This document is an addendum to a solicitation (FWC 24/25-06C) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the "St. Petersburg RMI Boiler Replacements" project. The solicitation seeks competitive pricing for the replacement of two boilers and two related pumps, along with necessary piping for the RMI and F Building, per the plans and specifications. The addendum provides responses to three questions related to the project, including information about the building's fire alarm system contractor, the preferred Building Management System (BMS) contractor, and the use of PVC conduit. All responses to the solicitation must be received by 3:00 PM ET on Friday, October 11, 2024.
The solicitation requires vendors to be registered in the MyFloridaMarketPlace (MFMP) system and with SunBiz prior to the bid opening. Interested parties can obtain an electronic copy of the construction plans and associated documents by emailing a completed Confidentiality Exemption Form to the FWC Procurement Manager. The project is located in Pinellas County, Florida.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners Rodney Barreto Chairman Coral Gables
Steven Hudson Vice Chairman Fort Lauderdale
Preston Farrior Tampa
Gary Lester Oxford
Albert Maury Coral Gables
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Office of the Executive Director Roger A. Young Executive Director
Charles “Rett” Boyd Assistant Executive Director
George Warthen Chief Conservation Officer
Jessica Crawford Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T) 800-955-8770 (V)
MyFWC.com
DATE: SEPTEMBER 26, 2024
ADDENDUM NO.: 1
BID NO.: FWC 24/25-06C
BID TITLE: ST. PETERSBURG RMI BOILER REPLACEMENTS
UPDATE: QUESTIONS AND ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 24/25-06C, “St. Petersburg RMI Boiler Replacements”.
All responses to the subject solicitation must be received no later than 3:00 PM (ET) on Friday, October 11, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Joshua Stringer, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
Who is the building fire alarm system contractor?
ANSWER #1
Fire Alarm Panels are proprietary Simplex/JCI. Cintas Fire Protection is our alarm & sprinkler service provider. Contact Bobby Vogel VogelR@cintas.com (727) 385-4308.
Alternatively, Piper Fire Protection is a preferred vendor for fire sprinkler work.
QUESTION #2
Who is preferred contractor for BMS system?
ANSWER #2
Automated Logic/Carrier. Contact Matthew Cumming matthew.cumming@carrier.com
(904) 517-9279
QUESTION #3
Can all conduit be ran in PVC, and with non-metallic flexible connections for pumps and equipment?
ANSWER #3
No, PVC is only acceptable underground. Refer to Electrical Specification 2.2, 2.3, 3.6C and 3.6D on sheet E0.2.
END ADDENDUM
mailto:VogelR@cintas.com mailto:matthew.cumming@carrier.com
| Question #1 |
| Answer #1 |
| Question #2 |
| Answer #2 |
| Question #3 |
| Answer #3 |