FWC 23.24-73C-Addendum 1.pdf
PDF 148 KB Posted
- Solicitation number
- ITB-07806
- Issued by
- Citrus County, Florida
About this file
This document is an addendum to an Invitation to Bid (ITB) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the "Crystal River Field Office Improvements in Citrus County" project. The addendum provides responses to contractor questions and an updated bid form. The project includes removing and replacing the metal roofing system, lightning protection, gutters, downspouts, and providing a continuous gutter system, downspouts, and drainage piping. Alternate bids are requested for removing and replacing wood cedar columns and the metal roof on the shop building. Bids are due no later than 3:30 PM ET on February 20, 2024. The contractor must be registered in MyFloridaMarketPlace and with the State of Florida's SunBiz portal prior to the bid opening.
The updated bid form provides instructions for submitting the bid, including required documents such as a bid bond, subcontractor list, and experience questionnaire. The base bid is a lump sum for the scope of work described, with unit prices provided for additional fascia and plywood sheathing. Alternate bid items are also provided as lump sum amounts. The contractor must agree to establish an office or ongoing project within 300 road miles of the project site if the bid amount is $200,000 or greater. For bids of $500,000 or greater, the contractor must perform at least 15% of the work with their own employees and provide proof of completing at least two similar projects within the last three years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 23.24-75C-ITB.pdf | ||
| FWC 23.24-75C-T&Cs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Preston Farrior
Tampa
Gary Lester
Oxford
Albert Maury
Coral Gables
Gary Nicklaus
Jupiter
Sonya Rood
St. Augustine
Office of the
Executive Director
Roger A. Young
Executive Director
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800 955-8770 (V)
MyFWC.com
DATE: FEBRUARY 13, 2024
ADDENDUM NO.: 1
BID NO.: FWC 23/24-75C
BID TITLE: Crystal River Field Office Improvements in Citrus
County
UPDATE: QUESTIONS AND ANSWERS AND REVISED BID FORM
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 23/24-75C, “Crystal River Field Office
Improvements in Citrus County”.
All responses to the subject solicitation must be received no later than 3:30
PM (ET) on Tuesday, February 20, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Dale Eastmond, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
The note #6 on sheet C202 of the project drawings, denote the use of 24GA Galvanized metal, our question is; Does this mean it is going to be mill finish or will there be a color coating such as Kynar 500.
ANSWER #1
Use Acrylic-Coated Galvalume panels.
QUESTION #2
Note #6 also denotes standing seam, given the fact that there are several types of standing seam our question is; Can snaplock and or a snapping panel be used with a
1” seam height. This type seam is a concealed fasnter panel and rated for 200 mph winds FL Code 17796.05
ANSWER #2
A Snaplock panel as described is acceptable. The awarded contractor must provide documentation showing that the system complies with local and state requirements during the shop drawing review process.
QUESTION #3
Please explain how much of the lightning protection system Contractor is responsible for.
ANSWER #3
The contractor is fully responsible for the lightning protection system. A lightning protection specialist subcontractor must be hired to remove and reinstall or replace the lightning protection system to be fully operational and provide certification that the final system meets all applicable regulations.
QUESTION #4
Are we just replacing existing terminals?
ANSWER #4
See Response # 3
QUESTION #5
Are we responsible for grounding, counterpoise?
ANSWER #5
See response #3
FWC SOLICITATION ADDENDUM 3
QUESTION #6
Please clarify how much plywood and 2x4 sleepers we need to include in bid.
ANSWER #6
Base bid shall include procurement and installation of up to 128 sq ft of roof sheathing plywood of matching thickness to existing, and 120 LF of Fascia board.
Please provide a cost for each additional 4X8 sheathing plywood sheet, and a cost for each additional 12 ft piece of fascia on the revised Bid Form.
FWC SOLICITATION ADDENDUM 4
EXHIBIT 2: UPDATED BID FORM
The Commission objects to and shall not consider any additional terms or conditions submitted by a
Contractor, including any appearing in documents attached as part of a Contractor’s response. Contractor agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect on the Contract Documents contained herein. Failure to comply with Contract
Documents, including those specifying information that must be submitted with a bid, may be grounds for rejecting a bid.
The undersigned, hereinafter called "Bidder", having visited the site of the proposed project and familiarized themself with the local conditions, nature and extent of the work, and having examined carefully the Contract documents, proposes to furnish all labor, materials, equipment and other items, facilities, and services for the proper execution and completion of Crystal River Field Office Improvements
(FWC 23/24-75C) at 10247 Suncoast Blvd, Crystal River, FL, in full accordance with any drawings and specifications prepared by the firm of (Florida Fish and Wildlife Conservation Commission located at 1875
Orange Ave. E. Tallahassee, FL, 32311-6160), for the following bid price:
Base Bid: Remove and replace metal roofing system, lightning protection, gutters, downspouts, and provide continuous gutter system and downspouts and manifold drainage pipe in accordance with plans and specifications.
