FY_2025_and_2026_PPPP_Application_Template.docx
DOCX document 168 KB Posted
- Opportunity number
- FHWA-PPPP-26-001
About this file
This is an application template for the FY 2025 and 2026 Prioritization Process Pilot Program (PPPP) Competitive Grant Program administered by the Federal Highway Administration. The template is designed for Metropolitan Planning Organizations (MPOs) serving census-delineated urban areas with populations exceeding 200,000 to apply for federal funding to develop and implement transparent, publicly accessible prioritization processes for ranking and selecting transportation projects in short-range and long-range transportation plans. The PPPP Competitive Grant Program will award up to $26 million total across FY 2025, FY 2026, and remaining FY 2024 funds through cost-reimbursable grants. Individual grant awards have a maximum cap of $2 million, with the federal government providing 100 percent of the project costs.
The application template serves as the standardized submission document that eligible MPOs must complete to apply for PPPP funding. Applicants are expected to address how their prioritization processes will integrate existing transportation programs and support projects that improve safety, climate change and sustainability, equity, and economic strength and global competitiveness in alignment with Department of Transportation strategic goals. Recipients must retain all project records and documents as required by 2 CFR 200.333. Specific response deadlines and award dates are not detailed in the template itself, with applicants directed to consult the individual Notice of Funding Opportunity for eligibility constraints, evaluation criteria, and application deadlines.
FY 2025 and 2026 PPPP Application Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PKG00294283.pdf | ||
| FHWA-PPPP-26-001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is the Application Template for Fiscal Years (FYs) 2025 and 2026 Prioritization Process Pilot Program (PPPP) Notice of Funding Opportunity (NOFO).
Submission of this Application Template is required as part of a complete application package. The Application Template, in conjunction with the allowable attachments and standard forms, should provide all information necessary for the U.S. Department of Transportation (DOT), Federal Highway Administration to determine if the prioritization project satisfies the eligibility requirements described in NOFO Section B and to evaluate the criteria specified in NOFO Section F. DOT will consider applications submitted without the completed template as incomplete and will not review the submission. DOT encourages applicants to review the NOFO in its entirety to verify that their proposed prioritization project[footnoteRef:2] is eligible and includes all required information is provided in their application. [2: The development of the prioritization process eligible for PPPP funding is referred to as the prioritization project. The actions that would eventually be selected by a State or MPO for funding through a funded prioritization process are referred to as projects.
I. SUMMARY
Expand the response blocks as necessary but limit the Summary section of the application to two total pages in length.
Prioritization Project Name:
Eligible Entity Applying to Receive Federal Funding:
Entity Type:
☐ State ☐ Metropolitan planning organizations (MPO) that serve a census designated urban area with a population over 200,000.
| Prioritization Project Scale: |
| ☐ Local ☐ Regional |
☐ Statewide ☐ Multi-State
| Total Prioritization Project Cost: (from all sources) |
| $ |
| PPPP funding request amount: |
| $ |
State(s) in which the Prioritization Project is located:
Lead Applicant Point of Contact Information:
Prioritization Project Abstract: Summarize work to be completed under the prioritization project and succinctly describe how the PPPP funds would be used to complete the prioritization project.
Attachments: Please list any attachments to this form, including letters of support.
II. PRIORITIZATION PROJECT INFORMATION
Expand the response blocks as necessary but limit the Prioritization Project Information section of the application to four total pages in length, including attachments. [Applicants: Delete instructions shown below in italic prior to submittal.]
| 1 |
| Prioritization Project Name: |
| 2 |
| Location of Prioritization Project Area: |
| [Instructions: Provide State and county, name of the city, town, or jurisdiction.] |
| 3 |
| Public or Private Parties: |
| [Instructions: If other parties are involved in delivering the prioritization project, disclose those entities and describe their role. Also state whether a private or non-private entity will receive a direct and predictable financial benefit if the prioritization project is selected for award.] |
| 4 |
| Eligibility: |
See Section B.2 of the NOFO for more information.
[Instructions: Described how the applicant will address all of the statutory required uses of PPPP grants under Infrastructure Investment and Jobs Act (IIJA), Sections 11204(c)(1)(A-D), 11204(c)(2)(A) or (B), and 11204(c)(2)(D), during the development and implementation of the PPPP prioritization project.]
