF INSURANCE

A. INSURANCE – WORK ON A GOVERNMENT PROPERTY

a) The contractor shall, at his/her own expense, provide and maintain during the entire performance of this contract, at least the kinds of minimum amounts of insurance in section (2) below.

b) Before commencing work under this contract, the Contractor shall certify in writing that the required insurance has been obtained. If in the case of policy cancellation or material change the Governments interest shall not be effective: (1) for such a period as the laws of the State in which this contract is to be performed prescribe, or (2) until thirty days after the insurer or the

Contractor gives written notice, which period is longer.

c) The Contractor shall ensure in any subcontracts under this contract the subcontractors provide and maintain the insurance required under his contract and shall provide in writing that the required insurance has been obtained, making available to the Contracting Officer upon request.

B. REQUIREMENT FOR INSURANCE

Type of Coverage

Accident per person per accident property

Commercial

General Liability $300,000. $25,000.

Automobile $20,000. $40,000. $5,000.

Liability $200,000. $500,000. $20,000.

Workers Compensation: as required by Federal and State Law.

All insurance policies shall provide for notice of cancellation and shall be given to the Contracting Officer not less than (30) days before the effective date.

PART 2 REQUIREMENTS

2.1 GENERAL

The Contractor shall provide all labor and equipment necessary to complete the described work in this contract.

2.2 STORAGE

The Contractor shall not store any materials or equipment on Government property.

If in the case of a machinery casualty, the Contractor must request and receive verbal approval from the Contracting Officer or his/her representative to store any item on Government property.

PART 3 EXECUTION

3.1 Contractor will mow and trim all designated areas.

Prior to mowing the Contractor shall remove all debris from the lawn areas. This shall include but not limited to fallen tree limbs and branches, rocks, etc.

Grass areas shall be maintained within a height range of 2”minimum up to 4” maximum.

Grass cutting shall be accomplished in a manner such that it is free from scalping, rutting, bruising and uneven or rough cutting and will promote proper growth and a neat appearance.

Trimming will include around all trees, poles, fences, signs. After grass cutting/trimming operations, all sidewalks, walkways, driveway, etc, shall be cleared of resulting debris.

The maximum amount of cuts will not exceed 28 cuts per contract.

3.2 Edging and Mulching.

Edge all designated bedding areas and apply Treflan 120 (weeds/herbicide application) prior to applying 2 to 3 inches of premium mix mulch consisting of

Hemlock and Pine bark combined. This will be done in the spring after spring clean up.

3.3 Application of lawn care products.

All applications will be done according to a seasonal schedule prepared by the contractor and submitted with bids.

Fertilizing - This will be accomplishing by:

One application of spring fertilizer with pre emerging crab grass control, One application of summer fertilizer with grub control.

All products used should stimulate the growth of the lawn while eliminating any and all lawn pests or disease according to professional lawn care industry standards.

3.4 Spring clean up

Overall clean up of the property of leaves, brush and debris. Edge and remove old mulch from existing beds. Clean lawn areas and mow & trim. Disposal is included.

3.5 Irrigation System

Open the system and adjust heads of coverage. The sprinkler system will be blown out at the end of the season and secured for winter.

3.6 Weeding

Weeding will be performed on designated areas (i.e. flower beds). The maximum amount of hours will not exceed 10 per contract.

PART 4 OCCUPATIONAL AND ENVIRONMENTAL COMPLIANCE

4.1 HANDLING AND DISPOSAL

The Contractor shall handle and dispose of materials and waste in accordance with applicable State and/or Federal Regulations.

The Contractor shall remove from the Government property all landscaping debris from this servicing and properly disposing of the same. At no time will the

Contractor dispose of any material in the wooded areas on Government property.

NOTE: CONTRACTOR SHALL PROVIDE SAFETY DATA SHEETS

(FORMERLY MATERIAL SAFETY DATA SHEETS) FOR ALL MATERIAL

APPLIED DURING THIS CONTRACT.

File details come from the government source that posted it. Updated .