FWGC_Black_Course_Holes_#_4,_10,_12,_15,_16_&_18_Cart_Path_Extensions_(Addendum_#1_Revision).pdf

PDF 353 KB Posted

Attached to
FWGC Black Course Holes # 4, 10, 12, 15, 16 & 18 Cart Path Extensions
Solicitation number
FWB036255
Issued by
Fairfield County, Bridgeport City, Connecticut

About this file

This is an Invitation to Bid (ITB) from the City of Bridgeport, Connecticut Department of Public Purchases for cart path extension and paving services at the Fairchild Wheeler Golf Course Black Course. The project involves constructing 8-foot-wide asphalt cart paths on six golf holes (#4, 10, 12, 15, 16, and 18), with an estimated total of 40,480 square feet of new asphalt paving. The scope of work includes removal of existing materials, installation of a 4-inch compacted gravel base, 2.5-inch compacted asphalt surface, and topsoil and seeding up to 5 feet on each side of the paths. Contractors must have a minimum of five years of golf course cart path installation experience. Electronic bid submissions are due by 2:00 pm on Tuesday, June 3, 2025, through the City's OpenGov e-Procurement Portal. Prospective bidders must submit written questions by 4:00 pm on Thursday, May 22, 2025, and are encouraged to attend a site visit on May 2, 2025, at 9:00 am. The estimated construction period begins July 7, 2025, with a 35-day completion timeline and an estimated final completion date of October 31, 2025.

The project is subject to prevailing wage requirements for bids exceeding $100,000. A 10% bid bond or certified check is required for bids over $50,000, except for Minority Business Enterprises (MBEs), which must provide a bid bond only if the bid exceeds $100,000. Payment and performance bonds equal to 100% of the contract price are required for contracts exceeding $100,000. The City encourages participation from Minority Business Enterprises, Women Business Enterprises, and City-based businesses (CBB), with MBE/WBE/CBB certifications required at the time of bid submission. Payment will be made in full after project completion and invoice approval, within 45 calendar days. All materials and labor are at the contractor's expense with no upfront payments. Connecticut-licensed contractors are required, and out-of-state bidders must obtain a Certificate of Authority to Do Business in Connecticut within five days of Notice of Intent to Award. The contractor must also provide a valid SAM, DUNS, Connecticut Tax ID, and Federal Tax ID prior to commencing work. The City reserves the right to reject any or all bids and will consider factors beyond lowest price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

FWB036255

FWGC BLACK COURSE HOLES # 4, 10, 12, 15, 16 & 18

CART PATH EXTENSIONS

CITY OF BRIDGEPORT

DEPARTMENT OF PUBLIC PURCHASES

999 BROAD STREET

BRIDGEPORT CT 06604

Submission Deadline:

Tuesday, June 3, 2025 by 2:00 pm

Table Of Contents

1. Introduction

2. Bid Information

3. Statement of Work

4. Bid Sheet

5. Submission Instructions

6. Terms and Conditions

7. Vendor Submission

Attachments:

A - Drawings & Details - Black Course (6 Holes)

B - General Conditions For Construction

C - Construction Insurance Rider

D - Construction Contract - FCWGC BID

E - Prevailing

Wages_FairchildWheelerGolfCourse_CartPathExtensionandPaving_UpdatedHeavySchedule

1. Introduction

The City of Bridgeport seeks bids for FWGC Black Course Holes # 4, 10, 12, 15, 16 & 18

Cart Path Extensions.

The requirements of this bid are outlined in greater detail under Bid Information Section.

The selected awardee must meet all municipal, State and Federal practices and requirements.

Please note the City of Bridgeport encourages Minority business enterprises (MBE), Women business enterprises (WBE) and City-based businesses (CBB) to submit proposals. MBE, WBE or CBB State and/or City certification(s) showing the vendor’s current M/WBE and/or CBB status must be included as part of the proposal package at the time of submission for such status to be considered. For details, please see City Ordinance 3.12.130D

1.1. Background

Fairchild Wheeler offers two challenging 18 hole golf courses. The Red Golf Course demands accurate tee shots which will leave most golfers with mid to short irons for their approach shots.

