FWC 24.25.39-Addendum 1.pdf
PDF 115 KB Posted
- Solicitation number
- RFP-10965
- Issued by
- Leon County, Florida
About this file
This is Addendum No. 1 issued by the Florida Fish and Wildlife Conservation Commission (FWC) for Solicitation No. FWC 24/25-39 titled "Land Management Information System ArcGIS Pro Migration and Technical Support." The addendum contains questions and answers related to the migration of existing FWC Land Management Information System database modules and customized Esri add-in tools from ArcMap to ArcGIS Pro. Responses must be received no later than 3:30 PM (ET) on December 30, 2024.
The current technical environment uses ArcMap 10.8.x and ArcGIS Pro 3.2.x, with Microsoft hosted Azure DevOps as the repository. AECOM (which acquired previous vendor URS Corporation) holds the existing contract for SaMP module migration to ArcGIS Pro and technical support of AMT and TechStaff through June 30, 2025, which is separate from this scope of work. The AMT application will be developed as an ArcGIS Pro add-in, with ESRI Experience Builder having been considered but not selected. The work can be performed remotely, though occasional on-premise meetings or training may be required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SaMP Desktop User Manual.pdf | ||
| SaMP Data Entry Documentation.pdf | ||
| FWC 24.25-39-RFP.pdf | ||
| LMIS_AMT_UserManual.pdf | ||
| LMIS_AMT_UserManual.pdf | ||
| SaMP Data Entry Documentation.pdf | ||
| TechStaffUserManual.pdf | ||
| FWC 24.25-39-RFP.pdf | ||
| SaMP Desktop User Manual.pdf | ||
| TechStaffUserManual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Preston Farrior
Tampa
Gary Lester
Oxford
Albert Maury
Coral Gables
Gary Nicklaus
Jupiter
Sonya Rood
St. Augustine
Office of the
Executive Director
Roger A. Young
Executive Director
Charles “Rett” Boyd
Assistant Executive Director
George Warthen
Chief Conservation Officer
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800-955-8770 (V)
MyFWC.com
DATE: DECEMBER 13, 2024
ADDENDUM NO.: 1
BID NO.: FWC 24/25-39
BID TITLE: LAND MANAGEMENT INFORMATION SYSTEM
ARCGIS PRO MIGRATION AND TECHNICAL
SUPPORT
UPDATE: QUESTIONS AND ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 24/25-39, “LAND MANAGEMENT
INFORMATION SYSTEM ARCGIS PRO MIGRATION AND TECHNICAL
SUPPORT”.
All responses to the subject solicitation must be received no later than 3:30
PM (ET) on Monday, December 30, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Dale Eastmond, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
What version of Esri are you currently using?
ANSWER #1
ArcMap 10.8.x and ArcGIS Pro 3.2.x
QUESTION #2
Are the applications married to using an ArcGIS Pro add-in or can out-of-the-box tools and
Python be used for the suite of tools?
ANSWER #2
As it stands, the AMT application would be an ArcGIS Pro add-in. We have considered
ESRI Experience Builder and chose not to go that way at this time.
QUESTION #3
Does FWC plan on switching to branch versioning?
ANSWER #3
We are currently using Microsoft hosted Azure DevOps as a repository and do not currently have plans for switching.
QUESTION #4
Is there an incumbent for the contract?
ANSWER #4
The question is unclear. There is an existing contract with AECOM for the migration of the
SaMP module to ArcGIS Pro and for technical support of the ArcMap versions of AMT and
TechStaff through June 30, 2025 which is not included in this Scope of Work for the initial year.
QUESTION #5
Do you have a list of previous vendors you would be willing to share?
ANSWER #5
URS Corporation, which was subsequently acquired by AECOM, is the only previous vendor for development, maintenance, and enhancement of the current system.
QUESTION #6
Will the work for this RFP require on-premise staffing or will you allow remote work?
FWC SOLICITATION ADDENDUM 3
ANSWER #6
There is no on-premise staffing required, thus remote work is allowed. On-premise meetings and/or training may occasionally be required.
END ADDENDUM