FWC Questions and Answers.pdf
PDF 196 KB Posted
- Solicitation number
- ITB-14605
- Issued by
- Leon County, Florida
About this file
This document is a Questions and Answers publication issued by the Florida Department of Management Services for the Florida Fish and Wildlife Conservation Commission's roof replacement project (ITB-REDM-12122025). The procurement solicits bids for a comprehensive roof replacement at the South Region Headquarters, including metal roof panel installation, soffit and plywood deck replacement, aluminum gutters and downspouts, sheet metal flashing, and lightning protection systems across three buildings. A mandatory pre-bid site visit occurred on December 19, 2025, at 1:00 PM ET, with questions required by December 23, 2025. Sealed bids are due January 5, 2026, at 2:00 PM, with bid opening scheduled for January 6, 2026, at 2:00 PM. The project requires substantial completion within 60 days per building, totaling 180 calendar days plus an additional 30 days for final completion. Key operational requirements include working hours from 6:00 AM to 5:00 PM, access restrictions limited to the front of Building A and back service road of Building C due to wetland conditions, and no equipment allowance in other areas.
The estimated construction cost is $800,000, with bids required to conform strictly to specifications and drawings with no manufacturer substitutions permitted. A general contractor license is required, and the bidder will be responsible for all trades. Bidders must provide a bid bond of at least five percent of the bid amount, with performance and labor/material payment bonds required. The project sits on wetlands, necessitating surface-mounted conductors in rigid conduit rather than concealed installation. Addendum #1 addresses modifications to grounding requirements due to site conditions. All bids must include a base bid for Building C with five alternates covering additional buildings and electrical work. The contract will be awarded to the qualified, responsive low bidder in accordance with Florida Administrative Rule 60D-5.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers (Rev. 07/2025) ITB-REDM-12122025
Real Estate Development and Management 4050 Esplanade Way
Tallahassee, FL 32399-0950 850-488-2074
Ron DeSantis, Governor
Tom Berger, Interim Secretary
QUESTIONS AND ANSWERS
ITB-REDM-12122025
ROOF REPLACEMENT (SOUTH REGION HQ) FOR THE FLORIDA AND WILDLIFE CONSERVATION
COMMISSION
FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA
STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY LAW WITHIN
THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF PROCEEDINGS
UNDER CHAPTER 120, FLORIDA STATUTES.
The Department’s responses to timely submitted questions are below.
Question Number Question Response
1. What is the type and model of sensor to be replaced? The new sensor is to match the existing one.
2. Please confirm if there is only one sensor to be replaced on roof B? Yes.
3.
Please confirm the date and time of the bid opening. It appears that the information on page 1 of the ITB was not amended from the original version of this bid notification.
Per page 2 of the ITB, the bid opening will be on Tuesday, January 6, 2026, at 2:00 P.M.
4. Please confirm the date and time for receipt of bids. Per page 2 of the ITB, bids are due on Monday, January 5, 2026, at 2:00 P.M.
5. Can a superintendent triple hat the project? Yes.
6.
Are there means to access the backside of the buildings for activities? Will lulls and lifts be allowed to be used in these areas?
This project sits on wetlands. All access and removal will be from the front of Building A and the back service road of Building C only.
In other areas, no equipment will be allowed.
7. What is the extent of the siding to be replaced on the raised sections of the roof?
Per drawings, all siding will be removed to accommodate new flashing for roof system as needed.
8. Is any flashing to be replaced above the flashings in the raised roof sections? See details and drawings.
9. Is a GC license required to bid on this project? The bidder will be responsible for all trades.
10.
Will other manufacturers be accepted for the SSMR?
Typically state funded projects allow for an approved equal.
At this time no substitutions will be allowed.
All bids must be per spec and drawings.
11. What are the hours for working? Anticipated working hours are from 6 A.M. to 5 P.M.
12. What are the reporting requirements to the state in regards to scheduling and progress?
Please see sample contract on the DMS website.
Questions and Answers (Rev. 07/2025) ITB-REDM-12122025
Real Estate Development and Management 4050 Esplanade Way
Tallahassee, FL 32399-0950 850-488-2074
Ron DeSantis, Governor
Tom Berger, Interim Secretary
Question Number Question Response https://dms-media.ccplatform.net/content/download/1708 83/file/DMS%20REDM%20General%20Cont ractor%20Agreement%20v.12-2024.pdf
13. Is there existing damage from leaks on the roofs to be replaced? Yes
14.
Please provide elevations showing the raised roof sections. There is not a clear view of this in the plans and no access was given to view these areas at the site visit.
No elevations will be provided.
15.
The specifications reference concealed conductors;
however, full concealment within wall cavities would not be feasible without significant demolition down to the structural framing, which does not appear to be included in the project scope.
Please confirm whether surface-mounted down conductors installed in rigid conduit on the exterior of the building are acceptable where concealment is not feasible.
Yes, all conductors will be surface mounted.
16.
The specifications reference a ground ring installation.
During prior discussions, it was noted that a ground ring may not be feasible due to the site conditions, including wetlands. Please confirm whether the ground ring requirement has been eliminated or modified.
Additionally, please advise whether existing sidewalks, parking areas, landscaping, or other hardscape elements are expected to be removed or restored as part of the grounding scope, or if alternative grounding methods are acceptable.
See Addendum #1.
17. Is there a possibility of extending the due date? No.
File details come from the government source that posted it. Updated .