Don’t let that fool you because the Red Golf Course has tough greens that will make most golfers double and triple check the breaks.

The Red Golf Course features 6,568 yards of golf from the Championship Tees for a par 72. The course rating is 71.0 and the slope is 124.

The Black Golf Course features 6,559 yards of golf from the Championship Tees for a par 71.

The course rating is 71.5 and the slope is 123. The Black course has beautiful winding hills, great scenic views and delivers a challenge with newly renovated fairway and greenside bunkers.

Besides Two Great Golf Courses, Fairchild Wheeler has so much more to offer. Fairchild

Wheeler is home of the First Tee of Metropolitan New York and Nike Junior Summer Golf

Camps. The Golf Shop is fully stocked and the wide open driving range allows you to hit short irons up to your driver. After playing 9 holes stop by Vazzy’s snack bar for a quick bite or enjoy a few drinks and some happy hour pizza in Tommy’s grill after your round.

2. Bid Information

Bonds and Contractors Requirements and Responsibilities

Bid Bond:

Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with its bid submission if the bid is $50,000.00 or more, except for bids from MBE’s, for which a bid bond is required on bids that are $100,000 or more.

Payment and Performance Bond:

The successful bidder, prior to permission to proceed, will be required to post a payment bond of 100% of the contract price if the contract price is in excess of $100,000, and a performance bond, for 100% of the contract price, if the bid is $50,000.00, or more except that performance bonds from MBE’s will only be required on projects that are $100,000.00 or more. THE MBE

CERTIFICATION SHALL BE SUBMITTED AT THE TIME OF BID OR NO

EXEMPTION FROM THE BID BOND REQUIREMENT SHALL BE PERMITTED.

Contractors Requirements and Responsibilities:

Contractor must be licensed in the State of Connecticut and all employees must be properly certified and qualified to perform the work. Out of state bidder must provide the City of

Bridgeport with a Certificate of Authority to Do Business in the State of Connecticut within five days of a Notice of Intent to Award. This can be obtained from the Connecticut Secretary of

State.

The contractor will be responsible for the safety of the work site.

The contractor is responsible obtaining and paying for any and all permits as required.

This contract award will require that the successful vendor have a valid SAM, DUNS, CT and

Federal Tax ID numbers prior to commencing work.

The Contractor is prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.

Prevailing Wage Rates:

Bids in excess of $100,000 must include Prevailing Wage Rates.(see attachment E)

Minority and Buy Local: The City of Bridgeport Minority and Buy Local Program Ord.

3.12.130 E, may be applicable to this project.

Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): In conjunction with this invitation, certifications of the vendors current MBE and, or CBB status must be included as part of the bid package at the time of the bid submission. Consistent with the terms of City Ordinance 3.12.130 no submission either MBE or CBB certification will be accepted when such certifications(s) is, are not submitted as part of the bid package at the time of bid submission.

For MBE | CBB certification information, please contact Mr. Jason Chandersingh, Special

Project Coordinator, Small & Minority Business Resource Center at (203) 576-

7110, jason.chandersingh@bridgeportct.gov

3. Statement of Work

3.1. General Requirements and Covenants

1. Definitions mailto:jason.chandersingh@bridgeportct.gov

1.1. Wherever "G.C.A." (Golf Course Architect) appears herein, it shall refer to the firm of

Golf Design Unlimited, LLC and any of their authorized representative(s): Douglas

Smith.

1.2. Wherever "G.C.S." (Golf Course Superintendent – Issam Kadi) appears herein, it shall refer to the person working in that capacity for The City of Bridgeport, or its authorized representative(s).

1.3. Wherever "Owner" appears herein, it shall refer to the City of Bridgeport – D.

Fairchild Wheeler Golf Course, and its authorized representative(s).

1.4. Wherever " Contractor" appears herein, it shall refer to the contractor who is performing the work.

1.5. The term "Plans" refers to all construction drawings within this document and field design sketches and details that the G.C.A. will do during construction, and details authorized by the Owner and pertaining to the work as prepared by the G.C.A.

