Fusion Change Order Notice V.25.1.pdf

PDF 1 MB Posted

Attached to
CHANGE ORDER NOTICE - Pharmacy System Amendment 2
Solicitation number
27-444DHS-444OC-B-53995
Issued by
Illinois

About this file

This is a Change Order Notice issued by the Chief Procurement Office for General Services regarding Amendment 2 to a Pharmacy System contract (BBREFNO: 27-444DHS-444OC-B-53995) for the Department of Human Services. The change order modifies the licensed software user count and system interfaces for the CIPS, CIPS Remote, and sMARt applications. Specifically, the change order increases PCAU (Pharmacy Call Alert Users) by fifteen units for CIPS Remote (from 40 to 55) and fifteen units for sMARt (from 140 to 155), while maintaining the CIPS count at 100. The change order removes three interfaces from the scope of work—Laboratory 4Medica, Master Patient Index (MPI), and Disclosure Tracking System (DTS)—and adds the National Research Institute (NRI) Interface. Additionally, the change order formalizes thirty-six reporting deliverables, with fifteen designated as required for Go-Live and twenty-one for post-Go-Live delivery. The implementation completion date is extended to approximately January 1, 2027, by mutual agreement of the parties.

The additional annual subscription fees associated with this change order total $48,675.00, consisting of $11,250.00 for three CIPS Remote bundles at $3,750.00 each and $37,425.00 for three sMARt bundles at $12,475.00 each. The change order establishes a comprehensive issue classification and governance framework defining Blockers, Defects, Enhancement Requests, Workarounds, and Patient Safety Risks, along with a formal dispute resolution process for classification disagreements. Add-on solutions activated at Go-Live include Fusion360 DSCSA Track and Trace Solution, RxRebate, and Relay Health, with fees as set forth in Amendment No. 1, Attachment J, and applicable pricing schedules. The change order confirms that the exchange of patient prescription information between the Inpatient System and CIPS remains within the existing scope and shall be structured as a flat fixed-length field text file rather than HL7 format.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DHS - Human Services
ProcurementTitle: CHANGE ORDER NOTICE - Pharmacy System Amendment 2
BBREFNO.: 27-444DHS-444OC-B-53995
thedetails: Users (“PCAU”) set forth in Section 4.5.1 of the Agreement is deleted in its entirety and replaced with the following:

Licensed Software # of PCAU

CIPS 100

CIPS Remote 55 sMARt 155 This reflects an increase of fifteen (15) PCAU for CIPS Remote (from 40 to 55) and fifteen (15) PCAU for sMARt (from 140 to 155); the PCAU count for CIPS is unchanged. Consistent with Sections 4.5.3 and 4.5.4 of the Agreement, the additional PCAU are provided in bundles of five (5) at the per-bundle annual subscription fees set forth in Section 4.5.4 (CIPS Remote: three (3) bundles at $3,750.00 = $11,250.00; sMARt: three (3) bundles at $12,475.00 = $37,425.00), for additional annual subscription fees of $48,675.00.

3.4.1.3. Removal of Interfaces (Global). The following interfaces are removed from the scope of the Agreement and shall no longer be deliverables or obligations of the Contractor (collectively, the “Removed Interfaces”):

Laboratory – 4Medica;

Master Patient Index (MPI); and Disclosure Tracking System (DTS).

Wherever the Removed Interfaces appear in the Agreement whether listed by name, described, or included in any interface table, deliverable, attachment, schedule, or specification, all references to the Removed Interfaces, and the corresponding line items, descriptive paragraphs, and table rows, are deleted in their entirety and shall be given no further force or effect.

In lieu of a Master Patient Index (MPI) interface, patient demographics shall be sourced from the inpatient system in accordance with the Agreement’s existing demographics-integration capability. The Laboratory, 4Medica and Disclosure Tracking System (DTS) interfaces are removed as no longer required by the Agency. Removal of the Removed Interfaces shall not affect any other interface, deliverable, or obligation of the Contractor under the Agreement, including the Inpatient System (EHR), Clinical e-Reports (DB2), Parata ATP2, Arxium MedSelect, and the Prescription Monitoring Program (PMP) interface.

3.4.1.4. Confirmation of Unit Dose / Inpatient Clinical Interface. For clarity, the Client’s current EHR system is identified as “Inpatient System” and/or “Unit Dose”. The Parties confirm that the exchange of patient prescription information between the Inpatient System and CIPS is within the existing scope of the Agreement under the clinical-system integration described in Section 1.2 of the Agreement. The Parties also agree that the interface will structured as a flat fixed length field text file and not HL7. Notwithstanding the above, this provision does not expand or alter the specifications of the Inpatient System interface as set forth in the Agreement.

The Parties acknowledge that if the Agency modifies or replaces Inpatient System such that the interface between CIPS and Inpatient System needs to be modified or replaced, any such modifications or new interfaces shall be out of scope.

3.4.1.5. Addition of NRI Interface. The following interface is added to the list of interfaces the Contractor shall provide: National Research Institute (NRI) Interface. The deliverable previously discussed by the Parties as a report relating to the National Research Institute is hereby classified as a system interface, and the Contractor shall design, build, and document the NRI interface in accordance with the interface provisions of the Agreement.

