FWC 22.23-67C Addendum Two Final.pdf
PDF 117 KB Posted
- Solicitation number
- ITB-03974
- Issued by
- Hillsborough County, Clewiston City, Florida
About this file
This document is an addendum to the Florida Fish and Wildlife Conservation Commission's (FWC) Solicitation No. FWC 22/23-67C for the "Dinner Island White Farm Control Structure Replacement in Hendry County". The addendum provides responses to written questions received regarding the project, including the use of earthen ditch blocks for dewatering, the availability of fill material, and the requirement for bypass pumping. The original solicitation was issued for the replacement of the control structure at the Dinner Island White Farm in Hendry County, Florida.
The solicitation allows for the use of earthen ditch blocks for dewatering activities, but the FWC does not have a designated fill source available. Contractors are permitted to dispose of any imported fill material on-site, provided it is free of invasive species. Bypass pumping is not required, as there is sufficient space at the project site to utilize gravity flow to bypass the channel during construction, if necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 22.23-67C ITB.pdf | ||
| FWC 22.23-67C Addendum One.pdf | ||
| FWC 22.23-67C Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Gary Lester
Oxford
Albert Maury
Coral Gables
Gary Nicklaus
Jupiter
Sonya Rood
St. Augustine
Robert A. Spottswood
Key West
Office of the
Executive Director
Dr. Thomas H. Eason
Acting Executive Director
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Finance and Budget Office
(850) 488-6551
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800 955-8770 (V)
MyFWC.com
DATE: FEBRUARY 24, 2023
ADDENDUM NO.: 2
BID NO.: FWC 22/23-67C
BID TITLE: DINNER ISLAND WHITE FARM CONTROL STRUCTURE
REPLACEMENT IN HENDRY COUNTY
UPDATE: RESPONSE TO WRITTEN QUESTIONS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 22/23-67C, “Dinner Island White Farm Control
Structure Replacement in Hendry County”.
All responses to the subject solicitation must be received no later than 3:30
PM (ET) on Monday, March 6, 2023.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Jordan Irving, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
Are earthen ditch blocks permissible or are we required to install sheet piling to create cofferdam?
ANSWER #1
Earthen ditch blocks are allowed.
QUESTION #2
If earthen ditch blocks are able to be utilized, does FWC have a source for fill such as a borrow pit or stockpile in close proximity to the project site (if so can you provide coordinates)?
ANSWER #2
The FWC does not have a fill source at this time.
QUESTION #3
If fill for ditch block has to be imported can it be disposed of on site?
ANSWER #3
Yes, please ensure fill material is free of invasive species.
QUESTION #4
Is bypass pumping required during construction/dewatering activities?
ANSWER #4
There is sufficient space at the project site to bypass the channel during construction utilizing gravity flow if necessary. Pumps can be used but are not required.
END ADDENDUM