1.6. The term "Site" refers to the grounds upon which the work is being constructed.

2. Contractor's and Owners Responsibilities.

2.1. Material - The Contractor shall supply all material. All stockpile areas are subject to the approval of the G.C.S. and the Owner.

2.2. The Owner shall indicate to the Contractor all haul roads and locations for storing any material and/or equipment. Any damage from an existing haul road by the Contractor shall be repaired by the Contractor at his own expense. Any new haul roads shall be removed and the area repaired to the state it originally was in. All haul road repairs are at the

Contractor’s own expense and subject to the approval of the G.C.A. and the G.C.S..

2.3. The Contractor shall be responsible to use proper surveying equipment to check that all cart paths are pitched at the proper slope to not have water puddle.

2.4. The Contractor shall provide and have on hand wooden stakes, metal marking flags, white and red fluorescent paint and a paint gun for the G.C.A.'s use during the project.

2.5. The Contractor shall keep in close contact with the G.C.A. and give him a minimum of 48 hours notice when the Architect's services are required for approval as dictated by the Specifications.

2.6. All work shall be included in the items whether mentioned or not mentioned in the specifications.

3. Summary of Project

3.1. Qualifications - for the project the Contractor must meet: The Contractor shall have cart path installation on a golf course with a minimum of five years. The supervisor for this project must have the same experience.

3.2. This project involves cart path work on six (6) holes on the black course. These holes are #4, 10, 12, 14, 16 & 18. All paths are to be 8’ wide. All excavated material shall be hauled off-site. The sides of the path are to be repaired up to 5’ outside of path with topsoil and seed. The job is prevailing wage.

3.3. The Contractor shall provide all material for the project.

3.4. Payment is in full after completion of job. Project must be signed off and invoices with PO number on it. All labor and materials will be at vendor’s expense – no upfront payments at start of job. A bond may be required by the City Of Bridgeport.

4. Construction Schedule

4.1. The Contractor must start work within seven to ten days of “Notice to Proceed” and complete work within 35 days after start. An estimated construction start date (weather permitting) is July 7, 2025 and a completion date by Oct 31, 2025.

3.2. Technical Specifications - Item 100 - SILT FENCE

Item 100 - SILT FENCE

DESCRIPTION. The work under this Item consists of the Contractor installing and maintaining silt fence around necessary construction areas as directed in the field by the G.C.A. The work also includes the removal of the silt fence by the Contractor after the construction areas are stabilized. Please note that the G.C.A. might direct the Contractor to install some additional silt fence not for its purpose of stopping erosion runoff but to fence out an area from golfers.

0. MATERIAL. All material under this Item shall be supplied by the Contractor.

0.1. Silt Fence. Silt fence shall be a woven polypropylene fabric resistant to soil chemicals, mildew, insects and exposure to sunlight. The fabric shall have the following minimum values:

Property

Test Method

Minimum Avg. Value

Tensile strength (lbs) ASTM-D-1682 200 WARP Elongation (%) ASTM-D-1682 2 Burst Strength (psi) Mullen Burst Test 300 Retention Efficiency (%) VTM-51-79 75 Equivalent Opening Size U.S. Sieve No.

Equiv.

30/ 50

0.2. Stakes. Shall be either wood or steel as recommended by the silt fence manufacturer.

1. CONSTRUCTION OPERATIONS.

1.1. Installation. Silt fence shall be installed and maintained around all locations as indicated on the Plans and/or as deemed necessary by the G.C.A. Silt fence shall be installed according to the detail and to the manufacturer's recommendations.

1.2. Removal. The Contractor shall remove silt fence upon approval of the Architect and/or the Owner.

2. CLEAN-UP AND APPROVAL. All work, methods of construction and clean-up shall be subject to the approval of the G.C.A.

3. PAYMENT. The Contractor shall be paid by his bid unit price per linear foot and it includes the installation, maintenance, removal of the silt fence and any turf restoration as necessary.