For consistency with the Agreement’s existing interface specifications (Agreement “3rd Party Interfaces/Conversions and Vendors,” p. 168, and the interface data specifications in Deliverable 5), the NRI Interface shall be documented in the same form and level of detail as the other interfaces, as follows:

Type Vendor Function Comments National Research Institute (NRI) NRI Interface Uni-Directional – flat fixed length field text file.

3.4.1.6. Reporting Deliverables. The Reporting provisions of the Agreement are amended to add the following:

3.4.1.6.1. The reporting deliverables under the Agreement are formally documented as the approximately thirty-six (36) reports identified in Schedule 2-A attached hereto. The subset identified in Schedule 2-A as “Required for Go-Live” shall be delivered and operable as of Go-Live; the remaining reports shall be delivered following Go-Live as identified in Schedule 2-A.

3.4.1.6.2. Post-Go-Live reports shall be delivered on a commercially reasonable basis and are not conditions of Go-Live. New or customized reports beyond those identified in Schedule 2-A may be agreed upon by the Parties separately in writing, consistent with the Agreement.

3.4.1.6.3. Pre- and Post-Go-Live Allocation. Of the approximately thirty-six (36) reports identified in Schedule 2-A, fifteen (15) reports are designated “Required for Go-Live” and twenty-one (21) reports are designated for post-Go-Live delivery as identified in Schedule 2-A.

3.4.1.6.4. Report Specification and Build Process. As a condition to Contractor’s obligation to build any report identified in Schedule 2-A, the Agency shall complete and submit to Contractor the applicable report specification/requirements form (“Report Request Form”) for that report. For any report designated “Required for Go-Live,” the Agency must submit the completed Report Request Form no later than ninety (90) days prior to the scheduled Go-Live date. Contractor’s delivery timelines for a report are measured from Contractor’s receipt of a complete Report Request Form, and Contractor shall not be responsible for a report’s unavailability at Go-Live to the extent the Agency fails to submit the completed Report Request Form by the applicable deadline.

3.4.1.6.5. Custom Reports. Contractor shall build and provide the custom reports identified in Schedule 2-A herein, subject to the Report Specification and Build Process above. Provision of such custom reports shall be deemed to satisfy the requirements under Task 8.6 of the Agreement as well as any references to third-party reporting tools such as Crystal Reports or SSRS.

3.4.1.7. New Section — Issue Classification and Governance. A new Section is added to the Agreement establishing the framework for classifying issues, requests, and risks encountered during system implementation and operation. The classifications are Defect, Enhancement Request, Blocker, Workaround, and Patient Safety Risk. These classifications govern prioritization decisions, Go-Live criteria, and escalation processes. Capitalized terms used but not defined herein have the meanings set forth in this Agreement. The classifications are defined as follows:

3.4.1.7.1. Blocker. means an issue that prevents the safe or functional operation of the Licensed Software and must be fully resolved before Go-Live or continued active use, unless a valid Workaround has been approved in accordance with this Agreement. An issue may be classified as a Blocker only if all of the following conditions are met: (i) the issue prevents completion of a documented critical workflow as identified in the approved functional workflows; (ii) no valid Workaround exists; (iii) the issue poses a verified Patient Safety Risk as defined in this Agreement, or constitutes a violation of an applicable regulatory or compliance requirement as confirmed in writing by both parties’ legal or compliance authorities; and (iv) the issue materially compromises system stability, data integrity, or security in a way that cannot be contained pending resolution..

3.4.1.7.2. Defect. means a failure of the Licensed Software to perform according to its documented and previously approved intended functionality — specifically, behavior that diverges from what was designed within the core platform or agreed upon in the approved functional specifications, UAT criteria, or written design documentation signed off by both parties. A Defect is not: (i) a request to alter, expand, or improve functionality that is currently operating as designed; (ii) a retrospective disagreement with a design decision that was reviewed and accepted during requirements or UAT; or (iii) a gap between what the Licensed Software does and what a user informally expected, where no written specification supports that expectation. A Defect classification does not constitute an Incident under any applicable SLA, and the identification of an Incident under any applicable SLA does not automatically constitute or establish a Defect. The remedies available for a Defect are governed exclusively by the Issue Classification and Governance provision of this Agreement reviewed and accepted during requirements or UAT; or (3) a gap between what the Licensed Software does and what a user informally expected where no written specification supports that expectation.

3.4.1.7.3. Enhancement Request. means any request for changes to the Licensed Software requiring code modification, including without limitation new or modified features, functionality, workflows, forms, reports, interfaces, integrations, APIs, or user interfaces not included in Licensor’s Out of the Box Product.

3.4.1.7.4. Workaround. means an alternative process or temporary method that allows users to safely complete a workflow while a permanent resolution is developed or evaluated. For a Workaround to be recognized as valid, all of the following must be true: (i) the Workaround has been reviewed and approved in writing by Licensee’s designated clinical lead as safe for use in patient care workflows, and both parties’ designated project leads have confirmed in writing that the Workaround is operationally feasible; (ii) the Workaround is executable within Licensee’s existing staffing, training, and operational constraints without introducing new risk; (iii) the Workaround is assigned a defined review window at which point both parties will jointly evaluate whether the underlying issue has been resolved or whether the Workaround requires re-approval; and (iv) the Workaround, its approval, and its review date are logged in the shared issue tracker.

