FWC 25.26-50 Addendum #1 Q&A FINAL.pdf
PDF 140 KB Posted
- Attached to
- Aquatic Fenced Enclosure Inspection & Repair
- Solicitation number
- ITB-14754
- Issued by
- Leon County, Florida
About this file
This is an Addendum No. 1 Q&A document issued by the Florida Fish and Wildlife Conservation Commission (FWC) for solicitation FWC 25/26-50 regarding Aquatic Fenced Enclosure Inspection and Repair services. The FWC is seeking a contractor to perform comprehensive inspection and repair services for approximately 75,000 linear feet of aquatic fencing distributed across 34 fenced enclosures located primarily on Lake George in the St. Johns River system across Lake, Putnam, and Volusia counties. The contractor must maintain a minimum daily production standard of 7,500 linear feet of inspections and repairs, working Monday through Friday during daylight hours with GPS tracking of all activities. A mandatory pre-bid conference was held on January 16, 2026, with mandatory site visits required before bid submission. Sealed bids were due by February 5, 2026 at 2:00 PM ET, with a public bid opening scheduled for the same date and anticipated award on February 9, 2026. The contract includes an initial one-year term from Purchase Order issuance with an option for one additional year renewal under the same terms and conditions.
The addendum clarifies that when inspection and repair activities are completed in less than the standard 10-business-day cycle, the contractor should immediately restart the next inspection and repair cycle without gaps in service, as the FWC anticipates continuous service operations. This interpretation applies unless otherwise instructed by the FWC Project Manager or Contract Manager. The total estimated budget is $300,000, with $150,000 allocated for the initial term and $150,000 for the optional renewal term. Payment is based on an hourly labor rate for a two-person crew with associated equipment, with partial invoices permitted every two weeks during active work. The FWC supplies all repair materials while the contractor provides equipment including boats, fuel, GPS devices, and tools. Failure to meet the daily production standard results in a $100 deduction per day unless delays are due to circumstances beyond the contractor's control or Force Majeure events.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 25.26-50 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Preston Farrior
Tampa
Joshua Kellam
Palm Beach Gardens
Gary Lester
Oxford
Albert Maury
Coral Gables
Sonya Rood
St. Augustine
Office of the
Executive Director
Roger A. Young
Executive Director
Charles “Rett” Boyd
Assistant Executive Director
George Warthen
Chief Conservation Officer
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800-955-8770 (V)
MyFWC.com
DATE: JANUARY 28, 2026
ADDENDUM NO.: 1
BID NO.: FWC 25/26-50
BID TITLE: AQUATIC FENCED ENCLOSURE INSPECTION AND REPAIR
UPDATE: QUESTIONS AND ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 25/26-50 AQUATIC FENCED ENCLOSURE
INSPECTION AND REPAIR.
All responses to the subject solicitation must be received no later than 2:00
PM (ET) on Thursday, February 5, 2026.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Martin Ehlen
FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
Addendum No. 1 Questions & Answers
FWC 25/26-50
QUESTION #1 Say it takes 10 days to inspect and repair fence. We come back in 10 business days and it only takes us 5 days do we come back 10 days from that day we finished from the 5th day?
ANSWER #1 If all fencing gets inspected/repaired within 10 days, and inspection/repair activities re-start and only takes 5 days to complete the 2nd round of inspection/repair, it is then projected that double the production standard has been achieved and the Commission anticipates the 3rd inspection/repair event re-start after the 5th day. The Commission does not anticipate any gaps in service simply due to the production standard being exceeded. The intent is for continuous inspection/repair services, unless otherwise instructed by the FWC Project Manager or FWC
Contract Manager.
END ADDENDUM