END OF ITEM 100

3.3. Technical Specifications - Item 200 – CART PATH

Item 200 – CART PATH

1. DESCRIPTION. Under this Item the Contractor shall supply and install 8’ wide asphalt paving as indicated on the Plans and/or as located in the field by the G.C.S. The GOLF

CONTRACTOR is also responsible for any grading and/or backfilling required for proper drainage a distance of five feet (5’) on both sides of the path. See Plans for length.

2. MATERIAL. All material under this Item shall be supplied by the Golf Contractor and approved by the G.C.S. and the Town.

2.1. Asphalt. The asphalt mix shall be equal to those specified by ASTM D 1633.

2.2. Stone Base -‐-Shall be 3/4"ʺ modified stone (2A) or 3/4"ʺ quarry blend, or QP.

3. CONSTRUCTION OPERATIONS FOR ASPHALT.

3.1. Removal of Excavated Material. The G.C.S. and the GCA shall indicate where the contractor will remove existing material for the cart path. The excavated material is put in a dumpster supplied by the Contractor and ultimately removed from the site.

3.2. Excavation Along Path. The Contractor shall remove a minimum of six and one-

‐-half inches (6-‐-1/2"ʺ) of existing grade (to be stockpiled and removed from the site as indicated by the G.C.A.), and then compact the subgrade with a one-‐-ton roller.

3.3. Base Course. The Contractor shall install and compact the base course with a one-

‐-ton roller to a final, compacted depth of four inches (4"ʺ).

3.4. Asphalt.

3.4.1. The Contractor shall install and compact to a final compacted depth of two and one-‐-half inches (2-‐-1/2"ʺ) the asphalt path as indicated on the Plans according to the G.C.S. and the City.

3.5. Final Grade of Cart Path. The final grade of the cart path must blend in with the existing grade five feet on both sides of path, and must provide for positive drainage. The

Contractor shall add topsoil to any areas that must be brought up to grade. There shall be no puddling on the paths. Any puddling shall be fixed by the Contractor at no extra charge.

All topsoil is to be provided by the Contractor and included in the price.

3.6. Adjacent Grade. The Contractor shall add topsoil to all areas parallel to the path to ensure no water pockets or ridges are left between the adjacent golf feature and the top of the path for a distance of five (5'ʹ) feet.

3.7. Grading, Fertilizing, and Seeding The Contractor shall final grade, fertilize, and seed a minimum of five feet along each side of the newly installed cart path according to the specific Items and as directed by the G.C.S. All seed and fertilizer shall be to the approval of the GCS.

4. CLEAN-‐-UP AND APPROVAL. All work, methods of construction and clean-‐-up shall be subject to the approval of the Town.

5. BASIS OF PAYMENT. Unit bid price per square foot of pavement, amount includes all labor, material and technical supervision to pave all areas on plan or as field designated by the

G.C.A. Included in the cost is removal of existing material excavated off site, and adding up to

5’ of topsoil on each side to blend path with existing areas.

200.0 New Asphalt Path..................................................................................... paid per lineal foot

END OF ITEM 200

3.4. Pricing

All pricing must be valid for no less than one hundred and twenty (120) days from the opening date. Services and materials for this project are exempt from State of Connecticut sales tax.

4. Bid Sheet

Item Item Description Estimated

Quantity Unit of

Measure Unit Price Estimated

Bid Total

100.0 Slit Fence 200 l.f.

200.0 New 8' Width Asphalt Cart Path 40,480 s.f.

(item includes removing existing material off-site, supplying and installing gravel base and asphalt path, topsoil and seed up to 5' each side of path)

TOTAL

5. Submission Instructions

All submissions must be submitted via the procurement portal.

Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.

5.1. Contacting the City of Bridgeport

The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.

The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.

Instructions to do so are as follows:

1. Go to the procurement portal, OpenGov

2. Click on any bid you see. It will take you that bid’s page.

3. On the right-hand side of the page, click on Register now for free!

4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.

If you have any trouble registering on the procurement portal, please email OpenGov at procurement-support@opengov.com

Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.

