This document is an addendum to a solicitation issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the Chinsegut Conservation Center Sidewalk ADA Retrofit project. The project involves the demolition of existing walkways in the butterfly garden, kiosk, and pole barn areas and the replacement with new concrete walkways per the provided plans and specifications. The addendum contains questions and answers regarding the project, including the availability of as-built elevations, grading requirements, vehicle crossing locations, utility locations, permitting, working hours, and subgrade replacement. The contract opportunity is open to vendors registered in the MyFloridaMarketPlace (MFMP) system and with SunBiz.

The project is located in Leon County and the City of Tampa, Florida. No permits are required for this project, and FWC prefers to complete the work in a single phase. Contractors and subcontractors will be allowed to use the available restroom facilities, and the contractor will need to provide compaction testing and density requirements as determined by FWC, with no more than 10 locations. The expansion joints must be installed per the design plan, and no changes to the plan are approved.

View the file

Other files

File Type Posted
FWC 23.24.37C Terms and Conditions Final.pdf PDF
FWC 23.24.37C ITB Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Fish and Wildlife Conservation Commission

Commissioners Rodney Barreto Chairman Coral Gables

Steven Hudson Vice Chairman Fort Lauderdale

Preston Farrior Tampa

Gary Lester Oxford

Albert Maury Coral Gables

Gary Nicklaus Jupiter

Sonya Rood St. Augustine

Office of the Executive Director Roger A. Young Executive Director

Jessica Crawford Chief of Staff

850-487-3796

850-921-5786 FAX

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676

Hearing/speech-impaired:

800-955-8771 (T) 800 955-8770 (V)

MyFWC.com

DATE: DECEMBER 6, 2023

ADDENDUM NO.: 1

BID NO.: FWC 23/24-31C

BID TITLE: CHINSEGUT CONSERVATION CENTER SIDEWALK ADA

RETROFIT

UPDATE: QUESTIONS AND ANSWERS.

The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 23/24-31C, “CHINSEGUT CONSERVATION CENTER

SIDEWALK ADA RETROFIT”.

All responses to the subject solicitation must be received no later than 3:00 PM (ET) on Wednesday, December 13, 2023.

A response received after the exact time specified will not be considered.

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.

Sincerely, Joshua Stringer, FWC Procurement Manager

FWC SOLICITATION ADDENDUM 2

BEGIN ADDENDUM

QUESTION #1

Based on the plans and discussions in the pre-bid a question was asked about the provision of as-built elevations of the current sidewalk. Please provide as-built if available, or otherwise please provide spot elevations every 50-75 ft, to help in calculating fill/cut requirements.

ANSWER #1

We have no current as built survey of the site, the plan documents show contour elevations and that is all we are providing for this project.

QUESTION #2

Based on the Concrete Walk-Section on Sheet C102 of the project, there is a 2 ft area on either side of the sidewalk that can be graded at 2% to match the existing grade.

There will be areas where the new sidewalk elevation will have to change, to allow it to all conform to ADA. In areas where new sidewalk elevation changes have to be made, it will be necessary to go outside of this designated 2 ft strip on each side to get the desired 4:1 slope. To avoid additional disturbance outside of this 2 ft strip, can we just match whatever grade is present at the edge of the 2 ft strip, without due consideration to making it 4:1 outside of the strip?

ANSWER #2

Set grade at 2% wherever possible, however do not deviate beyond the 2 feet disturbed area – where the grade must be steeper to accommodate that restriction or to match existing grade, that is acceptable

QUESTION #3

Note 1 on Sheet C102 requires 6" thick concrete at vehicle crossings. I have identified three (3) vehicle crossings at the sidewalk/dirt road intersections. Please confirm there are no other locations not shown.

ANSWER #3

There are three locations only

FWC SOLICITATION ADDENDUM 3

QUESTION #4

Are there sprinklers or any other utilities beneath or within the close vicinity of the sidewalks that may be encountered? If yes will CCC do the locates?

ANSWER #4

There is no watering system on site. There is one electrical service line from the building to the parking lot, but it shouldn’t be within the work area limits – we will investigate locating this if needed

QUESTION #5

Are the plans fully permit ready? If there are revisions to the plans or if other documents will be required for permitting, who handles that?

ANSWER #5

No permits required

QUESTION #6

Working hours were briefly spoken of in yesterday's pre-bid meeting. Please provide official working hours. Please take into consideration the need to do soil density tests on subgrade, if the bulk of work will have to be performed after hours or on the weekends.

ANSWER #6

Work hours are typically 7:00 AM to 5:00 PM – the exact scheduled days will need to be approved by FWC due to the possibility of previously scheduled events at the facilities.

QUESTION #7

As a follow-up to question 6. Will phasing of work be allowed and over what period of time, if it will be allowed?

ANSWER #7

Our preference is to do this in a single phase, due to the coordination necessary with local staff, ARM monitoring, ect – we don’t want to start and stop this project

QUESTION #8

Will contractors and subcontractors be allowed to use the available restroom facilities, or should a portable toilet be included in the bid?

ANSWER #8

Yes

FWC SOLICITATION ADDENDUM 4

QUESTION #9

Do we need to replace the subgrade?

ANSWER #9

No – compaction requirements will need to be met, but we don’t foresee full replacement being necessary

QUESTION #10

Do we need to provide testing / densities, or will these be provided by the owner?

ANSWER #10

Contractor will need to provide these – FWC will determine the locations as needed, no more than 10 locations total

QUESTION #11

Can the expansion joints sheet C102 note #3 be installed @ driveways and max 120 foot following FDOT index S22-001 by standard plans 2023-2024 instead of the noted 20’.

ANSWER #11

Install expansion joints are per the design plan, no changes to the plan are approved

END ADDENDUM

Question #1
Answer #1
Question #2
Answer #2
Question #3
Answer #3
Question #4
Answer #4
Question #5
Answer #5
Question #6
Answer #6
Question #7
Answer #7
Question #8
Answer #8
Question #9
Answer #9
Question #10
Answer #10
Question #11
Answer #11

File details come from the government source that posted it. Updated .