Base Bid Total (Lump Sum): $ ____________________________________
With foregoing as a Base Bid, the following costs of alternate bids are submitted in accordance with the drawings and specifications.
Alternate No. 1: Remove and replace wood cedar columns in accordance with plans and specifications.
Add Alternate No. 1 Cost (Lump Sum): $ __________________________
Alternate No. 2: Remove and replace metal roof at shop building in according to the plans and specifications.
Add Alternate No. 2 Cost (Lump Sum): $ __________________________
If more or less work is required than that qualified by the specifications and drawings, the following unit prices shall be applicable:
ITEM UNIT PRICE
Alternate 3.) 12 ft piece of fascia ________ ________________________________________________
Alternate 4.) 4X8 sheathing plywood sheet ________________________________________________
FWC SOLICITATION ADDENDUM 5
Total Bid Price (Add Base Bid, Alternate No. 1, Alternate 2, Alternate 3, and Alternate 4 together):
The Bidder hereby agrees that:
The above bid shall remain in full force and effect for a period of sixty (60) calendar days after the time of the opening of this bid and that the Bidder will not revoke or cancel this bid or withdraw from the competition within the said sixty (60) calendar days.
In the event the contract is awarded to this Bidder, he will enter into a formal written Contract with the
Owner in accordance with the accepted bid within five (5) calendar days after said contract is submitted to him and, if applicable, will furnish to the Owner a Contract Performance Bond and a Labor and Material
Payment Bond with good and sufficient sureties, satisfactory to the Owner, in the amount of 100% of the accepted bid, the form of which is shown by EXHIBITS 6 AND 7 of the Conditions of the Contract and terms of which shall fully comply with Section 255.05, Florida Statutes. The Bidder further agrees that in the event of the Bidder's default or breach of any of the agreements of this bid, the said bid deposit shall be forfeited as liquidated damages.
☐ If bid amount is equal to or greater than $200,000: Bidder confirms Pre-Qualification by the Florida Fish
& Wildlife Conservation Commission per Section titled Pre-Qualification to Submit a Bid.
Acknowledgement is hereby made that this bid includes required permit fees as directed in the section titled “Permits”.
Acknowledgement is hereby made of receipt of the following addenda issued during the bidding period:
Addendum No. _____________________ Dated ______________________
Addendum No. _____________________ Dated ______________________
Addendum No. _____________________ Dated ______________________
Addendum No. _____________________ Dated ______________________
Addendum No. _____________________ Dated ______________________
THE FOLLOWING FORMS OR DOCUMENTS SHALL BE COMPLETELY FILLED OUT AND
SUBMITTED WITH THIS BID FORM. THE BID MAY BE REJECTED FOR FAILURE TO INCLUDE ALL
THESE FORMS OR DOCUMENTS.
FWC SOLICITATION ADDENDUM 6
All submissions shall include:
1. Signed Bid Form (Exhibit 2)
2. List of Subcontractors (Exhibit 3)
3. References (Exhibit 4)
4. Bid Guaranty in the amount of 5% of the Bid, including Alternates (if bid amount is equal to or greater than $100,000.00)
5. Form Experience Questionnaire, Financial Information, & Project Supervision (Exhibit 5).
In addition to the requirements above, if the bid amount is equal to or greater than $200,000.00, the submission shall also include:
6. Bidder hereby agrees to establish or have an active office, or an ongoing project, which office or project is located within 300 road miles of the project site.
In addition to the requirements above, if the bid amount is equal to or greater than $500,000.00, the submission shall also include:
7. Bidder hereby agrees to perform no less than 15% of the construction work utilizing its own employees.
8. Bidder must complete requirements of Item 15 in the Experience Questionnaire, Financial
Information, & Project Supervision (Exhibit 5).
9. Bidder must provide proof, in its Experience Questionnaire, Financial Information, & Project
Supervision (Exhibit 5), or attached to that form, that it has successfully completed no less than two (2) projects of similar size and complexity within the last three (3) years.
Florida Construction Industries Licensing Board Certification:
(Name of Holder) (Certificate No.)
In witness whereof, the Bidder has hereunto set his/her signature and affixed his/her seal this __________ day of __________________________ , 20 ______ .
FWC SOLICITATION ADDENDUM 7
(SEAL)
Signature: _______________________________________________________________________________________
Print Name: _____________________________________________________________________________________
Title: ____________________________________________________________________________________________
Company: _______________________________________________________________________________________
Physical Address: ________________________________________________________________________________
Email: __________________________________________________________________________________________
Phone Number: __________________________________________________________________________________
Federal Employee Identification Number (FEIN): ___________________________________________________
DUNS/UEI Number:
END ADDENDUM