General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. All answers will be published in the form of addenda on the procurement portal.

Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.

mailto:procurement-support@opengov.com

5.2. Electronic Submission Instructions

THIS METHOD IS PREFERRED.

The City of Bridgeport is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup.

Once you have completed account registration, browse back to this page, click on "Submit

Response", and follow the instructions to submit the electronic bid.

5.3. Paper Submission Instructions

SEALED ONE (1) ORIGINAL, THREE (3) COPIES AND ONE (1) ELECTRONIC VIA

THUMBDRIVE MUST BE SUBMITTED.

Bid Submission: Sealed submissions must be received and time-stamped by the Department of

Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’

Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your

ITB envelope as follows:

FWB036255 FWGC Black Course Holes # 4, 10, 12, 15, 16 & 18 Cart Path Extensions

Mail your submissions to:

Caroline Sanchez City of Bridgeport Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604

ITB submissions are due:

Tuesday, June 3, 2025 2:00 pm Eastern Standard Time (EST)

Late Submissions: City will not assume responsibility if a submission is misdirected, or its delivery is delayed. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal

System or any other delivery service.

5.4. Submission Compliance

Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of

Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.

https://procurement.opengov.com/signup

No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No

Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No

Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.

Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.

Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.

Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.

Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process

Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.

Dates: Please keep in mind dates are estimates only and are subject to change.

5.5. Reservation of Rights

This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:

Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the

City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.

MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.

Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.

Purchase Order: No work of deliveries shall be performed under the contract award until a

Purchase Order has been issued by the Purchasing Department.

Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the

City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.

Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice.

Liability: The City of Bridgeport is not liable to any Respondent for damages of any type, however arising.

5.6. Additional Bid Requirements

Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.

Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.

Minority and Buy Local: The City of Bridgeport Minority and Buy Local Program Ord.

3.12.130 E, may be applicable to this project.

Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): In conjunction with this invitation, certifications of the vendors current MBE and, or CBB status must be included as part of the bid package at the time of the bid submission. Consistent with the terms of City Ordinance 3.12.130 no submission either MBE or CBB certification will be accepted when such certifications(s) is, are not submitted as part of the bid package at the time of bid submission. For MBE | CBB certification information, please contact Mr. Jason

Chandersingh, Special Project Coordinator, Small & Minority Business Resource Center at (203)

576-7110, jason.chandersingh@bridgeportct.gov

6. Terms and Conditions

All City of Bridgeport contracture terms, conditions, and requirements apply.

6.1. City Exempt From Certain Taxes

The City is exempt from certain Connecticut sales taxes under Title 12, Chapter 219 of the

Connecticut General Statutes, as amended from time to time.

6.2. Payment Terms

The City shall endeavor to make payment for goods and services within 45 calendar days after review for correctness, completeness and legality, and after approval of the fiscal officer in charge based upon complete and properly documented invoices.

6.3. Warranty

mailto:jason.chandersingh@bridgeportct.gov

The Contractor hereby warrants to the City that all of the Work shall be performed in conformance with Contract Documents, including without limitation, the Specification set forth therein, and shall be of good quality and free from any faults and defects.

The Contractor shall remove, replace and/or repair at its own expense and at the convenience of the City any portion of the Work, materials or equipment which, at any time up until two (2) years from the date of final acceptance of the Work hereunder, the

Architect or the City shall condemn as unsound, defective or improper or as in any way failing to conform to this Contract or other Contract Documents, and the Contractor, at its own cost and expense, shall replace the same with proper and satisfactory Work, materials and/or equipment.

Without limiting the generality of the foregoing, the Contractor warrants to the City that all materials and equipment furnished under this Contract will be of first class quality and new, unless otherwise required or permitted by the Contract Documents; that the

Work performed and materials used pursuant to this Contract will be free from any defects and that the Work will conform with the requirements of the Contract Documents. Work not conforming to such requirements, not of the prescribed quality, or not capable of meeting the

City's performance specifications, including substitutions not properly approved and authorized, shall be considered defective and must be removed and replaced by Contractor at its own cost and expense. All warranties contained in this Contract and in the other Contract Documents shall be in addition to and not in limitation of all other warranties or remedies required and/or arising pursuant to applicable law.