☐ A description of eligible activities is attached separately. The file is named:
| 5 |
| Lead Applicant Point(s) of Contact: |
| [Instructions: Name and contact information for the State, unit of local government, or Tribal applicant (or Lead Applicant where multiple entities are partnering for the prioritization project)] |
| 6 |
| Prioritization Project Background: |
| [Instructions: Provide a concise overview of the prioritization project scope. Also note any key project planning activities that have occurred, and a description of any previously incurred costs.] |
☐ A description of eligible activities is attached separately. The file is named:
III. BUDGET AND FUNDING
Expand the response blocks as necessary but limit the Budget and Funding section of the application to two total pages in length, excluding attachments. [Applicants: Delete instructions shown below in italic prior to submittal.]
| 1 |
| Program Request Amount: |
| Exact PPPP request amount in year-of-expenditure dollars: $____________. |
| 2 |
| Other Federal Funding: |
| Estimated total of other Federal funding, excluding PPPP requested funding, in year-of-expenditure dollars: $_________. |
Other Federal programs and estimated amounts: (add lines as needed) Program: _________________Amount: $____________.
| 3 |
| Future Prioritization Project Cost: |
| Provide the sum PPPP request, other Federal funds, and non-Federal funds as an estimate in year-of-expenditure dollars: $____________. |
| 4 |
| Previously Incurred Prioritization Project Costs: |
| [Instruction: If costs have already been incurred for the prioritization project, such as planning or design costs, provide the total here.] |
Amount: $____________.
| 5 |
| Total Prioritization Project Cost: |
| Estimate in year-of-expenditure dollars (sum of previously incurred prioritization project costs’ and ‘future prioritization project cost): $___________. |
| 6 |
| Statement of Work: |
| [Instruction: Include a detailed Statement of Work for the prioritization project in sufficient detail to demonstrate the prioritization project budget is reasonable. In addition, include a prioritization project schedule demonstrating prioritization project delivery milestones through prioritization project close-out.] |
☐ A detailed budget is attached separately. The file is named:
| 7 |
| Grant Funds, Sources and Uses of Prioritization Project Funds (detailed budget): |
| [Instruction: Include a detailed budget or attach separately. This budget must list the amount and percentage of both the Federal funding requested and any additional non-Federal funds, if any, that will be used to pay for the prioritization project. Additional lines can be added. This list can be modified as needed] |
Activity: Cost:
Activity: Cost:
Activity: Cost:
Activity: Cost:
☐ A detailed budget is attached separately. The file is named:
IV. MERIT CRITERIA
In the space below, describe how the prioritization project will meet the Merit Criteria and the associated objectives as found in Section F of the FYs 2025 and 2026 PPPP NOFO. Where appropriate, reference attachments or other sections of the application. Expand the response blocks as needed but limit the length of the Merit Criteria section of the application to six total pages in length.
Criterion #1: Innovation
Criterion #2: Economic Competitiveness
Criterion #3: Reinvesting in the American Family
Criterion #4: Addressing Core Infrastructure
V. READINESS
In the space below, describe how the prioritization project will meet the readiness considerations and the associated elements as found in Section F of the FYs 2025 and 2026 PPPP NOFO. Where appropriate, reference attachments or other sections of the application. Expand the response blocks as needed but limit the length of the readiness section of the application to two total pages in length.
Readiness: Technical Assessment
Readiness: Financial Completeness Assessment
VI. DOT PRIORITY CONSIDERATIONS
In the space below, describe how the prioritization project will meet the DOT priority considerations in Section F of the FYs 2025 and 2026 PPPP NOFO. Where appropriate, reference attachments or other sections of the application. Expand the response blocks, as needed, but limit the length of the statutory and DOT priority considerations section of the application to two total pages in length.
DOT Selection Priorities: Check if the following apply to the prioritization project (DOT will utilize information in other portions of the application to determine responsiveness to the other DOT Selection Priorities listed in Section F of the NOFO):
☐ DOT may provide awards to applications demonstrating a priority process that includes prioritizing congestion reduction.
☐ DOT may prioritize projects that consider repurposing, as part of their prioritization process, existing specialized travel lanes for bicycles for general purpose use, including by single-occupant motor vehicles, if the applicant demonstrates the repurposing will meet the PPPP program purpose.
☐ These considerations do not apply to the prioritization project.
Describe any boxes checked below:
File details come from the government source that posted it. Updated .