FWC 24.25-09 Addendum 1 Final.pdf
PDF 120 KB Posted
- Attached to
- Yucca Pens and 41 Tract Forestry Mulching
- Solicitation number
- ITB-10269
- Issued by
- Lee County, Florida
About this file
This document is an addendum to a solicitation issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the Yucca Pens and 41 Tract Forestry Mulching project. The project involves mechanically treating vegetation less than or equal to 6" in diameter to a height of 4" or lower within a 100-foot buffer around property boundaries, firebreaks, and roads. The work must be completed using a minimum 170 horsepower rubber-tired mulcher and the acreage will be verified using FWC-supplied GPS. The bid response is due by 2:30 PM ET on October 2, 2024, and any protests must be filed within the time prescribed by Florida Statutes.
The solicitation states there is $100,000 allocated for the project in the current fiscal year, with future funding to be determined. The addendum addresses several contractor questions, clarifying that rubber track machines will not be permitted and that the acreage and locations will be based on funding availability and hydrological conditions. The contractor must make every effort to minimize ground disturbance during the mechanical treatment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 24.25-09 Addendum 1 Final.pdf | ||
| FWC 24.25-09 Final.pdf | ||
| FWC 24.25-09 Final.pdf | ||
| FWC 24.25-09 Final.pdf | ||
| FWC 24.25-09 Addendum 2 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Preston Farrior
Tampa
Gary Lester
Oxford
Albert Maury
Coral Gables
Gary Nicklaus
Jupiter
Sonya Rood
St. Augustine
Office of the
Executive Director
Roger A. Young
Executive Director
Charles “Rett” Boyd
Assistant Executive Director
George Warthen
Chief Conservation Officer
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800-955-8770 (V)
MyFWC.com
DATE: SEPTEMBER 25, 2024
ADDENDUM NO.: 1
BID NO.: FWC 24/25-09
BID TITLE: YUCCA PENS AND 41 TRACT FORESTRY MULCHING
UPDATE: QUESTIONS AND ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 24/25-09, “YUCCA PENS AND 41 TRACT FORESTRY
MULCHING”.
All responses to the subject solicitation must be received no later than 2:30
PM (ET) on Wednesday, October 2, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Matthew Carroll, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
In section 5 Equipment Specifications, Sub Section 5.1.1, it states that a minimum HP rating of 170 is required and a rubber tire machine. Will there be no rubber track machines permitted?
ANSWER #1
Correct – no rubber track machines will be permitted.
QUESTION #2
What's the estimate of actual acreage needing to be mechanically treated?
ANSWER #2
Final acreage and locations of mechanical vegetation treatment will be determined based on funding availability and hydrological conditions. There will likely be more acreage than annual funding.
QUESTION #3
I see your specs call for a wheeled machine 170 hp or higher. We carry ASV RT-135F tracked loaders, which have the lowest ground pressure PSI in their class, minimizing their footprint.
They are 132hp and more than strong enough to cover the scope of work of under a 6” diameter without slowing down. Is this acceptable to you?
ANSWER #3
No – 5.1.1 Work shall be completed using a minimum 170 horsepower rubber-tired mulcher. Each piece of equipment performing mechanical treatments must be approved by the Project Manager.
QUESTION #4
We have a SK-190 rubber tracked mulcher with a 72 inch wide Fecon head. The request states that only wheeled machines will be considered. Our unit has a ground pressure of
5-6 lbs PSI. The same unit with wheels has a ground pressure of 10-11 lbs PSI.
If ground disturbance is the concern, will a rubber tracked machine be considered?
ANSWER #4
No – 5.1.1 Work shall be completed using a minimum 170 horsepower rubber-tired mulcher. Each piece of equipment performing mechanical treatments must be approved by the Project Manager.
FWC SOLICITATION ADDENDUM 3
QUESTION #5
For acreage performed will this be verified with FWC supplied GPS as well as Contractor supplied GPS?
ANSWER #5
Acreage performed will be verified with FWC supplied GPS unit.
QUESTION #6
Will this be just boundary line clearing or are there plans to do open acreage blocks (fuel reduction or similar)?
ANSWER #6
3.3. - Treatment will occur within the area mapped in Figures 1 & 2, focusing on a 100’ buffer (100’ from property boundary firebreaks, 50’ from each side of internal firebreaks, and roads are also considered firebreaks).
QUESTION #7
What is the expectation for saw palmetto mulching in terms of height and mulch quality?
ANSWER #7
3.4 - The Contractor will mechanically treat vegetation less than or equal to 6” diameter to a height of 4” or lower to the ground, within 12” of canopy trees, and must shred/mulch all treated vegetation. The Contractor should make every effort to create as little ground disturbance as possible within the treatment areas throughout the duration of the project.
QUESTION #8
Can you provide the anticipated budget for this project? If so, is said budget for a single year or the entire duration of the contract (if multiple years)?
ANSWER #8
There is $100,000 allocated to this project for this fiscal year. Future funding is determined on budgeting.
END ADDENDUM