6.4. Openness of Procurement Process

Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.

6.5. Errors and Omissions

Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.

6.6. Collusion

By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the

Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.

6.7. Suspension and Debarment

The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part

31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945

The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.

By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:

The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.

7. Vendor Submission

1. Federal I.D. Number or Social Security Number:*

*Response required

2. Confirmation*

Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.

☐ Please confirm

*Response required

3. Contractor's License Number*

*Response required

4. BID BOND: *

Bidder must Include with the submitted bid, a CURRENT CERTIFED ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with their bid submission if the bid is $50,000.00 or more, except for bids from MBE’s, for which a bid bond is required on bids that are $100,000 or more. Bid bonds must reference the current project. Certification showing the vendor’s current MBE status must be included as part of the submission package at the time of submission for such status to be considered.

*Response required

5. Contractor's Certification of Surety*

Please download the below documents, complete, and upload.

• Contractor's_Certification_...

*Response required

6. Contractor's Designation of Compliance Officer*

Please download the below documents, complete, and upload.

• Contractor's_Designation_of...

*Response required

7. Contractor's Good Standing Certification*

Please download the below documents, complete, and upload.

• Contractor's_Good_Standing_...

*Response required

8. Contractor's MWBE Utilization Form*

Please download the below documents, complete, and upload.

• Contractor's_MWBE_Utilizati...

*Response required

9. Contractor's Wage Certification Form*

Please download the below documents, complete, and upload.

• Contractor's_Wage_Certifica...

*Response required

10. Equal Opportunity Policy Statement* https://government-project.s3.us-west-2.amazonaws.com/115403/e5aa1a6f-6b99-4f8f-af4f-c380ae23d501_Contractor%27s_Certification_of_Surety.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=6b103cc56c4cf07562eaec06cf325e0619478b2c2838f402b11b70f9725877fb&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Certification_of_Surety.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/75efbd30-4945-4f69-a730-84ce2633da7b_Contractor%27s_Designation_of_Compliance_Officer.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=21e8304076af49a849b50125910dd358cad54b81a398b1fafe4df7d6e38b6b81&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Designation_of_Compliance_Officer.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/8d9bf061-767f-4716-a5fe-0d8d8ec81783_Contractor%27s_Good_Standing_Certification.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=f3e2d442da0bea6321dd758cd0cc00471edaeed6b7d04676e1e4bd2e9f5f0cf9&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Good_Standing_Certification.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/a2e401a8-0a6b-4dee-8b6c-a19d3aab26eb_Contractor%27s_MWBE_Utilization_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=f24fd6331d5d0f7ed494906df677260897a9ee70737ee54acf8826b1ca42bbb7&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_MWBE_Utilization_Form.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/1f78a44b-bb56-4dd0-8d6a-e058a93b966e_Contractor%27s_Wage_Certification_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=12108d23a7fbd930cb640b0f866f14bf8ef1b51e704417f47eb9e92f35d6608e&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Wage_Certification_Form.pdf%22&x-id=GetObject

Please download the below documents, complete, and upload.

• Equal_Opportunity_Policy_St...

*Response required

11. Mandatory Good Faith Efforts-Waivers-Exceptions*

Please download the below documents, complete, and upload.

• Mandatory_Good_Faith_Effort...

*Response required

12. No Conflicts-Disclosure Form*

Please download the below documents, complete, and upload.

• NO_CONFLICTS_FORM_10-2018_a...

*Response required

13. Qualification Requirements for Contractor*

Please download the below documents, complete, and upload.

• QUALIFICATION_REQUIREMENTS_...