3.4.1.7.5. Patient Safety Risk. “Patient Safety Risk” means a condition arising solely from a specific, identifiable behavior of the Licensed Software — and not from any cause external to the Licensed Software — that could directly and foreseeably cause clinical harm or error if left unaddressed. For an issue to be classified as a Patient Safety Risk, all of the following must be met: (i) the risk arises strictly from the Licensed Software’s behavior, not from how users have chosen to configure, operate, or work around the Licensed Software; (ii) the harm is a reasonably foreseeable consequence of the specific system behavior under normal operating conditions and is not speculative, theoretical, or dependent upon multiple unlikely user errors; and (iii) the classification has been confirmed in writing by Licensor’s Chief Medical Officer, whose determination shall be final and binding. Under no circumstances shall any of the following constitute a Patient Safety Risk: slower or sub-optimal workflows, personal or facility preferences, functionality offered by other EHRs not currently available in the Licensed Software, need for additional reports, fields, or validations, interface changes, staffing constraints, lack of auto-populate functionality, device or connectivity issues, or training issues. As used in this Agreement, the term “Patient Safety Risk” is a contractual classification used for administrative and prioritization purposes only and shall not be construed as an admission, finding, or determination that any patient health risk exists, that the Licensed Software has caused or contributed to any clinical harm, or that Licensor bears any responsibility for patient health outcomes. Licensee is fully and solely responsible for ensuring the safety and health of all patients at all times, regardless of any Patient Safety Risk classification under this Agreement Classification Dispute Process. The classification dispute process set forth herein is the exclusive mechanism for resolving disputes regarding the classification of issues under this Agreement and operates independently of and in lieu of any general dispute resolution process set forth elsewhere in this Agreement. When the parties disagree on how an issue should be classified, the following process applies. Neither party has unilateral authority to impose a classification that creates obligations for the other party. During any dispute, Licensor’s proposed classification shall apply on a provisional basis and the issue shall be treated accordingly until a final determination is made.

Step 1 — Good Faith Review. The party disputing a classification must submit a written objection identifying: (a) the issue in question; (b) the classification believed to be incorrect; (c) the classification believed to be correct; and (d) the specific criteria from this Agreement that support their position. The parties shall attempt to resolve the dispute through written exchange within five (5) business days of submission.

Step 2 — Joint Escalation Review. If the dispute is not resolved through written exchange, both parties’ designated project leads shall meet within five (5) business days for a structured review session. Licensor’s written response to the approved functional specifications and UAT sign-off documentation shall serve as the authoritative reference. Both parties must come prepared with supporting evidence.

Step 3 — Clinical Adjudication (Patient Safety disputes only). If the dispute involves a Patient Safety Risk classification and remains unresolved after Step 2, the matter is referred to Licensor’s Chief Medical Officer, whose determination shall be final and binding on the Patient Safety Risk classification in accordance with this Agreement.

Step 4 — Executive Escalation. If a dispute remains unresolved after Steps 1 through 3, it shall be escalated to executive sponsors on both sides for resolution within five (5) business days. No party may initiate any external dispute resolution process with respect to a classification dispute until Steps 1 through 4 have been completed.

Remedy Designation. The remedy for an issue classified as a Defect under this Agreement is governed by the Maintenance Release provisions set forth in this Agreement. The Classification Dispute Process set forth in this section governs disputes regarding classification only and does not extend to the operation, interpretation, or application of the Maintenance Release provisions, the assignment of Severity Levels under any applicable Service Level Agreement, or any other matter governed by any applicable Service Level Agreement

3.4.1.8. Implementation Timeframe (Contract § D.3.2.15). The Parties acknowledge that Section D.3.2.15 of the Agreement provides that “Implementation of the software with configurations shall be completed within twelve (12) months of contract execution or mutually agreed upon timeframe.” Pursuant to the “mutually agreed upon timeframe” provision of Section D.3.2.15, the Parties mutually agree that the implementation completion date is extended to approximately January 1, 2027. This extension is made by mutual agreement of the Parties, and no delay in completing implementation beyond the original twelve (12) month period shall constitute a breach of the Agreement by Contractor.

3.4.1.9. Activation of Add-On Solutions; Fees. The Parties confirm that the following add-on solutions are activated under the Agreement at Go-Live, and that the Agency shall incur the corresponding fees as set forth in the Agreement (including the applicable Attachment/pricing schedule):

Fusion360 – DSCSA Track and Trace Solution — activated; fees as set forth in Amendment No. 1 and Attachment J.

RxRebate — activated; fees as set forth in the Agreement/applicable pricing schedule.

Relay Health — activated; fees as set forth in the Agreement/applicable pricing schedule.

CheckBox1: 1
CheckBox2: 1

File details come from the government source that posted it. Updated .