FWC 25.26.76C Questions & Answers Addendum Summary
This document is an Addendum No. 1 issued by the Florida Fish and Wildlife Conservation Commission (FWC) on March 18, 2026, providing clarifications and answers to seven bidder questions regarding Solicitation No. FWC 25/26-76C for the Triple N Ranch WMA Pole Barn project. The project involves construction of a 40-foot by 90-foot pre-manufactured pole barn with a metal roof at Triple N Ranch Wildlife Management Area in Osceola County, Florida. The addendum addresses technical specifications regarding structural materials, roof style, concrete requirements, permits, and warranty provisions. All bid responses must be received no later than 3:00 PM ET on Monday, March 30, 2026, with an anticipated award date of April 6, 2026. The successful contractor must achieve substantial completion within seventy-five calendar days from the Notice to Proceed, with final completion required within an additional fifteen calendar days.
Key technical clarifications from the addendum include the requirement for iron support posts to meet wind resistance and structural integrity standards, mandate for a gable-style roof constructed of 24-gauge metal with a minimum 10-year finish warranty (Galvalume acceptable), and concrete meeting a minimum compression strength of 3,000 psi using either wet or bagged concrete at the contractor's discretion. The FWC has already obtained necessary permits or permit exemptions from the St Johns River Water Management District, Department of Historical Resources, and Florida Natural Areas Inventory, with Osceola County confirming no County Planning Permit or Zoning Amendment is required; all other permits remain the contractor's responsibility. The estimated project budget is $100,000, with all bids requiring a five percent bid guarantee and valid for sixty days following public opening. Bidders must comply with Build America, Buy America (BABA) requirements, and the project is subject to liquidated damages of $150 per calendar day for delays beyond the substantial completion date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 25.26.76C ITB Final.pdf | ||
| FWC 25.26.76C ITB Final.pdf | ||
| FWC 25.26.76C T&C's Final.pdf | ||
| FWC 25.26.76C T&C's Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Preston Farrior
Tampa
Joshua Kellam
Palm Beach Gardens
Gary Lester
Oxford
Albert Maury
Coral Gables
Sonya Rood
St. Augustine
Office of the
Executive Director
Roger A. Young
Executive Director
Charles “Rett” Boyd
Assistant Executive Director
George Warthen
Chief Conservation Officer
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800-955-8770 (V)
MyFWC.com
DATE: MARCH 18, 2026
ADDENDUM NO.: 1
BID NO.: FWC 25/26-76C
BID TITLE: TRIPLE N RANCH WMA POLE BARN
UPDATE: QUESTIONS & ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 25/26-76C, “ TRIPLE N RANCH WMA POLE
BARN”.
All responses to the subject solicitation must be received no later than 3:00
PM (ET) on Monday, March 30, 2026.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Randy Golightly
FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
Are 8x8 post recommended for the project?
ANSWER #1
Materials used for support posts must meet minimum standards for wind resistance and structural integrity outlined in drawings and specifications. Iron support posts are preferred.
QUESTION #2
Would a Gable style Pole barn be acceptable or Is a Single Slope required?
ANSWER #2
Per the drawings and specifications provided after submitting a Confidentiality
Exemption Form (Attachment A on the Invitation to Bid) to
Randolph.Golightly@myfwc.com, a gable roof should be used for this project.
QUESTION #3
What color Roof is required for this project?
ANSWER #3
Per the drawings and specifications provided after submitting a Confidentiality
Exemption Form (Attachment A on the Invitation to Bid) to
Randolph.Golightly@myfwc.com, the roof is to be constructed of 24 gauge metal of standard color selection provided by manufacturer with a 10-year finish warranty.
Galvalume is also acceptable.
QUESTION #4
Wet concrete or bagged concrete required?
ANSWER #4
The type of concrete used is at the discretion of the Contractor, but it must meet minimum compression strength of 3,000 psi, per the drawings and specifications provided after submitting a Confidentiality Exemption Form (Attachment A on the
Invitation to Bid) to Randolph.Golightly@myfwc.com.
QUESTION #5
Is the bid winner required to pull the permits for this project?
mailto:Randolph.Golightly@myfwc.com mailto:Randolph.Golightly@myfwc.com
FWC SOLICITATION ADDENDUM 3
ANSWER #5
Per the Supplementary Terms and Conditions, the Florida Fish and Wildlife
Conservation Commission has obtained permits or permit exemptions from the St Johns
River Water Management District, the Department of Historical Resources, and the
Florida Natural Areas Inventory, and has confirmed with Osceola County that a County
Planning Permit and a Zoning Amendment are not required for this project. All other permits are the responsibility of the contractor.
QUESTION #6
Panel requirements
Can we specify the panel type for clarification? Design requirements call for a 10-year finish and 20-year weathertight warranty. This warranty requirement is uncommon for this type of application. The finish warranty for Galvalume is 25 years, and for painted finishes, it ranges from 35 to 40 years, depending on the manufacturer. I do not know of a manufacturer that will issue a weathertight warranty on an open framed pole barn. If this is the case, can we have the manufacturing companies' information and the model panel we are to use?
ANSWER #6
A 10-year finish warranty is the minimum requirement for metal roof panels. The minimum can be exceeded.
QUESTION #7
Paint requirements
These panels all come pre painted by the manufacturer. Is this acceptable?
ANSWER #7
Per the drawings and specifications provided after submitting a Confidentiality
Exemption Form (Attachment A on the Invitation to Bid) to
Randolph.Golightly@myfwc.com, the roof is to be constructed of 24 gauge metal of standard color selection provided by manufacturer with a 10-year finish warranty.
Galvalume is also acceptable.