*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/5b16fe76-119d-4555-9b91-564f8a193a43_Equal_Opportunity_Policy_Statement.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=a7d095a1ccf4be45cee15d445c033f5b608f4b99de632523ac5cefe72cf1ca15&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Equal_Opportunity_Policy_Statement.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/5e2a342c-4e1b-495e-bcd0-968e0b09d858_Mandatory_Good_Faith_Efforts-Waivers-Exceptions.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=d3984e8d25c4a669bb1b706d9edc4537cfc345491e2d315bd72fd72269d7e41f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Mandatory_Good_Faith_Efforts-Waivers-Exceptions.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/157187/f7fd91f2-0a92-44e7-8912-9ed96a511d0f_NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=e0317982bd30d2702f50ecb23069fddf3101abae4c21ff26cc48f9d339598438&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/157187/ffe68011-00a1-49ce-8b5f-d445c3fa2cb0_QUALIFICATION_REQUIREMENTS_FOR_CONTRACTOR.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HUYOKYPZ%2F20250527%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250527T131049Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQDnJtDan7bEGv9fz3M1NyeDHnvnaqLVz%2Bb4QDgKYE6LKAIhAKQajdbyjyJicOBSdFT%2BdY4JPVTslYHfqd4H0QAJAv5lKoMFCF4QAhoMODkyMzY0Njg3NjcyIgzp%2BrvxagVYnnArneYq4AQ7nCPzniRqijUWH9K1UGuSC3zCpckTM7MFiOXNEeFsMIYuw16UQJjP2hIX8%2Fw6VAchbKf%2BN2Twp1JW8UijOPhFDZTmkU8ylcl%2BN5lnnr%2F2x6ZS9C9tAe3yBSfsmgwnriWOWR%2FKDOPE2t1O9IlVtWmYwhQIZT5xkgVma6%2Bl2NEhHZtJqftNmwkUFxUm8hcrlxddnsqF0apoKdR2W%2BGDO55EJ8zKRxB5ezUWwy9Xt%2B1Rxdfg%2FaVcM%2FaPn9NMp%2Bv2pqzRh6iZ7%2BroFx4uu92cCJghPiPVCqYPqhZZgJmv0vUiDx6IhjU7K5qGNcdUO9UPJtAKMwPV5FLo1x%2FnVH4LF88FSl02azAAPN%2FSCkeTtP49h42rMVKZwD4xP%2FHxd%2FidicB2iDUuVuHU%2BxM3%2B%2FoMgKdySHnMpLISqp9zH8JlT7ss0aT%2BaMX5bJ%2F34QIFZOLMHrqxe%2FmUDADEnpFuggRzKa4QaOlaICTgOEtaL4DZuKVNxLdfagwLf7dgUcOAekPtSTjLEH3RhOjSDH986QrSMAw%2BxFvU%2BUsKPab4sNvwexnHSuysO4xj4cjkpYgYS02KjK8MusAnRvzNU8CNVICgeqnSo4I9WEa9YosRt8zLH8mwhS6QqI2ab%2FsHkGKEf6uEgACQGgFPGPANDcuJGKpI3JVsrpqSFi%2BHkWj71ls%2BBF5jqQMLPdlgCWzaDX%2BFvHF3QMTCYzrKv071Bvd88M5m8%2BmFRjLizZRhlCpULzCk6Kl23ulc8i8q9Ay0OXSUSRG1Rxu2bKyT2OH8i0CFJdW3s3r8HuvVKRjvL3k5hBpILoPoCDDw8dbBBjqaAVARXPu310t1dYm6XV4P1klJX%2BWfUurYDuGiPKnGOIPiEYgYoE6VjawmKwWeNl%2F2sdeRAENuUKdCDtUjPzn35dZYD1ZS0hSBAipi9pBSbHznQphw7pbN8TB7eIcf%2FubAyQ1iC17RFIgCtfC9x2vdt2%2BM01S7pK4Zxcxay0PeEsNfDrlthUzS4hdfPa0r6fpWVXPvduS29VRE8Ds%3D&X-Amz-Signature=7ccf1e8a75d0b05f318a4493753765b9de6813bf084cbc2f808bb5a73ed40644&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22QUALIFICATION_REQUIREMENTS_FOR_CONTRACTOR.pdf%22&x-id=GetObject

File details come from the government source that posted it. Updated .