This document outlines a federal contract opportunity for construction services at an Alaska Air National Guard facility. The 176th Air Wing at Joint Base Elmendorf-Richardson is seeking to award a firm fixed-price contract to construct a 12 foot by 50 foot insulated wall and roof addition to an existing storage building, with optional bids for acoustic ceiling installation, an enclosed restroom, and epoxy flooring. The base bid and three options have a combined estimated value between $100,000 and $250,000. A pre-proposal site visit is scheduled for August 2nd, with the solicitation to be issued on or around July 30th via SAM.gov. The NAICS code for this opportunity is 236220 and it is set aside for total small businesses with average annual revenues under $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FXSB211653 SOW ADAL Services Storage.pdf | ||
| FXSB211653 SOW Drawing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANNING/CONSTRUCTION SERVICES
STATEMENT OF WORK
FXSB210279 SOW (continued) control system. Contractor will install 120 volt outlet every six feet on all walls and conduits and associated boxes for communications system with actual wiring to be installed by third party at a later date. Contractor will install a simple A-Framed metal canopy and exterior photocell activated LED light over new exterior door to protect occupants from sliding snow/ice from the roof and provide light during hours of darkness. Contractor will need to remove existing ventilation system and associated ducting that currently protrudes from center of existing building south facing wall where new addition will be joined. Opening from removal of ducting will be insulated and covered with corrugated siding to match existing. Contractor will extend fire sprinkler and alarms systems from existing building into addition and install at height and configuration to accommodate future suspended ceiling.
Contractor will install one 4 foot by 4 foot concrete porch right outside new entrance and 3 foot wide standard depth and base course concrete sidewalk to connect porch to existing sidewalk on south side of addition as shown on attached drawing.
Optional Bid Items
2. Suspended Acoustic Ceiling: Contractor will provide/install acoustic drop ceiling, painted gypsum board walls, and commercial grade carpet tile throughout building addition.
3. Restroom: Contractor will provide/install a small 8 foot by 8 foot painted gypsum board enclosed restroom in northwest corner of existing building as shown on attached drawing with one functional toilet, sink, small cabinet under sink, and one mirror over the sink. There shall be adequate lighting and a fan with self-opening/closing louvered ventilation to the outside of building when in use.
Contractor will also need cut and repair road to make tie in to sanitary sewer connect to line that runs parallel to existing building north facing wall as is shown on attached drawing.
4. Epoxy Existing Floor: As follows:
a. Degrease and shot blast entire floors. Seal all cracks and joints with
Sherman Williams Armorseal Crack filler or an approved equal.
b. Apply one coat, 2.5 - 4.0 mils DFT, of Sherman Williams Armorseal
1000HS or an approved equal in color Deck Gray followed by a second coat of same product, 3.0 - 5.0 mils DFT, over entire floors.
c. Apply one coat, 7.5 mils DFT, of Sherman Williams Setfast Acrylic Traffic Marking Paint or approved equal in colors white for traffic marking, yellow for clear zones in front of electrical panels and safety showers, and red for further delineation as needed.
4. PERIOD OF PERFORMANCE (POP)
1. POP shall be 75 days from date notice to proceed is issued for base bid item.
2. POP shall be 45 days from date notice to proceed is issued for each optional bid item.